HomeMy WebLinkAbout20190943 Thornton Subdivision Sketch Plan Application JFOR OFFICE USET
0 Gil
,S>JA CITY OF SARATOGA SPRINGS
Planning Board (Application#)
CITY HALL-474 BROADWAY
'
SARATOGA SPRINGS, NEW YORK 12866-2296 (Date received)
(i)
TEL: 518-587-3550. FAX: 518-580-9480
co,yo
oRATo),
HTTPINWWV.SARATOGA-SPRINGS.ORG
APPLICATION FOR:
SUBDIVISION APPROVAL
(Rev:8/8/19)
***Application Check List - All submissions must include completed application check list and all
required items. HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED!***
Project Name: Thornton Subdivision
Property Address/Location: 215 Grand Ave., Saratoga Springs, NY
165.65-2-21 UR-2
Tax Parcel#: Zoning District:
(for example: 165.52-4-37)
0A31 acres(18,765 sq.ft)
Total Acres: Land to be Subdivided Into: Lots
APPLICANT(S)* OWNER(S)(If not applicant ATTORNEY/AGENT
Name Patricia V. & Daniel B. Thornton (same) Agent: Engineering America Co.
215 Grand Ave., Saratoga, NY 12866 76 Washington St., Saratoga, NY 12866
Address
518/584 - 3695 518 / 587 - 1340
Phone
Email av ndorn3@yahoo.com tonyay@nycap.rr.com
Identify primary contact person: El Applicant 0 Owner @I Agent
*An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question.
Application Fee: A check for the total amount below payable to: "Commissioner of Finance" MUST accompany this
application.
rfir Sketch Plan—$300
LI Preliminary Subdivision Plat Approval
1-9 Lots $600 51+ $1,500
10-25 Lots $900
$ 300.00
26-50 Lots $1,200 Fee submitted $
LII Final Subdivision Plat Approval
Residential - $1,200 plus $120/lot
Non-Residential - $1,800/lot
LI Final Approval Modification
Residential- $300
Non-Residential- $500
Submission Deadline— Check City's website .saratoia-s rin s.or ) for meeting dates.
Does any City officer, Does any City officer, employee or family member theofhave a financial interest(as defined by
General Municipal Law Section 809) in this application? YES NO . If YES, a statement disclosing the name,
residence, nature and extent of this interest must be filed with this application.
I, the undersigned owner or purchaser under contract for the property, hereby request Subdivision consideration by the
Planning Board for the identified property above. I agree to meet all requirements under the Subdivision Regulations for
the City of Saratoga Springs.
Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property
associated with this application for purposes of conducting any necessary site inspections relating to this application.
/23
Applicant Signature: I Date: 1
If applicant is not current owner, owner must also sign.
Owner Signature: Date:
(FOR OFFICE USE1
ANT 0G
CITY OF SARATOGA SPRINGS
"4 (Application#)
� s ,; Planning Board
, , CITY HALL-474 BROADWAY (Date received)
a.���etkjv'. `• SARATOGA SPRINGS NEW YORK 12866-2296
`'�� �` TEL: 518-587-3550. FAX: 518-580-9480
°RPaRATE.0
HTTP://WVWV.SARATOGA-SPRINGS.ORG
SUBDIVISION APPROVAL
REQUIRED SUBMITTAL CHECK LIST FOR SKETCH PLAN APPROVAL
1. Project Name: Thornton Subdivision
2. Checklist Prepared By: Engineering America Co. (agent for applicant/owners)
3. Date:: September 20, 2019
Listed below are the minimum submittal requirements as set forth in the Planning Board's Subdivision
Regulations for a Subdivision Sketch Plan application before the Saratoga Springs Planning Board.
The Board reserves the right to request additional information, as necessary, to support an
application. The Board also reserves the right to reject the application if these minimal requirements
are not met.
REQUIRED ITEMS: *3 hard copies and 1 digital copy of ALL materials are required.
CHECK EACH **HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED**
ITEM
1. Completed Subdivision Application (3 hard copies-*1 w/original signature - and 1 digital)
and Fee
2. Set of plans including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of
not more than 1"=50 feet). One digital version of all submittal items (pdf) shall be provided.
REQUIRED ITEMS ON SUBDIVISION PLAT,As APPLICABLE:
YES NO N/A
YOUR SKETCH PLAN SUBMITTAL SHOULD INCLUDE THE FOLLOWING ITEMS,AS APPLICABLE:
E 0 Ei 1. Name of subdivision
[] 2• . Name, address and phone number of owner and purchaser under contract
Li3. Name, address and phone number of subdivision surveyor and/or engineer
Li ❑
ED
x 4. Identification of existing easements, covenants or legal rights-of-way on this property
a ❑
5• . Existing zoning and required area and bulk requirements
Q
Li [] 6• . Parcel tax map number
C Li ❑ 7. Names of all adjacent property owners within 300 feet
X Li ED 8. Identification of all property lines, watercourses, wooded areas and names of adjacent
streets
p.lof2
Ei L• i 9. Identification of size, elevations and slopes of all utilities within 400 feet of site
[1]• [1] 10.Approximate topography at 10 foot contours or less
Q 0 x0 11. Location and width of proposed streets
Q � Q 12. Preliminary proposal for utility systems and lateral connections
Ei Ei 13.Approximate location, dimensions and areas for all proposed lots and any proposed public
recreational land
x0 14. North arrow and map scale
Q L• II LI 15. Site location map (with Standard Title Block and Map Key)
Q LIII LI 16. Estimate of increase in water consumption
p.2 of 2