Loading...
HomeMy WebLinkAbout20250508 56 Duplainville Rd Regeneron Site Plan Engineering Report Water and Sanitary Sewer Engineering Report Water and Sanitary Sewer For Regeneron Guard House 56 Duplainville Rd. Saratoga Springs, NY 12866 Prepared For: Regeneron Pharmaceuticals, Inc. 1 Global View Troy, NY 12180 Prepared By: The LA Group, P.C. 40 Long Alley Saratoga Springs, New York 12866 June 10, 2025 I. INTRODUCTION The proposed Project is located at 56 Duplainville Road, in the City of Saratoga Springs, Saratoga County, NY. The project includes water and sanitary sewer connections to a new guard house building. It is expected that the Guard House will have a peak of 6 employees at a time. II. EXISTING WATER AND SANITARY UTILITES Water service is currently available inside the existing building approximately 675’ to the north of the location of the proposed guard house. An existing pump station is located outside of the existing building, approximately 645’ northwest of the location of the guard house, and services the existing building. Wastewater from this system ultimately flows to the Saratoga County Sewer District No. 1 (SCSD) wastewater treatment plant in Mechanicville. III. PROJECTED WATER AND WASTEWATER FLOWS Table 1 and Table 2 below provide information on the anticipated average potable water use and wastewater flow rates for the Project in gallons per day (gpd). Water use and wastewater flow are estimated to be equal for this study. Average daily demand for water and wastewater is estimated to be the same. Average daily flow for wastewater is estimated to be 0.0625 gallons per minute (gpm) based on a 24-hour workday and a maximum of 6 employees utilizing the guard house. Instantaneous peak demand is estimated at 2.28 gpm3, based on anticipated maximum flow rates from fixtures inside the guard house building. Refer to Table 1 and Table 2 below: Table 1: Projected Sanitary Flow Rates Description Use Rate Total Use (6) Employees 15 gpd/each1 90 gpd Total 90 gpd Table 2: Instantaneous Flow from Plumbing Fixtures Description Use Rate Total Use (2) Sinks 0.5 gpm 1.0gpm (1) Toilets 1.28 gpm 1.28 gpm Total 2.28 gpm IV. PROPOSED WATER AND WASTEWATER UTILITIES A. Proposed Potable Water Utilities To service the project, a 1.25” DR-11 HDPE water service is proposed to connect to the east side of the proposed building and run north to the existing building on site. Connection and appurtenances including tapping sleeves, valves, trenching, bedding, as well as testing and disinfection will all be specified in accordance with the City of Saratoga Springs and NYSDOH standards. B. Proposed Wastewater Utilities For sanitary sewer collection a 4” SDR-26 PVC lateral will flow by gravity into an E-ONE duplex grinder pump, positioned north of the proposed structure. The proposed grinder pump station will pump the effluent flow northwest to discharge in the existing pump station. References: 1. From Table B-3, NYSDEC 2014 Design Standards for Wastewater Treatment Works. 2. From Figure 1, GLUMRB Recommended Standards for Wastewater Facilities Q = (18 + P ½) ÷ (4 + P ½) where P = population in thousands 3. 2020 Plumbing Code of NYS, Section 604.3-4