Loading...
HomeMy WebLinkAbout20250507 624 N Broadway Site Plan Engineering Report Water and Sanitary Sewer Engineering Report Water and Sanitary Sewer For 624 North Broadway 624 North Broadway SARATOGA SPRINGS, NEW YORK Planning Board #25.XXX Prepared For: 624 N Broadway Development 2201 Neptune Avenue Brooklyn, NY 11224 Prepared By: The LA Group, P.C. 40 Long Alley Saratoga Springs, New York 12866 May 20, 2025 I. Project Description The 624 North Broadway project consists of the demolition of an existing building and construction of a new multi-family residence with associated site improvements. The residence is planned to have a basement level garage. II. Existing Water and Sanitary Sewer Utilities There are water and sanitary connections for the existing building on site, but they have not yet been located. The plans have called for these services to be located; for the sanitary sewer to be cut and capped, and for the water service connection to be located in the street and the corporation valve turned to permanently shut off the line. Removal of the curb box, and severing and capping of the line are also included on the plans. Municipal water service is available from the City of Saratoga Springs. A 10-inch diameter water main is located in the center of Rock Street. Two water mains are located on the east half of North Broadway; a 6-inch main is located near the center of the street and a 24-inch is located closer to the curb. Municipal sanitary sewer service is also available from the City of Saratoga Springs. A 12-inch diameter gravity sanitary sewer main runs along the north side of Rock Street. This sanitary line eventually connects to the Saratoga County Sewer District No. 1 (SCSD), where it ultimately is directed for conveyance and treatment at the SCSD wastewater treatment plant in Mechanicville. A 12-inch sanitary main is also located on the west side of North Broadway, but a connection to this main was determined to be infeasible due to the distance away from the new building and elevation. III. Projected Water and Wastewater Flows The table below provides information on the anticipated wastewater flow rates for the project. The building will have 4 individual units with a total of 14 bedrooms. Description Use Rate Total Use 14 total bedrooms 110 gpd/bedroom1 1,540 gpd Total 1,540 gpd Average daily flow for wastewater is estimated to be 1.1 gallons per minute (gpm) based on a 24 hour day. Estimated peak hourly flow is 4.6 gpm (4.2 x average).2 Average daily demand for water is estimated to be approximately equal to the wastewater flow or 1.1 gpm. IV. Proposed Water and Wastewater Utilities Proposed Water Utilities To service the project, a water service is proposed on the Rock Street side of the project. The project mechanical designer has not finalized sizing of the lateral, but it is believed that it will be between 2 to 4-inches in diameter. When the sizing is finalized, the plans will be updated to reflect the final sizing. Connections and appurtenances, including corporation stops, trenching, bedding, service connections, as well as testing and disinfection will all be specified in accordance with City of Saratoga Springs and NYSDOH standards. A residential sprinkler system is proposed for the building. Proposed Wastewater Utilities For sanitary sewer collection, a 6” PVC sewer lateral connection on the Rock Street side of the project is proposed. The lateral will be installed at a minimum 2.0% slope per City of Saratoga Springs requirements to ensure adequate pipe cleansing. Notes 1. From Table 1, Appendix 75-A Wastewater Treatment Standards - Residential Onsite Systems (110 gallons per day per bedroom) 2. From Figure 1, GLUMRB Recommended Standards for Wastewater Facilities Q = (18 + P ½) ÷ (4 + P ½) where P = population in thousands