Loading...
HomeMy WebLinkAbout20250054 115 Regent St Beagle School Site Plan Updated Layout & Materials Plan30 . 8 3 ' 5.29' 48 . 1 1 ' R10 . 0 0 ' R12.00' R10.00' R5.00' R5 . 0 0 ' R2 . 0 0 ' R8.00' R5.00' Unauthorized alteration or addition to this document is a violation of Section 7209 of the New York State Education Law. The Beagle School 115 Regent St. Saratoga Springs, NY 12866 Sa v e D a t e : 4/ 1 6 / 2 0 2 5 1 0 : 2 9 A M Fi l e N a m e : G: \ P r o j - 2 0 2 4 \ 2 0 2 4 1 0 6 _ B e a g l e _ S c h o o l \ 2 0 2 4 1 0 6 C A D \ L - 2 . 0 _ L a y o u t & M a t e r i a l s . d w g Pl o t t e d B y : MA T T B R O B S T O N Prepared for: © the LA Group 2017 Beagle School Building Expansion 115 Regent St, Saratoga Springs, NY 12866 Project Title: Drawing Title Drawing No. Description:Date: Project No.: Design: Drawn: Scale: Ch'k'd: 2024106 Planning Board # XXXXXX LAYOUT & MATERIALS PLAN L-2.0 MCB MCB DRC 1/24/2025 1"=10' 1 PLAN MODIFICATIONS 4/16/2025 86425 10100 Scale: 1" = 10' LEGEND PROPERTY LINE CONCRETE SIDEWALK ASPHALT PAVEMENT 1.ALL LINE AND GRADE INFORMATION SHALL BE LAID OUT BY A NEW YORK STATE REGISTERED SURVEYOR ENGAGED BY THE CONTRACTOR. 2.ALL NEW WORK SHALL BE STAKED OUT PRIOR TO CONSTRUCTION. THE OWNER'S REPRESENTATIVE SHALL BE NOTIFIED OF ANY DISCREPANCIES. FIELD ADJUSTMENTS MUST BE APPROVED BY THE OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. 3.ALL LINES AND DIMENSIONS ARE PARALLEL OR PERPENDICULAR TO THE LINES FROM WHICH THEY ARE MEASURED UNLESS OTHERWISE NOTED. 4.FIELD ADJUSTMENTS MUST BE APPROVED BY THE OWNER'S REPRESENTATIVE AND IF NECESSARY APPROPRIATE MUNICIPAL OFFICIALS. 5.ALL LAYOUTS FOR WALKS AND PATHS SHALL BE ADEQUATELY STAKED BY THE CONTRACTOR AND APPROVED BY THE OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. 6.ALL PROPOSED WALKS, PAVEMENTS, LIGHTS AND SITE IMPROVEMENTS SHALL BE STAKED IN THE FIELD FOR APPROVAL BY THE OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. 7.CONTRACTOR SHALL COORDINATE LOCATION OF ALL UTILITIES (LINES, DUCTS, CONDUITS, SLEEVES, FOOTINGS, ETC.) WITH LOCATIONS OF PROPOSED LANDSCAPE ELEMENTS (WALLS, FENCE, FOOTINGS, TREE ROOTBALLS, PROPOSED LIGHTING FOOTINGS, ETC.). CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO OWNER'S REPRESENTATIVE PRIOR TO CONTINUING WORK. 8.ALL EXISTING UTILITIES ARE SHOWN IN THEIR RELATIVE POSITION. CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE VERTICAL & HORIZONTAL POSITION OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. LAYOUT NOTES: PLAY HOUSE 820 SF ADDITION 1,680 SF EXISTING BUILDING 10x14 ADK LEAN-TO 4.00' 4.00'5.30' BIRD HOUSE TO REMAIN 33.50' 42 . 9 4 ' 11.54' 20 . 9 8 ' STEPPING STONE, TYP. 2 Vt 3 Vt 2 Hp 5 Sj 10 Sj ANNUAL PLANTINGS TYP. PLANT LIST SYM.QTY.BOTANICAL NAME COMMON NAME SIZE REMARKS/SPACING TREES & SHRUBS BN 1 Betula Nigra River Birch 10' Ht. Hp 7 Hydrangea paniculata Limelight Hydrangea 24"-30" ht. Sj 23 Spirea japonica Japanese Spirea 18"-24" ht. Vt 5 Viburnum trilobum Cranberrybush Viburnum 18"-24" ht. 6 L4.0 5 L4.0 8 L4.0 8 L4.0 8 L4.0 8 L4.0 EXISTING EXISTING EXISTING ANNUAL PLANTINGS TYP. LAWN LAWN LAWN LAWN EXISTING LAWN EXISTING LAWN EXISTING LAWN EXISTING LAWN ANNUAL PLANTINGS TYP. FRONT SETBACK REAR SETBACK SI D E S E T B A C K SI D E S E T B A C K 1.ALL NEW PLANT MATERIAL SHALL CONFORM TO THE MINIMAL GUIDELINES ESTABLISHED BY THE AMERICAN STANDARD FOR NURSERY STOCK PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. PROVIDE QUALITY, SIZE, GENUS, SPECIES, VARIETY OF TREES AND SHRUBS INDICATED, AND ROOT BALL SIZE COMPLYING WITH APPLICABLE REQUIREMENTS OF ANSI Z60.1 “AMERICAN STANDARD FOR NURSERY STOCK.” ALL PLANTS SHOULD BE NURSERY GROWN UNDER CLIMATIC CONDITIONS SIMILAR TO THOSE IN THE LOCALITY OF THE PROJECT. 2.PLANT SIZES: MEASURE TREES AND SHRUBS ACCORDING TO ANSI Z60.1 WITH BRANCHES AND TRUNKS OR CANES IN THEIR NORMAL POSITION. TAKE CALIPER MEASUREMENTS 6 INCHES ABOVE GROUND FOR TREES UP TO 4-INCH CALIPER SIZE, MEASURE MAIN BODY OF TREE OR SHRUB FOR HEIGHT AND SPREAD; DO NOT MEASURE BRANCHES OR ROOTS TIP-TO-TIP. 3.ALL CONTAINER GROWN PLANTS SHALL SIZED ACCORDING TO ANSI Z60.1 FOR TYPE AND SIZE OF PLANT REQUIRED. PLANTS SHALL BE PREMIUM QUALITY, APPEAR 'FULL', OR 'HEAVY' WITHIN THEIR CONTAINER, AND BE REPRESENTATIVE OF THE CONTAINER SIZE SPECIFIED. PLANTS DEEMED TO BE SUBSTANDARD IN SIZE BY THE LANDSCAPE ARCHITECT WILL BE REJECTED. 4.ALL NEW PLANTS TO BE BALLED AND BURLAPPED OR CONTAINER GROWN UNLESS OTHERWISE NOTED ON PLANT LIST. 5.TREES SHOULD BE FRESHLY DUG DURING THE SEASON OF PLANTING, MARCH 1ST TO MAY 1ST FOR SPRING PLANTING AND OCTOBER 15TH TO DECEMBER 15TH FOR FALL PLANTING. PLANTS KNOWN AS FALL DIG HAZARDS SHALL BE DUG IN THE SPRING ONLY. 6.THE CONTRACTOR SHALL SUPPLY ALL NEW PLANT MATERIAL IN QUANTITIES SUFFICIENT TO COMPLETE THE PLANTING SHOWN ON THE DRAWINGS. 7.IN GENERAL, PLANT SPECIES SUBSTITUTIONS WILL NOT BE ACCEPTED. IF SPECIFIED MATERIAL IS NOT OBTAINABLE, CONTRACTOR SHALL SUBMIT PROOF OF NON-AVAILABILITY TO LANDSCAPE ARCHITECT ALONG WITH PROPOSED SUBSTITUTION. ANY PROPOSED SUBSTITUTIONS OF PLANT SPECIES SHALL BE MADE WITH PLANTS OF EQUIVALENT OVERALL FORM, HEIGHT, SIZE, BRANCHING HABIT, FLOWER, LEAF, COLOR, FRUIT AND CULTURE, AND ONLY AFTER WRITTEN APPROVAL OF THE LANDSCAPE ARCHITECT. 8.THE LANDSCAPE ARCHITECT RETAINS THE RIGHT TO INSPECT TREES AND SHRUBS FOR SIZE AND CONDITION OF BALLS AND ROOT SYSTEMS, INSECTS, INJURIES AND LATENT DEFECTS, AND TO REJECT UNSATISFACTORY OR DEFECTIVE MATERIAL AT ANY TIME DURING PROGRESS OF WORK. CONTRACTOR SHALL REMOVE REJECTED TREES OR SHRUBS IMMEDIATELY FROM PROJECT SITE. 9.CONTRACTOR SHALL LOCATE AND VERIFY ALL EXISTING UTILITY LINES PRIOR TO PLANTING AND SHALL REPORT ANY CONFLICTS TO THE LANDSCAPE ARCHITECT. 10.THE CONTRACTOR SHALL STAKE THE LOCATIONS OF ALL PROPOSED PLANT MATERIAL AND PLANT BEDS FOR APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO THE COMMENCEMENT OF PLANTING. 11.INSTALLED PLANTS SHALL BEAR THE SAME RELATIONSHIP TO PROPOSED GRADE AS THEY BORE TO PREVIOUS GRADE. NO TREES SHALL BE PLANTED BEFORE ACCEPTANCE OF ROUGH GRADING. 12.CONTRACTOR SHALL PROVIDE LONG LASTING, SLOW RELEASE STARTER FERTILIZER IN EACH PLANTING PIT FOR TREES, SHRUBS AND PERENNIALS. 13.ALL PLANT BEDS SHALL RECEIVE THREE INCHES (3") OF SHREDDED BARK MULCH. MULCH SHALL BE FREE FROM DELETERIOUS MATERIALS AND SUITABLE AS A TOP DRESSING OF TREES AND SHRUBS, CONSISTING OF DOUBLE HAMMERED SHREDDED BARK MULCH COMPRISED OF EITHER HARDWOOD OR SOFTWOOD SHREDDED BARK. SHREDDED BARK MULCH SHALL NOT EXCEED 3" IN GREATEST DIMENSION, AND SHALL BE DARK BROWN IN COLOR. 14.PLANTS SHALL BE DELIVERED ONLY AS THEY CAN BE INSTALLED IN REASONABLE TIME. ALL PLANTS ARE SUBJECTED TO INSPECTION AT DELIVERY BY THE LANDSCAPE ARCHITECT / OWNER'S REPRESENTATIVE. 15.IF DISCREPANCIES EXIST BETWEEN THE NUMBER OF PLANTS DRAWN ON THE PLANTING PLAN AND THE NUMBER OF PLANTS IN THE PLANT LIST, THE PLANTING PLAN SHALL GOVERN. 16.MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PLANT IS PLANTED AND SHALL CONTINUE FOR A MINIMUM 30-DAY MONITORING PERIOD AFTER NOTIFICATION OF SUBSTANTIAL COMPLETION, AND UNTIL FINAL ACCEPTANCE, WHICHEVER IS GREATER. MAINTENANCE INCLUDES PRUNING, WEEDING, WATERING, FERTILIZATION, AND RE-SEEDING AS NECESSARY. 17.PROTECT PLANTS FROM DAMAGE DUE TO LANDSCAPE OPERATIONS AND OPERATIONS OF OTHER CONTRACTORS AND TRADES. MAINTAIN PROTECTION DURING INSTALLATION AND MAINTENANCE PERIODS. TREAT, REPAIR, OR REPLACE DAMAGED PLANTINGS. 18.UPON COMPLETION OF ALL PLANTING WORK, THE CONTRACTOR SHALL REQUEST IN WRITING THAT THE LANDSCAPE ARCHITECT FORMALLY INSPECT THE PLANTING WORK. IF PLANT MATERIALS AND WORKMANSHIP ARE ACCEPTABLE, THE LANDSCAPE ARCHITECT WILL ISSUE A WRITTEN CERTIFICATE OF SUBSTANTIAL COMPLETION. 19.FOLLOWING THE ISSUANCE OF THE CERTIFICATE OF SUBSTANTIAL COMPLETION TO THE CONTRACTOR, THE CONTRACTOR SHALL MAINTAIN THE PLANTS FOR THE MAINTENANCE PERIOD SPECIFIED IN THIS SECTION. PLANTING NOTES: 19.ACCEPTANCE STANDARDS AT END OF THE MAINTENANCE PERIOD: 19.1 PLANTS SHALL BE FREE OF FROST CRACKS; SUN SCALD; DAMAGE DUE TO INSECTS, PESTS, AND DISEASE; STRUCTURAL DEFECTS; AND DAMAGE RESULTING FROM MACHINERY OR TOOLS. ALL PLANTS REGARDLESS OF THE SEASON OF REVIEW SHALL HAVE A MINIMUM OF 75 PERCENT HEALTHY, BALANCED BRANCHING STRUCTURE WITH A HEALTHY TERMINAL LEADER(S) WITH VIABLE TERMINAL BUD(S). TREES SHALL BE PLUMB AND SHOW NO SIGNS OF UNEVEN SETTLING OR LEANING. 19.2 LAWN AREAS SHALL HAVE A HEALTHY, UNIFORM STAND OF GRASS FREE OF WEEDS, SURFACE IRREGULARITIES, WITH COVERAGE EXCEEDING 90% OVER ANY 10 SQ. FT. AND BARE SPOTS NOT EXCEEDING 5"X5" 20.IF PLANT MATERIALS AND WORKMANSHIP ARE ACCEPTABLE, THE LANDSCAPE ARCHITECT WILL ISSUE A WRITTEN CERTIFICATE OF FINAL ACCEPTANCE TO THE CONTRACTOR. 21.GUARANTEE: CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL TO REMAIN ALIVE AND BE IN A HEALTHY, VIGOROUS CONDITION FOR A PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE OF PLANTING WORK, AGAINST DEFECTS INCLUDING DEATH AND UNSATISFACTORY WORK. 22.CONTRACTOR SHALL REPLACE ALL PLANTS THAT ARE MORE THAN 25% DEAD OR, AS DETERMINED BY THE LANDSCAPE ARCHITECT, ARE IN AN UNHEALTHY OR UNSIGHTLY CONDITION. CONTRACTOR SHALL BEAR THE COST OF COMPLETE REPLACEMENT(S). REPLACEMENTS SHALL BE OF THE SAME SIZE AND SPECIES AS SPECIFIED ON THE PLANTING LIST. 23.GRASS SEED: FRESH, CLEAN, DRY, NEW-CROP SEED COMPLYING WITH AOSA'S "RULES FOR TESTING SEEDS" FOR PURITY AND GERMINATION TOLERANCES. PROVIDE SEED MIXTURE COMPOSED OF SPECIES, PROPORTIONS AND MINIMUM PERCENTAGES OF PURITY, GERMINATION, AND MAXIMUM PERCENTAGE OF WEED SEED, AS FOLLOWS: PROPORTION GERMINATION PURITY COMMON NAME BY WEIGHT MINIMUM MINIMUM CREEPING RED FESCUE 50% 85%95% OR CHEWINGS FESCUE KENTUCKY BLUEGRASS 25% 85% 90% PERENNIAL RYE 25%90%90% 24.TOPSOIL SHALL HAVE A SANDY LOAM, LOAMY SAND, OR LOAM TEXTURE AS DETERMINED BY MECHANICAL ANALYSIS (ASTM 422) AND BASED ON THE 'USDA CLASSIFICATION SYSTEM' MAXIMUM CLAY CONTENT SHALL BE 10%. TOPSOIL SHALL BE FERTILE, FRIABLE SOIL FREE OF STONES LARGER THAN ONE INCH IN ANY DIRECTION, LUMPS, PLANTS AND THEIR ROOTS, DEBRIS AND OTHER EXTRANEOUS MATTER AS DETERMINED BY THE OWNER'S REPRESENTATIVE, AND TOXIC MATTER HARMFUL TO PLANT GROWTH, TOPSOIL SPECIFICATION: GRADATION: SIEVE % PASSING BY WEIGHT CHEMICAL ANALYSIS MIN. MAX. #10 100 PH RANGE 5.2-7.0 #20 78 95 ORGANIC MATTER 4%-6% #40 67 87 MAGNESIUM 35LB. PER AC #60 48 78 PHOSPHORUS 75LB/AC #100 40 75 POTASSIUM 85LB/AC #200 28 63 SOLUBLE SALTS NOT TO EXCEED 500 PPM #270 22 55 .002 2 7 5 Hp 5 Sj 3 Sj 1 BN