Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20190938 Sanson Residence EAF
Short Environmental Assessment Form Part I -Project Information Instructions for Completing Part I--Project Information, The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding,are subject to public review,and may be subject to further verification. Complete Part I based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. Complete all items in Part I.You may also provide any additional information which you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part 1--Project and Sponsor Information Name of Action or Project: Sansonlwright Residence Addition&Renovation Project Location(describe,and attach a location map): 39 York Ave,Saratoga Springs NY 12866 Brief Description of Proposed Action: Owner is proposing to remove the existing garage and enclosed porch to construct a two story addition to the single family residence.The addition will incorporate a new sitting room,storage space,study,with a second floor bedroom&studio space.The existing interior space will be renovated to create an entry,palor,living room,kitchen&second floor bedrooms w!bath. Name of Applicant or Sponsor: Telephone: 518-581-9055 Robert Sanson&Cynthia Wright E-Mail: Robert©sanson.org Address: 39 York Ave. City/PO: State: Zip Code: Saratoga Springs NY 12866 1. Does the proposed action only involve the legislative adoption of a plan,local law,ordinance, NO YES administrative rule,or regulation? If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that 11.1 may be affected in the municipality and proceed to Part 2. If no,continue to question 2. 2. Does the proposed action require a permit,approval or funding from any other government Agency? NO YES If Yes,list agency(s)name and permit or approval: 111 3. a.Total acreage of the site of the proposed action? .10 acres b.Total acreage to be physically disturbed? .04 acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? .10 acres 4. Check all land uses that occur on,are adjoining or near the proposed action: 5. E]Urban fl Rural(non-agriculture) D Industrial ❑ Commercial © Residential(suburban) El Forest ❑ Agriculture E] Aquatic [] Other(Specify): ❑Parkland Page 1 of 3 SEAF 2019 5. Is the proposed action, NO YES N/A a. A permitted use under the zoning regulations? b. Consistent with the adopted comprehensive plan? NO YES 6. Is the proposed action consistent with the predominant character of the existing built or natural landscape? El El 7. Is the site of the proposed action located in,or does it adjoin,a state listed Critical Environmental Area? NO YES If Yes,identify: El NO YES 8. a. Will the proposed action result in a substantial increase intraffic above present levels? b. Are public transportation services available at or near the site of the proposed action? c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed action? —e W 9. Does the proposed action meet or exceed the state energy code requirements? NO YES If the proposed action will exceed requirements,describe design features and technologies: 10. Will the proposed action connect to an existing public/private water supply? NO YES If No,describe method for providing potable water: El 11. Will the proposed action connect to existing wastewater utilities? NO YES If No,describe method for providing wastewater treatment: El Li 12. a.Does the project site contain,or is it substantially contiguous to,a building,archaeological site,or district NO YES which is listed on the National or State Register of Historic Places,or that has been determined by the Commissioner of the NYS Office of Parks,Recreation and Historic Preservation to be eligible for listing on the El El State Register of Historic Places? b.Is the project site,or anyportion of it,located in or to an area designated as sensitive for adjacentgn se s ve o archaeological sites on the NY State Historic Preservation Office(SHPO)archaeological site inventory? 13. a. Does any portion of the site of the proposed action,or lands adjoining the proposed action,contain NO YES wetlands or other waterbodies regulated by a federal,state or local agency? b.Would the proposed action physically alter,or encroach into,any existing wetland or waterbody? El odand extent of alterations in square feet or acres: 'a IfYes,identify the wetland or waterbody -lw'�ills i. *415*, S l'i'.wxs1.<<'riyTf y.....,,.:a3•..,�r:'h'iie!YG'lY'�. us,ti '•w:. " ONOV y'iCyvf.'.<s�fa[yK*:� irs: ice .�Y9''-2,�,'•, i3 r '.;s.,-?'•y=, .max�:�•��ay�:;��°=�:y�.x: `aa'KYYr�rte'.. . r°'iA- Page 2 of 3 . ....... ..... 14. Identify the typical habitat types that occur on,or are likely to be found on the project site.Check all that apply: Shoreline El Forest 0 Agricultural/grasslands 0 Early mid-successional 0 Wetland 0 Urban ® Suburban 15. Does the site of the proposed action contain any species of animal,or associated habitats,listed by the State or NO YES Federal government as threatened or endangered? El 16. Is the project site located in the 100-year flood plan? NO YES El 17. Will the proposed action create storm water discharge,either from point or non-point sources? NO YES If Yes, Ei El a. Will storm water discharges flow to adjacent properties? El b. Will storm water discharges be directed to established conveyance systems(runoff and storm(rains)? ri If Yes,briefly describe: :,;.:..: __7-, .. Water will be collected and directed to surface discharge locations to flow to the street or to on site collection structures such as a rain `Nay - garden to limit discharge to adjacent properties. ` ; = r ?r;r:rrr:;i•:„'Y.7�'fz-�5��p£FF's�"°��5� 18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YES or other liquids(e.g.,retention pond,waste lagoon,dam)? If Yes,explain the purpose and size of the impoundment: 19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste NO YES management facility? If Yes,describe: EI 20.Has the site of the proposed action or an adjoining property been the subject of remediation(ongoing or NO YES completed) for hazardous waste? If Yes,describe: El I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Davi' D' .=ore Applicant/sponsor/name: A fil Date: pm- ir • Signature: :,�. ..� At Title. (7.-- PRINT FORM Page 3 of 3