HomeMy WebLinkAbout20250301 3 Unlimited Dr Land Disturbance Activity Narrative
Verity Engineering, D.P.C.
P.O. Box 474
Troy, New York 12181
518.389.7200 | verityeng.com
1
EngineeringVerity
Project Narrative
Proposed Warehouse Addition
City of Saratoga Springs, Saratoga County
April 2025
Site Address: 3 Unlimited Drive
Saratoga Springs, NY 12866
Tax Map 178.-1-50.121
Applicant: Munter Enterprises, Inc.
c/o John Munter
881 Murray Road
Middle Grove, NY 12850
Owner: Slack Chemical Company, Inc.
465 Clinton Street
Carthage, NY 13619
Design Engineer: Verity Engineering, D.P.C.
P.O. Box 474
Troy, NY 12181
Zoning: IND-G– General Industrial
Proposed use: Industrial-General Project Overview
The applicant is proposing to construct a ±17,363 square feet (sq. ft.) single-story warehouse
building addition keyed onto the northeast portion of the existing ±56,020 sq. ft. building,
totaling ±73,647 sq. ft. on a ±6.5-acre parcel with address 3 Unlimited Drive. The parcel is
located in the City of Saratoga Springs, NY and located in the General Industrial (IND-G)
zone and is an allowed use. The development plan includes other site appurtenances such as
storm water management, loading area and site lighting. No new public or private utility
service connections are proposed. The building addition will incorporate area dedicated to
high-bay industrial warehouse storage with two (2) loading dock positions along the west
building wall.
The project will disturb less than one (1) acre of land and is not subject to a New York State
Department of Environmental Conservation (NYSDEC) Stormwater Discharge Elimination
System (SPDES) permit coverage; however, is subject to City of Saratoga Springs
Stormwater regulations. Runoff from stormwater will be conveyed via sheet flow to surface
detention and infiltration practices. The project scope of work entails no clearing and
grubbing; earthwork and grading for the preparation of the building pad, stormwater
management practices, building construction, surfacing and building-mounted lighting. The
project will require site plan approval and a land disturbance permit from the City of
Saratoga Springs Planning Board. It should be noted that no tree cutting is proposed as part
of this project activity. Description of Existing Site and Use
The subject parcel is ±6.5 acres in size, principally developed with a ±56,312 sq. ft. structure
and wholly located within the General Industrial (IND-G) zone (Reference: City of Saratoga
Spring Planning project no’s: 11.025, 12.036, 16.041). The parcel is located easterly of the
2 V
intersection of Grande and Cady Hill Boulevards, a/k/a TMPL: 178.-1-50.121, (3 Unlimited
Drive). The parcel has frontage along the terminus of Unlimited Drive and contains a 75’
wide electricity transmission line easement and a 25’ wide no-cut buffer for the protection
of the Blue Karner habitat along the eastern property boundary. With exception to the
sloping grade difference along the western edge of the developed areas stemming from
undevelopable land encumbrances, the site is absent naturally occurring steep slopes,
wetlands, waterbodies, watercourses and is not located within a 100-year flood plain.
Drainage and Surface Water
Surface runoff from the property currently does not leave the site.
Easements and Utilities
See above: Description of Existing Site and Use above.
Anticipated Impacts on Services:
Traffic
A significant increase in traffic (>100 vehicles in a peak hour) is not anticipated due to the
building addition. According to the Institute of Traffic Engineers (ITE) Trip Generation land
use code 150, warehouse, the warehouse addition is estimated to generate approximately 2-
3 additional vehicle trips for both the AM and PM peak hours.
Water and Wastewater
No new water or sewer connections are proposed.
Municipal Solid Waste
The proposed project will generate additional solid waste that will require disposal to a
landfill and recycling center. Private trash collection contractors will continue to be used to
collect and dispose of the solid waste. Impact on Adjacent Property
Noise
Sound levels generated from potential uses are normal and customary to the surrounding
commercial and industrial uses in the IND-G zone and will not have adverse impacts to
adjacent neighbors.
Visual
The project will have no adverse visual impact. The proposed development will not be out of
character compared to the surrounding uses.
Lighting
Proposed lighting will be building-mounted, LED type, and located at the loading dock and
entry door locations. Lighting will be DarkSky compliant utilizing sharp-cutoff fixtures which
direct light only to targeted areas. A photometric plan can be found on sheet C-191.
Drainage and Stormwater
Drainage patterns will not be altered from the predevelopment conditions. See: Drainage
and Surface Water above. Site disturbance is less than one (1) acre and not subject to
NYSDEC SPDES permit coverage; however, it subject to a full SWPP per City of Saratoga
Springs Zoning UDO §17.5.B.1.a. Stormwater runoff will be conveyed via sheet flow, open
and closed drainage to various infiltration practices. Please reference the sheet C-121 and
the Storm Water Pollution Prevention Plan (SWPPP) for further details.
3 V
Air Quality
The project will have no adverse effect on air quality.
Odor
The project will have no adverse effect on odors.
Impact to Critical Environ or Archaeologically Sensitive Areas
NYSDEC mapping indicates the presence of rare plants or animals within the project area,
specifically frosted Elfin and Karner Blue. The proposed action will likely not result in the
taking of threatened or endangered species due to a lack of suitable habitat with the project
area of disturbance. No cutting of trees or removal of significant vegetation is proposed.
The project site is not within the archaeology sensitive area as mapped on the New York
State Office of Parks, Recreation and Historical Preservation database.
Existing and Proposed Building Gross Floor Area
Approximate Total Gross Floor Area (GFA): ±73,020 sq. ft.
Building Height and Number of Floors
The proposed building will be one (1) story and have a matching split roof design and height. Miscellaneous Site Information
Parking, Parking Improvements and Site Distance
The Industrial-General use shown on Table 10-C 6.2.6, Off-Street Vehicle and Bicycle Parking
Requirements, requires onsite vehicle and bicycle parking. One (1) vehicle space per 1,000
sq. ft. of gross floor area (GFA) up to 40,000 sq. ft. GFA plus one (1) vehicle space per 2,500
sq. ft. GFA grater than 40,000 sq. ft. GFA for a total of fifty-four (54) required vehicle spaces.
Twenty (20) spaces are proposed inclusive of ADA parking. One bicycle space per 2,500 sq.
ft. GFA is required for a total of 30 required bicycle parking spaces. No bicycle parking
spaces are proposed. Ample sight distance exists along Unlimited Drive at the existing
access driveway.
Hours of Operation
Specific tenant(s) use(s) is(are) unknown at this juncture; tenants may operate 24 hours per
day Monday through Sunday.
Open Space Preservation/Green Space
The proposed green space is approximately ±54.1%.
Construction Sequence and Phasing
The project is intended to be built in a single phase. Disposal of Chemicals
The operation will not involve the outdoor storage of regulated chemicals. Fertilizers and
pesticides for lawn and landscape treatment will be applied by licensed contractor/personnel
and products brought to the site at time of application.
Town Communication Impacts
No known communication devices or needs are proposed at this time.
4 V
Variances/Waivers/Referrals
The proposed project will require a variance for the relief to minimum off-street vehicle and
bicycle parking requirements per §10.5.A of the City of Saratoga Springs U