Loading...
HomeMy WebLinkAbout20250165 131 Middle Ave Subdivision Updated Application—HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** CITY OF SARATOGA SPRINGS r' PLANNING BOARD CITY HALL - 474 BROADWAY _ SARATOGA SPRINGS, NEW YORK 12866-2296 /lvC�'4pORAIED `�' 4 TEL: 518-587-3550 X2533 www.saratoga-springs.org APPLICATION FOR: n PRELIMINARY II FINAL SUBDIVISION Property Address/Location: 131 Middle Avenue & 124 York Avenue Tax Parcel #: 166.46-3-5.2 (for example: 165.52-4-37) Total Acres: 0.243 APPLICANT(S)* Name Kim & Mike Southern Address 124 York Ave Saratoga Springs, NY 12866 Phone (518) 316-4759 Email mksouth@verizon.net Identify primary contact person: ❑ Applicant [FOR OFFICE USEI (Application #) (Date received) (Project Title) Check if PH Required Staff Review Zoning District: U R3 FIRR/SR - Conservation Design Required Land to be Subdivided Into: (Modify) 2-Lots OWNER(S) (If not applicant) ❑ Owner N Agent ATTORNEY/AGENT Jesse Boucher, Kodiak Construction PO Box 657 Saratoga Springs, NY 12866 (518) 587-4847 Jesse@KodiakofSaratoga.com * An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. Has a previous application been filed with PB for this property? NO a YES W If YES, include Application TYPE 2-Lot Subdivision and DATE: 5/11 /17 Does any City officer, Does any City officer, employee or family member thereof have a financial interest (as defined by General Municipal Law Section 809) in this application? YES NO X If YES, a statement disclosing the name, residence, nature and extent of this interest must be filed with this application. I, the undersigned owner or purchaser under contract for the property, hereby request Subdivision consideration by the Planning Board for the identified property above. I agree to meet all requirements under the Unified Development Ordinance for the City of Saratoga Springs. Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property associated with this application for purposes of conducting any necessary site inspections relating to this application. Applicant Signature: 6 W �'q Ek Date: If applicant is not current ow r, Owner Signatur , Appl REF sign. Date: �b7 Zvi Fee: `Makks payable to the "Commissioner of Finance". THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT. Revised 8/2022 Check City's website (www.saratoga-springs.org) for meeting dates. {51"�CITY OF SARATOGA SPRINGS PLANNING BOARD 7 . r CITY HALL - 474 BROADWAY i * SARATOGA SPRINGS, NEW YORK 12866-2296 TEL: 518-587-3550 X2533 cO�poPnrco 9`` www.saratoga-springs.org PRELIMINARY/ FINAL SUBDIVISION APPROVAL REQUIRED SUBMITTAL CHECKLIST Checklist Prepared By: Jesse Boucher, Kodiak Construction Date: April 3, 2025 Listed below are the minimum submittal requirements as set forth in The City of Saratoga Springs' Subdivision Approval (Article 14). The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: "4 hard copies (1 w/original signature), 1 digital copy of ALL materials (all maps, drawings, or CHECK EACH ITEM image documents as separate files) and Fee are required. I . Completed Subdivision Application I a. Conservation Design (Article 16) if required 2. SEQR Environmental Assessment Form- short or long form as required by action. a 3. Set of plans including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not more than 1 "=50 feet) and (1) 11 " x 17" copy. One digital version (PDF) of all submittal items printable ❑ 4. o sc e Basic or Full Storm Water Pollution Prevention Plan as required per Article 17 of the UDO. 5. Copy of signed DPW water connection agreement for all projects involving new water connections to the City system 6. Engineering Report for Water and Sanitary 7. Complete Streets Checklist 8. Project Cost Estimate for Letter of Credit (utilize City template) REQUIRED ITEMS ON SUBDMSION PLAT, AS APPLICABLE: 1. Name of Subdivision Fv7with 2. Property line survey prepared by a licensed land surveyor. Subdivision plat must reference such survey all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the original property survey must also be included. 3. North arrow and map scale City of Saratoga Springs Subdivision Checklist Z4. Location of proposed home on each lot including finish floor elevation to nearest tenth foot. 5. Parcel tax map number 6. Site location map (with title block and map key) 7. Site vicinity map (all features within 300 feet of property) 8. Identification of current zoning district with corresponding dimensional standards 9. Building setback lines shown on plans 10. Title block with subdivision name; name and address of applicant; and name and address of property owner (if different) 7 11. Name, address and phone number of subdivision surveyor and/or engineer 12. Names of all adjacent property owners within 300 feet (include both sides of street) 13. Identification of size, material, elevations, and slopes of all existing and proposed utilities within 400 ft of site. 14. Parcel street address (existing and any proposed postal addresses) 15. Incorporate the City's standard engineering details. Yes No N/A 16. Identification of existing or proposed easements, covenants or legal rights -of -way on this property W1El F-1 17. References to all prior variances or special use permits 18. Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary ❑ ❑ 19. Identification of all watercourses, designated State wetlands, Federal wetlands, buffers, floodplains, rock outcroppings, etc. ❑ ❑ FVIcondition) 20. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and El ❑ FV1culverts, 21. Location, design specifications and construction material for all proposed site improvements (drains, retaining walls, berms, fences, etc.) ElEl FV1 22. Location and distance to fire hydrant W123. Erosion and sediment control plan — including designated concrete truck washout area W1El F-1 24. Approximate location, dimensions and areas for proposed lots and proposed public recreational land 25. Proposal for utility systems and lateral connections W] 26. Location and width of proposed streets City of Saratoga Springs Subdivision Checklist City of Saratoga Springs Y11AILAi City Hall - 474 Broadway y, Saratoga Springs, New York 12866 -< � .Ir Tel:518-587-3550 www.saratoga-springs.org Office of Planning & Economic Development Application to City Council FEE Comprehensive Plan amendment $1,800 + $300/acre Zoning Ordinance amendment $800 + $300/acre Planned Unit Development (PUD) amendment $800 + $300/acre Application to Zoning Board of Appeals Use Variance $1,400 + $50/app Area Variance - Residential (1 & 2 Family) $350/1 st var +$50/app +$150/ea add variance Area Variance - 3+ Family and Commercial $1000/1st var + $50/app+ $200/ ea add variance Interpretations $650 + $50/app Post Work Application Fee Application Fee x 2 + $50/app Variance extensions 50% of Application fee + $50/app Application to Design Review Commission Demolition $500 Residential Structures - 1 or 2 Family Principal or Accessory Structure Materials Change -roof, windows, siding $75 Faq.ade Change-removal/addition of windows, doors, porch $150 Addition or new construction $300 Approval Extension or Modification 50% of application fee 3 + /Multi -Family, Comm, Mixed -Use Principal or Accessory Structure Materials Change -roof, windows, siding, paint color $150 Signs, Awnings $150 Facade Change-removal/addition of windows, doors, porch $300 Addition or new construction $650 Approval Extension or Modification 50% of application fee Post Work Application Fee Application Fee x 2 Application to Planning Board Special Use Permit $1200 + $50/app Temporary Use Permit $500 Special Use Permit- extension $400 Special Use Permit - modification $550 + $50/app Site Plan Review- incl. PUD: Sketch Plan $400 per sketch Site Plan Full Residential $400 + $250/unit Non-residential $800 + $150/1000 sf Administrative SPR Residential $400 Non-residential $800 Extension Residential $250 Non-residential $350 Subdivision - incl. PUD: Sketch Plan $400 per sketch Preliminary Approval Residential: 1-5 lots $700 + $50/app Residential: 6-10 lots $1100 + $50/app Residential: 11-20 lots $1450 + $50/app Residential: 21+ lots $1800 + $50/app Residential - extension $350 Final Approval Residential $1,550 + $200/lot + $50/app Non- Residential $2,400/lot + $50/app Final Approval Modification Residential $400 + $50/app Non- Residential $800 + $50/app Final Approval Extension Residential $250 Non- Residential $350 (itner: Lot Line Adjustment/Subdivision Administrative Action $400 Letter of Credit - modification or extension $400 Letter of Credit - collection up to 1 % of LoC Recreation Fee $20001lot or unit Land Disturbance $750 + $35/acre Watercourse/Wetland Permit $750 SEQRA EIS Review Draft & Final TBD 6 K2diak STRUCTION'"` PO Box 657 Saratoga Springs, NY 12866 April 7, 2025 City of Saratoga Springs Planning Board 474 Broadway Saratoga Springs, NY 12866 Re: 131 Middle Avenue — Updated application info@KodiakofSaratoga. com (518) 587-4847 Enclosed is the Subdivision Application for 131 Middle Avenue to request modification to the lot approvals granted in 2017. This submission is to replace the previously submitted Site Plan Review Application submitted on March 7, 2025, following a review of the request by Susan Barden. All enclosures will remain the same for this application, as presented in the March 7, 2025 submission: 3/7/25 Enclosures: (8.5" x 11", 4-sets; 11" x 17" 3-sets) a) Site Plan Review Application, signed March 6, 2025 b) SEQRA Part I, signed March 6, 2025 c) Planning Board Notice of Decision, dated May 11, 2017 d) New Water Service Connection Agreement, dated January 5, 2017 e) City of Saratoga Springs Complete Streets Checklist, dated February 14, 2017 f) Construction Cost Estimate, dated February 22, 2017 g) Neighbor list within 300 ft 3/7/25 Enclosures: (24" x 36", 3-sets or 11" x 17", 1-set) h) Site Plan dated February 28, 2025 i) Artwork Floor Plans & Elevations for new residence, dated November 16, 2024 j) Subdivision Drawings, signed by the Planning Board Chair January 18, 2018 k) Vicinity Map showing neighboring front -load garages (11x17 original size) Please email Jesse@KodiakofSaratoga.com with questions or modifications that may be required in advance of the Planning Board meeting. T nk you, Jesse Boucher Kodiak Construction, Inc Agent for Applicants