HomeMy WebLinkAbout20250165 131 Middle Ave Subdivision Updated Application—HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED**
CITY OF SARATOGA SPRINGS
r' PLANNING BOARD
CITY HALL - 474 BROADWAY
_ SARATOGA SPRINGS, NEW YORK 12866-2296
/lvC�'4pORAIED `�' 4 TEL: 518-587-3550 X2533
www.saratoga-springs.org
APPLICATION FOR:
n PRELIMINARY II FINAL SUBDIVISION
Property Address/Location: 131 Middle Avenue & 124 York Avenue
Tax Parcel #: 166.46-3-5.2
(for example: 165.52-4-37)
Total Acres: 0.243
APPLICANT(S)*
Name Kim & Mike Southern
Address 124 York Ave Saratoga Springs, NY 12866
Phone (518) 316-4759
Email mksouth@verizon.net
Identify primary contact person: ❑ Applicant
[FOR OFFICE USEI
(Application #)
(Date received)
(Project Title)
Check if PH Required
Staff Review
Zoning District: U R3
FIRR/SR - Conservation Design Required
Land to be Subdivided Into: (Modify) 2-Lots
OWNER(S) (If not applicant)
❑ Owner N Agent
ATTORNEY/AGENT
Jesse Boucher, Kodiak Construction
PO Box 657 Saratoga Springs, NY 12866
(518) 587-4847
Jesse@KodiakofSaratoga.com
* An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question.
Has a previous application been filed with PB for this property? NO a YES W
If YES, include Application TYPE 2-Lot Subdivision and DATE: 5/11 /17
Does any City officer, Does any City officer, employee or family member thereof have a financial interest (as defined by
General Municipal Law Section 809) in this application? YES NO X If YES, a statement disclosing the name,
residence, nature and extent of this interest must be filed with this application.
I, the undersigned owner or purchaser under contract for the property, hereby request Subdivision consideration by the
Planning Board for the identified property above. I agree to meet all requirements under the Unified Development
Ordinance for the City of Saratoga Springs.
Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property
associated with this application for purposes of conducting any necessary site inspections relating to this application.
Applicant Signature: 6 W �'q Ek Date:
If applicant is not current ow r,
Owner Signatur ,
Appl
REF
sign.
Date:
�b7 Zvi
Fee: `Makks payable to the "Commissioner of Finance".
THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT.
Revised 8/2022
Check City's website (www.saratoga-springs.org) for meeting dates.
{51"�CITY OF SARATOGA SPRINGS
PLANNING BOARD
7 . r CITY HALL - 474 BROADWAY
i * SARATOGA SPRINGS, NEW YORK 12866-2296
TEL: 518-587-3550 X2533
cO�poPnrco 9`` www.saratoga-springs.org
PRELIMINARY/ FINAL SUBDIVISION APPROVAL
REQUIRED SUBMITTAL CHECKLIST
Checklist Prepared By: Jesse Boucher, Kodiak Construction
Date: April 3, 2025
Listed below are the minimum submittal requirements as set forth in The City of Saratoga Springs'
Subdivision Approval (Article 14). The Planning Board reserves the right to request additional information, as
necessary, to support an application. The Board also reserves the right to reject the application if these
minimum requirements are not met. Please complete the checklist below and provide with your submission.
REQUIRED ITEMS: "4 hard copies (1 w/original signature), 1 digital copy of ALL materials (all maps, drawings, or
CHECK EACH ITEM
image documents as separate files) and Fee are required.
I .
Completed Subdivision Application I a. Conservation Design (Article 16) if required
2.
SEQR Environmental Assessment Form- short or long form as required by action.
a
3.
Set of plans including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not more
than 1 "=50 feet) and (1) 11 " x 17" copy. One digital version (PDF) of all submittal items printable
❑
4.
o sc e
Basic or Full Storm Water Pollution Prevention Plan as required per Article 17 of the UDO.
5. Copy of signed DPW water connection agreement for all projects involving new water
connections to the City system
6.
Engineering Report for Water and Sanitary
7.
Complete Streets Checklist
8.
Project Cost Estimate for Letter of Credit (utilize City template)
REQUIRED ITEMS ON SUBDMSION PLAT, AS APPLICABLE:
1. Name of Subdivision
Fv7with
2. Property line survey prepared by a licensed land surveyor. Subdivision plat must reference such survey
all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the original
property survey must also be included.
3. North arrow and map scale
City of Saratoga Springs Subdivision Checklist
Z4.
Location of proposed home on each lot including finish floor elevation to nearest tenth foot.
5. Parcel tax map number
6. Site location map (with title block and map key)
7. Site vicinity map (all features within 300 feet of property)
8. Identification of current zoning district with corresponding dimensional standards
9. Building setback lines shown on plans
10. Title block with subdivision name; name and address of applicant; and name and address of property
owner (if different)
7
11. Name, address and phone number of subdivision surveyor and/or engineer
12. Names of all adjacent property owners within 300 feet (include both sides of street)
13. Identification of size, material, elevations, and slopes of all existing and proposed utilities within 400 ft
of site.
14. Parcel street address (existing and any proposed postal addresses)
15. Incorporate the City's standard engineering details.
Yes No N/A
16. Identification of existing or proposed easements, covenants or legal rights -of -way on this property
W1El F-1
17. References to all prior variances or special use permits
18. Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary
❑ ❑
19. Identification of all watercourses, designated State wetlands, Federal wetlands, buffers, floodplains,
rock outcroppings, etc.
❑ ❑
FVIcondition)
20. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and
El ❑ FV1culverts,
21. Location, design specifications and construction material for all proposed site improvements (drains,
retaining walls, berms, fences, etc.)
ElEl FV1
22. Location and distance to fire hydrant
W123.
Erosion and sediment control plan — including designated concrete truck washout area
W1El F-1
24. Approximate location, dimensions and areas for proposed lots and proposed public recreational land
25. Proposal for utility systems and lateral connections
W]
26. Location and width of proposed streets
City of Saratoga Springs Subdivision Checklist
City of Saratoga Springs
Y11AILAi
City Hall - 474 Broadway
y,
Saratoga Springs, New York 12866
-<
� .Ir
Tel:518-587-3550 www.saratoga-springs.org
Office of Planning & Economic Development
Application to City Council FEE
Comprehensive Plan amendment $1,800 + $300/acre
Zoning Ordinance amendment $800 + $300/acre
Planned Unit Development (PUD) amendment $800 + $300/acre
Application to Zoning Board of Appeals
Use Variance $1,400 + $50/app
Area Variance - Residential (1 & 2 Family) $350/1 st var +$50/app +$150/ea add variance
Area Variance - 3+ Family and Commercial $1000/1st var + $50/app+ $200/ ea add variance
Interpretations $650 + $50/app
Post Work Application Fee Application Fee x 2 + $50/app
Variance extensions 50% of Application fee + $50/app
Application to Design Review Commission
Demolition
$500
Residential Structures - 1 or 2 Family Principal or Accessory Structure
Materials Change -roof, windows, siding
$75
Faq.ade Change-removal/addition of windows, doors, porch
$150
Addition or new construction
$300
Approval Extension or Modification
50% of application fee
3 + /Multi -Family, Comm, Mixed -Use Principal or Accessory Structure
Materials Change -roof, windows, siding, paint color
$150
Signs, Awnings
$150
Facade Change-removal/addition of windows, doors, porch
$300
Addition or new construction
$650
Approval Extension or Modification
50% of application fee
Post Work Application Fee
Application Fee x 2
Application to Planning Board
Special Use Permit
$1200 + $50/app
Temporary Use Permit
$500
Special Use Permit- extension
$400
Special Use Permit - modification
$550 + $50/app
Site Plan Review- incl. PUD:
Sketch Plan
$400 per sketch
Site Plan Full
Residential
$400 + $250/unit
Non-residential
$800 + $150/1000 sf
Administrative SPR
Residential
$400
Non-residential
$800
Extension
Residential
$250
Non-residential
$350
Subdivision - incl. PUD:
Sketch Plan
$400 per sketch
Preliminary Approval
Residential: 1-5 lots
$700 + $50/app
Residential: 6-10 lots
$1100 + $50/app
Residential: 11-20 lots
$1450 + $50/app
Residential: 21+ lots
$1800 + $50/app
Residential - extension
$350
Final Approval
Residential
$1,550 + $200/lot + $50/app
Non- Residential
$2,400/lot + $50/app
Final Approval Modification
Residential
$400 + $50/app
Non- Residential
$800 + $50/app
Final Approval Extension
Residential
$250
Non- Residential
$350
(itner:
Lot Line Adjustment/Subdivision Administrative Action
$400
Letter of Credit - modification or extension
$400
Letter of Credit - collection
up to 1 % of LoC
Recreation Fee
$20001lot or unit
Land Disturbance
$750 + $35/acre
Watercourse/Wetland Permit
$750
SEQRA EIS Review Draft & Final
TBD
6
K2diak
STRUCTION'"`
PO Box 657
Saratoga Springs, NY 12866
April 7, 2025
City of Saratoga Springs
Planning Board
474 Broadway
Saratoga Springs, NY 12866
Re: 131 Middle Avenue — Updated application
info@KodiakofSaratoga. com
(518) 587-4847
Enclosed is the Subdivision Application for 131 Middle Avenue to request modification to the lot approvals granted
in 2017. This submission is to replace the previously submitted Site Plan Review Application submitted on March
7, 2025, following a review of the request by Susan Barden. All enclosures will remain the same for this
application, as presented in the March 7, 2025 submission:
3/7/25 Enclosures: (8.5" x 11", 4-sets; 11" x 17" 3-sets)
a) Site Plan Review Application, signed March 6, 2025
b) SEQRA Part I, signed March 6, 2025
c) Planning Board Notice of Decision, dated May 11, 2017
d) New Water Service Connection Agreement, dated January 5, 2017
e) City of Saratoga Springs Complete Streets Checklist, dated February 14, 2017
f) Construction Cost Estimate, dated February 22, 2017
g) Neighbor list within 300 ft
3/7/25 Enclosures: (24" x 36", 3-sets or 11" x 17", 1-set)
h) Site Plan dated February 28, 2025
i) Artwork Floor Plans & Elevations for new residence, dated November 16, 2024
j) Subdivision Drawings, signed by the Planning Board Chair January 18, 2018
k) Vicinity Map showing neighboring front -load garages (11x17 original size)
Please email Jesse@KodiakofSaratoga.com with questions or modifications that may be required in advance of
the Planning Board meeting.
T nk you,
Jesse Boucher
Kodiak Construction, Inc
Agent for Applicants