HomeMy WebLinkAbout20250242 45-47 Winding Brooke Dr Lot Line Adjustment ApplicationSubmission Requirements:
Please submit (check boxes):
Two (2) hard copies AND one (1) digital copy of the completed application.
If approved, the City will require the submission of two (2) mylars (one for City records and one for the applicant
to file with Saratoga County Real Property Services) and two (2) paper copies of the approved final plat.
Application Fee: Make checks payable to the "Commissioner of Finance”.
REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT.
Part I: General Information
Applicant * Surveyor/Engineer
Name: __________________________ Name: _______________________________
Address: _____________________________________
Phone: _______________________________
E-mail: _______________________________
Address: __________________________
Phone: _______________________________
E-mail: _______________________________
Property #1:Property #2:
Tax Parcel #: _______________________________
Address: _______________________________
Owner's Name: _______________________________
Phone: _______________________________
Tax Parcel #:_____________________________
Address: _______________________________
Owner's Name: __________________________
Phone: _______________________________
Identify primary contact person: Applicant Owner Agent
*An applicant must be the property owner, lessee, or one with an option to lease or purchase the
property in question.
Yes
Yes
Yes
No Will any additional lots be created?
No Will the newly configured lots meet all minimum zoning requirements?
No Will the proposed lot line adjustment comply with the Unified Development
Ordinance?
APPLICATION FOR:
LOT LINE ADJUSTMENT
[FOR OFFICE USE]
_______________
(Application #)
____________
(Date received)
__________________________
(Project Title)
Staff Review _______________
CITY OF SARATOGA SPRINGS
PLANNING BOARD
CITY HALL - 474 BROADWAY
SARATOGA SPRINGS, NEW YORK 12866-2296
TEL: 518-587-3550 X2533
www.saratoga-springs.org
**HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED**
Yes No Will the proposed lot line adjustment impede (existing or future) access or utility
service to the lots?
Yes No Will the proposed lot line adjustment impede (existing or future) access or utility
service to the lots?
Part II: Revised Final Plat and Documents Checklist
The revised Final Plat must provide the following in accordance with the following checklist.
•Sheet size:
•Horizontal scale:
•Title Block:
not to exceed 24” x 36”
not to exceed 1”=100’
Include existing subdivision name, identifying title, the words "City of Saratoga
Springs, Saratoga County, New York", submission date, names and
addresses of applicants and/or property owners, engineers, planners, and
surveyors.
Signature Block should read:
“Approved under authority of the Chairman of the Planning Board of the City of Saratoga Springs
per Subdivision Approval, Article 14."
Chairperson___________________________ Date Signed_________________________”
Site location map
Location/type of property corners
Zoning requirements, area and bulk schedule, setbacks
Tax map numbers
Names of all adjacent property owners
Location of all existing/proposed utilities: water, sanitary sewer, storm water
Location of all existing/proposed water and sewer services
Any existing/proposed easements
Any existing/proposed covenants
Existing boundaries/area
Proposed boundaries/area
Seal and signature by licensed land surveyor
Part III: Property Owner(s) Signature
I, the undersigned, have thoroughly read and understand the Application for Lot Line Adjustment and the list
of items to be shown on the Plats and Documents for Final Review and I consent to all the requirements as
set forth in this application. To the best of my knowledge the information provided in this application and on
the attached proposed plat and accompanying documentation is true and accurate.
Property #2:
Printed Name: ___________________________
Signature: ______________________________
Property #1:
Printed Name:_______________________________
Signature: _______________________________
Date: _______________________________ Date:_______________________________
To be completed by City of Saratoga Springs
Approved
Not approved by Chair
Reasons:_______________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
Note: If the requested lot line adjustment is not approved by the Planning Board Chair as an administrative
action, the applicant may seek approval by appearing before the full Planning Board.
____________________________ _____________________________________
Signature – Planning Board Chair Date
OPED Fees Type
Application to Zoning Board of Appeals [1] [2]TOTAL #VARIANCE
Use Variance
Area Variance - Residential
Area Variance - Multi-Family, Comm, Mixed-Use
Interpretations
Post-Work Application Fee
Variance extensions
Application to Design Review Commission [1]TOTAL #STRUCTURE
Demolition
Residential Structures
Principal
Accessory
Extension
Modification
Multi-Family, Comm, Mixed-Use Structures
Sketch
Principal
Extension
Modification
Multi-Family, Comm, Mixed-Use Accessory, Signs, Awnings
Principal
Extension
Modification
Post-Work Application Fee
Application to Planning Board [1]TOTAL #STRUCTURE
Special Use Permit [2]
Special Use Permit - extension
Special Use Permit - modification [2]
Site Plan Review - incl. PUD:
Sketch Plan
Residential
Residential - extension
Residential - modification
Non-residential
Non-Residential - extension
Non-Residential - modification
Subdivision - incl. PUD: TOTAL #LOTS
Sketch Plan
Preliminary Approval [2]
Residential: 1-5 lots
Residential: 6-10 lots
Residential: 11-20 lots
Residential: 21+ lots
Residential - extension
Final Approval [2]
Residential
Non- Residential
Final Approval Modification [2]
Residential
Non- Residential
Final Approval Extension
Residential
Non- Residential
Other:TOTAL #LOT/ACRE
Post-Work Application Fee
Lot L ine Adjustment
Letter of Credit - m odification o r extension
Letter of Credit - c ollection
Recreation Fee
Land Disturbance
SEQRA EIS Review (Draft & Final)
Legal Noticing if PB requires Public Hearing
2021 Fee
$1100 + $50/app
$275/var + $50/app + $125 each add'l variance
$660/var + $50/app + $200 each add'l variance
$550 +$50/app
Add 50% App fee + $50/app
50% of App fee + $50/app
$385
$55
$55
$35
$55
$165
$550
$200
$330
$140
$75
$140
Add 50% App fee
$990 + $50/app
$330
$450 + $50/app
$330
$330 + $200/unit
$200
$400
$660 + $130/1000 sf
$300
$650
$330
$660 + $50/app
$990 + $50/app
$1320 + $50/app
$1650 + 50/app
$330
$1320 + $175/lot + $50/app
$2000/lot + $50/app
$330 + $50/app
$550 + $50/app
$135
$330
Add 50% App fee
$350
$440
up to 1% of LoC
$2000/lot or unit
$660 + $55/acre
TBD
$50/app
[1]Fees are based on per structure, except where noted.
[2]Legal ad required; includes City processing and publishing
__________Total Paid at Intake
__________Revised Fee
__________Balance Due
___/___/___Balance Paid Staff approval _______________
2021 LAND USE BOARD FEE WORKSHEET
For Administrative Use
TOTAL DUE