HomeMy WebLinkAbout20250211 142 Henry St Site Plan Cost EstimateCost Estimate for Letter of Credit (Template) (Note: This is not an all inclusive list. Please adjust for project specifics.) Planning Board No.: Project: 142 Henry Street Location: 142 Henry Street Saratoga Springs, NY Date: 3/14/2025 Firm Name & Preparer: The LA Group, Matt Brobston On Site (All infrastructure & amenities on private property) Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Clearing & Grubbing 1 LS $2,000.00 $2,000.00 0%$2,000.00 2 Rough Grading 1 LS $10,000.00 $10,000.00 0%$10,000.00 3 Construction Entrance 1 EA $800.00 $800.00 0%$800.00 4 Misc. Erosion Control Measures 1 LS $2,500.00 $2,500.00 0%$2,500.00 Hard Scape 5 Asphalt Pavement 2,600 SF $4.25 $11,050.00 0%$11,050.00 6 Concrete Sidewalk 215 SF $5.50 $1,182.50 0%$1,182.50 7 Retaining Wall 175 LF $80.00 $14,000.00 0%$14,000.00 8 Stone Paver 256 SF $15.00 $3,840.00 0%$3,840.00 Site Water 11 4" D.I.P. Water Service 17 LF $75.00 $1,275.00 0%$1,275.00 12 Water Fittings 1 LS $1,200.00 $1,200.00 0%$1,200.00 Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Sanitary 14 6" SDR-26 Sanitary Line & Stone 37 LF $55.00 $2,035.00 0%$2,035.00 Landscaping 17 Topsoil/Seed/Mulch 1 LS $8,000.00 $8,000.00 0%$8,000.00 18 Trees 9 EA $300.00 $2,700.00 0%$2,700.00 19 Shrubs 36 EA $120.00 $4,320.00 0%$4,320.00 Total onsite Work $64,902.50 $64,902.50 Total onsite X.25 $16,225.63 $16,225.63 Off Site (All infrastructure & amenities to be dedicated to the City) Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Road Construction 45 Concrete Curbing 40 LF $40.00 $1,600.00 0%$1,600.00 46 Concrete Sidewalk 435 SF $5.50 $2,392.50 0%$2,392.50 Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Site Sanitary 63 SDR-35 8" Sanitary Main & Stone 78 LF $75.00 $5,850.00 0%$5,850.00 LOC-2025-03-14 64 Manhole Structure 1 EA $2,500.00 $2,500.00 0%$2,500.00 65 Kor N' Seal connection 1 EA $1,500.00 $1,500.00 0%$1,500.00 Misc. 71 As-built Drawing 1 LS $2,500.00 $2,500.00 0%$2,500.00 Total offsite Work $16,342.50 $16,342.50 Total On-Site Work X25%$16,225.63 Total Off-Site work $16,342.50 Total LOC Amount = $32,568.13 * New LOC Reduced Amount = $32,568.13 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $8,142.03 LOC-2025-03-14