Loading...
HomeMy WebLinkAbout20250089 247 Kaydeross Ave East Final Subdivision Cost Estimate Cost Estimate for Letter of Credit (Template) (Note: This is not an all inclusive list.Please adjust for project specifics.) Planning Board No.: 20210806 Project: 274 Kaydeross Subdivision Location: 274 Kaydeross Ave East Saratoga Springs,NY Date: 4/4/2024 Firm Name&Preparer: Studio A Landscape Architecture+Engineering D.P.C. Page 1 of 3 On Site (All infrastructure &amenities on private property) Item# Item/Remarks Quantity Unit Unit Cost Subtotal %Complete Reduced $ Site Preparation and Grading 1 Clearing&Grubbing 3 AC $1,500.00 $3,819.00 0% $3,819.00 2 Rough Grading 3 AC $17,424.00 $44,361.50 0% $44,361.50 3 Silt Fence 943 LF $5.00 $4,715.00 0% $4,715.00 4 Construction Entrance 1 EA $5,000.00 $5,000.00 0% $5,000.00 Hard Scape 11 Asphalt Pavement w/stone subbase 13,609 SF $45.00 $612,405.00 0% $612,405.00 Site Water 24 1.5"HDPE Water Service 1,221 LF $20.00 $24,420.00 0% $24,420.00 Site Sanitary 27 4"Perf.Sanitary Line&Stone 612 LF $75.00 $45,900.00 0% $45,900.00 28 4"Sch.40 PVC Sanitary Line 210 LF $75.00 $15,750.00 0% $15,750.00 29 Septic Tank&D-box 2 EA $2,500.00 $5,000.00 0% $5,000.00 Site Storm 31 12"HDPE Storm Drain&Stone 157 LF $160.00 $25,120.00 0% $25,120.00 Landscaping 39 Topsoil/Seed/Mulch 88449 SF $0.91 $80,488.59 0% $80,488.59 Total onsite Work $866,979.09 $866,979.09 Total onsite X.25 $216,744.77 $216,744.77 LOC.xIs Off Site (All infrastructure & amenities to be dedicated to the City) Item# Item/Remarks Quantity Unit Subtotal %Complete Reduced $ Road Construction 11 Asphalt Pavement w/stone subbase 174 SF $45.00 $7,830.00 0% $7,830.00 Off Site Water 58 1.5' Corp,WSO and 1.5"HDPE Water Servicee t 2 EA $2,450.00 $4,900.00 0% $4,900.00 61 Testing&Disinfection 1 LS $5,000.00 $5,000.00 0% $5,000.00 Landscaping 39 Topsoil/Seed/Mulch 274 SF $0.91 $249.34 0% $249.34 Misc. 71 As-built Drawing 1 LS $4,000.00 $4,000.00 0% $4,000.00 Total offsite Work $21,979.34 $21,979.34 Total On-Site Work X25% $216,744.77 Total Off-Site work $21,979.34 Total LOC Amount= $238,724.11 *New LOC Reduced Amount= $238,724.11 City LOC Approval/Date City LOC Reduction Approval/Date *LOC cannot be reduced to less than 25%of the original LOC amount. Maximum Reduction 75%= $59,681.03 LOCAs