Loading...
HomeMy WebLinkAbout20250182 30 1/2 Caroline St Site Plan Application —HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** [FOR OFFICE 11SE1 CITY OF SARATOGA SPRINGS (Application#) a i PLANNING BOARD CITY HALL-474 BROADWAY (Date received) SARATOGA SPRINGS, NEW YORK 12866-2296 TEL:518-587-3550 X2533 ORPpRA1Eo www.saratoga-springs.org (Project Title) Staff Review APPLICATION FOR: SITE PLAN REVIEW (INCLUDING PUD) **Application Check List-All submissions must include completed application check list and all required items.** Property Address/Location: 30 1/2 Caroline Street Tax Parcel# 165.60-1 -81/85 zoning District: T-6, Urban Core (for example: 165.52-4-37) Project Description: -Ehpnppingionmnsistsaf9garicltnAnirp.nirlentialaparimp.tqtnheactripfitothp 11 n v. sl d^I 8 'fh 9758 f }nowcornmerrin,apara. Date special use permit granted (if any): Date zoning variance granted(if any):07/25/24 Has a previous application been filed with PI3 for this property?: []NO ✓ YES If YES, include Application TYPE Site Plan and DATE: 2/17/23 Is property located within (check all that apply)?: ❑ Historic District ® Architectural Review District ❑ 500' of a State Park, city boundary, or county/state highway APPLICANT(S)* OWNER(S)(If not applicant) ATTORNEY/AGENT Name GM 30 Caroline Street Corp. Same The LA Group, PC Address 356 Arlington Ave, Brooklyn, NY 11208 40 Long Alley, Saratoga Springs Phone (646) 335 - 6126 (518) 587 - 8100 Email louislazz@aol.com dcarr@thelagroup.com Identify primary contact person: ❑ Applicant ❑ Owner N Agent *An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. Revised 8/2022 City of Saratoga Springs-Site Plan Review Application I REQUIRED ITEMS: `4 hard copies (1 w/original signature), 1 digital copy of ALL materials (all maps, drawings, or image documents as separate files to maintain their original scale and image resolution). Application Fee: Make checks payable to the"Commissioner of Finance'. REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT. Check City's website(www.saratoqa-springs.org)for meeting dates. Does any City officer, employee or family member thereof have a financial interest(as defined by General Municipal Law Section 809) in this application? YES_NO If YES, a statement disclosing the name, residence, nature and extent of this interest must be filed wi is application. I, the undersigned owner, leasee or purchaser under contract for the property, hereby request Site Plan Review by the Planning Board for the identified property above. I agree to meet all requirements under Article 13 of the Unified Development Ordinance of the City of Saratoga Springs. Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property associated with this application for purposes of conducting any necessary site inspections relating to this application. 2/24/2025 Applicant Signature: Date: r If applicant is not current owner, owner must also sign. Owner Signature: Date: City of Saratoga Springs-Site Plan Review Application 2 " °C` , CITY OF SARATOGA SPRINGS r PLANNING BOARD CITY HALL-474 BROADWAY SARATOGA SPRINGS, NEW YORK 12866-2296 o- TEL:518-587-3550 X2533 Alto www.saratoga-springs.org SITE PLAN REVIEW SUBMITTAL CHECKLIST Listed below are the minimum submittal requirements for site plan review as set forth in The City of Saratoga Springs' Unified Development Ordinance Article 13.5. The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: '4 hard copies (1 w/original signature), 1 digital copy of ALL materials CHECK EACH ITEM 0 1. Completed Site Plan Application (4 hard copies-`1 w/original signature-and 1 digital)and Fee ® 2. SEQR Environmental Assessment Form-short or long form as required by action. 3. Set of plans(prepared by a NYS licensed Engineer, Landscape Architect, or Architect) including:(3) large scale plans(sheets must be 24"x 36", drawn to a scale of not more than V=50 feet),and(1) 11"x -- . E)ie digital versio i (PDF) of a"subm ttal items printable to scene 0 4. Basic or Full Storm Water Pollution Prevention Plan as required per Article 17. 5. Copy of signed DPW water connection agreement for all projects involving new water connections to the City system ® 6. Engineering Report for Water and Sanitary ® 7. Complete Streets Checklist 0 8. Project Cost Estimate for Letter of Credit(Utilize City Template) REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE: 1. Property line survey prepared by a licensed land surveyor. Site plan must reference such survey with all corners set and marked on plan. Reference NGVD 1929 datum.A copy of the original property survey must also be included. ® 2. North arrow and map scale ® 3. Parcel tax map number ® 4. Site location map(with title block and map key) ✓Q 5. Incorporate the City's standard engineering details City of Saratoga Springs Site Plan Checklist ® 6. Site vicinity map(all features within 300 feet of property) 7. Identification of zoning district with corresponding dimensional standards ® 8. Building setback lines shown on plans. ® 9. Title block with project name; name and address of applicant;and name and address of property owner(if different) ® 10. Project Name ® 11. Name of all adjacent property owners within 300 feet(Include both sides of street) 12.Parcel street address(existing and any proposed postal addresses) Yes No NIA 13. Identification of all existing or proposed easements,covenants or legal rights-of-way on this ® El 0 property Z E] EU 14. References to all prior variances or special use permits ® ® ® 15.Existing and proposed contours and spot grades(at 2 foot intervals)extending to property boundary ® 16. Identification of all spoil, borrow,storage, or staging areas ❑ ® 17. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, buffers floodplains, rock outcroppings,etc. 18.Erosion and sediment control plan—including designated concrete truck washout area 0 ® ® 19.Identification of all existing or proposed sidewalks or pedestrian paths(show type, size and condition) ® E] 0 20.Location, design specifications and construction material for all proposed site improvements (drains, culverts,retaining walls, berms,fences, etc.) ® 21. Location and distance to fire hydrant ® EJ m 22.Identify size,material,elevations and slopes of all existing and proposed utilities with 400'of site 23.Parking lot layout plan and identification of all loading areas(number all spaces) ® ® � 24.Calculation of required spaces for vehicle and bicycle parking by proposed use(s) ® 25. Identification of parking spaces and access points for physically impaired persons 0 E3 0 26.Location and screening plan for dumpster or recycling bins 0 Ei o 27. Location, design,type of construction and materials, proposed use and exterior dimensions of all buildings(existing and proposed)on site including finish floor elevations to nearest tenth foot. ® 28. Identification of storage of any potentially hazardous materials ® 0 29.Planting plan identifying quantity, species and size of all proposed new plant materials. Label existing plant material to be retained or removed. Identify any existing signficant trees. ® 30.Lighting plan showing type, location and intensity of all existing and proposed exterior lighting fixtures Checklist prepared by:The LA Group, PC Date 2/24/2025 City of Saratoga Springs Site Plan Checklist 2 City of Saratoga Springs OFFICE OF PLANNING AND ECONOMIC DEVELOPMENT FEES-2023 licelion la Cil Council FEE Comprehensive Plan amendment $1,800+$300/acre Zoning Ordinance amendment $800+$300/acre Planned Unit Development PUD amendment $800+$300/8cre Application to Zoning Board of Appeals Use Variance $1,400+$50/app Area Valiance-Residential $35011 at var+$50/app+$150/ea add variance Area Variance-Non-residential $1000/1 at van+$50/app+$200/ea add variance Interpretations $650+$50/app Port Work Application Fee Application Fee x 2+$50/app Variance extensions 50%ofApplication fee+$50/a Application to Desi n Review Commission Demolition $500 Residential Structures Principal $70 Accessory $70 Extension $35 Modification $55 Multi-Family,Comm,Mixed-Use Structures Sketch $200 Principal $850 Extension $250 Modification $400 Multi-Family,Comm,Mixed-Use Accessory,Signs.Awnings Pnncpal $150 Extension $100 Motlifiwtion $150 Post Work Application Fee Application Fee x 2 Application to Planning Board Special Use Permit $1200+$50/app Temporary Use Permit $500 Special Use Persil-extension S400 Special Use Permit-modification $501app Site Plan Review-incl.PUD: Sketch Plan $400 per sketch Site Plan Full Residential $400+$250/u st Non-residential $8W+$150/1000 at Administrative SPR Residential $400 Non-residential $800 Extension Residential $250 Non-residential $350 Subdivision-incl.PUD: Sketch Plan WO per sketch Preliminary Approval Residential 1-5 lots $700+$50/app Residential:6-10 lots $1100+$50/app Residential:11-201ots $1450+$50/app Residential:2l+lots $1800+$50/app Residential-extension $350 Final Approval Residential $1.550+$200/lot+$50/app Non-Residential $2,40011o1+$50/app Final Approval Modification Residential $400+$50/app Non-Residential $800+$50/app Final Approval Extension Residential $250 Non-Residential S350 Other: Lot Line Adjustment/Subdivision Administrative Achim$400 Letter of Credit-modification or extension $400 Lefler of Credit-collection up to 1%of LOC Recreation Fee $2000401 or unit Land Disturbance $750+$35/acre Watercourse'Welland Permit $750 SEORA EIS Review Draft&Final TBD OPED Fees 5 Page 1 of 1