Loading...
HomeMy WebLinkAbout20190907 Citizens Bank Application **HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** [FOR OFFICE USE] CITY OF SARATOGA SPRINGS r Planning Board (Application#) , v i' CITY HALL-474 BROADWAY ` . = .`' '' SARATOGA SPRINGS, NEW YORK 12866-2296 TEL: 518-587-3550. FAX: 518-580-9480 (Date received) HTTP://WWW.SARATOGA-SPRI NGS.ORG APPLICATION FOR: SITE PLAN REVIEW (INCLUDING PUD) **Application Check List-All submissions must include completed application check list and all required items.** Project CitizensN m : Bank Saratoga Springs a e Property Address/Location: 1 Ballston Avenue 165.75-1-18 T-5, Corridor Lodging OverlayT x Parcel #: Zoning District: (for example: 165.52-4-37) Project Description: Proposed new location for a Citizens Bank retail branch.Project will include interior fit out adjustments,exterior redesign,and site plan adjustments for parking requirements and ADA accessibility. Date special use permit granted (if an : 2000 - But does not applyDate variance (if p y) zoning granted any): Is property located within (check all that apply)?: 0 Historic District 8 Architectural Review District 0 500' of a State Park, city boundary, or county/state highway APPLICANT(S)* OWNER(S) (If not applicant) ATTORNEY/AGENT N m Bruce Bisbano + Matt Silva Tara Strong a e 188 Valley Street,Suite 100,Providence,RI 02909 15 Summerfield Lane,Saratoga Springs,NY 12866 Address Phone 401-404-8310 518-281-6392 Email bruce©bisbano.com, msilva@bisbano.com stonerealestategroup@gmail.com Identify primary contact person: 8 Applicant 0 Owner 0 Agent * An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. City of Saratoga Springs-Site Plan Review Application 1 Application Fee: A check for the total amount below payable to: "Commissioner of Finance" MUST accompany this application. ❑ Sketch Plan - $300 $ ❑ Final Site Plan Approval Residential - $300 plus $180/unit $ Non-Residential - $600 plus $120/1,000 SQ. FT. $ ❑ Modification Residential - $300 $ Non-Residential - $600 $ 600 Total $ 600 Submission Deadline — Check City's website (www.saratoga-springs.org) for meeting dates. Does any City officer, employee or family member thereof have a financial interest (as defined by General Municipal Law Section 809) in this application? YES NO . If YES, a statement disclosing the name, residence, nature and extent of this interest must be filed with this application. I, the undersigned owner, leasee or purchaser under contract for the property, hereby request Site Plan Review by the Planning Board for the identified property above. I agree to meet all requirements under Section 240-7.2 of the Zoning Ordinance of the City of Saratoga Springs. Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property associated with this application for purposo-s of co ou ting any necessary site inspections relating to this application. 11'709/09/2019 �- Applicant Signature: `, � Date..r y If applicant is not current owne,, owner must also sign. Owner Signature: Date: City of Saratoga Springs-Site Plan Review Application 2 [FOR OFFICE USE1 CITY OF SARATOGA SPRINGS A lication# 4t, + ( pp ) Planning Board ' ., -11 . (Date received) CITY HALL-474 BROADWAY SARATOGA SPRINGS, NEW YORK 12866-2296 .2 1,c \ TEL: 518-587-3550. FAX: 518-580-9480 HTTP://WWW.SARATOGA-SPRINGS.ORG SITE PLAN REVIEW SUBMITTAL CHECKLIST Rev.05/2016 Project Name: Citizens Bank Saratoga Springs Listed below are the minimum submittal requirements for site plan review as set forth in The City of Saratoga Springs' Zoning Ordinance Appendix B. The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: *3 hard copies and 1 digital copy of ALL materials are required. CHECK EACH ITEM **HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** r•gl 1. Completed Site Plan Application (3 hard copies - *1 w/original signature - and 1 digital) and Fee [2] 2. SEQR Environmental Assessment Form- short or long form as required by action. 3. Set of plans including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not more than 1"=50 feet). One digital version of all submittal items (pdf) shall be provided. No c1Enge 4. Basic or Full Storm Water Pollution Prevention Plan as required per City Code Chapter 242. 5. Copy of signed DPW water connection agreement for all projects involving new water No ()flange connections to the City system No c1Enge 6. Engineering Report for Water and Sanitary ❑ 7. Complete Streets Checklist TED 8. Project Cost Estimate-Quantities of work items and estimate of costs REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE: I. Property line survey prepared by a licensed land surveyor. Site plan must reference such survey with all corners set and marked on plan. A copy of the original property survey must also be included. 2. North arrow and map scale 3. Parcel tax map number 4. Site location map City of Saratoga Springs Site Plan Checklist 1 II 5. Site vicinity map (all features within 300 feet of property) id 6. Identification of zoning district with corresponding area requirements il 7. Building setback lines, either listed or shown on plans. li 8. Title block with project name; name and address of applicant; and name and address of property owner (if different) U 9. Topography data tied to NGVD 1929 datum li 10. Name of all adjacent property owners 11 11. Parcel street address (existing and any proposed postal addresses) Yes No N/A 12. Identification of all existing or proposed easements, covenants or legal rights-of-way on this O 0 El property O 0 0 13. References to all prior variances or special use permits No longer applies. O 0 0 14. Existing and proposed contours and spot grades (at 2 foot intervals) 600 n n 15. Identification of all spoil or borrow areas (For#14 - Spot grades only.) O 0 El 16. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, floodplains, rock outcroppings, etc. El 0 0 17. Location of proposed storage(Trash/Dumpster) El 0 0 18. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition of existing sidewalks) El 0 0 19. Location, design specifications and construction material for all proposed site improvements (drains, culverts, retaining walls, berms, fences, etc.) El 0 0 20. Location and distance to fire hydrant El 0 0 21. Location, size, and material of all existing and proposed utility services El 0 0 22. Parking lot layout plan and identification of all loading areas (number all spaces) El 0 0 23. Parking demand calculations El 0 0 24. Identification of parking spaces and access points for physically impaired persons El 0 0 25. Location and screening plan for dumpster or recycling bins El 0 0 26. Location, design, type of construction and materials, proposed use and exterior dimensions of all buildings (existing and proposed) on site O 0 El 27. Identification of storage of any potentially hazardous materials El 0 0 28. Planting plan identifying quantity, species and size of all proposed new plant materials. Label existing plant material to be retained or removed. El El 0 29. Lighting plan showing type, location and intensity of all existing and proposed exterior lighting fixtures O El 0 30. Erosion and sediment control plan — including designated concrete truck washout area Checklist prepared by: Matt Silva Date: 09/09/2019 City of Saratoga Springs Site Plan Checklist 2