HomeMy WebLinkAbout20241018 NYS Route 29 Prime Station Lane Site Plan Application**HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** fFOROFFICEUSEt
CITY OF SARATOGA SPRINGS
PLANNING BOARD
CITY HALL - 474 BROADWAY
SARATOGA SPRINGS, NEW YORK 12866-2296
TEL: 518-587-3550 X2533
www. saratoga-springs. org
APPLICATION FOR:
SITE PLAN REVIEW
(INCLUDING PUD)
(Application #)
(Date received)
(Project Title)
Staff Review
**Application Check List -All submissions must include completed application check list and all required items.**
Property NYS Route 29
Address/Location:
Tax Parcel #: 165-2-70, 165-2-18, 165-2-19
(for example: 165.52-4-37)
Project Description:
zoning District:Neighborhood Center (NC)
�7-�la • • u - ••iinli7�11fi6E1ii11Plllil{i7i]IfIG •fl'Ti'l1�►ItiiiG�C � • • - • • - • • • • u u . • - � . � - • • � • . • • � . • . • • • - u . u • •
Date special use permit granted (if any): Date zoning variance granted (if any):
Has a previous application been filed with PB for this property?: �NO ❑IYES
If YES, include Application TYPE
Is property located within (check all that apply)?
APPLICANT(S)*
and DATE:
❑ Historic District ❑Architectural Review District
❑ 500' of a State Park, city boundary, or county/state
highway
OWNERS) (If not applicant)
Name Todd Curley-ar�►xt S�'n�o►1Lq►�,U.c_
Address 621 Columbia Street, Cohoes NY 12047
Phone 518-785-9000
Email TCurley@CBCprime.net
ATTORNEY/AGENT
James Easton
621 Columbia Street, Cohoes NY 12047
518-785-9000 ext 165
jeaston@theprimecompanies.com
Identify primary contact person: ❑Applicant ❑Owner 8 Agent
* An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in
question.
Revised 8/2022
City of Saratoga Springs- Site Plan Review Application
REQUIRED ITEMS: *4 hard copies (1 w/original signature), 1 digital copy of ALL materials (all maps,
drawings, or image documents as separate files to maintain their original scale and image resolution).
Application Fee: Make checks payable to the "Commissioner of Finance".
REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT.
Check City's website (www.saratoga-springs.orq) for meeting dates.
Does any City officer, employee or family member thereof have a financial interest (as defined by General
Municipal Law Section 809) in this application? YES NO x If YES, a statement disclosing the
name, residence, nature and extent of this interest must be filed with this application.
I, the undersigned owner, leasee or purchaser under contract for the property, hereby request Site
Plan Review by the Planning Board for the identified property above. I agree to meet all requirements
under Article 13 of the Unified Development Ordinance of the City of Saratoga Springs.
Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property
associated with this application for purposes of conducting any necessary site inspections relating to this
application.
Applicant Signature:
� ��'YI,z.., f.�: Date:
If applicant is not current owner, owner must also sign.
Owner Signature:
Date:
07/12/24
City of Saratoga Springs- Site Plan Review Application 2
CITY OF SARATOGA SPRINGS
PLANNING BOARD
CITY HALL - 474 BROADWAY
SARATOGA SPRINGS, NEW YORK 12866-2296
TEL: 518-587-3550 X2533
www.saratoga-springs.org
SITE PLAN REVIEW SUBMITTAL CHECKLIST
Listed below are the minimum submittal requirements for site plan review as set forth in The City of
Saratoga Springs' Unified Development Ordinance Article 13.5. The Planning Board reserves the
right to request additional information, as necessary, to support an application. The Board also
reserves the right to reject the application if these minimum requirements are not met. Please
complete the checklist below and provide with your submission.
REQUIRED ITEMS: *4 hard copies (1 w/original signature), 1 digital copy of ALL materials
CHECK EACH ITEM
1.
Completed Site Plan Application (4 hard copies - *1 w/original signature - and 1 digital) and Fee
®
2.
SEQR Environmental Assessment Form- short or long form as required by action.
3. Set of plans (prepared by a NYS licensed Engineer, Landscape Architect, or Architect) including: (3)
large scale plans (sheets must be 24" x 36", drawn to a scale of not more than 1"=50 feet), and (1) 11" x
items
17
4.
copy, One digital versio, Submittal JL�"[� sea e
Basic or Full Storm Water Pollution Prevention Plan as required per Article 17,
5.
Copy of signed DPW water connection agreement for all projects involving new water
connections to the City system
6.
Engineering Report for Water and Sanitary
7.
Complete Streets Checklist
171
8.
Project Cost Estimate for Letter of Credit (Utilize City Template)
REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE:171
1.
Property line survey prepared by a licensed land surveyor. Site plan must reference such
survey with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the
original property survey must also be included.
2.
North arrow and map scale
3.
Parcel tax map number
4.
Site location map (with title block and map key)
❑✓
5.
Incorporate the City's standard engineering details
City of Saratoga Springs Site Plan Checklist
W]
6.
Site vicinity map (all features within 300 feet of property)
W1
7.
Identification of zoning district with corresponding dimensional standards
91
8.
Building setback lines shown on plans.
9.
Title block with project name; name and address of applicant; and name and address of
property owner (if different)
10.
Project Name
11.
Name of all adjacent property owners within 300 feet (Include both sides of street)
12.
Parcel street address (existing and any proposed postal addresses)
Yes
m
No N/A
F1 FH
13.
Identification of all existing or proposed easements, covenants or legal rights -of -way on this
property
F1 ®
14.
References to all prior variances or special use permits
®
15.
Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary
®
® [2
16.
Identification of all spoil, borrow, storage, or staging areas
m
17.
Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, buffers
floodplains, rock outcroppings, etc.
m
F1 F
18.
Erosion and sediment control plan — including designated concrete truck washout area
®
19. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and
condition)
®
20.
Location, design specifications and construction material for all proposed site improvements
(drains, culverts, retaining walls, berms, fences, etc.)
®
F] F1
21.
Location and distance to fire hydrant
m
EJ 7
22.
Identify size, material, elevations and slopes of all existing and proposed utilities with 400' of site
®
Fn M
23.
Parking lot layout plan and identification of all loading areas (number all spaces)
®
® [2
24.
Calculation of required spaces for vehicle and bicycle parking by proposed use(s)
m
® 7
25.
Identification of parking spaces and access points for physically impaired persons
m
26.
Location and screening plan for dumpster or recycling bins
El
F127.
FH
all
Location, design, type of construction and materials, proposed use and exterior dimensions of
buildings (existing and proposed) on site including finish floor elevations to nearest tenth foot.
0
28.
Identification of storage of any potentially hazardous materials
F FT
29.
Planting plan identifying quantity, species and size of all proposed new plant materials.
Label existing plant material to be retained or removed. Identify any existing signficant trees.
ri
30.
Lighting plan showing type, location and intensity of all existing and proposed exterior
lighting fixtures
Checklist prepared by:
James Easton
Date: 7/12/24
City of Saratoga Springs Site Plan Checklist 2,
City of Saratoga Springs
OFFICE OF PLANNING AND ECONOMIC DEVELOPMENT FEES - 2023
Comprehensive Plan amendment $1,800 + $300/acre
Zoning Ordinance amendment $800 + $300/acre
Planned Unit Develooment (PUD) amendment $800 + $300/acre
Area Variance -Residential
Area Variance - Non-residential
Interpretations
Post Work Application Fee
Variance extensions
$1,400 + $50/app
$350/1 st var +$50/app +$150/ea add variance
$1000/1st var + $50/app+ $200/ ea add variance
$650 + $50/app
Application Fee x 2 + $50/app
50% of Application fee + $50/app
A lication to Desi n Review Commission
Demolition
$500
Residential Structures
Principal
$70
Accessory
$70
Extension
$35
Modification
$55
Multi -Family, Comm, Mixed -Use Structures
Sketch
$200
Principal
$650
Extension
$250
Modification
$400
Multi -Family, Comm, Mixed -Use Accessory, Signs,
Awnings
Principal
$150
Extension
$100
Modification
$150
Post Work Application Fee
Application Fee x 2
Application to Planning
Board
Special Use Permit
$1,250
$1200 + $50/app
Temporary Use Permit
$500
Special Use Permit - extension
$400
Special Use Permit - modification
$550 + $50/app
Site Plan Review -incl. PUD:
Sketch Plan
$400 per sketch
—► Site Plan Full
Residential
$97,900
$400 + $250/unit 344 multi -family units and 4
townhouses
=390 units
nd Maintenance Bldg. (2000 sf)
OPED Fees
Page 1 of 1