HomeMy WebLinkAbout20240975 3-11 Maple Dell Stewart's Subdivision Application*HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED"
' CITY OF SARATOGA SPRINGS
V PLANNING BOARD
CITY HALL -474 BROADWAY
SARATOGA SPRINGS, NEW YORK 12856-2296
c�RPORA10 TEL: 518-587-3550 X2533
www. saimatoga-springs. org
APPLICATION FOR:
Il PRELIMINARY R FINAL SUBDIVISION
Property Address/Location: 3-11 Maple dell
Tax Parcel
(for example: 165.52-4-37)
Total Acres: 1.23
APPLICANT(S)'
Name Stewart's Shops Corp.
Address P.O. Box 435 Saratoga Springs, NY 12866
Phone
518-581-1201 x 4260
Email rrubado@stewartsshops.com
[FOR OFFICE USO
(Application #)
(Date received)
(Project Title)
Check If PH Required
Staff Review
Zoning District:
�RR/SR - Conservation Design Required
Land to be Subdivided Into:2 Lots
OWNER($) (If nOt appllcant)
ATTORNEYIAGENT
Libby Clark, Esq.
63 Putnam St - Suite 2, Saratoga Springs, NY 12866
(518) 682-6901
libby@libbyclarklaw.com
Identify primary contact person: o
Applicant ❑Owner
❑Agent
An applicant must be the property
owner, lessee, or one with
an option to
lease or purchase the
property in question.
Has a previous application been filed with PB for this property? NO Q
If YES, include Application TYPE and DATE:
YES
Does any City officer, Does any
City officer,
employee or
family member thereof
have a financial interest (as defined by
General Municipal Law Section
809) in this
application?
YES x NO
If YES, a statement disclosing the name,
residence, nature and extent of
this interest
must be filed
with this application.
I, the undersigned owner or purchaser under contract for the property, hereby request Subdivision consideration by the
Planning Board for the identified property above. I agree to meet all requirements under the Unified Development
Ordinance for the City of Saratoga Springs,
property
Furthermore, I hereby authorize me bets of the Planning Board and designated City staff to enter the
associated with this applicatiq�-�urposes of conducting any necessary site inspections relating to this application.
i / �� 2� Applicant Signature: �/, _ Date:
If applicant is not current owner, owner must also sign.
Owner Signature:
Date:
Application
Fee:
Make checks payable to the "Commissioner of
Finance".
REFER TO
THE
CURRENT FEE WORKSHEET INCLUDED IN
THIS DOCUMENT.
ReYised 8/2022
Check City's website (www.saratoga-springs.org) for meeting dates.
jO ' Sti CITY OF SARATOGA SPRINGS
PLANNING BOARD
64.
CITY HALL - 474 BROADWAY
(t f SARATOGA SPRINGS, NEW YORK 12866-2296
TEL: 518-587-3550 X2533
LOerno,.Cn \9� www.saratoga-springs.org
Checklist Prepared By:
PRELIMINARY/ FINAL SUBDIVISION APPROVAL
REQUIRED SUBMITTAL CHECKLIST
Date:
Listed below are the minimum submittal requirements as set forth in The City of Saratoga Springs'
Subdivision Approval (Article 14). The Planning Board reserves the right to request additional information, as
necessary, to support an application. The Board also reserves the right to reject the application if these
minimum requirements are not met. Please complete the checklist below and provide with your submission,
REQUIRED ITEMS: k4 hand copies {9 w/orlc�inal signature), 1 digital ropy of ALL materials {all maps, drawings, or
CHECK EACH ITEM
Image documents as separate tiles) an rue are require .
I.
Completed Subdivision Application ElIa. Conservation Design (Article 16) if required
2,
SEQR Environmental Assessment Form- short or long form as required by action.
❑
3.
Set of plans including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not more
than 1"=50 feet) and (1) 1 1"x 17" copy, One digital version (PDF) of all submittal items printable
❑
4.
o scale
Basic or Full Storm Water Pollution Prevention Plan as required per Article 17 of the LIDO.
❑
5. Copy of signed DPW water connection agreement for all projects involving new water
connections to the City system
6.
Engineering Report for Water and Sanitary
7.
Complete Streets Checklist
8.
Project Cost Estimate for Letter of Credit (utilize City template)
REQUIRED ITEMS ON SUBDMSION PLAT, AS APPLICABLE:
I. Name of Subdivision
❑ 2. Property line survey prepared by a licensed land surveyor. Subdivision plat must reference such survey
with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the original
property survey must also be included.
El3. North arrow and map scale
City of Saratoga Springs Subdivision Checklist
4.
Location of proposed home on each lot including finish floor elevation to nearest tenth foot.
5.
Parcel tax map number
6.
Site location map (with title block and map key)
7.
Site vicinity map (all features within 300 feet of property)
8.
Identification of current zoning district with corresponding dimensional standards
9.
Building setback lines shown on plans
❑
10.
Title block with subdivision name; name and address of applicant; and name and address of property
owner (if different)
11.
Name, address and phone number of subdivision surveyor and/or engineer
12,
Names of all adjacent property owners within 300 feet (include both sides of street)
❑
13.
Identification of size, material, elevations, and slopes of all existing and proposed utilities within 400 ft
of site.
14.
Parcel street address (existing and any proposed postal addresses)
15.
Incorporate the City's standard engineering details.
Yes No N/A
16.
Identification of existing or proposed easements, covenants or legal rights -of -way on this property
❑
17.
References to all prior variances or special use permits
18.
Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary
El ❑ ❑
19.
Identification of all watercourses, designated State wetlands, Federal wetlands, buffers, floodplains,
rock outcroppings, etc.
❑ ❑ El
Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and
condition)
condition)
❑
❑ ❑
21.
Location, design specifications and construction material for all proposed site improvements (drains,
culverts, retaining walls, berms, fences, etc.)
22.
Location and distance to fire hydrant
23.
Erosion and sediment control plan — including designated concrete truck washout area
24.
Approximate location, dimensions and areas for proposed lots and proposed public recreational land
0
25.
Proposal for utility systems and lateral connections
11
❑
0
26.
Location and width of proposed streets
Clty o(Saratoga Springs Subdivision Checklist
City of Saratoga Springs
OFFICE OF PLANNING AND ECONOMIC DEVELOPMENT FEES - 2023
Zoning Ordinance amendment $800 + $300/acre
lication to Zonin Board ofA eats
Use Variance $1,400 + $50/app
Area Variance- Residential $350/1st var+$50/app+$150/ea add variance
Area Variance - Non-residential $1000/1 sl var + $50/app+ $200/ ea add variance
Interpretations $650+$50/app
Post Work Application Fee Application Fee x 2 + $50/app
Variance exlenslons 60% of Application fee + $50/app
A licafion to Desl n Review Commission
Demolition
$500
Residential Structures
Principal
$70
Accessory
$70
Extension
$35
Modification
$56
Multi -Family, Comm, Mixed -Use Structures
Sketch
$200
Principal
$650
Extension
$250
Modification
$400
Multi -Family, Comm, Mixed -Use Accessory, Signs, Awnings
Principal
$150
Extension
$100
Modification
$150
Post Work Application Fee
Application Fee x 2
Appication to P1 nninq Board
Special Use Permit
$1200 + $50/app
Temporary Use Permit
$500
Special Use Permit - extension
$400
Special Use Permit - mod cation
$50/app
Site Plan Review -incl. PUD:
Sketch Plan
$400 per sketch
Site Plan Full
Residential
$400 + $250/unit
Non-residential
$B00 + $150/1000 sf
Administrative SPR
Residential
$400
Non-residential
$800
Extension
Residential
$250
Non-residential
$350
Subdivision - Ind. PUD:
Sketch Plan
$400 per sketch
Preliminary Approval
Residential: 1-5 lots
$700 + $50/app
Residential: 6-10 lots
$1100+$50/app
Residential: 11-20 lots
$1450 + $50/app
Residential: 21+lots
$1800 + $50/app
Residential - extension
$350
Final Approval
Residential
$1,650 + $200/1ot + $50/app
Non- Residential
$2,4004ol+$50/app
Final Approval Modification
Residential
$400 + $50/app
Non- Residential
$800 + $50/app
Final Approval Extension
Residential
$250
Non- Residential
$350
Other:
Lot Line Adjustment/Subd!vision Administrative Action $400
Letter of Credit- modification or extension
$400
Letter of Credit - collection
up to 1 % of LoC
Recreation Fee
$20004ol or unit
Land Disturbance
$750 + $35/acre
Watercowse/Wetland Permit
$750
SEQRA EIS Review Draft&Final
TBD
OPED Fees
Page 1 of 1