Loading...
HomeMy WebLinkAbout20240975 3-11 Maple Dell Stewart's Subdivision PlansSITE LOCATION MAP 50AL.E: N.T.5. LEGEND PROPERTY LINE -- FIRE HYDRANT WATER VALVE 6A5 VALVE SEWER MANHOLE O SEWER GLEANOUT O❑ GURB INLET kid CATCH BA51N ❑ O GUY WIRE UTILITY POLE 516NPOST ELEGTRIGAL BOX POLE LIGHT �■ WELL BOLLARD • IRRIGATION 5LEEVE �IR� OVERHEAD UTILITIES U/6 WATER LINE U/6 5EHER LINE STORM PIPE, PROP05ED, HDPE STORM PIPE, EXISTING 5TOGKADE FENCE GHAINLINK FENCE 5PLITRAIL FENCE U/G ELEGTRIGAL/TELE 5ERVIGE SUE r U/6 ELECTRICAL CONDUIT U U/6 6A5 LINE 6 U/G GAMERAL CONDUIT, 51N67LE GAM - U/G GAMERAL CONDUIT WITH OTY CAM-2X DIE5EL PRODUGT LINE -DSL- SUPER PRODUGT LINE SUP� UNLEADED PRODUCT LINE �UNL� EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR -/00 PROP05ED MAJOR CONTOUR PROP05ED MINOR CONTOUR PROP05ED SPOT ELEVATION I00.00 EXI5TIN6 UNGHANC7ED SPOT ELEVATION 100.00 NOTES I. SOME FEATURE5 IN LE6END MAY NOT HAVE BEEN USED. 2. DARKER LINES INDICATE NEH WORK. 3. DOTTED LINES INDICATE REMOVED ITEMS. PROPOSED LOT: SD-2 1 \ 1 \ 1 °4031" — — PROPOSED LOT: SD-1 N"'llr'sll Rou '50 PERMANENT NATIONAL GRID OVERHEAD TRAN5M15510N E145EMENF A5 PER 5ARATO6A ICE COMPANY TO N1A6ARA MOHAWK POWER CORP. - 11/O6/1967, L.,320 Rl6 I 1 586°30'00"L 143.41' ° 1 I OF NEW I IN r Lu c� w rn �J'1 ExCELSta` FO p 091096 ��FESSIONP�- ALTERATION5 TO THI5 DOCUMENT BY OTHER THAN AN AUTHORIZED LIGEN5ED PROFESSIONAL ENGINEER 15 ILLE6AL AND A VIOLATION OF THE NEH YORK 5TATE EDUGATION LAW W- G I TY OF SARATOGA SPRINGS (UDO) 0 E 5ARATOGA COUNTY PARCEL #: 166.05-2-40 ZONE: 0G-U (GATEWAY URBAN GOMMERG I AL) EXI5TING PROPOSED REQUIRED LOT AREA TOTAL: 51,1gq 5F (I.Iq AG) SUBDIVIDE 10,000 5F MIN. LOT AREA, 50-1 22,120 5F (0.51 AG) 10,000 5F MIN. LOT AREA, 50-2 2g,61g 5F (Ob8 AG) 10,000 5F MIN. PROPERTY DATA, 5D-I: U5E MEDICAL OFFICE GAR HASH BUILDING GOVERA&E 6% 1% 45% MAX. IMPERVIOUS AREA 40% 3q% 85% MAX. BUILDING SETBACK, FRONT (N) Iq FT 14 FT 25 FT-40 FT BUILDING 5ETBAGK, INTERIOR 510E (W) 101 FT 82 FT 15 FT BUILDING 5ET13AGK, CORNER 51DE (E) 54 FT 80 FT 25 FT BUILDING 5ETBAGK, REAR (5) 28 FT 30 FT 25 FT PARKING 5PAGE5 PROPERTY DATA, 50-2: U5E RETAIL MEDICAL OFFICE BUILDIN6 GOVERAOE 21% 21% 45% MAX. IMPERVIOU5 AREA 14% 14% 85% MAX. BUILDING 5ETBAGK, FRONT (N) 40 FT 40 FT 25 FT-40 FT BUILDIN6 5ETBAGK, 51DE (NH) 40 FT 40 FT 15 FT MIN. BUILDING 5ETBAGK, REAR (5) 45 FT 45 FT 25 FT MIN. PARKING 5PAGE5 8 8 I6 5PAGE5 I. PARKING: GAR WA9N - I PER GAR WASH BAY + 4 STACKING 5PAGE5 PER BAY hEPKa1L OFFICE - I PER 300sf 6FA 2. WALL sI" EXISTING PROPOSED SITE U5AGE DATA (50-1) 51TE U5AGE DATA (50-1) 67REEN5PAGE 13,218 5F (60%) 6REEN5PAGE 13,5g1 5F (61%) BUILDING 1,314 5F ((9%) BUILDIN6 1,485 5F (l%) CONCRETE 615 5F (3%) CONCRETE 811 5F (4%) PAVEMENT/GRAVEL b,g15 5F (31%) PAVEMENT/&RAVEL 6,161 5F (28%) EXISTING PROPOSED 51TE U5AGE DATA (50-2) 51TE U5AGE DATA (50-2) 67REEN5PAGE 1,(OS 5F (34%) 6REEN5PAGE 1,608 5F (26%) BUILDIN6 4,142 5F (I6%) BUILDING 4,142 5F (16%) CONCRETE 081 5F (6%) CONCRETE 1,130 5F (4%) PAVEMENT/GRAVEL 15,442 5F (52%) PAVEMENT/GRAVEL 16,221 5F (54%) 5TORE NAME, ABBREVIATION b NO. MAPLE DELL GAR NASH 517E LOCATION MAPLE DELL, SARAT06A SPRINGS, NY 12866 DATE NO. REVISION5 DRAWN BY: RR 5GALE: I " = 20' DATE: 5/22/24 DRAWING NO. S-2 TITLE: PROPOSED SITE PLAN