Loading...
HomeMy WebLinkAbout20240590 400 Louden Site Plan Unitarian Universalist Congregation Updated Cost Estimate 2024 11 08Cost Estimate for Letter of Credit Planning Board No.: 2023-0593 Project: New Church - Unitarian Universalist Congregation of Saratoga Springs Location: 400 Louden Road Town of Wilton and Saratoga Springs, NY Date: Firm Name & Preparer: Studio A, Landscape Architecture and Engineering, D.P.C.Page 1 of 3 Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Clearing & Grubbing 1.85 AC $1,500.00 $2,775.00 0%$2,775.00 2 Rough Grading 1.85 CY $17,424.00 $32,234.40 0%$32,234.40 3 Silt Fence 350 LF $5.00 $1,750.00 0%$1,750.00 4 Construction Entrance 1 EA $5,000.00 $5,000.00 100%$0.00 5 Buffer Protection 0 EA $0.00 $0.00 0%$0.00 6 Misc. Erosion Control Measures 1 EA $5,000.00 $5,000.00 0%$5,000.00 Demolition 7 Building Removal 0 EA $0.00 $0.00 0%$0.00 8 Asphalt Removal 0 SF $0.00 $0.00 0%$0.00 9 Concrete Removal 0 SF $0.00 $0.00 0%$0.00 Hard Scape 10 Stone Subbase 0 SY $30.00 $0.00 0%$0.00 11 Asphalt Pavement* inc. subbase 2424 SY $55.00 $133,301.67 0%$133,301.67 12 CIP Curbing 170 LF $30.00 $5,100.00 0%$5,100.00 13 Concrete Sidewalk 4325 SF $12.00 $51,900.00 0%$51,900.00 14 Retaining Wall 0 LF $0.00 $0.00 0%$0.00 Site Amenities 15 Traffic Signs 2 EA $1,500.00 $3,000.00 0%$3,000.00 16 Striping 720 LF $0.50 $360.00 0%$360.00 17 Crosswalk 0 LS $0.00 $0.00 0%$0.00 18 Bench 0 EA $0.00 $0.00 0%$0.00 19 Bike Rack 0 EA $0.00 $0.00 0%$0.00 20 Site Lighting 11 EA $2,000.00 $22,000.00 0%$22,000.00 -Entry Sign 1 LS $5,000.00 $5,000.00 0%$5,000.00 -Electrical Service 360 LF 40 $14,400.00 0%$14,400.00 Site Water -Well 1 LS $10,000.00 $10,000.00 0%$10,000.00 23 3/4" Type K Copper Water Service 100 LF $20.00 $2,000.00 0%$2,000.00 24 1" Type K Copper Water Service 0 EA $0.00 $0.00 0%$0.00 25 Water Fittings 0 LS $0.00 $0.00 0%$0.00 26 Fire Hydrant Assembly 0 EA $0.00 $0.00 0%$0.00 On Site (All infrastructure & amenities on private property) 11/7/2024 Cost Estimate for Letter of Credit Page 2 of 3 Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Sanitary -1.5" DR II HDPE 400 LF $75.00 $30,000.00 0%$30,000.00 -E-ONE Grinder Pump 1 EA $5,000.00 $5,000.00 0%$5,000.00 -Directional Drill 150 LF $150.00 $22,500.00 0%$22,500.00 Site Storm 30 6" HDPE Storm Drain & Stone 0 LF $0.00 $0.00 0%$0.00 31 12" HDPE Storm Drain & Stone 326 LF $76.03 $24,785.78 0%$24,785.78 32 Catch Basin 5 EA $1,250.00 $6,250.00 0%$6,250.00 33 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 34 Yard Drains 0 EA $0.00 $0.00 0%$0.00 Stormwater Management 35 Bioretention Area 1 LS $45,000.00 $45,000.00 0%$45,000.00 36 UG Infiltration Chambers 0 EA $0.00 $0.00 0%$0.00 37 Hydrodynamic Separator 0 EA $0.00 $0.00 0%$0.00 38 Wet Pond 0 EA $0.00 $0.00 0%$0.00 Landscaping 39 Topsoil/Seed/Mulch 17000 SF $0.75 $12,750.00 0%$12,750.00 40 Deciduous Trees 43 EA $750.00 $32,250.00 0%$32,250.00 41 Shrubs 275 EA $35.00 $9,625.00 0%$9,625.00 -Fine Grading 0.75 AC 17424 $13,068.00 0%$13,068.00 Total onsite Work $495,049.85 $490,049.85 Total onsite X.25 $123,762.46 $122,512.46 Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Road Construction 42 Stonel Subbase 0 CY $0.00 $0.00 0%$0.00 43 Asphalt Pavement (Binder)0 SF $0.00 $0.00 0%$0.00 44 Asphalt Pavement (Top)0 SF $0.00 $0.00 0%$0.00 45 Concrete Curbing 0 LF $0.00 $0.00 0%$0.00 46 Concrete Sidewalk 0 SF $0.00 $0.00 0%$0.00 Site Amenities 47 Traffic Signs 0 EA $0.00 $0.00 0%$0.00 48 Striping 0 LS $0.00 $0.00 0%$0.00 49 Crosswalk 0 LS $0.00 $0.00 0%$0.00 50 Street Signs 0 EA $0.00 $0.00 0%$0.00 51 Decrotive Street Light 0 EA $0.00 $0.00 0%$0.00 Off Site Water 52 6" DIP class 52 Water Main 0 LF $0.00 $0.00 0%$0.00 53 6" Mueller Gate Valve 0 EA $0.00 $0.00 0%$0.00 Off Site (All infrastructure & amenities to be dedicated to the City) Cost Estimate for Letter of Credit Page 3 of 3 Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ 54 8" DIP class 52 Water Main 0 LF $0.00 $0.00 0%$0.00 55 8" Mueller Gate Valve 0 EA $0.00 $0.00 0%$0.00 56 S.S. Tapping Sleeve and Valve Connection0 EA $0.00 $0.00 0%$0.00 57 3/4" Corp, WSO and Type K water service to PL0EA $0.00 $0.00 0%$0.00 58 1" Corp, WSO and Type K water service to PL0EA $0.00 $0.00 0%$0.00 59 Water Fittings 0 LS $0.00 $0.00 0%$0.00 60 Fire Hydrant Assembly 0 EA $0.00 $0.00 0%$0.00 61 Testing & Disinfection 0 LS $0.00 $0.00 0%$0.00 Site Sanitary 62 SDR-35 6" Sanitary Service to PL & Stone 0 EA $0.00 $0.00 0%$0.00 63 SDR-35 8" Sanitary Main & Stone 0 LF $0.00 $0.00 0%$0.00 64 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 65 Kor N' Seal connection 0 EA $0.00 $0.00 0%$0.00 Site Storm 66 12" HDPE Storm Line & Stone 0 LF $0.00 $0.00 0%$0.00 67 Catch Basin 0 EA $0.00 $0.00 0%$0.00 68 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 Landscaping 69 Topsoil/Seed/Mulch 0 CY $0.00 $0.00 0%$0.00 70 Street Trees 0 EA $0.00 $0.00 0%$0.00 Misc. 71 As-built Drawing 0 LS $0.00 $0.00 0%$0.00 Total offsite Work $0.00 $0.00 Total On-Site Work X25% Total Off-Site work**$0.00 Total LOC Amount = * New LOC Reduced Amount = $0.00 $286,515.60 City LOC Approval / Date City LOC Reduction Approval /Date $122,512.46 $122,512.46 * LOC cannot be reduced to less than 25% of the original LOC amount. **All offsite work is in the Town of Wilton/Louden Road Maximum Reduction 75% =