Loading...
HomeMy WebLinkAbout20240932 16 Marion Final Subdivision Cost EstCost Estimate for Letter of Credit: 16 Marion Ave & Avenue A Planning Board No.: # 2024…. Project: Tanner - (2) Lot Minor Subdivision Location: # 16 Marion Ave. & Avenue A Saratoga Springs, NY Date: 9/24/2024 Firm Name & Preparer: Engineering America Co. - Tonya Yasenchak, PE Page 1 of 3 On Site (All infrastructure & amenities on private property) Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Clearing & Grubbing 0 Lot $1,500.00 $0.00 0%$0.00 2 Rough Grading 103 CY $6.00 $618.00 0%$618.00 3 Silt Fence 252 LF $4.00 $1,008.00 0%$1,008.00 4 Construction Entrance 1 EA $250.00 $250.00 0%$250.00 5 Tree / Buffer Protection 0 LF $0.00 $0.00 0%$0.00 6 Misc. Erosion Control Measures 0 EA $0.00 $0.00 0%$0.00 Demolition 7 Building Removal (House, Garage & Shed)1 EA $8,000.00 $8,000.00 0%$8,000.00 8 Asphalt Removal (Cut for Utilities)0 SF $4.00 $0.00 0%$0.00 9 Concrete Removal (On-Site Sidewalk removal)0 SF $4.00 $0.00 0%$0.00 Hard Scape 10 Stone Subbase (Driveway)9 CY $25.00 $225.00 0%$225.00 11 Asphalt Pavement (Driveway)480 SF $13.00 $6,240.00 0%$6,240.00 12 CIP Curbing 0 LF $20.00 $0.00 0%$0.00 13 Concrete Sidewalk 0 SF $0.00 $0.00 0%$0.00 14 Retaining Wall 0 LF $0.00 $0.00 0%$0.00 Site Amenities 15 Traffic Signs 0 EA $0.00 $0.00 0%$0.00 16 Striping 0 LS $0.00 $0.00 0%$0.00 17 Crosswalk 0 LS $0.00 $0.00 0%$0.00 18 Bench 0 EA $0.00 $0.00 0%$0.00 19 Bike Rack 0 EA $0.00 $0.00 0%$0.00 20 Site Lighting 0 EA $0.00 $0.00 0%$0.00 21 Fencing 0 LF $0.00 $0.00 0%$0.00 Site Water 22 6" DIP Class 52 Water Main 0 LF $0.00 $0.00 0%$0.00 23 3/4" Type K Copper Water Service 0 EA $2,000.00 $0.00 0%$0.00 24 1" Type K Copper Water Service 0 EA $0.00 $0.00 0%$0.00 25 Water Fittings 0 LS $0.00 $0.00 0%$0.00 26 Fire Hydrant Assembly 0 EA $0.00 $0.00 0%$0.00 Tanner Subdiv - Cost Estimate Rev 8-26-24 Page 2 of 3 Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Sanitary 27 6" SDR-26 Sanitary Line & Stone 0 LF $0.00 $0.00 0%$0.00 28 8" SDR-26 Sanitary Line & Stone 0 LF $0.00 $0.00 0%$0.00 29 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 Site Storm 30 6" HDPE Storm Drain & Stone 0 LF $0.00 $0.00 0%$0.00 31 12" HDPE Storm Drain & Stone 0 LF $0.00 $0.00 0%$0.00 32 Catch Basin 0 EA $0.00 $0.00 0%$0.00 33 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 34 Yard Drains 0 EA $0.00 $0.00 0%$0.00 Stormwater Management 35 Bioretention Area 0 EA $0.00 $0.00 0%$0.00 36 UG Infiltration Chambers 0 EA $0.00 $0.00 0%$0.00 37 Hydrodynamic Separator 0 EA $0.00 $0.00 0%$0.00 38 Wet Pond 0 EA $0.00 $0.00 0%$0.00 Landscaping 39 Topsoil/Seed/Mulch 103 CY $25.00 $2,575.00 0%$2,575.00 40 Deciduous Trees 0 EA $0.00 $0.00 0%$0.00 41 Shrubs 0 EA $0.00 $0.00 0%$0.00 Total onsite Work $18,916.00 $18,916.00 Total onsite X.25 $4,729.00 $4,729.00 Off Site (All infrastructure & amenities to be dedicated to the City) Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Demolition 42 Asphalt Removal (Cut for Utilities)0 SF $4.00 $0.00 0%$0.00 43 Concrete Removal (Cut sidewalk for new drive)0 SF $4.00 $0.00 0%$0.00 Road Construction 44 Stone Subbase 3 CY $30.00 $75.00 0%$75.00 45 Asphalt Pavement (Binder)120 SF $10.00 $1,200.00 0%$1,200.00 46 Asphalt Pavement (Top)120 SF $13.00 $1,560.00 0%$1,560.00 47 Concrete Curbing 130 LF $20.00 $2,600.00 0%$2,600.00 48 Concrete Sidewalk 650 SF $7.50 $4,875.00 0%$4,875.00 Site Amenities 49 Traffic Signs 0 EA $0.00 $0.00 0%$0.00 50 Striping 0 LS $0.00 $0.00 0%$0.00 51 Crosswalk 0 LS $0.00 $0.00 0%$0.00 52 Street Signs 0 EA $0.00 $0.00 0%$0.00 53 Decorative Street Light 2 EA $3,550.00 $7,100.00 0%$7,100.00 Off Site Water 54 6" DIP class 52 Water Main 0 LF $0.00 $0.00 0%$0.00 55 6" Mueller Gate Valve 0 EA $0.00 $0.00 0%$0.00 56 8" DIP class 52 Water Main 0 LF $0.00 $0.00 0%$0.00 57 8" Mueller Gate Valve 0 EA $0.00 $0.00 0%$0.00 58 S.S. Tapping Sleeve and Valve Connection 0 EA $0.00 $0.00 0%$0.00 Tanner Subdiv - Cost Estimate Rev 8-26-24 59 3/4" Corp, WSO and Type K water service to PL 0 EA $1,500.00 $0.00 0%$0.00 60 1" Corp, WSO and Type K water service to PL 0 EA $1,500.00 $0.00 0%$0.00 61 Water Fittings 0 LS $0.00 $0.00 0%$0.00 62 Fire Hydrant Assembly 0 EA $0.00 $0.00 0%$0.00 63 Testing & Disinfection 0 LS $250.00 $0.00 0%$0.00 Page 3 of 3 Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Site Sanitary 64 SDR-35 6" Sanitary Service to PL & Stone 0 EA $1,500.00 $0.00 0%$0.00 65 SDR-35 8" Sanitary Main & Stone 0 LF $0.00 $0.00 0%$0.00 66 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 67 Kor N' Seal connection 0 EA $150.00 $0.00 0%$0.00 Site Storm 68 12" HDPE Storm Line & Stone 0 LF $0.00 $0.00 0%$0.00 69 Catch Basin 0 EA $0.00 $0.00 0%$0.00 70 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 Landscaping 71 Topsoil/Seed/Mulch 12 CY $15.00 $180.00 0%$180.00 72 Removal of Trees in R.O. W 0 EA $0.00 $0.00 0%$0.00 73 Street Trees 2 EA $550.00 $1,100.00 0%$1,100.00 Misc. 74 As-built Drawing 1 LS $3,250.00 $3,250.00 0%$3,250.00 Total offsite Work $21,940.00 $21,940.00 Total On-Site Work X25%$4,729.00 Total Off-Site work $21,940.00 Total LOC Amount = $26,669.00 * New LOC Reduced Amount = $26,669.00 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $6,667.25 Tanner Subdiv - Cost Estimate Rev 8-26-24