Loading...
HomeMy WebLinkAbout20180977 Saratoga Eagle Expansion Engineers comments 8-6-19 THE CAPITAL DISTRICT OFFICE ChazycLaivnidl Esngineers 547 River Street purveyors Planners Troy, NY 12180 COMPANIES® Environmental&Safety Professionals L�andscape Architects P: 518.273.0055 or 888.539.9073 Prod to be Employee owned Transportation Planners&Engineers www.chazencompanies.com Ms. Susan Barden, AICP City Principal Planner City of Saratoga Springs 474 Broadway Saratoga Springs, New York 12866 Delivered via email: susan.barden@saratoga-springs.com Re: City Designated Consulting Services for Saratoga Eagle Warehouse Expansion Planning, Site Plan, SWPPP and Traffic Evaluation Reviews—3rd submittal review 45 Duplainville Road, Saratoga Springs, Saratoga County, New York City Project No. PB#18.053 Chazen Project No. 31804.11 Dear Susan: The Chazen Companies (Chazen) have completed our review of the following materials received: • Application for Site Plan Amendment. • Proposed Plan Revision. • Narrative describing the Modifications to the approved site plan approval. • Approved Mylar Plans with modifications highlighted. • Revised site drawings entitled "Saratoga Eagle Expansion", last revised April 17, 2019, prepared by The LA Group, unless noted otherwise, consisting of the following 6 sheets: o L-01—Site Demolition, Erosion &Sediment Control Plan o L-02—Site Layout& Materials Plan o L-03—Site Grading& Drainage Plan o L-04—Site Landscape Plan o L-04.1—Site Lighting Plan o L-07—Site Details It is Chazen's understanding that this project was previously approved and that all of the comments in our January, 11, 2019 letter have been satisfied to the satisfaction of the City Engineering/Planning staff. The materials provided show modifications to the site grading, the removal of the office expansion and associated parking, and modifications to site landscaping and lighting. Following are our observations/comments: Water Sewer Engineering Report: 1. A Water and Sewer Engineering Report was not provided with this submission. Please verify that there are no changes to the projected water demands as a result of the proposed modifications, or make appropriate revisions to the Water and Sewer Engineering Report previously provided. Site Plans: HUDSON VALLEY•CAPITAL DISTRICT• NORTH COUNTRY•WESTCHESTER • NASHVILLE,TN Chazen Engineering, Land Surveying& Landscape Architecture Co., D.P.C. (New York) Chazen Engineering Consultants, LLC(Tennessee) Saratoga Eagle Warehouse Expansion—3rd Submittal Review August 6,2019 Page 2 of 2 2. The plans indicate that the existing PVC storm pipe is proposed to be extended with a new HDPE pipe. Please provide a detail for this connection. SWPPP: 3. A revised SWPPP was not provided with this submission.The applicant shall provide an updated SWPPP for review, reflecting the proposed modifications to the site plans. In order to expedite and simplify the review of revised materials we would appreciate if the next submission be accompanied by a response letter that describes the revised materials and how our comments were/were not integrated. If you have any comments, questions or need additional information, please do not hesitate to contact this office at 518-273-0055. Sincerely,- /7) - Yw James Connors, P.E., Principal Sr. Director, Engineering Services cc: Jennifer Nechamen, P.E. Chazen Jessica Brown, P.E. Chazen File Z:\projects\31800-31899\31804.xx Saratoga Springs\31804.11-Saratoga Eagle PB#18.053\submittals\3rd submittal\31804.11-Saratoga Eagle-PB#18.053-3rd submittal.docx