HomeMy WebLinkAbout2024 10 19 DRB ROD 10G,4 5,� Primary
City of Saratoga Springs Tamie Ehinger(Chair)
Q Rob DuBoff(Vice Chair)
1� DESIGN REVIEW BOARD
Chris Bennett
V .S City Hall•474 Broadway Leslie DiCarlo
Saratoga Springs,New York 12866 Jeffrey Gritsavage
Tad Roemer
4tJRn7 518.587.3550 Ellen Sheehan
www.saratoga-springs.org
Karen Cavotta(Alternate)
DESIGN REVIEW BOARD - October 9,2024
Record of Decision
Present: T.Ehinger,R.DuBoff,C.Bennett,L.DiCarlo,J.Gritsavage,T.Roemer, K.Cavotta
1.Approved Meeting Minutes: September 25,2024
2.Consent Agenda Items The intent of a consent agenda is to identify any"approvable"applications without the need for further evaluation or discussion.
'Agenda Project# 'Project Title Project Location Project Description ACTION
Order
1 20240778 30 Whistler Court 30 Whistler Architectural Review of exterior modifications to Motion to approve with conditions-passed 6-1(T.
Scupper&Downspout Court address drainage issues within the Neighborhood Roemer opposed).
Center(T-5)District.
2 20240775 26 Fifth Ave Gutters 26 Fifth Ave Historic Review of gutters and downspouts within Motion to approve as presented-passed 7-0.
and Downspouts the Urban Residential-1 District.
4.DRB Architectural Applications Under Consideration
Agenda Project# Primary Project Location Project Description Action
Order
3 20240653 142 Henry Three Family 142 Henry St. Architectural Review of new residential construction within Motion to approve with conditions-
Construction the Urban Residential-4 District passed 6-1(C.Bennett opposed).
4 20231041 153 Van Dam Addition 153 Van Dam St Architectural Review a one-story side addition with deck Motion to approve with conditions-
and Exterior and exterior modifications within the Urban Residential-3 passed 6-1(J.Gritsavage opposed).
Modifications District.
3.DRB Historic Applications Under Consideration
Agenda Project# Primary Project Location Project Description Action
Order
5 20240777 248 Broadway Window 248 Broadway Historic Review of window replacement within Motion to approve with conditions-passes 7-
Replacement the Urban Core(T-6)District. 0.
6 20240774 33 Franklin Fire Escape& 33 Franklin St. Historic Review of exterior modifications within Motion to approve as presented-passed 7-0.
Windows the Urban Residential-4 District.
7 20240752 76 Walton Second Floor 76 Walton St. Historic Review of renovation and new Application continued to a future meeting.
Addition construction within the Urban Residential-3
10/11/2024
Received by Accounts Dept.
Chair,Design Review Commission