Loading...
HomeMy WebLinkAbout20190232 Flat Rock Parking Structure Correspondance (2) S (11- flog ,' pl- 1n \ 4 ' Preservation Foundation April 17, 2019 ( F:0---7,,V:' Tamie Ehinger, Chair � �,� Design Review Commission PRESERVATION City Hall FOR - YEARS 474 Broadway _ 7 Saratoga Springs, NY 12866 f RE: Saratoga Springs City Center Proposed Flat Rock Parking Structure v4 , Dear Tamie, i,t 11 The Saratoga Springs Preservation Foundation has reviewed the proposed Saratoga _ Springs City Center Flat. Rock parking structure which is immediately adjacent to the Broadway Historic District listed on the National Register ofHistoric Places. Board of Directors The Saratoga Springs City Center is a tremendous economic generator and important gathering space for our city. The Foundation recognizes the need to accommodate Matthew Veitch parking to maintain the vitality of downtown as well as the need for the City Center to President meet its current and future operational parking requirements. James Gold Vice President & When the Saratoga Springs City Center initially proposed a parking structure at this site Secretary in 2014, the Foundation had significant concerns regarding the three levels of parking Adam N. Favro approximately 100' in length located above Maple Avenue. Maple Avenue while Treasurer currently bordered by several parking lots, it serves as an important transportation Caroline Cardone corridor that links several prominent downtown destinations: Congress Park, Saratoga Brennan Drake Springs Public Library, Caroline Street entertainment district, City Hall, Saratoga Springs Sandra Fox City Center, and Excelsior Avenue. More importantly Maple Avenue links several Liz Israel Samantha Kercull significant historic sites including: the Niagara Mohawk Gasholder Building, Olde Bryan Douglas Kerr Inn, High Rock Park, and Congress Park — all of which are listed on the National Register Richard King of MichellePaquette-Deuel Historic Places. Cindy Spence Dmitry Yermolayev The Foundation is very pleased that the three levels of parking over Maple Avenue have been removed from the proposal and replaced with a transparent pedestrian walkway, an James Kettlewell element the Foundation advocated for in 2014 and has historic precedence within the city emeritus — the Congress Hotel pedestrian bridge over Spring Street. The Foundation is also pleased the overall height, scale, and mass have been reduced and the setbacks have been Samantha Bosshart increased on High Rock Avenue and York. Avenue. Executive Director � �e Babe The Foundation appreciates the time and investment that the Saratoga Springs City NMembership & Center and the City of Saratoga Springs have made to improve this project. The Programs Director Foundation looks forward to reviewing additional details regarding design and materials as the project develops. Sincerely, 141/01t€A1—' ig. it/},:_it-t. i , ,k3:2,44_,L0,6/ 2400.7. 01.da Matthew Veitch Samantha Bosshart President Executive Director 1 , r �, x f , s t Cc: Ryan McMahon, Saratoga Springs City Center President — Applicant 12Saratoga Spring . NY 12 tr) 6 Bradley Birge, Administrator of the Office of Planning and Economic Development 518- 587 - 51) 30