Loading...
HomeMy WebLinkAbout20240696 25 New St. Site Plan Application **HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** I•FOR OFFICE USE1 NT 0G.4 'SAS CITY OF SARATOGA SPRINGS (Application#) PLANNING BOARD CITY HALL-474 BROADWAY (Date received) SARATOGA SPRINGS, NEW YORK 12866-2296 TEL: 518-587-3550 X2533 �CORPORATO) ,9 h www.saratoga-springs.org (Project Title) Staff Review APPLICATION FOR: SITE PLAN REVIEW (INCLUDING PUD) **Application Check List-All submissions must include completed application check list and all required items.** Property 25 New Street Address/Location. Tax Parcel #: Zoning District: (for example: 165.52-4-37) Project Description: Date special use permit granted (if any): Date zoning variance granted (if any): Has a previous application been filed with PB for this property?: ONO [DYES If YES, include Application TYPE and DATE: Is property located within (check all that apply)?: ❑ Historic District ❑ Architectural Review District ❑ 500' of a State Park, city boundary, or county/state highway APPLICANT(S)* OWNER(S)(If not applicant) ATTORNEY/AGENT Name MJ Engineering, Walt Lippmann Address Phone 518-587-3700 518-371-0799 Email 518-587-3700 Identify primary contact person: ❑ Applicant ❑ Owner 8 Agent * An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. Revised 8/2022 City of Saratoga Springs-Site Plan Review Application 1 REQUIRED ITEMS: *4 hard copies (1 w/original signature), 1 digital copy of ALL materials (all maps, drawings, or image documents as separate files to maintain their original scale and image resolution). Application Fee: Make checks payable to the "Commissioner of Finance". REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT. Check City's website (www.saratoga-springs.org)for meeting dates. Does any City officer, employee or family member thereof have a financial interest (as defined by General Municipal Law Section 809) in this application? YES NO . If YES, a statement disclosing the name, residence, nature and extent of this interest must be filed with this application. I, the undersigned owner, leasee or purchaser under contract for the property, hereby request Site Plan Review by the Planning Board for the identified property above. I agree to meet all requirements under Article 13 of the Unified Development Ordinance of the City of Saratoga Springs. Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property associated with this application for purposes of conducting any necessary site inspections relating to this application. i 8/9/24 Applicant Signature: Date: If applicant is not current owner, owner must also sign. Owner Signature: Date: City of Saratoga Springs-Site Plan Review Application 2 �JOGA CITY OF SARATOGA SPRINGS o PLANNING BOARD CITY HALL-474 BROADWAY SARATOGA SPRINGS, NEW YORK 12866-2296 w.. h' TEL: 518-587-3550 X2533 cORpoRar�o 9, www.saratoga-springs.org SITE PLAN REVIEW SUBMITTAL CHECKLIST Listed below are the minimum submittal requirements for site plan review as set forth in The City of Saratoga Springs' Unified Development Ordinance Article 13.5. The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: *4 hard copies (1 w/original signature), 1 digital copy of ALL materials CHECK EACH ITEM W1 1. Completed Site Plan Application (4 hard copies - *1 w/original signature - and 1 digital) and Fee W1 2. SEQR Environmental Assessment Form- short or long form as required by action. 3. Set of plans (prepared by a NYS licensed Engineer, Landscape Architect, or Architect) including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not more than 1"=50 feet), and (1) 11"x 17" copy. One digital version (PDF)of a" submittal items printable to scale 0 4. Basic or Full Storm Water Pollution Prevention Plan as required per Article 17. 5. Copy of signed DPW water connection agreement for all projects involving new water connections to the City system Q 6. Engineering Report for Water and Sanitary 0 7. Complete Streets Checklist El 8. Project Cost Estimate for Letter of Credit (Utilize City Template) REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE: 1. Property line survey prepared by a licensed land surveyor. Site plan must reference such survey with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the original property survey must also be included. 2. North arrow and map scale 3. Parcel tax map number 4. Site location map (with title block and map key) �✓ 5. Incorporate the City's standard engineering details City of Saratoga Springs Site Plan Checklist 1