Loading...
HomeMy WebLinkAbout20240585 86 Ludlow Final Subdivision Cost EstimateCost Estimate for Letter of Credit Planning Board No.: 24.XXXX Project: 86 & 86-A Ludlow Street Subdivision Location: 86 Ludlow Street Saratoga Springs, NY Date: 7/24/2024 Firm Name & Preparer: The LA Group, Doug Heller (Job # 2023055) On Site (All infrastructure & amenities on private property) Item # Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ 1 Demolition/Erosion Control 1 LS $2,000.00 $2,000.00 0% $0.00 Site Amenities 2 Striping 1 LS $1,000.00 $1,000.00 0% $0.00 3 Topsoil and Seed 1 LS $500.00 $500.00 0% $0.00 Site Utilities 4 6" PVC Sanitary Line 21 LF $32.00 $672.00 0% $0.00 5 Water Service Line 58 LF $40.00 $2,320.00 0% $0.00 Hardscape 6 Asphalt/Concrete pavement 843 SF $8.00 $6,744.00 0% $0.00 Total onsite Work $13,236.00 $0.00 Total onsite X.25 $3,309.00 $0.00 Off Site (All infrastructure & amenities to be dedicated to the City) Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ 1 Demolition 1 LS $2,000.00 $2,000.00 0% $0.00 Site Amenities 2 Landscaping 1 LS $1,500.00 $1,500.00 0% $0.00 Hardscape 3 Asphalt pavement 285 SF $6.00 $1,710.00 0% $0.00 4 Concrete pavement 110 SF $8.00 $880.00 0% $0.00 5 Asphalt/Concrete pavement 59 SF $8.00 $472.00 0% $0.00 Site Utilities 6 6" PVC Sanitary Line 20 LF $32.00 $640.00 0%$0.00 7 Sanitary Connection 1 LS $2,000.00 $2,000.00 0% $0.00 8 Gate Valve 1 EA $500.00 $500.00 0% $0.00 9 Water Service Line 27 LF $40.00 $1,080.00 0% $0.00 10 Water Connection 1 LS $2,000.00 $2,000.00 0% $0.00 Item # Misc. 11 As Built Drawings 1 LS $1,500.00 $1,500.00 0% $0.00 Total offsite Work $14,282.00 $0.00 2024-07-18_LOC Page 1 of 2 Total On-Site Work X25% $3,309.00 Total Off-Site work $14,282.00 Total = $17,591.00 * New LOC Reduced Amount = XXXX LOC Amount = $18,000.00 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $4,500.00 (25% LOC Amount) 2024-07-18_LOC Page 2 of 2