HomeMy WebLinkAbout20240563 3376 S Broadway Treehouse Site Plan Modification Correspondance
Via Overnight Delivery
July 17, 2024
City of Saratoga Springs
Planning Department
474 Broadway
Saratoga Springs, NY 12866
Attention: Susan Barden, AICP
Re: Amended Site Plan Application
Proposed Saratoga Brewery
Route 9/South Broadway
Dear Ms. Barden,
On behalf of our client, THBC NY, LLC, we are pleased to submit this amended site plan application to the City of Saratoga Springs for the above referenced project. A summary of the
changes to the southerly access drive per a comment email from NYSDOT dated May 21, 2024 are noted below.
Per DOT comments in an email dated May 21, 2024, the southerly proposed access drive should be moved ±20’ to the south. The purpose of this is to straighten the entrance to provide quicker
access to prevent any potential backup traffic on Route 9. The revised plans included in this amended application propose minimal change over the plans approved by the City on May 16,
2024. The width of the proposed access drive will remain 20’, while the length from the existing edge of pavement to the interior circulation road is reduced from ±140’ to ±133’. There
will be no impacts to the SWPPP and the overall amount of proposed impervious surface proposed will be slightly decreased. Additionally, the changes are not anticipated to have any
effect on the traffic impact study, per an email from GTS Consulting dated July 11, 2024, included in this revised application submission.
Please do not hesitate to contact us should you need any additional information or have any questions.
Sincerely,
Bohler
Steven R. Wilson, LEED AP