Loading...
HomeMy WebLinkAbout20240563 3376 S Broadway Treehouse Site Plan Modification Correspondance Via Overnight Delivery July 17, 2024 City of Saratoga Springs Planning Department 474 Broadway Saratoga Springs, NY 12866 Attention: Susan Barden, AICP Re: Amended Site Plan Application Proposed Saratoga Brewery Route 9/South Broadway Dear Ms. Barden, On behalf of our client, THBC NY, LLC, we are pleased to submit this amended site plan application to the City of Saratoga Springs for the above referenced project. A summary of the changes to the southerly access drive per a comment email from NYSDOT dated May 21, 2024 are noted below. Per DOT comments in an email dated May 21, 2024, the southerly proposed access drive should be moved ±20’ to the south. The purpose of this is to straighten the entrance to provide quicker access to prevent any potential backup traffic on Route 9. The revised plans included in this amended application propose minimal change over the plans approved by the City on May 16, 2024. The width of the proposed access drive will remain 20’, while the length from the existing edge of pavement to the interior circulation road is reduced from ±140’ to ±133’. There will be no impacts to the SWPPP and the overall amount of proposed impervious surface proposed will be slightly decreased. Additionally, the changes are not anticipated to have any effect on the traffic impact study, per an email from GTS Consulting dated July 11, 2024, included in this revised application submission. Please do not hesitate to contact us should you need any additional information or have any questions. Sincerely, Bohler  Steven R. Wilson, LEED AP