Loading...
HomeMy WebLinkAbout20240458 96 Union 28 North Exterior Modifications PlansCOTTAGE PLANPROPOSEDFRANKI'S COTTAGE# 28 NORTH LN, SARATOGA SPRINGS, NYDESIGN BY:ENGINEERING AMERICA CO.76 WASHINGTON ST. SARATOGA SPRINGS, NY518/587-13407/15/24 SCALE: 1/4" = 1'-0"SEWERCLEAN OUTELEC. METER7'-6"NEWLIVING AREABED NOOKKITCHEN21'-6"LOFTABOVEFLATCEILINGCATHEDRALCEILING(10'-10" CEILING HT)7'-2 1/ 2"WALL HT(7'-5" CEILING HT)SOFFITABOVENORTH LANE (ALLEY)DIRECTION OFMAIN HOUSE2'-6"SHOWERNEW W.C.NEW SINKNEW TILE FLOORLAUNDRYCLOSET2-6NEW AWNINGWINDOWNEW CASEMENTWINDOWNEW SINKDWDISHWASHERNEWINDUCTIONSTOVENEW REFRIG.NEW 3-0 WOOD DRNEW WINDOW3'-0 x 5'-0 WOOD DHNEW TRANSOMWINDOWNEW (2)AWNINGWINDOWS(2)NEW WINDOWS3'-0 x 5'-0 WOOD DHMODIFIEDNEW COUNTER &CABINETSOPT. ISLANDSTOOPNEW COVEREDNO NEW WINDOWSALLOWED ALONG THISWALL DUE TO WALLBEING < 3' FROM PROP.LINE9'-7" ±2'-1"5'-1" 2'-2"1-82-02-04'-1"3'-4"1-61-64'-1"7'-10"14'-3" ± 3'-6"8'-0"8" POSTSREMOVE WINDOW &FRAME IN. FINISH WITHSHUTTER ON OUTSIDEFRAME IN OPENINGBLOCKCHIMNEYREMOVED EAST ELEVATIONPROPOSEDFRANKI'S COTTAGE# 28 NORTH LN, SARATOGA SPRINGS, NYDESIGN BY:ENGINEERING AMERICA CO.76 WASHINGTON ST. SARATOGA SPRINGS, NY518/587-1340(AS VIEWED FACING WEST FROM SIDE YARD)7/15/24 SCALE: 1/4" = 1'-0"EXISTING BLOCKROOF OVER ENTRY8" SQUAREWOOD POSTSTUCCO CHIMNEYTO BE REMOVEDEXISTING WINDOW REMOVEDWALL FRAMED IN WITHSHUTTER EXTERIOR FINISHNEW STANDINGSEAM METAL ROOFRAFTER TAILSREPAIRED & PAINTED NORTH ELEVATIONPROPOSEDFRANKI'S COTTAGE# 28 NORTH LN, SARATOGA SPRINGS, NYDESIGN BY:ENGINEERING AMERICA CO.76 WASHINGTON ST. SARATOGA SPRINGS, NY518/587-1340(AS VIEWED FACING SOUTH FROM MID YARD)7/15/24 SCALE: 1/4" = 1'-0"BOREL PANELSNEW (2) 3'-0 x 5'-0WOOD DH WINDOWSEXISTING BLOCKWOOD & GLASS FRENCH DRSTUCCO BLOCK CHIMNEYTO BE REMOVEDEXISTING BLOCKWINDOWS REMAINNEW STANDING SEAM METAL ROOFREPAIRED & PAINTED SHAKE SIDINGNEW 3'-0 x 5'-0DH WINDOWMETAL STANDING SEAM ROOFWOOD or BOREL FACIA8" SQUAREWOOD POST8" SQUARE WOOD POSTREPAIRED & PAINTED WOOD TRIMNEW WOOD WINDOWTO MATCH REMAINING(IN PLACE OF REMOVEDCHIMNEY)CMU REPAIRED AFTER CHIMNEYREMOVAL WEST ELEVATIONPROPOSEDFRANKI'S COTTAGE# 28 NORTH LN, SARATOGA SPRINGS, NYDESIGN BY:ENGINEERING AMERICA CO.76 WASHINGTON ST. SARATOGA SPRINGS, NY518/587-1340(AS VIEWED FACING EAST FROM DRIVEWAY)7/15/24 SCALE: 1/4" = 1'-0"EXISTING BLOCKROOF OVER ENTRY8" SQUAREWOOD POSTSTUCCO CHIMNEYTO BE REMOVEDNEW STANDINGSEAM METAL ROOFEXISTING WINDOW REMOVED &REPLACED WITH NEW WOODAWNING WINDOW WITHWOOD / BOREL PANEL BELOWSOUTHTOWARDS ALLEYNORTHTOWARDS HOUSERAFTER TAILSREPAIRED & PAINTED SOUTH ELEVATIONPROPOSEDFRANKI'S COTTAGE# 28 NORTH LN, SARATOGA SPRINGS, NYDESIGN BY:ENGINEERING AMERICA CO.76 WASHINGTON ST. SARATOGA SPRINGS, NY518/587-1340(AS VIEWED FACING NORTH FROM ALLEY)7/15/24 SCALE: 1/4" = 1'-0"EXISTING BLOCKSTUCCO BLOCK CHIMNEYTO BE REMOVEDEXISTING BLOCKNEW STANDING SEAM METAL ROOFREPAIRED & PAINTED SHAKE SIDINGEXISTING WINDOW REMAINSELECTRIC METERREMAINSEXISTING VINYL WINDOWSTO BE REMOVED & REPLACEDWITH (2)2'-8 x 1'-6 WOODAWNING WINDOWSDOOR REMOVED & FRAMED INNEW / REPAIRED WOOD SIDING&TRIM OUT FOR FAUX DOORSBETWEEN FINISHED BLOCK AREAS FAUX DOOR DETAIL PROPOSED FRANKI'S COTTAGE # 28 NORTH LN, SARATOGA SPRINGS, NY DESIGN BY: ENGINEERING AMERICA CO. 76 WASHINGTON ST. SARATOGA SPRINGS, NY 518/587-1340 (AS VIEWED FACING NORTH FROM ALLEY) 7/15/24 SCALE: 1/4" = 1'-0" 8'-31 2" ± 4'-13 4"4'-13 4"7'-8" ±4" WOOD (OR BORAL) TRIM 2'-8" x 1'-6" WOOD AWNING WINDOW 5'-6" ±2" WOOD / BORAL TRIM BORAL TRU-EXTERIOR 4" BEADBOARD IN-FILL 1x6 BORAL TRU-EXTERIOR TRIM SKIRT BOARD BLACK METAL DOOR HANDLES ver 3.0 Page1of5 Pei www.p-e-i.com Pei Pei Pei Pei Progressive Engineering Inc.Pei Pei Surface Burning Characteristics - Flame Spread less than 40 / Smoke Development less than 450 when tested in accordance with ASTM E84-09 (2012 IBC/IRC) and ASTM E 84-2013A (2015 IBC/IRC) PER-14090 Page2of5 PER-14090 Page3of5 PER-14090 Pei Pei Progressive Engineering Inc. Pei Page4of5 Pei PER-14090 Page5of5 PER-14090