HomeMy WebLinkAbout20240535 59 Myrtle Saratoga Hospital Zoning Amendment Application
Planned Unit Development
Amendment
The Saratoga Hospital
211 Church Street, Saratoga Springs
New York, 12866
July 5, 2024
Submitted By:
Matthew J. Jones, Esq.
Jones Steves Grassi LLP
Attorneys for The Saratoga Hospital
68 West Avenue
Saratoga Springs, New York 12866
(518) 587-0080
mjones@saratogalaw.com
C. Michael Ingersoll, RLA, CLARB, ASLA
The LA Group
40 Long Alley
Saratoga Springs, New York 12866
(518) 587-8100
mingersoll@thelagroup.com
Table of Contents
I. Petition
II. Application Narrative
III. SEQRA FEAF
IV. SEQRA – History and Treatment
V. PUD Redline
VI. PUD Clean Copy
VII. Aerial Photographs
VIII. PUD Sketch Plan
I
p. 1 of 2 City of Saratoga Springs
Application for Zoning AmendmentZĞǀŝƐĞĚϭͬϮϬϮϭ
1. Name of Petitioner: ___________________________________________________________________
2. Type of Amendment (Map or Text):
Map Amendment:
Site Location: ________________________________
Tax Parcel #: _________________________________
Current Zoning: ______________________________
Proposed Zoning: _____________________________
Reason for amendment:
______________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________
Text Amendment:
Section to be amended: ____________________________________________________________
Proposed wording of text amendment (attach additional sheets if necessary):
__________________________________________________________________________________
__________________________________________________________________________________
_______________________________________________________________________________
Reason for
amendment:_______________________________________________________________________
_________________________________________________________________________________
3. Professional Representing Applicant (if any):
Name: ______________________________________________________
Phone: ______________________________________________________
Address: ____________________________________________________
Email: ______________________________________________________
Identify primary contact person: Applicant Owner Agent
4. Does any City officer, employee or family member thereof have a financial interest (as defined by General
Municipal Law Section 809) in this application? YES_____ NO _____. IF YES, a statement disclosing the
name, residence, nature and extent of this interest must be filed with this application.
Please check the following to affirm information is included with submission.
PETITION FOR:ZONING AMENDMENT
**HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED**
CITY OF SARATOGA SPRINGS
&,7<<&281&,/
&,7< +$// %52$':$<
6$5$72*$635,1*61(:<25.
7(/;
ZZZVDUDWRJDVSULQJVRUJ
[FOR OFFICE USE]
_____________BB
$SSOLFDWLRQ
_________BB_
'DWH UHFHLYHG
@@@@@@@@@@@@@@@@@@@@@@@@@@
3URMHFW7LWOH
&KHFNLI3+5HTXLUHG
6WDII5HYLHZBBBBBBBBBBBBBBB
The Saratoga Hospital
59 Myrtle Street
165.-1-44
PUD
PUD
See attached Application Narrative
See attached Application Narrative
See attached Application Narrative
See attached Application Narrative
Matthew Jones, Esq., Jones Steves Grassi, LLP
518-587-0080
68 West Avenue, Saratoga Springs, NY
mjones@saratogalaw.com
X
II
1
Schedule A v7 07.01.24
Application Narrative
The Saratoga Hospital Medical/Professional PUD
July 5, 2024
The Saratoga Hospital petitions the City Council for approval of this PUD
Amendment to the Saratoga Hospital Medical/Professional PUD (“PUD”) adopted
by the Saratoga Springs City Council on September 8, 1987 and amended on April
19, 1993; January 21, 1997; October 21, 2003; April 7, 2009; March 1, 2011; and
March 25, 2013. The PUD is the zoning document that regulates the development
of the 28.69 acre parcel on both the east and west sides of Myrtle Street with the
main hospital building fronting on Church Street.
Over the past ten years the Hospital has identified the pressing need for
additional medical offices on its campus. This application is intended to respond
to that need beginning with the demolition of the existing 10,200 sf medical office
building (“MOB”) in Zone B – shown in the attached photographs – that was
formerly occupied by the specialized medical practices for OB/GYN and
pulmonary care. Thereafter, the Hospital proposes to construct a new MOB with a
maximum building height of 50 feet1. The structure will include a maximum of
60,000 sf of medical office space inclusive of common areas, hallways, utility
rooms, lavatories, reception areas, and such other support spaces and systems
customarily associated with medical office buildings. The building will
incorporate medical offices and services designed to support a Center for
Successful Aging (“CSA Building”) wherein patients can receive medical care
from various specialties focused on the aging population. Those specialties may
include some or all of the following: primary care physicians, specialists, care
coordinators, social workers, pharmacists, and dietitians , among others. The
Hospital seeks this PUD amendment to provide the underlying zoning changes
needed for the construction of the CSA Building.
The Hospital desires to maintain the overall density maximums within the
PUD by transferring a portion of the remaining development capacity in Zone A
(the main Hospital Building) to Zone B. More specifically, the Hospital’s plan is
to increase the building square footage capacity in Zone B from the current 31,200
sf to 60,000 sf, an increase sufficient to accommodate the CSA Building.
1 Building height measured pursuant to UDO Section 21.4(D).
2
Schedule A v7 07.01.24
Correspondingly, the Hospital proposes to reduce the surplus capacity in Zone A
by 28,800 sf in order to achieve a net zero impact on capacity for the entire
campus. Further, to accommodate the full 60,000 sf of medical space within the
proposed CSA building, this amendment seeks to extend the maximum building
height from the current 40 feet to the proposed 50 feet.
In addition to the foregoing, this amendment also seeks the following
modifications:
1. Incorporate UDO: Since the adoption of the most recent PUD
amendment on March 25, 2013, the City Council adopted the
Unified Development Ordinance which became effective on
July 15, 2022, replacing the previous Zoning Ordinance of the
City of Saratoga Springs. The UDO explicitly maintains the
previously adopted PUDs, including the Saratoga Hospital
PUD. In addition, references to the previous Zoning Ordinance
have been replaced, where appropriate, with references to the
UDO.
2. Remove expiration date of site plans: From Article “IX. Projects”
the Hospital proposes to remove the language Planned Unit
Development zoning approval for the project shall expire for all
uncompleted projects if site plan approval is not obtained from the
City of Saratoga Springs Planning Board by January 1, 2024 . This
artificial limitation on site plan approvals does not appear to serve any
zoning or planning objective and, as such, the Hospital proposes to
remove the paragraph as an alternative to continually extending the
date through unnecessary PUD amendments.
3. Permit “daycare” and other uses customary to hospitals:
The amendment also seeks to expand the permitted uses by
allowing “daycare” throughout the campus along with “such
other and further usual and customary uses of hospitals,”
(Article VI (A) – Zone A). Daycare facilities within the
campus are very important to the Hospital staff and the absence
of such facilities puts an unnecessary strain on the staff. The
latter provision addresses the ever-changing approaches to
diagnostics and treatment within the medical community. The
3
Schedule A v7 07.01.24
language is intended to allow the Hospital to be both adaptive
and agile as the delivery of medical services continues to
advance and evolve.
4. Amend Zone B Parking: Parking within Zone B – the Zone in
which the CSA will be built – will maintain the ratio of 1 space/300
feet, but it will require only 75% of the parking spaces to be located
within Zone B while the remaining 25% of parking spaces will be
available throughout the campus in existing parking lots.
5. Prepare Zone B site for CSA Building: Zone B regulations
will be amended to provide for the demolition of the 10,200 sf
vacant building currently on the site, removal of the zoning
authority within the PUD that would permit the second 31,800
sf B-2 building, and affirmatively provide the zoning authority
– following site plan approval – for the construction of the CSA
Building to a maximum of 60,000 sf and a maximum building
height of 50 ft.
6. Signage: Article XV has been changed to reflect the current Albany
Med. Health System/Saratoga Hospital brand guidelines in the
appropriate fonts and colors, which will be coordinated by the
Saratoga Hospital marketing and communications team in
collaboration with the system team.”
7. Structured parking: The future demand for parking on the Hospital
campus will increase during the ramp up of the CSA medical
practices. At a point following full occupancy of the CSA Building,
the Hospital contemplates the need for additional parking on the
campus. To that end, the Hospital seeks zoning approval in this PUD
Amendment Application to build structured parking within Zone E.
8. Miscellaneous and technical changes: Where possible, the
amendment attempts to reconcile language throughout the PUD in an
effort to simplify and clarify various provisions. These changes are
called out in the redline version of the PUD.
III
Page 1 of 13
Full Environmental Assessment Form
Part 1 - Project and Setting
Instructions for Completing Part 1
Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
are subject to public review, and may be subject to further verification.
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist,
or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to
update or fully develop that information.
Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that
must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the
answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any
additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information
contained in Part 1is accurate and complete.
A.Project and Applicant/Sponsor Information.
Name of Action or Project:
Project Location (describe, and attach a general location map):
Brief Description of Proposed Action (include purpose or need):
Name of Applicant/Sponsor: Telephone:
E-Mail:
Address:
City/PO: State: Zip Code:
Project Contact (if not same as sponsor; give name and title/role): Telephone:
E-Mail:
Address:
City/PO:State: Zip Code:
Property Owner (if not same as sponsor): Telephone:
E-Mail:
Address:
City/PO:State: Zip Code:
FEAF 2019
Page 2 of 13
B. Government Approvals
B.Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial
assistance.)
Government Entity If Yes: Identify Agency and Approval(s)
Required
Application Date
(Actual or projected)
a.City Counsel, Town Board, 9 Yes 9 No
or Village Board of Trustees
b. City, Town or Village 9 Yes 9 No
Planning Board or Commission
c.City, Town or 9 Yes 9 No
Village Zoning Board of Appeals
d. Other local agencies 9 Yes 9 No
e. County agencies 9 Yes 9 No
f. Regional agencies 9 Yes 9 No
g. State agencies 9 Yes 9 No
h. Federal agencies 9 Yes 9 No
i. Coastal Resources.
i.Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway?9 Yes 9 No
ii.Is the project site located in a community with an approved Local Waterfront Revitalization Program? 9 Yes 9 No
iii. Is the project site within a Coastal Erosion Hazard Area?9 Yes 9 No
C. Planning and Zoning
C.1. Planning and zoning actions.
Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the 9 Yes 9 No
only approval(s) which must be granted to enable the proposed action to proceed?
•If Yes, complete sections C, F and G.
•If No, proceed to question C.2 and complete all remaining sections and questions in Part 1
C.2. Adopted land use plans.
a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site 9 Yes 9 No
where the proposed action would be located?
If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action 9 Yes 9 No
would be located?
b.Is the site of the proposed action within any local or regional special planning district (for example: Greenway; 9 Yes 9 No
Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan;
or other?)
If Yes, identify the plan(s):
_______________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, 9 Yes 9 No
or an adopted municipal farmland protection plan?
If Yes, identify the plan(s):
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
Page 3 of 13
C.3. Zoning
a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance.9 Yes 9 No
If Yes, what is the zoning classification(s) including any applicable overlay district?
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
b. Is the use permitted or allowed by a special or conditional use permit?9 Yes 9 No
c. Is a zoning change requested as part of the proposed action?9 Yes 9 No
If Yes,
i.What is the proposed new zoning for the site? ___________________________________________________________________
C.4. Existing community services.
a. In what school district is the project site located? ________________________________________________________________
b. What police or other public protection forces serve the project site?
_________________________________________________________________________________________________________
c. Which fire protection and emergency medical services serve the project site?
__________________________________________________________________________________________________________
d. What parks serve the project site?
__________________________________________________________________________________________________________
__________________________________________________________________________________________________________
D. Project Details
D.1. Proposed and Potential Development
a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all
components)?
_________________________________________________________________________________________________________
b. a. Total acreage of the site of the proposed action?_____________ acres
b. Total acreage to be physically disturbed?_____________ acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor?_____________ acres
c. Is the proposed action an expansion of an existing project or use?9 Yes 9 No
i.If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units,
square feet)? % ____________________ Units: ____________________
d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes 9 No
If Yes,
i.Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types)
________________________________________________________________________________________________________
ii. Is a cluster/conservation layout proposed? 9 Yes 9 No
iii.Number of lots proposed? ________
iv.Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________
9 Yes 9 No
_____ months
_____
_____ month _____ year
e.Will the proposed action be constructed in multiple phases?
i.If No, anticipated period of construction:
ii.If Yes:
•Total number of phases anticipated
•Anticipated commencement date of phase 1 (including demolition)
•Anticipated completion date of final phase _____ month _____year
•Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
determine timing or duration of future phases: _______________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
Page 4 of 13
f. Does the project include new residential uses?9 Yes 9 No
If Yes, show numbers of units proposed.
One Family Two Family Three Family Multiple Family (four or more)
Initial Phase ___________ ___________ ____________ ________________________
At completion
of all phases ___________ ___________ ____________ ________________________
g. Does the proposed action include new non-residential construction (including expansions)? 9 Yes 9 No
If Yes,
i. Total number of structures ___________
ii.Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length
iii.Approximate extent of building space to be heated or cooled: ______________________ square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any 9 Yes 9 No
liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
i.Purpose of the impoundment: ________________________________________________________________________________
ii.If a water impoundment, the principal source of the water: 9 Ground water 9 Surface water streams 9 Other specify:
_________________________________________________________________________________________________________
iii.If other than water, identify the type of impounded/contained liquids and their source.
_________________________________________________________________________________________________________
iv.Approximate size of the proposed impoundment. Volume: ____________ million gallons; surface area: ____________ acres
v.Dimensions of the proposed dam or impounding structure: ________ height; _______ length
vi.Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):
________________________________________________________________________________________________________
D.2. Project Operations
a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? 9 Yes 9 No
(Not including general site preparation, grading or installation of utilities or foundations where all excavated
materials will remain onsite)
If Yes:
i .What is the purpose of the excavation or dredging? _______________________________________________________________
ii.How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
•Volume (specify tons or cubic yards): ____________________________________________
•Over what duration of time? ____________________________________________________
iii.Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.
________________________________________________________________________________________________________
________________________________________________________________________________________________________
iv.Will there be onsite dewatering or processing of excavated materials? 9 Yes 9 No
If yes, describe. ___________________________________________________________________________________________
________________________________________________________________________________________________________
v.What is the total area to be dredged or excavated? _____________________________________acres
vi.What is the maximum area to be worked at any one time? _______________________________ acres
vii.What would be the maximum depth of excavation or dredging? __________________________ feet
viii.Will the excavation require blasting?9 Yes 9 No
ix.Summarize site reclamation goals and plan: _____________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment 9 Yes 9 No
into any existing wetland, waterbody, shoreline, beach or adjacent area?
If Yes:
i.Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic
description): ______________________________________________________________________________________________
_________________________________________________________________________________________________________
Page 5 of 13
ii.
iii.
Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or
alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
Will the proposed action cause or result in disturbance to bottom sediments? Yes 9 No
If Yes, describe: __________________________________________________________________________________________
iv.Will the proposed action cause or result in the destruction or removal of aquatic vegetation?9 Yes 9 No
If Yes:
•acres of aquatic vegetation proposed to be removed: ___________________________________________________________
•expected acreage of aquatic vegetation remaining after project completion:________________________________________
•purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________
____________________________________________________________________________________________________
•proposed method of plant removal: ________________________________________________________________________
•if chemical/herbicide treatment will be used, specify product(s): _________________________________________________
v.Describe any proposed reclamation/mitigation following disturbance: _________________________________________________
_________________________________________________________________________________________________________
c. Will the proposed action use, or create a new demand for water? 9 Yes 9 No
If Yes:
i.Total anticipated water usage/demand per day: __________________________ gallons/day
ii.Will the proposed action obtain water from an existing public water supply? 9 Yes 9 No
If Yes:
•Name of district or service area: _________________________________________________________________________
•Does the existing public water supply have capacity to serve the proposal? 9 Yes 9 No
•Is the project site in the existing district? 9 Yes 9 No
•Is expansion of the district needed? 9 Yes 9 No
•Do existing lines serve the project site? 9 Yes 9 No
iii.Will line extension within an existing district be necessary to supply the project? 9 Yes 9 No
If Yes:
•Describe extensions or capacity expansions proposed to serve this project: ________________________________________
____________________________________________________________________________________________________
•Source(s) of supply for the district: ________________________________________________________________________
iv.Is a new water supply district or service area proposed to be formed to serve the project site? 9 Yes 9 No
If, Yes:
•Applicant/sponsor for new district: ________________________________________________________________________
•Date application submitted or anticipated: __________________________________________________________________
•Proposed source(s) of supply for new district: _______________________________________________________________
v.If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________
_________________________________________________________________________________________________________
vi.If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute.
d. Will the proposed action generate liquid wastes?9 Yes 9 No
If Yes:
i.Total anticipated liquid waste generation per day: _______________ gallons/day
ii.Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
approximate volumes or proportions of each): __________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
iii.Will the proposed action use any existing public wastewater treatment facilities?9 Yes 9 No
If Yes:
•Name of wastewater treatment plant to be used: _____________________________________________________________
•Name of district: ______________________________________________________________________________________
•Does the existing wastewater treatment plant have capacity to serve the project?9 Yes 9 No
• Is the project site in the existing district?9 Yes 9 No
• Is expansion of the district needed?9 Yes 9 No
Page 6 of 13
9 Yes 9 No •Do existing sewer lines serve the project site?
•Will a line extension within an existing district be necessary to serve the project?9 Yes 9 No
If Yes:
•Describe extensions or capacity expansions proposed to serve this project: ____________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
iv.Will a new wastewater (sewage) treatment district be formed to serve the project site?9 Yes 9 No
If Yes:
•Applicant/sponsor for new district: ____________________________________________________________________
•Date application submitted or anticipated: _______________________________________________________________
•What is the receiving water for the wastewater discharge? __________________________________________________
v.If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
receiving water (name and classification if surface discharge or describe subsurface disposal plans):
________________________________________________________________________________________________________
________________________________________________________________________________________________________
vi.Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point 9 Yes 9 No
sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
source (i.e. sheet flow) during construction or post construction?
If Yes:
i.How much impervious surface will the project create in relation to total size of project parcel?
_____ Square feet or _____ acres (impervious surface)
_____ Square feet or _____ acres (parcel size)
ii.Describe types of new point sources. __________________________________________________________________________
_________________________________________________________________________________________________________
iii.Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
groundwater, on-site surface water or off-site surface waters)?
________________________________________________________________________________________________________
________________________________________________________________________________________________________
•If to surface waters, identify receiving water bodies or wetlands: ________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
•Will stormwater runoff flow to adjacent properties?9 Yes 9 No
iv.Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater?9 Yes 9 No
f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel 9 Yes 9 No
combustion, waste incineration, or other processes or operations?
If Yes, identify:
i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
_________________________________________________________________________________________________________
ii.Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
________________________________________________________________________________________________________
iii.Stationary sources during operations (e.g., process emissions, large boilers, electric generation)
________________________________________________________________________________________________________
g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit,9 Yes 9 No
or Federal Clean Air Act Title IV or Title V Permit?
If Yes:
i.Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet 9 Yes 9 No
ambient air quality standards for all or some parts of the year)
ii.In addition to emissions as calculated in the application, the project will generate:
•___________Tons/year (short tons) of Carbon Dioxide (CO2)
•___________Tons/year (short tons) of Nitrous Oxide (N2O)
•___________Tons/year (short tons) of Perfluorocarbons (PFCs)
•___________Tons/year (short tons) of Sulfur Hexafluoride (SF6)
•___________Tons/year (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs)
•___________Tons/year (short tons) of Hazardous Air Pollutants (HAPs)
Page 7 of 13
h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants,9 Yes 9 No
landfills, composting facilities)?
If Yes:
i.Estimate methane generation in tons/year (metric): ________________________________________________________________
ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or
electricity, flaring): ________________________________________________________________________________________
_________________________________________________________________________________________________________
i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as 9 Yes 9 No
quarry or landfill operations?
If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial 9 Yes 9 No
new demand for transportation facilities or services?
If Yes:
i.When is the peak traffic expected (Check all that apply): Morning Evening Weekend
Randomly between hours of __________ to ________.
ii.For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): _____________
iii.
iv.
v.
Parking spaces: Existing ___________________ Proposed ___________ Net increase/decrease _____________________
Does the proposed action include any shared use parking? Yes No
9 Yes 9 No vi.Are public/private transportation service(s) or facilities available within ½ mile of the proposed site?
vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric 9 Yes 9 No
or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing 9 Yes 9 No
pedestrian or bicycle routes?
k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand 9 Yes 9 No
for energy?
If Yes:
i.Estimate annual electricity demand during operation of the proposed action: ____________________________________________
_________________________________________________________________________________________________________
ii.Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or
other):
________________________________________________________________________________________________________
iii.Will the proposed action require a new, or an upgrade, to an existing substation?9 Yes 9 No
l. Hours of operation. Answer all items which apply.
i. During Construction:ii.During Operations:
•Monday - Friday: _________________________•Monday - Friday: ____________________________
•Saturday: ________________________________•Saturday: ___________________________________
•Sunday: _________________________________•Sunday: ____________________________________
•Holidays: ________________________________•Holidays: ___________________________________
If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe:
________________________________________________________________________________________________________
________________________________________________________________________________________________________
Page 8 of 13
m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction,9 Yes 9 No
operation, or both?
If yes:
i.Provide details including sources, time of day and duration:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen?9 Yes 9 No
Describe: _________________________________________________________________________________________________
_________________________________________________________________________________________________________
n. W th ill prop e os actio ed hav n e outd ligh oor ting? 9 Yes 9 No
If yes:
i.Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
ii.Will proposed action remove existing natural barriers that could act as a light barrier or screen?9 Yes 9 No
Describe: _________________________________________________________________________________________________
_________________________________________________________________________________________________________
o.Does the proposed action have the potential to produce odors for more than one hour per day?9 Yes 9 No
If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
occupied structures: ______________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
p.9 Yes 9 No Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons)
or chemical products 185 gallons in above ground storage or any amount in underground storage?
If Yes:
i.Product(s) to be stored ______________________________________________________________________________________
ii.Volume(s) ______ per unit time ___________ (e.g., month, year)
iii.Generally, describe the proposed storage facilities:________________________________________________________________
________________________________________________________________________________________________________
q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides,9 Yes 9 No
insecticides) during construction or operation?
If Yes:
i.Describe proposed treatment(s):
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
ii.Will the proposed action use Integrated Pest Management Practices?9 Yes 9 No
r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal 9 Yes 9 No
of solid waste (excluding hazardous materials)?
If Yes:
i.Describe any solid waste(s) to be generated during construction or operation of the facility:
•Construction: ____________________ tons per ________________ (unit of time)
•Operation : ____________________ tons per ________________ (unit of time)
ii.Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:
•Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
•Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
iii.Proposed disposal methods/facilities for solid waste generated on-site:
•Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
•Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
Page 9 of 13
s. Does the proposed action include construction or modification of a solid waste management facility?9 Yes 9 No
If Yes:
i.Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or
other disposal activities): ___________________________________________________________________________________
ii.Anticipated rate of disposal/processing:
•________ Tons/month, if transfer or other non-combustion/thermal treatment, or
•________ Tons/hour, if combustion or thermal treatment
iii.If landfill, anticipated site life: ________________________________ years
t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous 9 Yes 9 No
waste?
If Yes:
i.Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
ii.Generally describe processes or activities involving hazardous wastes or constituents: ___________________________________
_________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Specify amount to be handled or generated _____ tons/month
iv.Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: ____________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
v.Will any hazardous wastes be disposed at an existing offsite hazardous waste facility?9 Yes 9 No
If Yes: provide name and location of facility: _______________________________________________________________________
________________________________________________________________________________________________________
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility:
________________________________________________________________________________________________________
________________________________________________________________________________________________________
E. Site and Setting of Proposed Action
E.1. Land uses on and surrounding the project site
a. Existing land uses.
i.Check all uses that occur on, adjoining and near the project site.
9 Urban 9 Industrial 9 Commercial 9 Residential (suburban) 9 Rural (non-farm)
9 Forest 9 Agriculture 9 Aquatic 9 Other (specify): ____________________________________
ii.If mix of uses, generally describe:
__________________________________________________________________________________________________________
__________________________________________________________________________________________________________
b. Land uses and covertypes on the project site.
Land use or
Covertype
Current
Acreage
Acreage After
Project Completion
Change
(Acres +/-)
•Roads, buildings, and other paved or impervious
surfaces
•Forested
•Meadows, grasslands or brushlands (non-
agricultural, including abandoned agricultural)
•Agricultural
(includes active orchards, field, greenhouse etc.)
•Surface water features
(lakes, ponds, streams, rivers, etc.)
•Wetlands (freshwater or tidal)
•Non-vegetated (bare rock, earth or fill)
•Other
Describe: _______________________________
________________________________________
Page 10 of 13
c. Is the project site presently used by members of the community for public recreation?9 Yes 9 No
i.If Yes: explain: __________________________________________________________________________________________
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9 No
day care centers, or group homes) within 1500 feet of the project site?
If Yes,
i.Identify Facilities:
________________________________________________________________________________________________________
________________________________________________________________________________________________________
e. Does the project site contain an existing dam?9 Yes 9 No
If Yes:
i.Dimensions of the dam and impoundment:
•Dam height: _________________________________ feet
•Dam length: _________________________________ feet
•Surface area: _________________________________ acres
•Volume impounded: _______________________________ gallons OR acre-feet
ii.Dam=s existing hazard classification: _________________________________________________________________________
iii.Provide date and summarize results of last inspection:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility,9 Yes 9 No
or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility?
If Yes:
i. Has the facility been formally closed?9 Yes 9 No
•If yes, cite sources/documentation: _______________________________________________________________________
ii.Describe the location of the project site relative to the boundaries of the solid waste management facility:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
iii.Describe any development constraints due to the prior solid waste activities: __________________________________________
_______________________________________________________________________________________________________
g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9 No
property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
i.Describe waste(s) handled and waste management activities, including approximate time when activities occurred:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9 No
remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i.Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No
Remediation database? Check all that apply:
9 Yes – Spills Incidents database Provide DEC ID number(s): ________________________________
9 Yes – Environmental Site Remediation database Provide DEC ID number(s): ________________________________
9 Neither database
ii.If site has been subject of RCRA corrective activities, describe control measures:_______________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii.Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database?9 Yes 9 No
If yes, provide DEC ID number(s): ______________________________________________________________________________
iv.If yes to (i), (ii) or (iii) above, describe current status of site(s):
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
Page 11 of 13
v.Is the project site subject to an institutional control limiting property uses?9 Yes 9 No
•If yes, DEC site ID number: ____________________________________________________________________________
•Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________
•Describe any use limitations: ___________________________________________________________________________
•Describe any engineering controls: _______________________________________________________________________
•Will the project affect the institutional or engineering controls in place?9 Yes 9 No
•Explain: ____________________________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site? ________________ feet
b. Are there bedrock outcroppings on the project site?9 Yes 9 No
If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________%
c. Predominant soil type(s) present on project site: ___________________________ __________%
___________________________ __________%
____________________________ __________%
d. What is the average depth to the water table on the project site? Average: _________ feet
e. Drainage status of project site soils: 9 Well Drained:_____% of site
9 Moderately Well Drained: _____% of site
9 Poorly Drained _____% of site
f. Approximate proportion of proposed action site with slopes: 9 0-10%:_____% of site
9 10-15%: _____% of site
9 15% or greater: _____% of site
g. Are there any unique geologic features on the project site?9 Yes 9 No
If Yes, describe: _____________________________________________________________________________________________
________________________________________________________________________________________________________
h. Surface water features.
i.Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers,9 Yes 9 No
ponds or lakes)?
ii.Do any wetlands or other waterbodies adjoin the project site?9 Yes 9 No
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii.Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal,9 Yes 9 No
state or local agency?
iv.For each identified regulated wetland and waterbody on the project site, provide the following information:
•Streams: Name ____________________________________________ Classification _______________________ •Lakes or Ponds: Name ____________________________________________ Classification _______________________•Wetlands: Name ____________________________________________ Approximate Size ___________________ •Wetland No. (if regulated by DEC) _____________________________
v.Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired 9 Yes 9 No
waterbodies?
If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________
___________________________________________________________________________________________________________
i.Is the project site in a designated Floo dway?9 Yes 9 No
j.Is the project site in the 100-year Floodplain?9 Yes 9 No
k.Is the project site in the 500-year Floodplain?9 Yes 9 No
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer?9 Yes 9 No
If Yes:
i.Name of aquifer: _________________________________________________________________________________________
Page 12 of 13
m. Identify the predominant wildlife species that occupy or use the project site: ______________________________
______________________________ _______________________________ ______________________________
______________________________ _______________________________ ______________________________
n. Does the project site contain a designated significant natural community?9 Yes 9 No
If Yes:
i.Describe the habitat/community (composition, function, and basis for designation): _____________________________________
________________________________________________________________________________________________________
ii.Source(s) of description or evaluation: ________________________________________________________________________
iii.Extent of community/habitat:
•Currently: ______________________ acres
•Following completion of project as proposed: _____________________ acres
•Gain or loss (indicate + or -): ______________________ acres
o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9 No
endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species?
p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9 No
special concern?
q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing?9 Yes 9 No
If yes, give a brief description of how the proposed action may affect that use: ___________________________________________
________________________________________________________________________________________________________
E.3. Designated Public Resources On or Near Project Site
a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9 No
Agriculture and Markets Law, Article 25-AA, Section 303 and 304?
If Yes, provide county plus district name/number: _________________________________________________________________
b. Are agricultural lands consisting of highly productive soils present?9 Yes 9 No
i.If Yes: acreage(s) on project site? ___________________________________________________________________________
ii.Source(s) of soil rating(s): _________________________________________________________________________________
c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9 No
Natural Landmark?
If Yes:
i.Nature of the natural landmark: 9 Biological Community 9 Geological Feature
ii.Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
d. Is the project site located in or does it adjoin a state listed Critical Environmental Area?9 Yes 9 No
If Yes:
i.CEA name: _____________________________________________________________________________________________
ii.Basis for designation: _____________________________________________________________________________________
iii.Designating agency and date: ______________________________________________________________________________
If Yes:
i.Species and listing (endangered or threatened):______________________________________________________________________________
________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
If Yes:
i.Species and listing:____________________________________________________________________________________________________
_______________________________________________________________________________________________________________________
IV
SEQRA
History and Treatment
Consistent with the application requirements of the City of Saratoga Springs
Petitions for Zoning Amendments and in compliance with the applicable
provisions of the Unified Development Ordinance and the State Environmental
Quality Review Act, the applicant submits herewith an executed FEAF for review
by the lead agent.
As reflected in the Application Narrative, the Saratoga Hospital
Medical/Professional PUD (“PUD”) was adopted by the Saratoga Springs City
Council on September 8, 1987 and amended on April 19, 1993; January 21, 1997;
October 21, 2003; April 7, 2009; March 1, 2011; and March 25, 2013. With each
PUD amendment, the City Council – as lead agent – undertook the SEQRA review.
By way of example, we provide the history of the last four SEQRA resolutions
beginning in 2003.1
On October 21, 2003, Commissioner Stephen Towne moved and
Commissioner Thomas Curley seconded that the Council (i) established itself as
the lead agent for the SEQRA environmental review because no other involved
agencies have challenged this request, (ii) declare that Part II of the SEQRA Long
Environmental Assessment Form has been reviewed and is deemed accurate and
complete and (iii) issue a negative declaration of environmental significance
because the analysis of the information provided and presented i n Part II of the
Environmental Assessment Form demonstrates that these amendments will not
result in any large and important impacts and, therefore, is one that will not have a
significant impact on the environment, and (iv) adopt the proposed amendments in
the PUD as presented. All five members of the Council voted in the affirmative.
On April 7, 2009, Commissioner Franck moved and Commissioner
Scirocco seconded to declare a negative declaration under SEQRA for the Saratoga
Hospital PUD Amendment. The Council reviewed each of the 20 questions on Part
II of the SEQRA form and answered each of those 20 questions in the negative .
The Council then adopted the resolution by unanimous vote.
1 Minutes of the approval resolutions in 2003, 2009, 2011 and 2013 are attached hereto.
On March 1, 2011, Commissioner Franck introduced the zoning amendment
to the Council describing the proposed action with the Saratoga Golf and Polo
Club, then proceed through each of the questions set forth on the SEQRA form in
advance of a motion by Commissioner Franck, seconded by Commissioner Ivins to
issue a SEQRA negative declaration. The motion was adopted unanimously by the
Council.
On October 1, 2013, Mayor Johnson introduced the proposed Saratoga
Hospital PUD Amendment and proceeded through the individual questions set
forth on the SEQRA form. At the conclusion of that review by the Council, Mayor
Johnson moved, and Commissioner Franck seconded, the motion to issue a
SEQRA negative declaration. That motion was adopted unanimously.
Consistent with the process undertaken the City Council for the last four
PUD Amendment Applications, The Saratoga Hospital has submitted a project
narrative and a Full Environmental Assessment Form for review and analysis by
the City Council.
The Council’s 37-year history with the review of The Saratoga Hospital
PUD and the six amendments thereto have provided the Council with substantial
background and familiarity with the campus as it has expanded over the years.
With each amendment to the PUD, the Council – serving as lead agent – has
undertaken the environmental review of those aspects of each project that are new
and different from the environmental impacts evaluated by the Council during
previous applications. Continuing in this format, the Hospital urges the City
Council to again perform all of the functions as lead agent in order that it fully and
properly assess the impacts associated with the development of the Center for
Successful Aging and the other smaller changes to the PUD in order that it take a
hard look and make a reasoned elaboration of the significance of those impacts.
The Hospital looks forward to providing the City Council with all of the
information reasonably required by the Council to perform its function fully,
thoroughly and with reasonable diligence.
Page 1 of 13
CITY OF SARATOGA SPRINGS
CITY COUNCIL MEETING
CITY COUNCIL ROOM
TUESDAY, OCTOBER 21, 2003
7:00 P.M.
PRESENT :Commissioner Thomas Curley, DPS
Commissioner Michael Lenz, Finance
Kenneth Klotz, Mayor
Commissioner Thomas McTygue, DPW
Commissioner Stephen E. Towne, Accounts
ALSO PRESENT:Anthony Scirocco, Supervisor
Phil Klein, Supervisor
STAFF PRESENT :Bruce Brown, Deputy Commissioner, DPW
Erin Dreyer, Deputy Commissioner, DPS
Christine Gillmett-Browne, Deputy Commissioner, Finance
Deborah Harper, Deputy Commissioner, Accounts
Hank Kuczynski, Deputy Mayor (arrived 8:00 p.m.)
Jeff Wait, City Attorney (arrived 7:15 p.m.)
SARATOGA HOSPITAL PUD B PUBLIC HEARING
Mayor Kenneth Klotz said this was a public hearing on a petition submitted by the Saratoga Hospital to amend
the Saratoga Hospital Medical/Professional PUD at 211 Church Street.He said the required advisory opinion
from the City Planning Board was on file.He noted that the Planning Board made a number of revisions to the
original proposal and they have issued a favorable advisory opinion on those revisions.He said on October
14,2003,the petitioner submitted a set of minor amendments that deleted any reference to a new heliport on
the roof of the main hospital building and those amendments have been incorporated in the final draft
ordinance that was distributed to the Council yesterday by the City Attorney.He said the required proof of
notice to nearby by property owners has been submitted.
Appearing before the Council was Matthew Jones &Stephanie Feradino,attorneys,representing the applicant;
Steve Everest;John Dawes,CT Male;Ken Wurston,Creighton Manning;and Steve Frenchak,Saratoga
Hospital.Matthew Jones showed a power point presentation of this project.He reminded Council members
that in July,he appeared before the Council with an overview of the project.He explained that areas B,C,D,
&E are the parking lot and area A being the hospital.He said that the focus of tonight=s presentation was
Zone A.He said there are two proposed major undertakings in Zone A,the radiation unit and patient care
addition to the northwest corner.He said,though,that there had been some minor changes to Zones B,C,D
& E. He said those changes include additional parking and a five percent change in building space.
Matthew Jones said the project originally proposed in July is different from what was before the Council this
evening.He explained that the applicant now proposes the possibility of doubling the size of the radiation
therapy center from 9,000 to 18,000 square feet by adding a second floor.He said another change to this
proposal was the traffic flow.He said they are now proposing to widen Corey Lane from 15 feet to 40 feet and
along Medical Arts Lane they will donate some land to the City to correct the traffic flow concerns in that area.
He said there will also be some allowances for Dr.Byrne=s parcel.He explained that some of Dr.Byrne=s
parking is in the public right of way and they will be sure that Dr.Byrne is not disadvantaged in any way
through this project.Matthew Jones said if this project is approved this evening,they will return to the Planning
Board on November 5,the Design Review Commission on November 6 and then onto the Department of
Health on November 20.
Matthew Jones said the second part of this proposal was the patient care addition on the northwest corner.He
said originally the building was a rectangular building,but since meeting with the neighbors,the Planning
Board and the City=s Real Estate Committee,the shape of the building has been changed to square and is
City of Saratoga Springs City Council Meeting Minutes
Tuesday, October 21, 2003
Page 2 of 13
now 80 feet from the northerly boundary line and 10 feet from Myrtle Street.He said they have not yet
developed the design of the building.He noted that the ambulance entrance will be located on Myrtle Street
and they have also agreed to maintain the mature vegetation between the hospital and the neighbors.He said
they will also do many other things to minimize the noise,lighting and other negative environmental impacts to
the neighbors in this area.
Matthew Jones summarized the changes noting that the parking along the boundary line near the Golf &Polo
Club had been removed and more parking for staff has been added,Corey Lane will be widened,Medical Arts
Lane pavement will be corrected,Byrne=s needs will be met and they will work with DPW to run a storm
drainage system to connect to a manhole in Woodland Court.He said if all goes well,they planned to start the
site work in December and they hoped to have the radiation therapy center operating by spring.
Matthew Jones said they have also removed the heliport site from the top of the patient care addition,
therefore,that was not an item for discussion this evening.He said that the addition of the heliport will require
further study.
Matthew Jones said the addition of the patient care addition is sorely needed.He said the Emergency
Department can comfortably accommodate 22,000 patients per year,but they exceed 30,000.He said this will
also allow for the expansion of the ICU and allows for three floors of new patient rooms.He said through this
expansion, the hospital would be able to meet the needs of the community.
Mayor Kenneth Klotz asked about the timetable for this addition.Matthew Jones said it would be between one
and two years before site plan review took place.He said,though,that as the demand for beds and
emergency services increases,the timetable will continue to move up.Mayor Kenneth Klotz clarified that the
radiation therapy center and the patient care addition were independent of one another.Matthew Jones said
yes. He said they both need separate approvals from the Department of Health.
Mayor Kenneth Klotz opened the public hearing.
Kathleen Hamill,Vice President &Chief Nurse,said she oversees patient care on a day to day basis.She said
because of the growth on patient population,they have had to hold patients in waiting rooms and postpone
elective surgeries.She said this is a very important project that will add more beds and also provides for more
privacy for patients.She also noted that the radiation therapy center will also assist patients so that they do
not have to travel 45 minutes for treatment.
Dr.Timothy Brooks,Emergency Room director,said he has been in this community for more than 16 years.
He said when he first arrived at the Emergency Department staff saw about 24,000 patients each year,but that
number has now increased to about 34,000.He said the hospital has only 16 spots available in the
Emergency Department for patients,therefore,although it was unfortunate,the hallway is often used to
accommodate patients.He said they are hindered by the physical plant and the additional space will allow for
privacy and also allows for different options for patients.He said the radiation therapy center is also needed so
that patients do not need to travel so far for treatment.
Cynthia Giordano,Myrtle Street &Woodland Court,said while she supported this application there are impacts
to the value of their homes. She said drainage is difficult in this area and it needed to be addressed in detail.
Sal Ferlazzo,attorney representing the neighbors,said he had been working with City staff and the applicants=
attorneys on this matter.He said the neighbors were glad to see that the heliport had been removed from this
proposal.He said the neighbors are not opposed to this proposal,but wanted to be sure that it went through
the proper SEQR process.He said they were concerned that the SEQR process had not been followed.Sal
Ferlazzo explained that under this zoning,this was a type one action which presumes that an EIS is required.
He said there are significant impacts to the neighbors.He said if the SEQR standards are reduced for this
project,the Council would need to follow suit on other projects.He pointed out that this is a five-story building
and it impacts the neighbors.He said the impacts include,traffic,noise,property values and drainage and
quality of life.He said there have been no studies on the visual impact,drainage or traffic.He said they were
City of Saratoga Springs City Council Meeting Minutes
Tuesday, October 21, 2003
Page 3 of 13
also concerned with hazardous materials.He said they were also very concerned that there was some
segmentation and that the hospital will bring back the heliport.He then quoted from previous case law on
segmentation findings.Sal Ferlazzo said the Council should be going through the environmental process and
encouraged the Council to do so.
Lew Benton,Planning Board Chair,said the Planning Board worked with all interested parties and crafted
changes to the proposal to accommodate the concerns.He said the only change to the proposal since the
Planning Board forwarded their favorable advisory opinion was the removal of the heliport.He said one of the
more important recommendations of the Planning Board was the establishment of a capital reserve fund that
would be used for traffic mitigation.He said they encouraged the Council to channel any fees that the hospital
might incur under future applications to be used for traffic related issues.He reminded Council members that
at every phase of this project there will be review by the Planning Board and in some cases the Design Review
Commission as well.He said the Planning Board has the authority to halt subsequent phases if adequate
infrastructure is not in place.He said at each phase of the project there will be negotiation.He noted that the
Planning Board had the foot print of the patient care addition reconfigured to accommodate neighbors
concerns.
Lew Benton said that while the Planning Board is an involved agency,it is the Council is the lead agency on
this project.He reminded Council members that the Planning Board recently dealt with the segmentation
matter on another project and the case was dismissed.He said a Type I SEQR does not compel a DEIS.He
said that what is required is that the applicant complete part one the Council make a determination under part
two and the impact and mitigation are identified under part three,if necessary.He said the Planning Board
was comfortable that the process had been adhered to.He said the City Council has not violated any SEQR
procedures because the Council has not taken any action on this application.
Deane Pfeil,340 Broadway,member of the Saratoga Care Foundation Board,said the hospital adds to the
community.She said it was especially nice that residents do not need to travel 45 minutes to get to an
emergency room.She said many of the physicians are board certified and they contribute to the health of the
community through their excellent medical services provides.She also noted that the hospital is one of the
largest employers in the area.She too agreed that the Emergency Department is seeing more patients each
year.She said the outpatient services for 2002 were at 188,000 and the hospital is now constructing an
ambulatory surgery center in Wilton to assist them in that area.She said they operate close to capacity nearly
every day. She urged the Council to approve this application.
Joanne Avella,Seward Street,said she supported this application and noted that she was a former hospital
board member.She said though that she was concerned with the widening of Corey Lane and the impact it
would have on her neighborhood.She said Seward Street already has a lot of traffic and this would only
increase that amount.She said she supported the project but hoped the Council would consider the impact to
the surrounding neighbors.
Anna Alpern,14 Woodland Court,said she was concerned about the traffic in this area.She said she was also
concerned that the heliport proposal would be brought back sooner rather than later.She said the hospital
should agree to the neighbors request that it not be brought back for at least five years.
Wayne Harrision,8 Medial Arts Lane,said Medical Arts Lane should remain a City street.He said they need to
have access for postal services, plowing, etc.
Alice Smith,Woodland Court,said while the hospital expansion is needed,it should be studied carefully.She
said she was concerned about the details of the project such as the drainage and traffic.She said she did not
believe enough study had been done in those areas.
Doug Dockendorf,48 Myrtle Street,agreed there are a lot of issues that have not yet been addressed.He said
the neighbors should be made to feel comfortable with the project.He said he supported the project,but
wanted to see studies completed.
City of Saratoga Springs City Council Meeting Minutes
Tuesday, October 21, 2003
Page 5 of 13
ACCOUNTS DEPARTMENT
Saratoga Hospital PUD (03-165)
Commissioner Stephen Towne asked Jeff Wait,City Attorney,to respond to some of the issues raised by the
neighbors=attorney.Jeff Wait said he had not heard all of the comments because of his late arrival,therefore,
it was not appropriate for him to respond.He said he did hear Lew Benton=s remarks and spoke to Geoff
Bornemann,City Planner,and it was their opinion that the requirements which trigger a DEIS were not
sufficient and he concurred.
Geoff Bornemann clarified that this is not a Type I action because it is 25 acres but because it is adjacent to
the historic district.He also noted that a negative SEQR determination has previously been issued by the
Council.He said the negative SEQR was issued with an environmental process and not a DEIS.He further
explained that the Council must first establish the lead agency and then that will allow the Council to evaluate
the environmental assessment work included in the Council=s packet.He said it was the Council=s choice,
however,he did not believe that there was anything in the application that was so large that it could not be
mitigated.He said if the Council chooses to require a DEIS,the document must be modified because those
factors had not been listed.He said just because it is a Type I process does not automatically mean that it
needs to go to a DEIS.He said there has been some visual and traffic analysis and those documents exist as
part of the record for this project.
Commissioner Michael Lenz asked if Council action tonight would violate the SEQR process.Geoff
Bornemann said it was up to the Council to determine if the packet was complete.
Commissioner Stephen Towne said that pursuant to the Council=s request of July 16,the City Planning Board
reviewed the proposed zoning amendments to the Saratoga Hospital Medical/Professional Planned Unit
Development District.He said the Planning Board reviewed the proposal at their July 23,September 10 and
September 17 meetings and as a result of that process they have revised the text and map of the proposed
amendments.Those meetings produced several changes to the PUD ordinance as follows:a)several
amendments were designed and intended to reduce negative sensory and physical impact on Woodland Court
and encourages a more urban design of the patient care addition;b)the changes also recognize potential traffic
generating characteristics of several of the improvements to be made and suggested a strategy for advancing
traffic improvements.He said these changes include the establishment of a capital reserve fund to be used
exclusively to finance necessary traffic improvements on the Church Street corridor.He said at the Planning
Board=s September 10 meeting they voted 7-0 to defer lead agency status for this project to the City Council.
He said at the Planning Board=s September 17 meeting they voted 7-0 to issue a favorable advisory opinion
on the revised proposed amendment for the following reasons:
1.The proposal meets the intent and objective of the PUD as expressed in Article 240-3.5:
a)It meets all the general requirements of Article 240-3.5
b)The proposal is conceptually sound in that it meets a community need and it conforms
to acceptable design principles in the proposed functional roadway system,land use
configuration,open space system,drainage system and scale of the elements,both
absolutely and to one another.
2.There are adequate services and utilities available or proposed to be made available in the
construction of the development.
Therefore,Commissioner Stephen Towne moved and Commissioner Thomas Curley seconded that the
Council:
1.Establish itself as the lead agent for the SEQR environmental review because no other
involved agencies have challenged this request;
2.Declare that Part II of the SEQR long environmental assessment form has been reviewed
and is deemed accurate and complete;
3.Issue a negative declaration of environmental significance because the analysis of the
information provided and presented in Part II of the environmental assessment form
City of Saratoga Springs City Council Meeting Minutes
Tuesday, October 21, 2003
Page 6 of 13
demonstrates that these amendments will not result in any large and important impacts
and, therefore, is one that will not have a significant impact on the environment; and
4.Adopt the proposed amendments to the PUD as presented.
Mayor Kenneth Klotz said that clearly the hospital had made a great effort to work with the neighbors and a
number of those issues have been resolved.He said for further explanation though on the heliport issue.Matt
Jones said there had been some discussion that the hospital not bring this matter back before the Council for
five years from the time the building is completed.He said the applicant views this matter differently,though,
in that the heliport may never come to fruition.He said there is also the matter that approach to the heliport
from the southeast could be better.He said the applicant was willing to work with the neighbors on this time
frame.
Sal Ferlazzo said on behalf of the neighbors they were willing to compromise at four years.He said they were
looking for some comfort level.Matthew Jones said it would be good if the applicant could say that this matter
had been resolved and that the neighbors were content,but that was not the case.Sal Ferlazzo said he
reserves the right on behalf of the neighbors to look at their legal options on this matter.He said they were
comfortable with many of the other issues such as traffic and drainage and they wanted the same comfort level
for the heliport.
Commissioner Michael Lenz clarified that if the Council adopts this proposal this evening,the applicant would
return to the Planning Board for further review of such details.Matthew Jones agreed and further noted that
they would also appear before the Design Review Commission.
Commissioner Stephen Towne said that it was important to note that there is a public benefit to this project.
He urged a continued dialogue among all interested parties.He agreed that all of these details need to be
looked at under the site plan review process.
Mayor Kenneth Klotz asked Jeff Wait if a Type I action requires a full DEIS.Jeff Wait said it does not require a
full DEIS.Mayor Kenneth Klotz said the Council could determine that there are environmental impacts but
they could be mitigated in ways that do not require a full study.Jeff Wait agreed.Mayor Kenneth Klotz said
the Planning Board has recommended that the Council issue a negative SEQR.Jeff Wait said that approval of
the motion would be appropriate and he was comfortable with the Council proceeding in this matter.
Ayes all.
MAYOR =S OFFICE
Land Acquisition Consultant
Mayor Kenneth Klotz said this item appeared on his agenda two weeks ago and he withdrew it for further
review. He asked Jeff Olson to comment.
Jeff Olson explained that he had met with Commissioner Stephen Towne to address his concerns.He said
they have since reviewed the package and are now ready to proceed.He said he understood that there were
two other interested firms wishing an opportunity to review this proposal.He said he talked to both of those
firms today and asked them to give him a proposal with a fee structure but he did not receive anything.
Therefore,they are ready to proceed.He said there is some concern that if the committee does not take action
soon, these parcels may no longer be available. He said there was already one parcel that was under contract.
Mayor Kenneth Klotz moved and Commissioner Thomas McTygue seconded to accept the
recommendations of the Land Acquisition Committee for the hiring John Behan Associates as consultants
on this matter under the terms and conditions as presented .
PRESENT:Scott Johnson, Mayor
John Franck, Commissioner of Accounts
Ken Ivins, Commissioner of Finance
Ron Kim, Commissioner of DPS
Anthony Scirocco, Commissioner of DPW
PRESENT:Matthew Veitch, Supervisor
Joanne Yepsen, Supervisor
STAFF PRESENT:Michele Boxley, Deputy Commissioner, Accounts
Eileen Finneran, Deputy Commissioner, DPS
Kate Jarosh, Deputy Commissioner, Finance
Shauna Sutton, Deputy Mayor
Joe Scala, City Attorney
ABSCENT:Patrick Design, Deputy Commissioner, DPW
RECORDING OF PROCEEDING
The proceedings of this meeting were taped for the benefit of the secretary.Because the minutes are not
a verbatim record of the proceedings, the minutes are not a word-for-word transcript.
PUBLIC HEARINGS
Citizen Advisory Committee Recommendations for 2009 Entitlement Action Plan
Mayor Johnson opened the public comment period at 6:51p.m.
No one spoke.
Mayor Johnson closed the public hearing.
Street Acceptance – David Lane
Mayor Johnson opened the public comment period at 6:52 p.m.
No one spoke.
Mayor Johnson closed the public hearing.
Saratoga Hospital PUD Amendment
Mayor Johnson opened the public comment period at 6:55 p.m.
No one spoke.
Mayor Johnson kept the public hearing open for the public to respond after they hear the presentation.
CITY OF SARATOGA SPRINGS
CITY COUNCIL MEETING
CITY COUNCIL ROOM
TUESDAY, APRIL 7, 2009
7:00 P.M.
City Council Meeting
4/07/09
Page 4 of 23
Rich Straut advised the Geyser Crest Wellfield is a significant asset of the City’s drinking water system.
There have been some issues in the past year of so that they have been helping the City address.It is a
major part of the City’s supply source.The wellfield has 7 wells and is capable of pumping 187 million
gallons of water per day.Currently 4 wells are not capable of being used.This past November,the
Department of Health inspected the well site and noted several things that needed to be addressed.The
biggest issue being that 4 out of the 7 wells are incapable of being used;one of the well pumps has met
its lifespan.Three of the smaller wells can’t be used because the storage tank they are hooked to has
sprung a leak and had to be shut down.A significant part of the mechanical pumping systems are down
and need to be retrofitted.The disinfection of the water has been determined insufficient by the health
department.The water is disinfected by liquid chlorine;but what is missing is enough time where the
water is in contact with the liquid chlorine before it reaches the residents.The Department of Health has
given the City until December 1,2009 to correct that or all of the people who use the water supply will
have to be on a continuous boil water notice.Barton &Loguidice helped the City earlier this year to
secure a grant from NYSERDA to begin the engineering analysis on that.
The last upgrade was over 20 years ago.NYSERDA’s interest is these wells it to be more energy
efficient.The plan includes fixing the disinfection system;this will have to be a fast track fix to be done by
December 1st to prevent a boil water situation.The project cost is $770,000 for the upgrade;the City had
budget approximately $550,000 prior to the report being done.
Commissioner Franck asked what areas the wellfields cover.
Rich stated the water covers all of Geyser Crest;they use about 260,000 gallons per day.Another
400,000 gallons per day comes back into the City system.
Presentation – Saratoga Hospital PUD Amendment
Stephanie Ferradino of Jones Ferradino presented.In 2003 the Planned Development Unit (PUD)that
was made was significant.They added acreage to the campus to accommodate the radiation oncology
center and the emergency room.This amendment is less complex and the changes far fewer than in
2003.The current amendments are intended to add 2 properties to the PUD.One property at 238
Church Street is currently owned by the hospital.The second property is 35 Myrtle Street,which is
currently a doctor’s office;they will be using this parcel for parking.The property at 238 Church Street will
be used as a respite for the doctors who are on call.The hospital signage is not intended to change,so
they are looking for administrative review for a similar sign.
Commissioner Kim asked if there are standards of what will be referred for administrative review.
Stephanie advised there approvals that have already been granted.If the sign doesn’t fall within that
approval,the sign will have to go through the normal process,where you start at zoning and go through
design review. They are asking that the Council take action under SEQRA.
Commissioner Ivins asked what has been addressed regarding ground water by taking an existing
structure and turning it into more parking.
Stephanie advised they are increasing the pervious surfaces so that the amount of green space located
within that lot is increased. It is sufficient to handle the runoff.
EXECUTIVE SESSION
Mayor Johnson moved and Commissioner Scirocco seconded to move to executive session regarding
proposed,pending or current litigation;personal private information of a person or corporation,or
matters leading to the appointment,employment,promotion,demotion,discipline,suspension,
dismissal or removal of a person or corporation.
Ayes – ALL
City Council Meeting
4/07/09
Page 10 of 23
and our own zoning ordinance and City Charter were raised,discussed,and dismissed by the court.
There were 3 claims being made:declare the City Council approval of the project violated the City
Charter and the state finance law because the project was not included in the City’s 6 year capital
program for 2009,violated city ordinance because the City initially bypassed the Zoning Board of Appeals
and did not apply for area variances from that board,and the City violated SEQRA both procedurally and
substantively in that such violations mandated the City Council made previously of a negative declaration
meaning it had no adverse environmental impact to the chosen site and seeking the forcing of the City to
go back a do a ‘proper’SEQRA review of the project.The court dismissed them as being without merit.
The court also commented that the alienation issue –the building of the indoor recreation center on this
land would constitute alienation of park land that wasn’t previously approved by the state department with
jurisdiction in that matter –the court found there was no alienation on this project in this capacity.The
court also found in favor of the City regarding the deed restrictions on this land which states in the event
the land was not used as a playground or for recreational purposes,it could possibly revert or go back to
the ownership of the school district if the City violated the use of land.The court found that the deed
restriction was not being violated for the proposed use by the City.These are all relevant findings by the
court.This was a complete validation and vindication of the City’s position on this project on these issues.
He is pleased to report to the community the City was upheld across the board on these issues.
The Department of Labor stop bid order is still in effect.We are in negotiations hour by hour.He is
hopeful they may have the final determination by tomorrow.
Accounts Department
Announcement: Saratoga County Economic Opportunity Council Volunteers
Commissioner Franck announced as the elected official for the City of Saratoga Springs on the Board of
the Saratoga County Economic Opportunity Council,I wanted to share some information.The Saratoga
County EOC is starting a new initiative to assist individuals who live and work at the Saratoga Race
Course Backstretch.The EOC will be starting a backstretch community dinner for workers that are on the
track grounds at the very beginning and very end of the training season,when no other food service is
available on the track.Starting April 15th thru May 15th and then again October 15th thru November 15th,
the EOC will be cooking and serving dinner Monday thru Friday from 4:30 –5:30 pm.The EOC is looking
for volunteers to assist with either cooking or serving.This is a great opportunity for all of us to show
support of our community and lend a hand.He will be serving.If anyone else is interested,please
contact the EOC at 587-3158 ext. 37.
Discussion and Vote: SEQRA for Saratoga Hospital PUD Amendment (09-91)
Commissioner Franck moved and Commissioner Scirocco seconded to declare a negative declaration
under SEQRA for the Saratoga Hospital PUD Amendment.
The City’s Planning Board and Design Review Commission as well as Saratoga County’s Planning Board
reviewed the Saratoga Hospital PUD Amendment.All of these boards approved or issued a favorable
advisory opinion for this project.The applicant has completed Part 1 of the SEQRA long form and the City
Council must complete Part 2 of the SEQRA long form as they claimed lead agency at the City Council
meeting held on February 3, 2009.
Although the applicant provided a draft copy of how to complete Part 2 of the SEQRA long form,it is the
Council’s final decision.I will read through each question of Part 2 of the SEQRA form and suggest the
appropriate answer to the Council.
Impact on Land:
1.Will the Proposed Action result in a physical change to the project site? NO
City Council Meeting
4/07/09
Page 11 of 23
2.Will there be an effect to any unique or unusual land forms found on the site?(i.e.,cliffs,dunes,
geological formations, etc.) NO
3.Will Proposed Action affect any water body designated as protected?(under Articles 15,24,25 of
the Environmental Conservation Law, ECL) NO
4.Will Proposed Action affect any non-protected existing or new body of water? NO
5.Will Proposed Action affect surface or groundwater quality or quantity? NO
6.Will Proposed Action alter drainage flow or patterns, or surface water runoff? NO
7.Will Proposed Action affect air quality? NO
8.Will Proposed Action affect any threatened or endangered species? NO
9.Will Proposed Action substantially affect non-threatened or non-endangered species? NO
Impact on Agricultural Land Resources:
10.Will Proposed Action affect agricultural land resources? NO
Impact on Aesthetic Resources:
11.Will Proposed Action affect aesthetic resources?(If necessary,use the Visual EAF Addendum in
Section 617.20, Appendix B) NO
12.Will Proposed Action impact any site or structure of historic,prehistoric or paleontological
importance? NO
Impact on Open Space and Recreation:
13.Will Proposed Action affect the quantity or quality of existing or future open spaces or recreational
opportunities? NO
14.Will Proposed Action impact the exception or unique characteristics of a critical environmental
area (CEA) established pursuant to subdivision 6NYCRR 617.14(g)? NO
Impact on Transportation:
15.Will there be an effect to existing transportation systems? NO
Impact on Energy:
16.Will Proposed Action affect the community’s sources of fuel or energy supply? NO
Noise and Odor Impact:
17.Will there be objectionable odors, noise, or vibration as a result of the Proposed Action? NO
Impact on Public Health:
18.Will Proposed Action affect public health and safety? NO
Impact on Growth and Character of Community or Neighborhood:
19.Will Proposed Action affect the character of the existing community? NO
20.Is there,or is there likely to be,public controversy related to potential adverse environment
impacts? NO
Commissioner Franck stated he received e-mails in the past from homeowners on Woodland Court.The
e-mails were primarily questions, not comments.
Stephanie Ferradino explained the residents of Woodland Court were more involved during the 2003
amendment because it affected the helipad.
Commissioner Franck continued to say since there were no potentially large impacts identified in Part 2,
we do not proceed to Part 3. The City Council of the City of Saratoga Springs has reviewed and analyzed
City Council Meeting
4/07/09
Page 12 of 23
Parts 1 and 2 of the full EAF; has fully considered the environmental impacts of the project and hereby
determines that the project will not result in any large or important impacts and therefore is one which will not
have a significant impact on the environment. Therefore, a negative declaration is hereby issued by the City
Council for this project which will be maintained in a file readily accessible to the public as well as required
from the SEQRA.
Mayor Johnson asked if the planned redevelopment of the intersection of Church Street and Myrtle Street
was taken into consideration with the draft answers to these questions.
Stephanie Ferradino stated that the engineers were well aware of the fact of the proposed construction,
however the answers were provided under the present configuration.
Ayes – All
Discussion and Vote: Approval of Saratoga Hospital PUD Amendment (09-92)
Commissioner Franck stated as just discussed,the City Council approved a negative declaration under
SEQRA for the Saratoga Hospital PUD Amendment.
Mayor Johnson closed public hearing so a vote can be taken.
Commissioner Franck moved and Commissioner Scirocco seconded to approve the zoning
amendment request for the Saratoga Hospital PUD as presented to the Council.
Aye s - All
Discussion and Vote: Support of New York State Records Management Program (09-80)
Commissioner Franck moved and Commissioner Ivins seconded to accept the resolution as read.
Commissioner Franck advised the Local Government Records Management Improvement Fund was
established in 1989 to fund grants to local governments for the management of their records and to fund
the provision of related advisory services through nine regional record management offices across the
State.
The City has benefited immensely from the program;we have received $425,000 in grants to fund many
projects including inventories,record storage improvements,microfilming,e-government initiatives,map
scanning,record surveys and Novus Agenda.I urge the Council to please support the following resolution
to officially demonstrate our continuing support of this prolific and effective program:
Resolution of Support for Local Government Records Management Improvement Fund (LGRMIF)
Whereas , the New York State Archives and Records Administration’s Cultural Education Account and the Local Government
Records Management Improvement Fund is primarily supported by fees charged by County Clerks for index numbers of pending
Supreme and County Court actions; and
Whereas , the Cultural Education Account Funds most of the operations of the State Museum Library and Archives; and
Whereas , the Local Government Records Management Improvement Fund (LGRMIF) has been providing technical assistance and
grants to establish, improve or enhance records management programs in New York’s 4400 local governments since its creation in
1989; and
Whereas , the LGRMIF has supported the preservation of over 3 million essential documents throughout New York State, ensuring
their continued availability to the public including students, teachers, genealogists, and other researchers, through education and the
awarding of over $176 million in records management improvement grants to local governments; and
Whereas , since 1989, State Archives staff have conducted 20,000 site visits to local governments to provide hands-on records
management guidance and have trained over 10,300 local government officials to manage both paper and electronic records
through 130 onsite workshops and webinars offered annually to local governments at no cost to the taxpayers; and
Whereas , the City of Saratoga Springs has benefited from technical assistance, training, publications and has received 22 grants
totaling $424,923from the LGRMIF to improve and increase access and availability of records and information to the public; and
Whereas , the City’s records management program continues to be a viable and intrinsic liaison between municipal leadership and
the public in striving toward the City’s goal of transparency in government; and
Whereas , the LGRMIF fee has never been increased since its inception in 1989,
Now therefore be it resolved that the City Council of the City of Saratoga Springs supports Assembly Bill A.6783 and Senate Bill
S.3460, which propose increases in the fees supporting the Cultural Education Account from $15.00 to $22.50 and the Local
7:00 PM
CALL TO ORDER
ROLL CALL
SALUTE TO FLAG
PUBLIC COMMENT PERIOD / 15 MINUTES
PRESENTATION(S)
1.WASAD Annual Report
EXECUTIVE SESSION:Discussion regarding proposed,pending or current litigation;personal
private information of a person or corporation,or matters leading to the appointment,employment,
promotion,demotion,discipline,suspension,dismissal or removal of a person or corporation,
collective negotiations.
CONSENT AGENDA
1.Approval of 2/15/11 City Council Minutes
2.Approval Budget Amendments
3.Approve Budget Transfers
4.Approve Capital Fund Budget Transfers
5.Approve Payroll 2/18/11 $401,533.02
6.Approve Payroll 2/25/11 $425,436.10
7.Approve Warrant 2010 Mid 10MWDEC7 $14,229.89
8.Approve Warrant 2010 Mid 10DEC8 $1,250.00
9.Approve Warrant 2011 Mid 11MWFEB3 $775,606.42
10.Approve Warrant 2011 Regular 11MAR1 $256,142.33
11.Correction Payroll 2/4/11 $370,158.90
MAYOR’S DEPARTMENT
1.Presentation: 2011 CDBG Funding Recommendations
2.Set Public Hearing:Citizen Advisory Committee Recommendations for 2011 Entitlement Action
Plan
3.Discussion and Vote: Indoor Recreation Center American Red Cross Agreements
4.Discussion: Closure of Borders Bookstore
ACCOUNTS DEPARTMENT
1.Discussion: Basic STAR Income Requirements
2.Discussion and Vote: Creation of a Temporary Clerk Position with State Archives Grant Funds
3.Discussion and Vote: SEQRA for Saratoga Golf and Polo Zoning Amendment
4.Discussion and Vote: Approval of Zoning Amendment for Saratoga Golf and Polo
5.Discussion and Vote: SEQRA for Saratoga Hospital PUD Zoning Amendment
6.Discussion and Vote: Approval of PUD Zoning Amendment for Saratoga Hospital
March 1, 2011
CITY OF SARATOGA SPRINGS
City Council
Meeting
Agenda
City Council Meeting
3/1/11
Page 4 of 13
Commissioner Ivins stated the numbers Commissioner Scirocco showed have not been audited by his
department yet.
John Krause of 227 Grand Avenue asked if DPW has completed the project with the sewer line in the
Jefferson Street area.
Paul Male,city engineer advised phases have been completed.They have plans to start on Phase 5 this
spring.
Mr.Krause continued to say he can’t complain about a 2%increase.The water and sewer budget in total
is voted on in November as part of the comprehensive budget.He understands it is a timing problem;
however,he sees that problem as the same problem Commissioner Ivins faces when he has to put
together an operating budget with information available through September.He wonders if there is a way
next October to do trend analysis for the past 5 or 10 years to gain a better idea of the projected water and
sewer budget.
Commissioner Ivins closed the public hearing at 6:56 p.m.
Zoning Amendment for Saratoga Golf & Polo
Commissioner Ivins opened the public hearing at 6:57 p.m.
Stephanie Ferradino,attorney for the applicant,clarified that items 3 &4 of the Accounts agenda should
have Saratoga Hospital removed as it relates to the golf and polo club only.
Commissioner Ivins closed the public hearing at 6:58 p.m.
PUD Zoning Amendment for Saratoga Hospital
Commissioner Ivins opened this public hearing at 6:58 p.m.
No one spoke.
Commissioner Ivins closed the public hearing at 7:01 p.m.
CALL TO ORDER
Commissioner Ivins called the meeting to order at 7:01 p.m.
PUBLIC COMENT
Commissioner Ivins opened the public comment period at 7:02 p.m.
Commissioner Ivins said the public comment period is limited to a total of 15 minutes and
individuals are limited to two minutes each according to the rules approved in February of 2004 by
the City Council.
Rick Thompson of 26 Frederick Drive stated he finds it unusual our citizens can’t vote on a lawful issue.
He read a letter to the editor from the February 26,2011 Saratogian.This letter was written by Barbara
Thomas of the League of Women Voters.He stated this is an unbiased group that would like to see this
proposal on the ballot.
City Council Meeting
3/1/11
Page 8 of 13
Discussion and Vote: SEQRA for Saratoga Golf & Polo Zoning Amendment (11-69)
Commissioner Franck advised the zoning amendment proposed is for the exchange of land between
Saratoga Hospital and Saratoga Golf &Polo Club.The hospital proposes to exchange 1.5 acres of land
from the hospital campus on the west side of Myrtle Street,upon which the Saratoga Golf &Polo Club has
their driving range,for a .61 acre,“L”shaped portion of land from Saratoga Golf and Polo Club.The City
and County Planning Boards reviewed this amendment and both boards approved or issued a favorable
advisory opinion.The applicant has completed Part 1 of SEQRA Short Form.Now the City Council must
complete Part 2 of the SEQRA Short Form.He proposed the following responses to Part 2 of the SEQRA
Short Form:
A. DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR, PART 617.4? No
B. WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR, PART
617.6? No
C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED WITH THE FOLLOWING:
C1. Existing air quality, surface or groundwater quality or quantity, noise levels, existing traffic pattern, solid waste
production or disposal, potential for erosion, drainage or flooding problems? No Impact anticipated.
C2. Aesthetic, agricultural, archaeological, historic or other natural or cultural resources; or community or
neighborhood character? No Impact anticipated.
C3. Vegetation or fauna, fish, shellfish or wildlife species, significant habitats, or threatened or endangered species?
No Impact anticipated.
C4. A community’s existing plans or goals as officially adopted, or a change in use or intensity of use of land or other
natural resources? No Impact anticipated.
C5. Growth, subsequent development, or related activities likely to be induced by the proposed action? No Impact
anticipated.
C6. Long term, short term, cumulative, or other effects not identified in C1-C5? No Impact anticipated.
C7. Other impacts (including changes in use of either quantity or type of energy? No Impact anticipated.
D.WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE
ESTABLISHMENT OF A CRITICAL ENVIRONMENTAL AREA (CEA)? No
E.IS THERE, OR IS THERE LIKELY TO BE, CONTROVERSY RELATED TO POTENTIAL ADVERSE
ENVIRONMENTAL IMPACTS? No
Part III
Check this box if you have determined,based on the information and analysis above and any supporting documentation,
that the proposed action WILL NOT result in any significant adverse environmental impacts AND provide,on attachments
as necessary, the reasons supporting this determination.
Commissioner Franck advised based upon the answers to Part 2 of the SEQRA Short Form, it is the City
Council’s opinion that the project will not result in any large or important impacts, therefore it is one that will
not have a significant adverse impact on the environment.
Commissioner Franck moved and Commissioner Ivins seconded to issue a SEQRA Negative
Declaration for this action.
Ayes - All
Discussion and Vote: Approval of Zoning Amendment for Saratoga Golf & Polo (11-70)
Commissioner Franck moved and Commissioner Wirth seconded to approve the zoning
amendment proposed by Saratoga Golf & Polo Club.
Ayes - All
Discussion and Vote: SEQRA for Saratoga Hospital PUD Zoning Amendment (11-71)
Commissioner Franck advised the PUD zoning amendment proposes the following:
Remove a portion of land which is currently located in the PUD and add it to a .6 acre portion of
land that is being received from Saratoga Golf and Polo Club.
Increase the size of the proposed C-2 building by 10,000 square feet based on .6 acre property
proposed for additional parking.
City Council Meeting
3/1/11
Page 9 of 13
Modify portions of the legislation which are either no longer applicable or consolidate sections that
have the same purpose and intent.
He continued to say the City and County Planning Boards reviewed this amendment and both boards
approved or issued a favorable advisory opinion.The applicant has completed Part 1 of SEQRA Long
Form.Now the City Council must complete Part 2 of the SEQRA Long Form.He proposed the following
responses to Part 2 of the SEQRA Long Form:
Impact on Land:
1.Will the Proposed Action result in a physical change to the project site? NO
2.Will there be an effect to any unique or unusual land forms found on the site?(i.e.,cliffs,dunes,
geological formations, etc.) NO
3.Will Proposed Action affect any water body designated as protected?(under Articles 15,24,25 of
the Environmental Conservation Law, ECL) NO
4.Will Proposed Action affect any non-protected existing or new body of water? NO
5.Will Proposed Action affect surface or groundwater quality or quantity? NO
6.Will Proposed Action alter drainage flow or patterns, or surface water runoff? NO
7.Will Proposed Action affect air quality? NO
8.Will Proposed Action affect any threatened or endangered species? NO
9.Will Proposed Action substantially affect non-threatened or non-endangered species? NO
Impact on Agricultural Land Resources:
10.Will Proposed Action affect agricultural land resources? NO
Impact on Aesthetic Resources:
11.Will Proposed Action affect aesthetic resources?(If necessary,use the Visual EAF Addendum in
Section 617.20, Appendix B) NO
12.Will Proposed Action impact any site or structure of historic,prehistoric or paleontological
importance? NO
Impact on Open Space and Recreation:
13.Will Proposed Action affect the quantity or quality of existing or future open spaces or recreational
opportunities? NO
14.Will Proposed Action impact the exception or unique characteristics of a critical environmental area
(CEA) established pursuant to subdivision 6NYCRR 617.14(g)? NO
Impact on Transportation:
15.Will there be an effect to existing transportation systems? NO
Impact on Energy:
16.Will Proposed Action affect the community’s sources of fuel or energy supply? NO
Noise and Odor Impact:
17.Will there be objectionable odors, noise, or vibration as a result of the Proposed Action? NO
Impact on Public Health:
18.Will Proposed Action affect public health and safety? NO
Impact on Growth and Character of Community or Neighborhood:
19.Will Proposed Action affect the character of the existing community? NO
20.Is there,or is there likely to be,public controversy related to potential adverse environment
impacts? NO
Commissioner Franck advised since there were no potentially large impacts identified in Part 2,we do not
need to proceed to Part 3.The City Council has fully considered the environmental impacts of the project
and hereby determines that the project will not result in any large or important impacts and will not have a
significant impact on the environment.
City Council Meeting
3/1/11
Page 10 of 13
Commissioner Franck moved and Commissioner Ivins seconded to issue a SEQRA Negative
Declaration for this action.
Ayes - All
Discussion and Vote: Approval of PUD Zoning Amendment for Saratoga Hospital (11-72)
Commissioner Franck moved and Commissioner Ivins seconded to approve the PUD zoning
amendment proposed by Saratoga Hospital.
Ayes - All
FINANCE DEPARTMENT
Discussion and Vote: Department of Public Safety Payroll Transfers (11-73)
Commissioner Ivins moved and Commissioner Wirth seconded to approve the Department of
Public Safety Payroll transfers as previously distributed to the Council.
Ayes – All
Discussion: 2010 Sales Tax
Commissioner Ivins stated there is good news to report for 2010.Consumers spent over $45.5 million
more in taxable items in 2010 than in 2009.The total sales tax collected for 2010 is $9,045,606.32.We
started to see a change in spending trend in November 2009 with the amount of spending being to the
positive.We realized an 8.2%growth in 2010 from 2009.He is confident that the sales tax total will be
$9.1 million for 2011.
Discussion: Update In-Rem Proceeding
Commissioner Ivins stated tax collection is governed by NYS Real Property Law and his office is in
compliance with the law.They have a 94%collection rate.Delinquent taxes are subject to a 6%late fee.
Liens are held for 2 years before they could be placed in an in-rem proceeding.He started an in-rem
proceeding last year.A mailing to each party found to have an interest in a delinquent parcel will be sent
with notification of the proceedings.On or about March 15th they will fulfill the publication and posting
requirements.Once the judge gives the City the deeds,the Council can choose to move to auction.The
total amount owed was $882,697.17 when the proceedings began.The amount still outstanding is
$655,809.01.
Discussion: City Finances
Commissioner Ivins stated the City received a new debt schedule regarding the refinancing of the interest
on the 1997 bond.The principal payment will remain the same from August 15,2011 through August 15,
2017.Under the old term,the City would have paid $202,626.25 in interest for that time period.Under the
new terms,the City will pay $82,321.37 in interest;a savings of $120,304.88 in interest over that time
period.
PUBLIC WORKS DEPARTMENT
Discussion and Vote: Authorization for Mayor to Sign Contract with Mahoney Notify Plus (11-74)
Commissioner Scirocco stated as a cost savings measure the Department of Public Works eliminated the
Verizon lines at the 23 sewer pump stations and contracted with Mahoney Notify.In the event a pump
6:00 P.M. – Workshop: NYS ORPS Re: Basic
STAR Registration
6:45 P.M. – P.H. – Amend Capital Budget
Water Treatment Plant
Emergency Generator
6:55 P.M. – P.H. – Amend Capital Budget –
Safe Routes to School
7:00 PM
CALL TO ORDER
ROLL CALL
SALUTE TO FLAG
PUBLIC COMMENT PERIOD / 15 MINUTES
PRESENTATION(S)
1.2014 Comprehensive Budget
2.Water Treatment Plant Emergency Generator
3.Vietnam 50th Commemoration Partnership Program
EXECUTIVE SESSION: None.
CONSENT AGENDA
1.Approval of 9/16/13 Pre-Agenda Meeting Minutes
2.Approval of 9/17/13 City Council Meeting Minutes
3.Approve Budget Amendments (Increases)
4.Approve Budget Transfers - Regular
5.Approve Payroll 09/20/13 $405,253.14
6.Approve Payroll 09/27/13 $432,888.32
7.Approve Warrant: 2013 Mid – 13MWSEP2 $3,192,135.26
8.Approve Warrant: 2013 REG – 13OCT1 $448,461.30
MAYOR’S DEPARTMENT
1.Discussion and Vote:Authorization for Mayor to Sign Agreement with National Landscaping and Lawn
Care for East Side Big Baseball Diamond Sod
2.Discussion and Vote: Assuming Lead Agency Status on Saratoga Hospital PUD amendments
3.Discussion and Vote:Determination of Significance Under SEQRA for Proposed Saratoga Hospital
PUD Amendment
4.Discussion and Vote:Approval of Zoning Map and Text Amendments for Saratoga Hospital PUD
Amendment
5.Discussion and Vote: Amend the Capital Program and 2013 Capital Budget – Safe Routes to School
6.Discussion and Vote:Authorization for Mayor to Sign Agreement with NYS DOT for Safe Routes to
School Grant
October 1, 2013
CITY OF SARATOGA SPRINGS
City Council
Meeting
Agenda
City Council Meeting
10/1/13
Page 10 of 21
all times.The project timeline is to complete design,obtain NYSDOH review and approval by end of
October, 2013; order and sign contract by end of November, 2013.
Commissioner Franck confirmed the generator runs on fuel.
Tim advised the generator is a diesel generator.
Commissioner Scirocco read the letter from the DOH from May 17, 2013 into the record as follows:
Commissioner Madigan confirmed that he believes the City will be fine with the installation of the generator
in 2014 when the letter states the end of 2013.
Vietnam 50th Commemorative Partnership Program
This presentation was removed from the agenda as Commissioner Mathiesen was not able to make this
meeting.
CONSENT AGENDA
Mayor Johnson moved and Commissioner Scirocco seconded to approve the consent agenda as
follows:
1.Approval of 9/16/13 Pre-Agenda Meeting Minutes
2.Approval of 9/17/13 City Council Meeting Minutes
3.Approve Budget Amendments (Increases)
4.Approve Budget Transfers – Regular
5.Approve Payroll 09/20/13 $405,253.14
6.Approve Payroll 09/27/13 $432,888.32
7.Approve Warrant: 2013 Mid – 13MWSEP2 $3,192,135.26
8.Approve Warrant: 2013 REG – 13OCT1 $448,461.30
Ayes – All
MAYOR’S DEPARTMENT
Discussion and Vote: Authorization for Mayor to Sign Agreement with National Landscaping and Lawn
Care for East Side Big Baseball Diamond Sod (13-327)
Mayor Johnson explained this project totals $8,516 and includes the removal of existing turf and installation
of sod to the infield.The project has been approved by the school board as a 2012 capital project.Funds
are from line H3657142 / 52000 / 1008.
Mayor Johnson moved and Commissioner Scirocco seconded to authorize the mayor to enter into
the agreement as listed and described.
Ayes - All
Discussion and Vote: Assuming Lead Agency Status on Saratoga Hospital PUD Amendments (13-328)
Mayor Johnson stated the Council sent their intent to the other boards regarding that they wish to take lead
agency status.Responses have been received from the City Planning Board,County Planning Board,and
Design Review Commission that they do not wish to assume lead agency status.
City Council Meeting
10/1/13
Page 11 of 21
Mayor Johnson moved and Commissioner Madigan seconded for the City to assume lead agency
status in the SEQRA determination of the Saratoga Hospital PUD amendment.
Ayes - All
Discussion and Vote: Determination of Significance Under SEQRA for Proposed Saratoga Hospital PUD
Amendment (13-329)
Mayor Johnson advised Part 1 has been completed and is part of the record.The Council agreed to waive
the reading of Part 1.
Kate Maynard of the Planning Department suggested changes to Part 1 as follows:page 8,question 25
should have architectural review and site plan review added;question C1 should have architectural review
added here again. This should be added by the applicant for Part 1 and resubmitted by the applicant.
Mayor Johnson confirmed it should be added as final submission and acceptance by the Council.
Kate advised that is correct.
Mayor Johnson read the proposed responses for Part 2 of SEQRA into the record as follows:
Impact on Land:
1.Will the Proposed Action result in a physical change to the project site? Yes
o Construction that will continue for more than 1 year or involve more than one phase or
stage. Small to Moderate Impact
Can Impact Be Mitigated by Project Change? No
2.Will there be an effect to any unique or unusual land forms found on the site?(i.e.,cliffs,dunes,
geological formations, etc.) NO
3.Will Proposed Action affect any water body designated as protected?(under Articles 15,24,25 of
the Environmental Conservation Law, ECL) NO
4.Will Proposed Action affect any non-protected existing or new body of water? NO
5.Will Proposed Action affect surface or groundwater quality or quantity? NO
o Other impacts:Full storm water analysis and protection be required.All storm water
will be mitigated to DEC and City standards.
6.Will Proposed Action alter drainage flow or patterns, or surface water runoff? NO
o Other impacts:Full storm water analysis and protection be required.All storm water
will be mitigated to DEC and City standards.
7.Will Proposed Action affect air quality? NO
8.Will Proposed Action affect any threatened or endangered species? NO
9.Will Proposed Action substantially affect non-threatened or non-endangered species? NO
Impact on Agricultural Land Resources:
10.Will Proposed Action affect agricultural land resources? NO
Impact on Aesthetic Resources:
11.Will Proposed Action affect aesthetic resources?(If necessary,use the Visual EAF Addendum in
Section 617.20, Appendix B) NO
o Other impacts:Identified as a City gateway location therefore DRC review is
required.
12.Will Proposed Action impact any site or structure of historic,prehistoric or paleontological
importance? YES
City Council Meeting
10/1/13
Page 12 of 21
o Proposed action occurring wholly or partially within or substantially contiguous to any
facility of site listed on the State or National Register of historic places.Small to
Moderate Impact
Can Impact Be Mitigated by Project Change? No
o Other impacts:DRC issued a favorable advisory opinion for proposed action and
DRC architectural review will be required.
Impact on Open Space and Recreation:
13.Will Proposed Action affect the quantity or quality of existing or future open spaces or recreational
opportunities? NO
14.Will Proposed Action impact the exception or unique characteristics of a critical environmental area
(CEA) established pursuant to subdivision 6NYCRR 617.4(g)? NO
Impact on Transportation:
15.Will there be an effect to existing transportation systems? NO
Impact on Energy:
16.Will Proposed Action affect the community’s sources of fuel or energy supply? NO
Noise and Odor Impact:
17.Will there be objectionable odors, noise, or vibration as a result of the Proposed Action? NO
Impact on Public Health:
18.Will Proposed Action affect public health and safety? NO
Impact on Growth and Character of Community or Neighborhood:
19.Will Proposed Action affect the character of the existing community? Yes
o Proposed action occurring wholly or partially within or substantially contiguous to any
facility of site listed on the State or National Register of historic places.Small to
Moderate Impact
Can Impact be Mitigated by Project Change? No
o Other impacts:Planning Board issued a favorable advisory opinion for proposed
action. Jobs will be created as a result of the action.
20.Is there,or is there likely to be,public controversy related to potential adverse environment
impacts? NO
Mayor Johnson advised the Council does not need to proceed to Part III.
Mayor Johnson stated it is reasonably determined that the project will not result in any large and important
impact and therefore is one that will not have a significant impact on the environment;therefore a negative
declaration will be prepared.
Mayor Johnson moved and Commissioner Franck seconded to adopt the proposed
recommendations,responses,as well as the issuance of a negative declaration under purposes of
determination of significance under SEQRA.
Ayes - All
Discussion and Vote: Approval of Zoning Map and Text Amendments for Saratoga Hospital PUD
Amendment (13-330)
City Council Meeting
10/1/13
Page 13 of 21
Mayor Johnson advised the proposed amendment consists of the following:demolition of the Cramer
House;construction of a 33,900 square foot surgical suite addition and modification of the PUD boundary
to remove the property at 238 Church Street from the PUD.Steps need to be taken to classify the zoning of
this parcel.
Matt Jones of the Jones Law Firm and attorney for the applicant advised OMBD-2 is the preferred zoning
for that location.
Mayor Johnson stated he thinks it would be appropriate for that dedication.
Mayor Johnson moved and Commissioner Madigan seconded for the City Council to adopt the
proposed amendment to the Saratoga Hospital medical/professional PUD of the City of Saratoga
Springs Code in a form next hereto and will direct the local law to be filed with the New York State
Secretary of State forthwith.
Ayes - All
Discussion and Vote: Amend the Capital Program and 2013 Capital Budget – Safe Routes to School (13-
331)
Mayor Johnson moved and Commissioner Franck seconded to amend the capital program and the
2013 capital budget for the Safe Routes to School item,which is 100%reimbursable grant from
New York State in the amount of $246,617 under line item H3015112 / 52021 / 75959.
Ayes - All
Discussion and Vote: Authorization for Mayor to Sign Agreement with NYS DOT for Safe Routes to School
Grant (13-332)
Mayor Johnson stated this grant is 100%reimbursable.The City will put the money out but will receive the
full amount back from New York State.The amount is $246,617.This was in collaboration with the school
district to allow people in the Geyser Crest community along Geyser Road to get from their homes to
Geyser Road Elementary school.
Mayor Johnson stated above is the motion and Commissioner Madigan seconded.
Ayes - All
Discussion and Set Public Hearing: Proposed Adoption of the Master Plan and Phase 1 – Waterfront Park
Mayor Johnson stated this is to roll this matter out and set a public hearing.The City took up this project in
late 2008.They were looking for a way to develop the parcel.They took members from the original
committee and added to it.The result was a proposed master plan that was unveiled in 2009.Due to the
economy,there wasn’t much that could be done back then and was put on hold.Efforts were taken to
open the park and pave the road.The first match grant received was a $200,000 matching grant and a
then we received a second matching grant of $325,000.We need to go through a SEQRA of the site and
go through a master plan.New York State wants to know what our vision is for the parcel.Two conceptual
drawings have been attached to the agenda.Phase I provides us with what the state needs to move
forward.
Brad Birge of the Planning Department explained the site is 3 tiered.The master plan is long term multi-
year,multi-stage.The top area is envisioned to be a parking lot and scenic overlook;the middle stage is
smaller and envisioned to be a passive lawn area and potential amphitheater;and the lower tier is by the
lake with short term parking and beach front access for swimming.
Mayor Johnson set a public hearing for Monday, November 4, 2013 at 6:50 p.m.
V
PUD REDLINE DRAFT
July 1, 2024
1
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
CHAPTER 241.3
AN ORDINANCE PROVIDING FOR THE ESTABLISHMENT OF
A PLANNED UNIT DEVELOPMENT DISTRICT
TO BE KNOWN AS
“SARATOGA HOSPITAL MEDICAL/PROFESSIONAL PUD”
BE IT ORDAINED, by the City Council of the City of Saratoga Springs, New York,
following a public hearing, as follows:
I. NAME
This Ordinance shall be known as SARATOGA HOSPITAL MEDICAL/
PROFESSIONAL PUD and amends the Unified Development Ordinance (formerly
Chapter 241.3 of the Zoning Ordinance of the City of Saratoga Springs, New York).
II. AMENDMENT
The City Council of the City of Saratoga Springs, on September 8, 1987, adopted the
ordinance creating The Saratoga Hospital Medical/Professional Planned Unit Development
District. That Planned Unit Development legislation was amended by the Saratoga Springs City
Council on April 19, 1993, on January 21, 1997, on October 21, 2003, on April 7, 2009, on
March 1, 2011, and on October 1, 2013. The purpose of this legislation is to further amend the
boundaries and uses of the original Saratoga Hospital Medical/Professional Planned Unit
Development District legislation, so as to meet the needs of the institution and the community it
serves.
This Ordinance amends the City of Saratoga Springs Zoning Map by rezoning the
properties described in Appendix “A” and shown on a map attached hereto and made a part
hereof and entitled Sketch Plan for Saratoga Hospital Medical/Professional PUD, prepared
by C.T. Male and dated May 23, 2003, revised January 26, 2009, October 27, 2009, January
10, 2011, and March 25, 2013 and ______ from their current zoning designation of
“Office/Medical Business District” to “Saratoga Hospital Medical/Professional Planned Unit
Development District.”
This Ordinance also amends the Unified Development Ordinance (formerly Chapter 241.3
of the Zoning Ordinance of the City of Saratoga Springs, New York) by identifying certain uses
which may be established within the amended boundary of the Saratoga Hospital
Medical/Professional PUD and describing the review processes necessary to establish said uses.
III. BOUNDARY
The total area of the Saratoga Hospital Medical/Professional PUD, as amended by this
ordinance, will consist of 28. 69 ± acres as bounded and described in Appendix “B” attached
hereto and made a part hereof. The area is located on the westerly side of the City of Saratoga
PUD REDLINE DRAFT
July 1, 2024
2
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
Springs, north of Church Street, generally east of West Avenue, west of Seward Street, and
generally south of Morgan Street. The tax map references are as follows:
1. Map 165, Block 1, Lot 44
2. Map 165, Block 3, Lot 35
3. Map 165.41, Block 1, Lot 28
The Saratoga Hospital has consolidated its lots identified in the 2011 Ordinance and in
Appendix “A” to create fewer individual tax parcels for the lots owned by Saratoga Hospital and
contained in this Planned Unit Development. The above tax parcels reflect the campus as it was
configured in the 2013 Ordinance.
If the planned unit development zoning approval for this site expires or is abandoned, or
the PUD boundary is otherwise altered, the City Council shall establish the zoning district that will
be assigned to any such impacted parcel at that time
IV. SKETCH PLAN
The Saratoga Hospital Medical/Professional PUD shall be developed in general
compliance with a sketch plan filed in the Offices of the Planning Board of the City of Saratoga
Springs, New York, and attached hereto and made a part hereof as Appendix “C”. The plan
shall be used by the City and the Hospital as a guide for overall development. The sketch plan
may be changed, altered or amended, pursuant to Section 13.16 et seq. of the Saratoga Springs
Unified Development Ordinance. 240-3.6 of the City of Saratoga Springs Zoning Ordinance.
V. PURPOSE
It is the purpose of this Ordinance to provide a means for the development of the Planned
Unit Development, as amended by this ordinance, in which certain economics of scale or creative
planning concepts may be utilized by the developer without departing from the spirit and intent of
the Zoning OrdinanceUnified Development Ordinance of the City of Saratoga Springs. It is
further the purpose of this Ordinance to promote flexibility in the development and design of
Saratoga Hospital Medical/Professional PUD that will result in the more efficient use of land,
promote good site design and visual quality, and result in a more pleasing environment than
otherwise possible to the maximum extent practicable.
VI. USES AND CHARACTERISTICS
There may be contained within the boundaries of Saratoga Hospital Medical/Professional
PUD, City of Saratoga Springs, buildings for medical, hospital, clinical, diagnostic, daycare1 and
treatment uses, all of the aforesaid construed in their broadest terms, as well as professional uses
and associated support services and customary accessory uses for all of the foregoing. The PUD
shall be divided into zones A, B, C, D, and E as depicted on the sketch plan attached hereto as
1 Must be located within either existing buildings or the to-be-constructed buildings within the campus.
PUD REDLINE DRAFT
July 1, 2024
3
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
Appendix “C.” Within each zone, certain projects described in Article IX of this Ordinance may
be constructed consistent with the requirements herein.
A. ZONE A
The area of Zone A, as amended by this ordinance, consists of 10.45+/- acres. The
existing Hospital building in Zone A (including its adjoining structures) is commonly known as
211 Church Street. The existing Hospital building presently covers an area of
148,648± square feet. The principal building has five above grade levels, with a total square
footage of 579,935±. Future Hospital building coverage within Zone A may increase the lot
coverage by a net of 1,352± square feet to a maximum permitted lot coverage of 150,000 square
feet.
In addition to the above, the Hospital building may be increased to a total of five above
ground levels, not exceeding a height of seventy feet (70’).
Within Zone A, principal uses shall be for acute medical/surgical services and related
support (non-clinical) systems. These generally may include medicine, diagnostic and treatment,
surgery, emergency medicine, pediatrics, obstetrics/gynecology, psychiatry, clinical ancillary,
radiation therapy, long term & elder care, daycare, business, medical and professional office use,
on call physicians’ respite area, along with administrative, material support systems and parking
for these uses, together with such other and further usual and customary uses of hospitals.
Primary health services may consist generally of in-patient (admission more than twenty-
four hours), out-patient (admission for less than twenty-four hours) and an internal support
system (administrative services, etc.) necessary for the delivery of acute/medical surgical care.
Hospital
(a) Maximum number of buildings 1
(b) Maximum building coverage 150,000 sf
(c) Maximum building levels 5
(above ground)
(d) Maximum building height 70
(e) Total building square footage 579,935± sf
B. ZONE B
Zone B consists of 3.57 ± acres.
Within Zone B uses shall be for primary medical care and ancillary clinical functions,
including laboratory, radiology, ultrasound, specialists, care coordinators, social workers,
pharmacists, and dieticians, and other as well as other like services necessary or desirable to
PUD REDLINE DRAFT
July 1, 2024
4
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
support such care, as well as administrative support services for any or all of the foregoing,
and parking.
The medical office building or buildings in Zone B shall not exceed 60,000 square feet
with a maximum building height of 50 feet.
All structures in Zone B shall be subject to final site plan approval in accordance with the
applicable provisions of (i) this Ordinance and (ii) the Unified Development Ordinance.
The medical office building or buildings in Zone B shall not exceed 31,200 square feet of
building square footage. An existing medical office building in this zone is a single story
structure of 10,200 square feet. The use may be achieved through the development of up to two,
two-story structures with total building coverage not to exceed 20,700 square feet.
The B-2 area is currently being utilized as a temporary parking area containing 165
parking spaces.
All uses in Zone B shall be subject to final site plan approval in accordance with Article
VIII of this Ordinance.
Hospital
(a) Maximum number of buildings 2
(b) Maximum building coverage 20,700 sf
(c) Maximum building height 2 stories or 40 feet
(d) Total building square footage 31,200 sf
C. ZONE C
Zone C consists of 4.86± acres.
Within Zone C Medical, and Professional and Hospital Offices for primary medical care,
and ancillary clinical functions, including a chronic kidney dialysis center and kidney care
center, including laboratory, radiology, ultrasound and other like services necessary to support
such care, offices for hospital related functions such as finance, patient accounts, human
resources, and family health administration and parking may be permitted. Zone C shall be
used, if necessary, for storm water management from Zone B, D and E. Zone E shall be used for
any necessary additional parking demands.
The kidney dialysis center shall not exceed 10,000 square feet of gross space. Total
building coverage is not to exceed 30,000 square feet.
PUD REDLINE DRAFT
July 1, 2024
5
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
All uses in Zone C shall be subject to final site plan approval in accordance with Article
VIII of this Ordinance.
(a)
Maximum number of buildings
Hospital
3
(b)
Maximum building coverage
30,000 sf
(c)
Maximum building height
3 stories or 45 feet
(d)
Total building square footage
50,000 sf
D.
ZONE D
Zone D consists of 0.57± acres.
Hospital Accessory Support areas may be established in Zone D. It is anticipated that this
zone will be used to complement and support the activities undertaken in Zone A; it may also be
used for management of storm water received from Zone B, C, and E. This zone will remain as
green space until a further amendment to this Ordinance. This area shall be reserved for further
development.
All uses in Zone E shall be subject to final site plan approval in accordance with
Article VIII of thisthe applicable provisions of the Unified Development Ordinance.
E. ZONE E
Zone E consists of 9.24± acres.
Zone E may support accessory parking for staff associated with activities in Zone A, B, and
D.
Supplemental parking is provided in Zone E. Parking structures are also permitted
throughout Zone E. to contain spaces for a total of 620 cars. Currently, there are 597 parking
spaces in Zone E.
Wholly contained landscaped islands will be provided at the ratio of one planting area per
each fifteen vehicles. Planting areas shall be at least 162 square feet or 9 x 18 feet. Planting
areas may be located together to increase parking and maintenance efficiencies.
All uses in Zone E shall be subject to final site plan approval in accordance with
Article VIII of this Ordinance.
Zone E contains a heliport.
VII. DENSITY
PUD REDLINE DRAFT
July 1, 2024
6
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
The overall density of the Saratoga Hospital Medical/Professional PUD shall not exceed
the thresholds defined below.
% of PUD occupied
Total PUD Area = ± 28.69 acres 1,249,736 sf 100%
Total Building Coverage 192,826 sf 15%
Impervious Area 575,125 sf 46%
Total greenspace 481,785 sf 39%
Total Building Square Footage 831,200689,935 sf 6755%
VIII. REQUIREMENTS FOR ISSUANCE OF BUILDING PERMITS
Prior to the issuance of a building permit to develop any or all of the area within Saratoga
Hospital Medical/Professional PUD, the applicant shall receive final site plan approval from the
City of Saratoga Springs Planning Board.
The final site plan shall show the area of the Saratoga Hospital Medical/Professional
PUD proposed for development and its relationship to existing development and vacant areas
within Saratoga Hospital Medical/Professional PUD. The final site plan shall also conform to
the applicable provisions of the Unified Development Ordinancethe requirements as set forth
in Article V of the City of Saratoga Springs Zoning Ordinance.
IX. PROJECTS
Following the effective date of this Ordinance, projects as described below may be
developed within the Saratoga Hospital Medical/Professional PUD. Certain projects identified in
this Article have been completed prior to the adoption of this amendment and are so identified.
The projects listed below may progress in any order. In addition, projects may be undertaken or
completed in more than one stage.
A. Projects, Zone A
Project A-1: Hospital Complex: Completed.
Project A-2 - Parking Expansion: Completed.
Project A-3 - Ambulatory Care Facility Expansion: Completed.
Project A-4 - Future Expansions: Project abandoned.
Project A-5: Radiation Oncology Center, Cafeteria, Parking Relocations and Expansion
and Driveway Alterations: Completed, except 2nd floor addition on Radiation Oncology Center
and additional radiation vault. Radiation Oncology Center Expansion shall not exceed 9,000 sf of
additional building coverage. The structure itself may have one or two levels, but it is currently
contemplated that the Radiation Oncology Center will occupy only the lower portion of the new
PUD REDLINE DRAFT
July 1, 2024
7
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
building. The upper level, if any, will be utilized for any authorized use in Zone A.
Project A-6: Central Plant Expansion: Completed.
Project A-7: Patient Care Addition: Phase I completed. Patient Care Addition shall
consist of below grade logistical support services, on-grade Emergency Department and critical
care beds, and patient care rooms. It will not exceed 30,000 sf of additional building coverage.
The structure itself shall have a maximum of five above grade levels, which may be constructed
in phases, and 181,500 sf additional building square footage.
Project A-8: Physician Respite Area: Project Removed from PUD.
Project A-9: Surgical Suite Addition: Completed.Surgical Suite Addition shall consist of
operating rooms, pre and post-care operating rooms, pre-admission testing, waiting area, and
elevators. It will not exceed 11,300 sf of additional building coverage. The structure itself shall
have three above grade levels, an unoccupied penthouse for mechanical equipment storage, and
33,900 sf of additional building square footage, exclusive of connectors. The project may be
constructed in phases, the first of which will include the construction of operating rooms and
shell space. Based on the financial status and growth of the hospital, future phases will respond
to the needs of the hospital in developing the remaining space.
B. Projects, Zone B
Project B-1: Existing Saratoga Care Medical Office Building: Completed.
Project B-2: Medical Professional Office Expansion: This expansion will include one
additional building with 10,500 sf building coverage and 21,000 sf of additional building square
footage.
Project B: Medical Office Building not exceeding 60,000 sf of medical office space with
a building height not exceeding 50 feet measured pursuant to the UDO Section 21.4(D).
C. Projects, Zone C
Project C-1: Existing Hortense and Louis Rubin Dialysis Center: Completed.
Project C-2: Medical Professional Offices: Completed.
D. Projects, Zone D
Project D-1: Hospital Accessory Support Reserve Area: Completed.
No projects are planned for Zone D at the time of this amendment.
E. Projects, Zone E
PUD REDLINE DRAFT
July 1, 2024
8
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
Project E-1: Parking Expansion: Completed.
Project E-2: Parking Expansion: Completed.
Project E-4: Heliport: Completed.
Project E-5: Parking Expansion: Completed.
Project E-6: Parking Expansion: Completed.
Parking structures are permitted throughout Zone E.
F. PUD Site Plan Applications
PUD Site Plan Applications for any of the Projects or uses identified in this Article
Planned Unit Development may be made at any time to the Saratoga Springs Planning Board.
Planned Unit Development zoning approval for the project shall expire for all
uncompleted projects if site plan approval is not obtained from the City of Saratoga Springs
Planning Board by January 1, 2024.
X. PARKING
Parking demand for the entire PUD is to be met through the provision of a large group
parking lot in Zone E, a newly reconfigured parking area on Myrtle Street in Zone E, and/or in
the provision of smaller parking areas associated with each of the buildings in the respective
zones, and parking structures to be constructed in Zone E. Zone E parking contains spaces for
620 cars on approximately 9.24± acres.
During construction of specific projects in Zones A, B and C, the parking areas in Zones
E, may be altered or improved upon.
The minimum number of parking spaces shall be provided as shown in the following
schedule:
ZONE PARKING REQUIREMENTS (RATIO)
Zone A. 1 space/2 in-patient acute beds
1 space/5 in-patient skilled nursing beds
1 space/300 sf of out-patient service
1 space/300 sf of internal support
Zone B. 1 space/300 sf of gross floor space for medical office buildings with 75% of
parking spaces to be sited within Zone B and the remaining 25% of parking
PUD REDLINE DRAFT
July 1, 2024
9
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
spaces to be within the remainder of the campus 1 space/300 sf of gross floor
space for medical office buildings
Zone C. 16 spaces for the 10,000 sf kidney dialysis center
1 space/300 sf of gross floor space for medical office buildings
Zone D. Green space until a further amendment.
Zone E. No parking demand required for heliport.
The interior open space is primarily designed for the required parking. All of the
buildings will be designed to ensure that the front entrance will be oriented toward the center.
All new or revised parking created as a demand of this PUD shall contain landscaping
areas at a ratio of one 9' x 18' space/15 spaces for vehicles. This landscaping requirement
shall not apply to parking associated with the construction of new parking structures
constructed within Zone E.
XI. AMENDMENTS TO THIS ORDINANCE
Amendments may be made to this Ordinance by the City of Saratoga Springs City
Council.
XII. INFRASTRUCTURE IMPROVEMENTS
The entire project as set forth herein will be serviced by City water and sanitary sewer
lines. These lines will be constructed to City standards, but will not be conveyed to the City of
Saratoga Springs. The water and sewer lines will be maintained by the Hospital.
Storm water disposal areas shall be constructed and maintained by the Hospital.
The roadways and thoroughfares through the project will be private drives maintained by
the Hospital.
Upon request, the City of Saratoga Springs shall be granted appropriately sized
easements for the construction and maintenance of water, sanitary sewer or storm water sewer
lines through Zone A of the PUD site.
The City, upon request, may take over ownership, control and responsibility for any
infrastructure main, pipe, or line presently within or constructed within the PUD site and the City
shall further be granted reasonable easements to interconnect with any infrastructure main, line
or pipe for which they have taken responsibility.
The City is hereby granted the right to enter upon the PUD site for the purpose of making
emergency repairs to any privately owned main, pipe or line. The City shall have the right to
charge the Hospital or the individual project’s sponsor whose pipe or main is repaired for any
PUD REDLINE DRAFT
July 1, 2024
10
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
necessary services.
All private water lines connecting into any structure within the PUD site shall be
individually metered.
XIII. OFF SITE IMPROVEMENTS
Project A-1 - Hospital Complex: Completed. A-1 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project A-2 - Parking Expansion: Completed. A-2 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project A-3 - Ambulatory Care Facility Expansion: Completed. A-3 was identified
in the 1997 Ordinance and is included for reference and consistency only.
Project A-4 - Future Expansion: Project abandoned. A-4 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project A-5 - Radiation Oncology Center, Cafeteria, Parking Relocations and
Expansion and Driveway Alterations: Completed. A-5 was identified in the 2003 Ordinance
and is included for reference and consistency only.
Project A-6 - Central Plant Expansion: None required.
Project A-7 - Patient Care Addition: Completed. A-7 was identified in the 2011
Ordinance and is included for reference and consistency only.
Project A-8 - Physician Respite Area: Project removed from PUD.
Project A-9 –Surgical Suite Addition: None
Project B-1 - Existing Saratoga Care Medical Office Building2: This medical office
building will be demolished at a time determined by the Hospital to allow for the construction of
the building(s) identified in Project B-2 below. Completed. B-1 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project B-2 -– Construction of Future Medical Professional Office
ExpansionBuilding: Within a timeframe developed by the Hospital and following site plan
approval by the Planning Board, the Hospital will undertake the construction of one or more new
medical office buildings with a total square footage not exceeding 60,000 sf and a maximum
2 Projects B-1 and B-2 shall – upon adoption of this PUD amendment – be combined and known as Project B within
Zone B as depicted on the PUD Sketch Plan for the Saratoga Hospital Medical/Professional PUD, last revised on June
11, 2024 and herein made a part of this PUD amendment.
PUD REDLINE DRAFT
July 1, 2024
11
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
building height of 50 feet3. The Hospital shall undertake and/or update appropriate studies
relating to (1) storm water management for the area of the PUD site west of Myrtle Street; (2)
sanitary sewer condition and capacity for lines which serve the site; and (3) a traffic study
relating to vehicle access to the PUD site with focus on the capacity of the Church Street/Myrtle
Street intersection as part of the Planned Unit Development site plan approval for Project B-2.
After reviewing the results of these studies, the City of Saratoga Springs Planning Board has the
right to restrict further development of the Planned Unit Development until the necessary off-site
improvements (if any) are made. The means of
payment for any improvement identified as needed by any of these studies shall be
negotiated between the Hospital and the City Council of the City of Saratoga Springs. The
Hospital may be required to contribute an appropriate share toward said improvements.
Project C-1 - Existing Hortense and Louis Rubin Dialysis Center: Completed. C-1
was identified in the 1997 Ordinance and is included for reference and consistency only.
Project C-2 - Future Medical Professional Offices: Completed. C-2 was identified
in the 2011 Ordinance and is included for reference and consistency only.
Project D-1 - Hospital Accessory Support Reserved Area: Completed. D-1 was
identified in the 1997 Ordinance and is included for reference and consistency only.
Project E-1 - Parking Expansion: Completed. E-1 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project E-2 - Parking Expansion: Completed. E-2 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project E-3 - Storage Building: Project abandoned. E-3 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project E-4 - Accessory Parking and Heliport: Completed. E-4 was identified in the
1997 Ordinance and is included for reference and consistency only.
Project E-5 - Parking Expansion: Completed. E-5 was identified in the 2003 ordinance
and is included for reference and consistency only.
Project E-6 - Parking Expansion: Completed. E-6 was identified in the 2011
Ordinance and is included for reference and consistency only.
XIV. SETBACKS
ZONE A
Any buildings constructed in Zone A on or after the effective date of this Ordinance shall
3 Building height measured pursuant to UDO Section 21.4(D).
PUD REDLINE DRAFT
July 1, 2024
12
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
be no closer than fifty feet (50') from the exterior boundary of the PUD with the following
exceptions: 1) the minimum setbacks along Myrtle Street shall be ten feet (10’) for any projects
north of Project A-9 and five feet (5’) for Project A-9 and south to Church Street; and 2) for
Project A-7, the minimum setbacks shall be eighty feet (80’) from the northern property line.
There shall be no internal setbacks between parcel lines for building, parking, driveways or
paved areas. There shall be no setbacks in Zone A for driveways, parking areas, or other paved
areas, but during PUD site plan review, the City Planning Board may require special mitigating
measures than otherwise possible to the maximum extent practicable (fencing, landscaping, etc.)
to provide adequate buffers for neighboring properties.
ZONES B, C, D, & E
For Zones B, C, D & E, a thirty foot (30') wide (minimum) planted buffer strip shall be
maintained or installed along the PUD exterior boundary lines, except as follows: (1) a forty foot
(40') and a fifty foot (50') wide (minimum) planted buffer strip as shown on the PUD Sketch Plan
shall be maintained or installed along the northern boundary line on Zone C; (2) a ten foot (10')
wide (minimum) planted buffer strip shall be maintained along the southern and western
boundary lines of Zone E to within 140' of Myrtle Street as shown on the PUD Sketch Plan. No
buffer will be required within the remaining 140' southern boundary of Zone E as shown on the
PUD Sketch Plan; and (3) Green space buffer is four feet (4’) on Myrtle Street Parcels of E – 6.
In Zones B, C, D, & E, no structure or parking space will be constructed within the
required buffer zone. At least 40% of the installed plant material in the planted buffer strips shall
be evergreen.
No building in Zones B, C, D & E shall be constructed within forty feet (40') of another
building unless the two buildings are connected with an enclosed hallway meeting all local and
state building codes.
No building in Zones B, C, D & E shall be constructed within thirty feet (30') of the PUD
property line or within fifty feet (50') of the Myrtle Street property line.
In Zone E-6, no parking space shall be constructed within 5 feet of the boundary lines.
XV. SIGNAGE
All signs currently located on the Hospital campus are part of an approved signage plan
implemented in 2003 and subsequently updated. The approved signage plan categorized the
signs into the categories set forth below, and approved the below sign types with the dimensions
and other restrictions included herein. The below types of signs currently exist on the hospital
campus and have received approval by the Saratoga Springs Zoning Board of Appeals and the
Design Review Commission.
The Hospital may add or replace signage within the PUD consistent with the guidelines
contained in this section, providing the new signs do not exceed the existing specifications,
including height and dimensions, for each sign type, as set forth more fully below, and subject to
PUD REDLINE DRAFT
July 1, 2024
13
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
the regulations set forth in this provision. Signs shall be erected and constructed with the purpose
of safe and efficient flow of traffic in and through the site. All signs shall be compatible within
the context of its visual and physical environment.
Sign type Maximum size and height
ED.1
Large two-sided campus entrance
identification sign
66.5 sf
12 feet height
No more than 2 signs
ED.2 Medium size vehicular directional
sign
42" X 49" or 14.29 sf
6 feet height
Signage type shall be limited to use for
emergency entrances to the campus.
ED.3 Small vehicular directional sign 42" x 30" or 8.75 sf
6 feet height
FID.1 Large facade-mounted identification
sign
11' 4" X 240"
No more than 2 signs per establishment
FID.2
Small facade-mounted identification
sign
108" X 52" or 39 sf
4.25 feet height
Only one sign per facade that has street
frontage
FID.3
Large building entrance
identification sign
9' x 20" or 15 sf
No more than one sign per public entrance for
significant hospital functions (ie. emergency
department, maternity, main entrance,
radiation oncology, etc)
FID.4 Small building entrance
identification sign
24" X 24" or 4 sf
FID.5
Ambulance/ emergency department
entrance identification sign
60" x 20" or 8.33 sf
6 feet height
Allowable as needed to identify Ambulance
and Emergency entrances to the Emergency
Department
ID.1 Large two-sided outpatient facility
identification sign
3' x 3' or 9 sf
6 feet height
No more than one sign per outpatient facility
ID.4 Ground-mounted identification sign 54" x 36"
ID.5
Tall, ground-mounted identification
sign
24" x 24" or 4 sf
9'6" height
PUD REDLINE DRAFT
July 1, 2024
14
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
Ground mounted donor
identification sign
47.2 sf
9'6" height
PKG.1 Parking lot identification signs 30" X 36" or 6.25 sf
6 feet height
Limited to one per entrance to parking lot.
Non- smoking facility designation
signs
10" x 14"
One sign per bench for all outdoor seating
Only ED.1 (large two sided campus entrance identification) and ED.3 (small vehicular
directional) signage shall be allowed to be located within 150 feet of the signalized intersection
of Myrtle and Church Streets.
The following types of signs shall be permitted within 50 feet of a non-signalized
intersection: ED.1 (large two sided campus entrance identification), ED.2 (medium sized
vehicular directional), ED.3 (small vehicular directional), ID.1 (large two sided outpatient
facility identification sign), and any signage located on the facade of the buildings.
Throughout the campus, signs shall be permitted to be located within 50 feet of
another sign.
Within the limitations set forth above, facade signage may be permitted to occur in
excess of one sign per facade. The dimensions shall not exceed the sizes noted above
within each category. The location or relocation of wall signage shall be completed in a
manner that prevents irreversible damage to the facade substrate. Sign anchors in masonry
facades shall be limited to mortar joints. Any areas from which wall signage has been
removed or relocated shall be repaired to match surrounding facades.
The Hospital signage should reflect current Albany Med Health System/Saratoga Hospital
brand guidelines and appropriate fonts, colors, and style which will be coordinated by the Albany
Med Health System Marketing and Communications Team.The Hospital signage should utilize
Franklin Gothic font and the following colors shall be utilized throughout the signage on the
PUD site : Purple (PMS 0519), Gold (PMS 4515), Blue (PMS 2748), Red (PMS 0186), Teal
(PMS 3155) and White (White 00).
The FID.3 (large building entrance identification sign), ED.1 (large two sided campus
entrance identification sign) and ED.2 (medium vehicle directional sign) signs are designed for
internal illumination using florescent lamps which conform to UL and industry standards. Light
is contained within the sign, except where the translucent white acrylic letters or symbols have
been inserted into the aluminum face. Neon lighting for a back lit halo effect is used for the
FID.1 (large facade mounted identification sign) sign near the hospital entrance. LED lights may
replace the neon on future installations.
The Hospital shall submit documentation to the Saratoga Springs Office of Planning and
Economic Development when additional signage in compliance with the above restrictions is
PUD REDLINE DRAFT
July 1, 2024
15
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
necessary or required on the PUD campus. The documentation shall include information on the
proposed location, style, dimensions and height of the proposed sign. The request may be treated
as an administrative action. The Planning Board Chair will consider any applications which raise
issues of the location of signage. The Design Review Commission Chair will consider any
applications pertaining to percentage of blank space on the signs, lighting of the signs and
design. The appropriate Chair will seek guidance and input from the Office of Planning and
Economic Development in reviewing any applications submitted by the hospital. The Chair or
the Hospital, at their option, shall determine if any individual submission shall be decided by the
appropriate city board and shall refer such applications for full board consideration.
XVI. TIME EXTENSIONS
On For good cause shown, the Hospital may apply for an one or more extensions of an
approved PUD site plan. An aApplications for such requests shall be made to the Planning
Board.
XVII. CONSTRUCTION STANDARDS
All construction standards for buildings, private and public improvements and for utilities
shall be prepared and approved by licensed architects, landscape architects, or engineers. All
costs associated with this shall be borne by the developer whether the plans are provided by the
City of Saratoga Springs or by the developer. Further, all completed construction shall be
certified to the City of Saratoga Springs by licensed architects, landscape architects, or engineers
as being completed in the manner called for in the plans and shall be certified in accordance
therewith. The City may require any or all costs connected with this to be borne by the
developer. Prior to the construction of any approved Project, a pre-construction conference with
the City Engineer and the City Building Department shall be required. At such conference, the
City may impose reasonable standards designed to lessen the impact of construction noise, dust
and construction vehicle traffic on any adjacent residential area.
XVIII. ADDITIONAL FUTURE PROJECTS
Although the development of the proposed PUD has been set forth in its entirety and this
Ordinance rezones the entire 28.69± acres as a Planned Unit Development, it grants only the
actual development of Projects within the PUD area. The remaining undeveloped land will
remain as green space until such time as the Hospital and Planning Board of the City of Saratoga
Springs agree upon the impact, if any, upon the infrastructure of the City, the meeting of those
needs, and the specific development uses.
XIX. OWNERSHIP
Saratoga Hospital intends to own and/or control, as well as maintain and operate, the
roadways and land within its PUD. In the event that ownership of the area wholly encompassed
by the Saratoga Hospital Medical/Professional PUD is transferred or conveyed to any third
person, firm, corporation, partnership or other entity by the applicant herein, the City of Saratoga
Springs reserves the right to require proof of financial responsibility of the transferee in
accordance with the same procedures set forth in Section 240-3.7 of the Zoning Ordinance of the
PUD REDLINE DRAFT
July 1, 2024
16
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
City of Saratoga Springs.
XX. MAP
A mylar of the final approved sketch plan shall be filed with the City Planning
Board and the City Clerk. A copy shall be filed with the City Building Inspector.
XXI. AMENDMENTS
Saratoga Hospital Medical/Professional PUD shall be developed in compliance with the final
approved sketch plan. Any amendments thereto will be made pursuant to the City of Saratoga
Springs Zoning Unified Development Ordinance.
XXII. VALIDITY
If any provision of this Ordinance shall be held invalid, the remainder of the Ordinance
shall not be affected thereby.
XXIII. EFFECTIVE DATE
This Ordinance shall take effect one day after approval by the Saratoga Springs City
Council and posting and publishing in the official newspaper of the City as required by law.
ADOPTED: September 8, 1987
AMENDED: April 19, 1993
AMENDED: January 21, 1997
AMENDED: October 21, 2003
AMENDED: April 7, 2009
AMENDED: March 1, 2011
AMENDED: October 1, 2013
AMENDED: __________________
APPENDIX “A”
Amendments to Zone A, Saratoga Hospital Medical/Professional PUD
LEGAL DESCRIPTION AND MAP OF PARCELS TO BE ADDED TO
THE SARATOGA HOSPITAL
PLANNED UNIT DEVELOPMENT DISTRICT
PUD REDLINE DRAFT
July 1, 2024
17
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
PARCEL 1:
All that certain tract, piece or parcel of land situate in the City of Saratoga Springs, County of
Saratoga, State of New York, lying Northerly of Church Street (New York State Route 9N) and
Easterly of Myrtle Street, and being more particularly bounded and described as follows:
BEGINNING at the point of intersection of the Northeasterly street boundary of Church Street
(New York State Route 9N) as described in Document No. 2009019933 with the Easterly street
boundary of Myrtle Street; thence from said point of beginning along said Easterly street boundary
of said Myrtle Street the following two (2) courses: 1) North 03 deg. 50 min. 09 sec. West 538.98
feet to a point; and 2) North 03 deg. 58 min. 54 sec. West 147.84 feet to its point of intersection
with the common division line between the lands now or formerly of The Saratoga Hospital as
described in Book 1525 of Deeds at Page 675, Book 991 of Deeds at Page 152, Book 990 of Deeds
at Page 792 and Book 1651 of Deeds at Page 293 on the South and the lands now or formerly of
Mary Grygiel as described in Book 1099 of Deeds at Page 3, lands now or formerly of Larry D.
Fox and Linda C. Fox as described in Book 1336 of Deeds at Page 220, lands now or formerly of
Ronald G. Conlee and Diane M. Conlee as described in Book 1054 of Deeds at Page 537, lands
now or formerly of Alice A. Smith as described in Book 1373 of Deeds at Page 745, lands now or
formerly of Margaret A. MacFarland as described in Book 1097 of Deeds at Page 471, lands now
or formerly of Raymond C. Yager and Terry A. Yager as described in Book 866 of Deeds at Page
364, lands now or formerly of Laurence Aryeh Alpern and Anna Alpern as described in Book 1241
of Deeds at Page 750 and lands now or formerly of Irving L. Metzger and Marcia P. Metzger d.b.a.
Metzger and Sons as described in Book 1052 of Deeds at Page 872 Deed Parcel No. 6 on the North;
thence along said common division line North 86 deg. 15 min. 24 sec. East 550.31 feet to its point
of intersection with the division line between the said lands of The Saratoga Hospital on the West
and the said lands of Irving L. Metzger and Marcia P. Metzger d.b.a. Metzger and Sons as described
in Book 1052 of Deeds at Page 872, Deed Parcel No. 6 and No. 10 on the East; thence along said
division line South 04 deg. 02 min. 45 sec. East 203.47 feet to its point of intersection with the
division line between the said lands of The Saratoga Hospital as described in Book 1651 of Deeds
at Page 293 on the South and the said lands of Irving L. Metzger and Marcia P. Metzger d.b.a.
Metzger and Sons Deed Parcel No. 10 on the North; thence along said division line North 85 deg.
26 min. 15 sec. East 166.00 feet to its point of intersection with the Westerly boundary of a 20-
foot-wide alley (a.k.a. Medical Arts Lane), said point also being the Northwesterly terminus of said
alley; thence along said Westerly boundary South 04 deg. 02 min. 45 sec. East 350.00 feet to its
point of intersection with the Northerly boundary of a 15-foot-wide alley (a.k.a. Corey Lane), said
point also being the Southwesterly terminus of said 20-foot-wide alley (a.k.a. Medical Arts Lane);
thence along the Northerly boundary of said 15-foot-wide alley (a.k.a. Corey Lane) South 85 deg.
26 min. 15 sec. West 166.00 feet to the Northwesterly terminus of said 15-foot-wide alley (a.k.a.
Corey Lane) and marking the former Easterly boundary of North Van Rensselaer Street as
conveyed to The Saratoga Hospital in Book 1668 of Deeds at Page 317; thence along the Westerly
terminus of said 15-foot-wide alley (a.k.a. Corey Lane) and said former Easterly boundary of North
Van Rensselaer Street, South 04 deg. 02 min. 45 sec. East 15.00 feet to its point of intersection
with the division line between the lands now or formerly of The Saratoga Hospital as described in
Book 1668 of Deeds at Page 317 former Van Rensselaer Street on the West and the lands now or
formerly of J. J. Byrne as described in Book 887 of Deeds at Page 11 on the East; thence along said
division line South 04 deg. 02 min. 45 sec. East 164.28 feet to its point intersection with the
PUD REDLINE DRAFT
July 1, 2024
18
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
Northerly street boundary of Church Street (New York State Route 9N); thence along said
Northerly street boundary the following two (2) courses: 1) South 84 deg. 27 min. 34 sec. West
53.49 feet to a point; and 2) South 89 deg. 29 min. 56 sec. West 319.29 feet to its point of
intersection of the Northerly street boundary of Church Street (New York State Route 9N) as
described in Document No. 2009019933; thence along said Northerly and Northeasterly street
boundary the following two (2) courses: 1) North 89 deg. 14 min. 23 sec. West 156.10 feet to a
point; and 2) North 58 deg. 55 min. 08 sec. West 30.26 feet to the point or place of beginning,
containing 10.453± acres of land.
Subject to an area granted by easement for parking as described in Book 1682 of Deeds at
Page 570 and being more particularly bounded and described as follows:
BEGINNING at a point on the division line between the said lands of The Saratoga Hospital as
described in Book 1668 of Deeds at Page 317 former bed of North Van Rensselaer Street on the
West and lands now or formerly of J.J. Byrne as described in Book 887 of Deeds at Page 11 on the
East, said point being situate North 04 deg. 02 min. 45 sec. West along said division line 39.32 feet
from its intersection with the Northerly street boundary of Church Street (New York State Route
9N); thence from said point of beginning through the said lands of The Saratoga Hospital the
following twelve (12) courses: 1) South 85 deg. 57 min. 12 sec. West 9.47 feet to a point; 2) South
03 deg. 38 in. 27 sec. East 13.63 feet to a point; 3) South 85 deg. 57 min. 15 sec. West 27.91 feet
to a point; 4) North 04 deg. 02 min. 45 sec. West 52.94 feet to a point; 5) South 84 deg. 18min. 53
sec. West 15.60 feet to a point; 6) North 03 deg. 45 min. 12 sec. West 32.52 feet to a point; 7) North
86 deg. 01 min. 11 sec. East 15.43 feet to a point; 8) North 04 deg. 02 min. 45 sec. West 46.29 feet
to a point of curvature; 9) Northeasterly along a curve to the right having a radius of 14.00 feet, an
arc length of 21.99 feet and a chord bearing of North 40 deg. 57 min. 15 sec. East 19.80 feet to a
point of tangency; 10) North 85 deg. 57 min. 15 sec. East 17.36 feet to a point; 11) South 04 deg.
02 min. 45 sec. East 9.11 feet to a point; and 12) North 85 deg. 57 min. 15 sec. East 6.12 feet to a
point on the above first mentioned division line; thence along said above first mentioned division
line South 04 deg. 02 min. 45 sec. East 122.54 feet to the point or place of beginning.
Intending to describe an irregular shaped parcel to be granted by easement for parking.
Subject to any easements, covenants or restrictions of record.
PUD REDLINE DRAFT
July 1, 2024
19
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
APPENDIX “B”
LEGAL DESCRIPTION OF ENTIRE AMENDED PUD AREA ZONE A
All that certain tract, piece or parcel of land situate in the City of Saratoga Springs, County of
Saratoga, State of New York, lying Northerly of Church Street (New York State Route 9N) and
Easterly of Myrtle Street, and being more particularly bounded and described as follows:
BEGINNING at the point of intersection of the Northeasterly street boundary of Church Street
(New York State Route 9N) as described in Document No. 2009019933 with the Easterly street
boundary of Myrtle Street; thence from said point of beginning along said Easterly street boundary
of said Myrtle Street the following two (2) courses: 1) North 03 deg. 50 min. 09 sec. West 538.98
feet to a point; and 2) North 03 deg. 58 min. 54 sec. West 147.84 feet to its point of intersection
with the common division line between the lands now or formerly of The Saratoga Hospital as
described in Book 1525 of Deeds at Page 675, Book 991 of Deeds at Page 152, Book 990 of Deeds
at Page 792 and Book 1651 of Deeds at Page 293 on the South and the lands now or formerly of
Mary Grygiel as described in Book 1099 of Deeds at Page 3, lands now or formerly of Larry D.
Fox and Linda C. Fox as described in Book 1336 of Deeds at Page 220, lands now or formerly of
Ronald G. Conlee and Diane M. Conlee as described in Book 1054 of Deeds at P age 537, lands
now or formerly of Alice A. Smith as described in Book 1373 of Deeds at Page 745, lands now or
formerly of Margaret A. MacFarland as described in Book 1097 of Deeds at Page 471, lands now
or formerly of Raymond C. Yager and Terry A. Yager as described in Book 866 of Deeds at Page
364, lands now or formerly of Laurence Aryeh Alpern and Anna Alpern as described in Book 1241
of Deeds at Page 750 and lands now or formerly of Irving L. Metzger and Marcia P. Metzger d.b.a.
Metzger and Sons as described in Book 1052 of Deeds at Page 872 Deed Parcel No. 6 on the North;
thence along said common division line North 86 deg. 15 min. 24 sec. East 550.31 feet to its point
of intersection with the division line between the said lands of The Saratoga Hospital on the West
and the said lands of Irving L. Metzger and Marcia P. Metzger d.b.a. Metzger and Sons as described
in Book 1052 of Deeds at Page 872, Deed Parcel No. 6 and No. 10 on the East; thence along said
division line South 04 deg. 02 min. 45 sec. East 203.47 feet to its point of intersection with the
division line between the said lands of The Saratoga Hospital as described in Book 1651 of Deeds
at Page 293 on the South and the said lands of Irving L. Metzger and Marcia P. Metzger d.b.a.
Metzger and Sons Deed Parcel No. 10 on the North; thence along said division line North 85 deg.
26 min. 15 sec. East 166.00 feet to its point of intersection with the Westerly boundary of a 20 -
foot-wide alley (a.k.a. Medical Arts Lane), said point also being the Northwesterly terminus of said
alley; thence along said Westerly boundary South 04 deg. 02 min. 45 sec. East 350.00 feet to its
point of intersection with the Northerly boundary of a 15-foot-wide alley (a.k.a. Corey Lane), said
point also being the Southwesterly terminus of said 20-foot-wide alley (a.k.a. Medical Arts Lane);
thence along the Northerly boundary of said 15-foot-wide alley (a.k.a. Corey Lane) South 85 deg.
26 min. 15 sec. West 166.00 feet to the Northwesterly terminus of said 15-foot-wide alley (a.k.a.
Corey Lane) and marking the former Easterly boundary of North Van Rensselaer Street as conveyed
to The Saratoga Hospital in Book 1668 of Deeds at Page 317; thence along the Westerly terminus
of said 15-foot-wide alley (a.k.a. Corey Lane) and said former Easterly boundary of North Van
Rensselaer Street, South 04 deg. 02 min. 45 sec. East 15.00 feet to its point of intersection with the
division line between the lands now or formerly of The Saratoga Hospital as described in Book
1668 of Deeds at Page 317 former Van Rensselaer Street on the West and the lands now or formerly
of J. J. Byrne as described in Book 887 of Deeds at Page 11 on the East; thence along said division
line South 04 deg. 02 min. 45 sec. East 164.28 feet to its point intersection with the Northerly street
PUD REDLINE DRAFT
July 1, 2024
20
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
boundary of Church Street (New York State Route 9N); thence along said Northerly street boundary
the following two (2) courses: 1) South 84 deg. 27 min. 34 sec. West 53.49 feet to a point; and 2)
South 89 deg. 29 min. 56 sec. West 319.29 feet to its point of intersection of the Northerly street
boundary of Church Street (New York State Route 9N) as described in Document No. 2009019933;
thence along said Northerly and Northeasterly street boundary the following two (2) courses: 1)
North 89 deg. 14 min. 23 sec. West 156.10 feet to a point; and 2) North 58 deg. 55 min. 08 sec.
West 30.26 feet to the point or place of beginning, containing 10.453± acres of land.
Subject to an area granted by easement for parking as described in Book 1682 of Deeds at
Page 570 and being more particularly bounded and described as follows:
BEGINNING at a point on the division line between the said lands of The Saratoga Hospital as
described in Book 1668 of Deeds at Page 317 former bed of North Van Rensselaer Street on the
West and lands now or formerly of J.J. Byrne as described in Book 887 of Deeds at Page 11 on the
East, said point being situate North 04 deg. 02 min. 45 sec. West along said division line 39.32 feet
from its intersection with the Northerly street boundary of Church Street (New York State Route
9N); thence from said point of beginning through the said lands of The Saratoga Hospital the
following twelve (12) courses: 1) South 85 deg. 57 min. 12 sec. West 9.47 feet to a point; 2) South
03 deg. 38 in. 27 sec. East 13.63 feet to a point; 3) South 85 deg. 57 min. 15 sec. West 27.9 1 feet
to a point; 4) North 04 deg. 02 min. 45 sec. West 52.94 feet to a point; 5) South 84 deg. 18min. 53
sec. West 15.60 feet to a point; 6) North 03 deg. 45 min. 12 sec. West 32.52 feet to a point; 7) North
86 deg. 01 min. 11 sec. East 15.43 feet to a point; 8) North 04 deg. 02 min. 45 sec. West 46.29 feet
to a point of curvature; 9) Northeasterly along a curve to the right having a radius of 14.00 feet, an
arc length of 21.99 feet and a chord bearing of North 40 deg. 57 min. 15 sec. East 19.80 feet to a
point of tangency; 10) North 85 deg. 57 min. 15 sec. East 17.36 feet to a point; 11) South 04 deg.
02 min. 45 sec. East 9.11 feet to a point; and 12) North 85 deg. 57 min. 15 sec. East 6.12 feet to a
point on the above first mentioned division line; thence along said above first mentioned division
line South 04 deg. 02 min. 45 sec. East 122.54 feet to the point or place of beginning.
Intending to describe an irregular shaped parcel to be granted by easement for parking.
Subject to any easements, covenants or restrictions of record.
ZONES B, C, D & E
All that certain tract, piece or parcel of land situate in the City of Saratoga Springs, County of
Saratoga, State of New York, lying West of Myrtle Street and North of Church Street, and being
more particularly bounded and described as follows:
BEGINNING at the point of intersection of the division line between the lands now or formerly
of The Saratoga Hospital, Inc. as described in Book 1454 of Deeds at Page 41 on the South and the
lands now or formerly of Gary P. Dicresce and Nancy L. Dicresce as described in Book 1235 of
Deeds at Page 68 on the North with the Westerly street boundary of Myrtle Street and runs thence
from said point of beginning along said Westerly street boundary the following six (6) courses: 1)
South 04 deg. 12 min. 45 sec. East 223.95 feet to a point; 2) South 04 deg. 08 min.
15 sec. East 490.70 feet to a point; 3) South 03 deg. 25 min. 45 sec. East 50.01 feet to a point; 4)
South 04 deg. 30 min. 11 sec. East 19.99 feet to a point; 5) South 04 deg. 42 min. 38 sec. East
29.69 feet to a point; and 6) South 03 deg. 50 min. 09 sec. East 213.10 feet to its point of intersection
with the division line between the lands now or formerly of The Saratoga Hospital as described in
Instrument No. 2009023919 on the North and the lands now or formerly of Ronald A. Loffredo as
PUD REDLINE DRAFT
July 1, 2024
21
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
described in Book 1083 of Deeds at Page 520 on the South; thence along said division line South
85 deg. 34 min. 34 sec. West 99.32 feet to its point of intersection with the common division line
between the lands now or formerly of Saratoga Golf & Polo Club, Inc. as described in Book 831 of
Deeds at Page 10 to be conveyed to The Saratoga Hospital on the West and the said lands now or
formerly of Ronald A. Loffredo as described in Book 1083 of Deeds at Page 520 and other lands
now or formerly of Ronald A. Loffredo as described in Book 1174 of Deeds at Page 80 on the East;
thence along said common division line South 04 deg. 25 min. 26 sec. East 230.03 feet to its point
of intersection with the Northerly street boundary of Church Street; thence along said Northerly
street boundary the following two (2) courses: 1) North 86 deg. 18 min. 19 sec. West 7.26 feet
to a point; and 2) North 84 deg. 37 min. 10 sec. West 43.83 feet to its point of intersection with
the division line between the said lands to be conveyed to The Saratoga Hospital on the East and
remaining lands now or formerly of Saratoga Golf & Polo Club, Inc. as described in Book 831 of
Deeds at Page 10 on the West; thence along said division line North 04 deg. 25 min. 26 sec. West
464.33 feet to its point of intersection with the division line between the said lands now or formerly
of The Saratoga Hospital, Inc. as described in Book
1454 of Deeds at Page 41 on the East and the said lands now or formerly of Saratoga Golf &
Polo Club, Inc. on the West; thence along the said division line North 04 deg. 56 min. 05 sec. West
70.00 feet to its point of intersection with the division line between the said lands now or formerly
of The Saratoga Hospital, Inc. on the North and the said lands now or formerly of Saratoga Golf
& Polo Club, Inc. on the South; thence along said division line South 85 deg. 34 min. 45 sec. West
529.19 feet to its point of intersection with the division line between the said lands now or formerly
of The Saratoga Hospital, Inc. on the East and the said lands now or formerly of Saratoga Golf &
Polo Club, Inc. on the West; thence along said division line North
03 deg. 50 min. 15 sec. West 10.00 feet to its point of intersection with the division line between
the said lands now or formerly of The Saratoga Hospital, Inc. on the North and the said lands
now or formerly of Saratoga Golf & Polo Club, Inc. on the South; thence along said division line
South 85 deg. 34 min. 45 sec. West 215.95 feet to its point of intersection with the division line
between the said lands now or formerly of The Saratoga Hospital, Inc. on the Northeast and the
said lands now or formerly of Saratoga Golf & Polo Club, Inc. on the Southwest; thence along said
division line North 49 deg. 39 min. 29 sec. West 42.60 feet to its point of intersection with the
division line between the said lands now or formerly of The Saratoga Hospital, Inc. on the East and
the said lands now or formerly of Saratoga Golf & Polo Club, Inc. on the West; thence along said
division line North 04 deg. 53 min. 43 sec. West 230.65 feet to its point of intersection with the
division line between the said lands now or formerly of The Saratoga Hospital, Inc. on the South
and the lands to be conveyed by The Saratoga Hospital, Inc. to Saratoga Golf & Polo Club, Inc. on
the North; thence along said division line North 71 deg. 36 min. 56 sec. East 26.67 feet to its point
of intersection with the division line between the said lands now or formerly of The Saratoga
Hospital, Inc. on the Southeast and the said lands to be conveyed to Saratoga Golf
& Polo Club, Inc. on the Northwest; thence along said division line North 33 deg. 09 min. 50
sec. East 112.67 feet to its point of intersection with the division line between the said lands now
or formerly of The Saratoga Hospital, Inc. on the East and the said lands to be conveyed to Saratoga
Golf & Polo Club, Inc. on the West; thence along said division line North 15 deg. 57 min. 55 sec.
East 249.24 feet to its point of intersection with the division line between the said lands now or
formerly of The Saratoga Hospital, Inc. on the Northeast and the said lands to be conveyed to
Saratoga Golf & Polo Club, Inc. on the Southwest; thence along said division line North 48 deg.
47 min. 47 sec. West 167.86 feet to its point of intersection with the division line between the said
lands now or formerly of The Saratoga Hospital, Inc. on the Southeast and other lands now or
formerly of Saratoga Golf & Polo Club, Inc. on the Northwest; thence along said division line North
32 deg. 06 min. 27 sec. East 350.00 feet to its point of intersection with the above first mentioned
PUD REDLINE DRAFT
July 1, 2024
22
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
division line; thence along said above first mentioned division line South
70 deg. 59 min. 24 sec. East 720.70 feet to the point or place of beginning and containing 18.24
acres of land, more or less.
PUD REDLINE DRAFT
July 1, 2024
23
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Tracked Changes
APPENDIX “C”
SKETCH PLAN
(On File in the City Planning Board Office)
ADOPTED: September 8, 1987
AMENDED: April 19, 1993
AMENDED: January 21, 1997
AMENDED: October 21, 2003
AMENDED: April 7, 2009
AMENDED: March 1, 2011
AMENDED: March 25, 2013
AMENDED:
VI
1
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
CHAPTER 241.3
AN ORDINANCE PROVIDING FOR THE ESTABLISHMENT OF
A PLANNED UNIT DEVELOPMENT DISTRICT
TO BE KNOWN AS
“SARATOGA HOSPITAL MEDICAL/PROFESSIONAL PUD”
BE IT ORDAINED, by the City Council of the City of Saratoga Springs, New York,
following a public hearing, as follows:
I. NAME
This Ordinance shall be known as SARATOGA HOSPITAL MEDICAL/
PROFESSIONAL PUD and amends the Unified Development Ordinance (formerly
Chapter 241.3 of the Zoning Ordinance of the City of Saratoga Springs, New York).
II. AMENDMENT
The City Council of the City of Saratoga Springs, on September 8, 1987, adopted the
ordinance creating The Saratoga Hospital Medical/Professional Planned Unit Development
District. That Planned Unit Development legislation was amended by the Saratoga Springs City
Council on April 19, 1993, on January 21, 1997, on October 21, 2003, on April 7, 2009, on
March 1, 2011, and on October 1, 2013. The purpose of this legislation is to further amend the
uses of the original Saratoga Hospital Medical/Professional Planned Unit Development District
legislation, so as to meet the needs of the institution and the community it serves.
This Ordinance amends the City of Saratoga Springs Zoning Map by rezoning the
properties described in Appendix “A” and shown on a map attached hereto and made a part
hereof and entitled Sketch Plan for Saratoga Hospital Medical/Professional PUD, prepared
by C.T. Male and dated May 23, 2003, revised January 26, 2009, October 27, 2009, January
10, 2011, March 25, 2013 and ______ from their current zoning designation of “Office/Medical
Business District” to “Saratoga Hospital Medical/Professional Planned Unit Development
District.”
This Ordinance also amends the Unified Development Ordinance (formerly Chapter 241.3
of the Zoning Ordinance of the City of Saratoga Springs, New York) by identifying certain uses
which may be established within the amended boundary of the Saratoga Hospital
Medical/Professional PUD and describing the review processes necessary to establish said uses.
III. BOUNDARY
The total area of the Saratoga Hospital Medical/Professional PUD, as amended by this
ordinance, will consist of 28. 69 ± acres as bounded and described in Appendix “B” attached
hereto and made a part hereof. The area is located on the westerly side of the City of Saratoga
Springs, north of Church Street, generally east of West Avenue, west of Seward Street, and
2
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
generally south of Morgan Street. The tax map references are as follows:
1. Map 165, Block 1, Lot 44
2. Map 165, Block 3, Lot 35
3. Map 165.41, Block 1, Lot 28
The Saratoga Hospital has consolidated its lots identified in the 2011 Ordinance and in
Appendix “A” to create fewer individual tax parcels for the lots owned by Saratoga Hospital and
contained in this Planned Unit Development. The above tax parcels reflect the campus as it was
configured in the 2013 Ordinance.
If the planned unit development zoning approval for this site expires or is abandoned, or
the PUD boundary is otherwise altered, the City Council shall establish the zoning district that will
be assigned to any such impacted parcel at that time
IV. SKETCH PLAN
The Saratoga Hospital Medical/Professional PUD shall be developed in general
compliance with a sketch plan filed in the Offices of the Planning Board of the City of Saratoga
Springs, New York, and attached hereto and made a part hereof as Appendix “C”. The plan
shall be used by the City and the Hospital as a guide for overall development. The sketch plan
may be changed, altered or amended, pursuant to Section 13.16 et seq. of the Saratoga Springs
Unified Development Ordinance.
V. PURPOSE
It is the purpose of this Ordinance to provide a means for the development of the Planned
Unit Development, as amended by this ordinance, in which certain economics of scale or creative
planning concepts may be utilized by the developer without departing from the spirit and intent of
the Unified Development Ordinance of the City of Saratoga Springs. It is further the purpose of
this Ordinance to promote flexibility in the development and design of Saratoga Hospital
Medical/Professional PUD that will result in the more efficient use of land, promote good site
design and visual quality, and result in a more pleasing environment than otherwise possible to
the maximum extent practicable.
VI. USES AND CHARACTERISTICS
There may be contained within the boundaries of Saratoga Hospital Medical/Professional
PUD, City of Saratoga Springs, buildings for medical, hospital, clinical, diagnostic, daycare1 and
treatment uses, all of the aforesaid construed in their broadest terms, as well as professional uses
and associated support services and customary accessory uses for all of the foregoing. The PUD
1 Must be located within either existing buildings or the to-be-constructed buildings within the campus.
3
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
shall be divided into zones A, B, C, D, and E as depicted on the sketch plan attached hereto as
Appendix “C.” Within each zone, certain projects described in Article IX of this Ordinance may
be constructed consistent with the requirements herein.
A. ZONE A
The area of Zone A, as amended by this ordinance, consists of 10.45+/- acres. The
existing Hospital building in Zone A (including its adjoining structures) is commonly known as
211 Church Street. The existing Hospital building presently covers an area of
148,648± square feet. The principal building has five above grade levels, with a total square
footage of 579,935±. Future Hospital building coverage within Zone A may increase the lot
coverage by a net of 1,352± square feet to a maximum permitted lot coverage of 150,000 square
feet.
In addition to the above, the Hospital building may be increased to a total of five above
ground levels, not exceeding a height of seventy feet (70’).
Within Zone A, principal uses shall be for acute medical/surgical services and related
support (non-clinical) systems. These generally may include medicine, diagnostic and treatment,
surgery, emergency medicine, pediatrics, obstetrics/gynecology, psychiatry, clinical ancillary,
radiation therapy, long term & elder care, daycare, business, medical and professional office use,
on call physicians’ respite area, along with administrative, material support systems and parking
for these uses, together with such other and further usual and customary uses of hospitals.
Primary health services may consist generally of in-patient (admission more than twenty-
four hours), out-patient (admission for less than twenty-four hours) and an internal support
system (administrative services, etc.) necessary for the delivery of acute/medical surgical care.
Hospital
(a) Maximum number of buildings 1
(b) Maximum building coverage 150,000 sf
(c) Maximum building levels 5
(above ground)
(d) Maximum building height 70
(e) Total building square footage 579,935± sf
B. ZONE B
Zone B consists of 3.57 ± acres.
Within Zone B uses shall be for primary medical care and ancillary clinical functions,
including laboratory, radiology, ultrasound, specialists, care coordinators, social workers,
4
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
pharmacists, and dieticians, as well as other like services necessary or desirable to support
such care, administrative support services for any or all of the foregoing, and parking.
The medical office building or buildings in Zone B shall not exceed 60,000 square feet
with a maximum building height of 50 feet.
All structures in Zone B shall be subject to final site plan approval in accordance with the
applicable provisions of (i) this Ordinance and (ii) the Unified Development Ordinance.
C. ZONE C
Zone C consists of 4.86± acres.
Within Zone C Medical, and Professional and Hospital Offices for primary medical care,
and ancillary clinical functions, including a chronic kidney dialysis center and kidney care
center, including laboratory, radiology, ultrasound and other like services necessary to support
such care, offices for hospital related functions such as finance, patient accounts, human
resources, and family health administration and parking may be permitted. Zone C shall be
used, if necessary, for storm water management from Zone B, D and E. Zone E shall be used for
any necessary additional parking demands.
The kidney dialysis center shall not exceed 10,000 square feet of gross space. Total
building coverage is not to exceed 30,000 square feet.
All uses in Zone C shall be subject to final site plan approval in accordance with Article
VIII of this Ordinance.
(a)
Maximum number of buildings
Hospital
3
(b)
Maximum building coverage
30,000 sf
(c)
Maximum building height
3 stories or 45 feet
(d)
Total building square footage
50,000 sf
D.
ZONE D
Zone D consists of 0.57± acres.
Hospital Accessory Support areas may be established in Zone D. It is anticipated that this
zone will be used to complement and support the activities undertaken in Zone A; it may also be
used for management of storm water received from Zone B, C, and E. This zone will remain as
green space until a further amendment to this Ordinance. This area shall be reserved for further
development.
5
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
All uses in Zone E shall be subject to final site plan approval in accordance with the
applicable provisions of the Unified Development Ordinance.
E. ZONE E
Zone E consists of 9.24± acres.
Zone E may support accessory parking for staff associated with activities in Zone A, B, and
D.
Supplemental parking is provided in Zone E. Parking structures are also permitted
throughout Zone E.
Wholly contained landscaped islands will be provided at the ratio of one planting area per
each fifteen vehicles. Planting areas shall be at least 162 square feet or 9 x 18 feet. Planting
areas may be located together to increase parking and maintenance efficiencies.
All uses in Zone E shall be subject to final site plan approval in accordance with
Article VIII of this Ordinance.
Zone E contains a heliport.
VII. DENSITY
The overall density of the Saratoga Hospital Medical/Professional PUD shall not exceed
the thresholds defined below.
% of PUD occupied
Total PUD Area = ± 28.69 acres 1,249,736 sf 100%
Total Building Coverage 192,826 sf 15%
Impervious Area 575,125 sf 46%
Total greenspace 481,785 sf 39%
Total Building Square Footage 689,935 sf 55%
VIII. REQUIREMENTS FOR ISSUANCE OF BUILDING PERMITS
Prior to the issuance of a building permit to develop any or all of the area within Saratoga
Hospital Medical/Professional PUD, the applicant shall receive final site plan approval from the
City of Saratoga Springs Planning Board.
The final site plan shall show the area of the Saratoga Hospital Medical/Professional
PUD proposed for development and its relationship to existing development and vacant areas
within Saratoga Hospital Medical/Professional PUD. The final site plan shall also conform to
the applicable provisions of the Unified Development Ordinance.
6
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
IX. PROJECTS
Following the effective date of this Ordinance, projects as described below may be
developed within the Saratoga Hospital Medical/Professional PUD. Certain projects identified in
this Article have been completed prior to the adoption of this amendment and are so identified.
The projects listed below may progress in any order. In addition, projects may be undertaken or
completed in more than one stage.
A. Projects, Zone A
Project A-1: Hospital Complex: Completed.
Project A-2 - Parking Expansion: Completed.
Project A-3 - Ambulatory Care Facility Expansion: Completed.
Project A-4 - Future Expansions: Project abandoned.
Project A-5: Radiation Oncology Center, Cafeteria, Parking Relocations and Expansion
and Driveway Alterations: Completed, except 2nd floor addition on Radiation Oncology Center
and additional radiation vault. Radiation Oncology Center Expansion shall not exceed 9,000 sf of
additional building coverage. The structure itself may have one or two levels, but it is currently
contemplated that the Radiation Oncology Center will occupy only the lower portion of the new
building. The upper level, if any, will be utilized for any authorized use in Zone A.
Project A-6: Central Plant Expansion: Completed.
Project A-7: Patient Care Addition: Phase I completed. Patient Care Addition shall
consist of below grade logistical support services, on-grade Emergency Department and critical
care beds, and patient care rooms. It will not exceed 30,000 sf of additional building coverage.
The structure itself shall have a maximum of five above grade levels, which may be constructed
in phases, and 181,500 sf additional building square footage.
Project A-8: Physician Respite Area: Project Removed from PUD.
Project A-9: Surgical Suite Addition: Completed..
B. Projects, Zone B
Project B: Medical Office Building not exceeding 60,000 sf of medical office space with
a building height not exceeding 50 feet measured pursuant to the UDO Section 21.4(D).
C. Projects, Zone C
Project C-1: Existing Hortense and Louis Rubin Dialysis Center: Completed.
7
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
Project C-2: Medical Professional Offices: Completed.
D. Projects, Zone D
Project D-1: Hospital Accessory Support Reserve Area: Completed.
No projects are planned for Zone D at the time of this amendment.
E. Projects, Zone E
Project E-1: Parking Expansion: Completed.
Project E-2: Parking Expansion: Completed.
Project E-4: Heliport: Completed.
Project E-5: Parking Expansion: Completed.
Project E-6: Parking Expansion: Completed.
Parking structures are permitted throughout Zone E.
F. PUD Site Plan Applications
PUD Site Plan Applications for any of the Projects or uses identified in this Planned Unit
Development may be made at any time to the Saratoga Springs Planning Board.
X. PARKING
Parking demand for the entire PUD is to be met through the provision of a large group parking lot
in Zone E, a newly reconfigured parking area on Myrtle Street in Zone E, smaller parking areas
associated with each of the buildings in the respective zones, and parking structures to be
constructed in Zone E.
During construction of specific projects in Zones A, B and C, the parking areas in Zones
E, may be altered or improved upon.
The minimum number of parking spaces shall be provided as shown in the following
schedule:
ZONE PARKING REQUIREMENTS (RATIO)
Zone A. 1 space/2 in-patient acute beds
1 space/5 in-patient skilled nursing beds
8
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
1 space/300 sf of out-patient service
1 space/300 sf of internal support
Zone B. 1 space/300 sf of gross floor space for medical office buildings with 75% of
parking spaces to be sited within Zone B and the remaining 25% of parking
spaces to be within the remainder of the campus
Zone C. 16 spaces for the 10,000 sf kidney dialysis center
1 space/300 sf of gross floor space for medical office buildings
Zone D. Green space until a further amendment.
Zone E. No parking demand required for heliport.
The interior open space is primarily designed for the required parking. All of the
buildings will be designed to ensure that the front entrance will be oriented toward the center.
All new or revised parking created as a demand of this PUD shall contain landscaping
areas at a ratio of one 9' x 18' space/15 spaces for vehicles. This landscaping requirement
shall not apply to parking associated with the construction of new parking structures
constructed within Zone E.
XI. AMENDMENTS TO THIS ORDINANCE
Amendments may be made to this Ordinance by the City of Saratoga Springs City
Council.
XII. INFRASTRUCTURE IMPROVEMENTS
The entire project as set forth herein will be serviced by City water and sanitary sewer
lines. These lines will be constructed to City standards, but will not be conveyed to the City of
Saratoga Springs. The water and sewer lines will be maintained by the Hospital.
Storm water disposal areas shall be constructed and maintained by the Hospital.
The roadways and thoroughfares through the project will be private drives maintained by
the Hospital.
Upon request, the City of Saratoga Springs shall be granted appropriately sized
easements for the construction and maintenance of water, sanitary sewer or storm water sewer
lines through Zone A of the PUD site.
9
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
The City, upon request, may take over ownership, control and responsibility for any
infrastructure main, pipe, or line presently within or constructed within the PUD site and the City
shall further be granted reasonable easements to interconnect with any infrastructure main, line
or pipe for which they have taken responsibility.
The City is hereby granted the right to enter upon the PUD site for the purpose of making
emergency repairs to any privately owned main, pipe or line. The City shall have the right to
charge the Hospital or the individual project’s sponsor whose pipe or main is repaired for any
necessary services.
All private water lines connecting into any structure within the PUD site shall be
individually metered.
XIII. OFF SITE IMPROVEMENTS
Project A-1 - Hospital Complex: Completed. A-1 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project A-2 - Parking Expansion: Completed. A-2 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project A-3 - Ambulatory Care Facility Expansion: Completed. A-3 was identified
in the 1997 Ordinance and is included for reference and consistency only.
Project A-4 - Future Expansion: Project abandoned. A-4 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project A-5 - Radiation Oncology Center, Cafeteria, Parking Relocations and
Expansion and Driveway Alterations: Completed. A-5 was identified in the 2003 Ordinance
and is included for reference and consistency only.
Project A-6 - Central Plant Expansion: None required.
Project A-7 - Patient Care Addition: Completed. A-7 was identified in the 2011
Ordinance and is included for reference and consistency only.
Project A-8 - Physician Respite Area: Project removed from PUD.
Project A-9 –Surgical Suite Addition: None
Project B-1 - Existing Saratoga Care Medical Office Building2: This medical office
2 Projects B-1 and B-2 shall – upon adoption of this PUD amendment – be combined and known as Project B within Zone B as
depicted on the PUD Sketch Plan for the Saratoga Hospital Medical/Professional PUD, last revised on June 11, 2024 and herein
made a part of this PUD amendment.
10
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
building will be demolished at a time determined by the Hospital to allow for the construction of
the building(s) identified in Project B-2 below.
Project B-2 – Construction of Medical Professional Office Building: Within a
timeframe developed by the Hospital and following site plan approval by the Planning Board, the
Hospital will undertake the construction of one or more new medical office buildings with a total
square footage not exceeding 60,000 sf and a maximum building height of 50 feet3.
Project C-1 - Existing Hortense and Louis Rubin Dialysis Center: Completed. C-1
was identified in the 1997 Ordinance and is included for reference and consistency only.
Project C-2 - Future Medical Professional Offices: Completed. C-2 was identified
in the 2011 Ordinance and is included for reference and consistency only.
Project D-1 - Hospital Accessory Support Reserved Area: Completed. D-1 was
identified in the 1997 Ordinance and is included for reference and consistency only.
Project E-1 - Parking Expansion: Completed. E-1 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project E-2 - Parking Expansion: Completed. E-2 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project E-3 - Storage Building: Project abandoned. E-3 was identified in the 1997
Ordinance and is included for reference and consistency only.
Project E-4 - Accessory Parking and Heliport: Completed. E-4 was identified in the
1997 Ordinance and is included for reference and consistency only.
Project E-5 - Parking Expansion: Completed. E-5 was identified in the 2003 ordinance
and is included for reference and consistency only.
Project E-6 - Parking Expansion: Completed. E-6 was identified in the 2011
Ordinance and is included for reference and consistency only.
XIV. SETBACKS
ZONE A
Any buildings constructed in Zone A on or after the effective date of this Ordinance shall
be no closer than fifty feet (50') from the exterior boundary of the PUD with the following
exceptions: 1) the minimum setbacks along Myrtle Street shall be ten feet (10’) for any projects
north of Project A-9 and five feet (5’) for Project A-9 and south to Church Street; and 2) for
3 Building height measured pursuant to UDO Section 21.4(D).
11
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
Project A-7, the minimum setbacks shall be eighty feet (80’) from the northern property line.
There shall be no internal setbacks between parcel lines for building, parking, driveways or
paved areas. There shall be no setbacks in Zone A for driveways, parking areas, or other paved
areas, but during PUD site plan review, the City Planning Board may require special mitigating
measures than otherwise possible to the maximum extent practicable (fencing, landscaping, etc.)
to provide adequate buffers for neighboring properties.
ZONES B, C, D, & E
For Zones B, C, D & E, a thirty foot (30') wide (minimum) planted buffer strip shall be
maintained or installed along the PUD exterior boundary lines, except as follows: (1) a forty foot
(40') and a fifty foot (50') wide (minimum) planted buffer strip as shown on the PUD Sketch Plan
shall be maintained or installed along the northern boundary line on Zone C; (2) a ten foot (10')
wide (minimum) planted buffer strip shall be maintained along the southern and western
boundary lines of Zone E to within 140' of Myrtle Street as shown on the PUD Sketch Plan. No
buffer will be required within the remaining 140' southern boundary of Zone E as shown on the
PUD Sketch Plan; and (3) Green space buffer is four feet (4’) on Myrtle Street Parcels of E – 6.
In Zones B, C, D, & E, no structure or parking space will be constructed within the
required buffer zone. At least 40% of the installed plant material in the planted buffer strips shall
be evergreen.
No building in Zones B, C, D & E shall be constructed within forty feet (40') of another
building unless the two buildings are connected with an enclosed hallway meeting all local and
state building codes.
No building in Zones B, C, D & E shall be constructed within thirty feet (30') of the PUD
property line or within fifty feet (50') of the Myrtle Street property line.
In Zone E-6, no parking space shall be constructed within 5 feet of the boundary lines.
XV. SIGNAGE
All signs currently located on the Hospital campus are part of an approved signage plan
implemented in 2003 and subsequently updated. The approved signage plan categorized the
signs into the categories set forth below, and approved the below sign types with the dimensions
and other restrictions included herein. The below types of signs currently exist on the hospital
campus and have received approval by the Saratoga Springs Zoning Board of Appeals and the
Design Review Commission.
The Hospital may add or replace signage within the PUD consistent with the guidelines
contained in this section, providing the new signs do not exceed the existing specifications,
including height and dimensions, for each sign type, as set forth more fully below, and subject to
the regulations set forth in this provision. Signs shall be erected and constructed with the purpose
of safe and efficient flow of traffic in and through the site. All signs shall be compatible within
the context of its visual and physical environment.
12
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
Sign type Maximum size and height
ED.1
Large two-sided campus entrance
identification sign
66.5 sf
12 feet height
No more than 2 signs
ED.2 Medium size vehicular directional
sign
42" X 49" or 14.29 sf
6 feet height
Signage type shall be limited to use for
emergency entrances to the campus.
ED.3 Small vehicular directional sign 42" x 30" or 8.75 sf
6 feet height
FID.1 Large facade-mounted identification
sign
11' 4" X 240"
No more than 2 signs per establishment
FID.2
Small facade-mounted identification
sign
108" X 52" or 39 sf
4.25 feet height
Only one sign per facade that has street
frontage
FID.3
Large building entrance
identification sign
9' x 20" or 15 sf
No more than one sign per public entrance for
significant hospital functions (ie. emergency
department, maternity, main entrance,
radiation oncology, etc)
FID.4 Small building entrance
identification sign
24" X 24" or 4 sf
FID.5
Ambulance/ emergency department
entrance identification sign
60" x 20" or 8.33 sf
6 feet height
Allowable as needed to identify Ambulance
and Emergency entrances to the Emergency
Department
ID.1 Large two-sided outpatient facility
identification sign
3' x 3' or 9 sf
6 feet height
No more than one sign per outpatient facility
ID.4 Ground-mounted identification sign 54" x 36"
ID.5
Tall, ground-mounted identification
sign
24" x 24" or 4 sf
9'6" height
Ground mounted donor
identification sign
47.2 sf
9'6" height
13
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
PKG.1 Parking lot identification signs 30" X 36" or 6.25 sf
6 feet height
Limited to one per entrance to parking lot.
Non- smoking facility designation
signs
10" x 14"
One sign per bench for all outdoor seating
Only ED.1 (large two sided campus entrance identification) and ED.3 (small vehicular
directional) signage shall be allowed to be located within 150 feet of the signalized intersection
of Myrtle and Church Streets.
The following types of signs shall be permitted within 50 feet of a non-signalized
intersection: ED.1 (large two sided campus entrance identification), ED.2 (medium sized
vehicular directional), ED.3 (small vehicular directional), ID.1 (large two sided outpatient
facility identification sign), and any signage located on the facade of the buildings.
Throughout the campus, signs shall be permitted to be located within 50 feet of
another sign.
Within the limitations set forth above, facade signage may be permitted to occur in
excess of one sign per facade. The dimensions shall not exceed the sizes noted above
within each category. The location or relocation of wall signage shall be completed in a
manner that prevents irreversible damage to the facade substrate. Sign anchors in masonry
facades shall be limited to mortar joints. Any areas from which wall signage has been
removed or relocated shall be repaired to match surrounding facades.
The Hospital signage should reflect current Albany Med Health System/Saratoga Hospital brand
guidelines and appropriate fonts, colors, and style which will be coordinated by the Albany Med
Health System Marketing and Communications Team.
The FID.3 (large building entrance identification sign), ED.1 (large two sided campus
entrance identification sign) and ED.2 (medium vehicle directional sign) signs are designed for
internal illumination using florescent lamps which conform to UL and industry standards. Light
is contained within the sign, except where the translucent white acrylic letters or symbols have
been inserted into the aluminum face. Neon lighting for a back lit halo effect is used for the
FID.1 (large facade mounted identification sign) sign near the hospital entrance. LED lights may
replace the neon on future installations.
The Hospital shall submit documentation to the Saratoga Springs Office of Planning and
Economic Development when additional signage in compliance with the above restrictions is
necessary or required on the PUD campus. The documentation shall include information on the
proposed location, style, dimensions and height of the proposed sign. The request may be treated
as an administrative action. The Planning Board Chair will consider any applications which raise
issues of the location of signage. The Design Review Commission Chair will consider any
applications pertaining to percentage of blank space on the signs, lighting of the signs and
design. The appropriate Chair will seek guidance and input from the Office of Planning and
Economic Development in reviewing any applications submitted by the hospital. The Chair or
14
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
the Hospital, at their option, shall determine if any individual submission shall be decided by the
appropriate city board and shall refer such applications for full board consideration.
XVI. TIME EXTENSIONS
For good cause shown, the Hospital may apply for one or more extensions of an
approved PUD site plan. Applications for such requests shall be made to the Planning Board.
XVII. CONSTRUCTION STANDARDS
All construction standards for buildings, private and public improvements and for utilities
shall be prepared and approved by licensed architects, landscape architects, or engineers. All
costs associated with this shall be borne by the developer whether the plans are provided by the
City of Saratoga Springs or by the developer. Further, all completed construction shall be
certified to the City of Saratoga Springs by licensed architects, landscape architects, or engineers
as being completed in the manner called for in the plans and shall be certified in accordance
therewith. The City may require any or all costs connected with this to be borne by the
developer. Prior to the construction of any approved Project, a pre-construction conference with
the City Engineer and the City Building Department shall be required. At such conference, the
City may impose reasonable standards designed to lessen the impact of construction noise, dust
and construction vehicle traffic on any adjacent residential area.
XVIII. ADDITIONAL FUTURE PROJECTS
Although the development of the proposed PUD has been set forth in its entirety and this
Ordinance rezones the entire 28.69± acres as a Planned Unit Development, it grants only the
actual development of Projects within the PUD area. The remaining undeveloped land will
remain as green space until such time as the Hospital and Planning Board of the City of Saratoga
Springs agree upon the impact, if any, upon the infrastructure of the City, the meeting of those
needs, and the specific development uses.
XIX. OWNERSHIP
Saratoga Hospital intends to own and/or control, as well as maintain and operate, the
roadways and land within its PUD. In the event that ownership of the area wholly encompassed
by the Saratoga Hospital Medical/Professional PUD is transferred or conveyed to any third
person, firm, corporation, partnership or other entity by the applicant herein, the City of Saratoga
Springs reserves the right to require proof of financial responsibility of the transferee in
accordance with the same procedures set forth in Section 240-3.7 of the Zoning Ordinance of the
City of Saratoga Springs.
15
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
XX. MAP
A mylar of the final approved sketch plan shall be filed with the City Planning
Board and the City Clerk. A copy shall be filed with the City Building Inspector.
XXI. AMENDMENTS
Saratoga Hospital Medical/Professional PUD shall be developed in compliance with the final
approved sketch plan. Any amendments thereto will be made pursuant to the Saratoga Springs
Unified Development Ordinance.
XXII. VALIDITY
If any provision of this Ordinance shall be held invalid, the remainder of the Ordinance
shall not be affected thereby.
XXIII. EFFECTIVE DATE
This Ordinance shall take effect one day after approval by the Saratoga Springs City
Council and posting and publishing in the official newspaper of the City as required by law.
ADOPTED: September 8, 1987
AMENDED: April 19, 1993
AMENDED: January 21, 1997
AMENDED: October 21, 2003
AMENDED: April 7, 2009
AMENDED: March 1, 2011
AMENDED: October 1, 2013
AMENDED: __________________
16
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
APPENDIX “A”
Amendments to Zone A, Saratoga Hospital Medical/Professional PUD
LEGAL DESCRIPTION AND MAP OF PARCELS TO BE ADDED TO
THE SARATOGA HOSPITAL
PLANNED UNIT DEVELOPMENT DISTRICT
PARCEL 1:
All that certain tract, piece or parcel of land situate in the City of Saratoga Springs, County of
Saratoga, State of New York, lying Northerly of Church Street (New York State Route 9N) and
Easterly of Myrtle Street, and being more particularly bounded and described as follows:
BEGINNING at the point of intersection of the Northeasterly street boundary of Church Street
(New York State Route 9N) as described in Document No. 2009019933 with the Easterly street
boundary of Myrtle Street; thence from said point of beginning along said Easterly street boundary
of said Myrtle Street the following two (2) courses: 1) North 03 deg. 50 min. 09 sec. West 538.98
feet to a point; and 2) North 03 deg. 58 min. 54 sec. West 147.84 feet to its point of intersection
with the common division line between the lands now or formerly of The Saratoga Hospital as
described in Book 1525 of Deeds at Page 675, Book 991 of Deeds at Page 152, Book 990 of Deeds
at Page 792 and Book 1651 of Deeds at Page 293 on the South and the lands now or formerly of
Mary Grygiel as described in Book 1099 of Deeds at Page 3, lands now or formerly of Larry D.
Fox and Linda C. Fox as described in Book 1336 of Deeds at Page 220, lands now or formerly of
Ronald G. Conlee and Diane M. Conlee as described in Book 1054 of Deeds at Page 537, lands
now or formerly of Alice A. Smith as described in Book 1373 of Deeds at Page 745, lands now or
formerly of Margaret A. MacFarland as described in Book 1097 of Deeds at Page 471, lands now
or formerly of Raymond C. Yager and Terry A. Yager as described in Book 866 of Deeds at Page
364, lands now or formerly of Laurence Aryeh Alpern and Anna Alpern as described in Book 1241
of Deeds at Page 750 and lands now or formerly of Irving L. Metzger and Marcia P. Metzger d.b.a.
Metzger and Sons as described in Book 1052 of Deeds at Page 872 Deed Parcel No. 6 on the North;
thence along said common division line North 86 deg. 15 min. 24 sec. East 550.31 feet to its point
of intersection with the division line between the said lands of The Saratoga Hospital on the West
and the said lands of Irving L. Metzger and Marcia P. Metzger d.b.a. Metzger and Sons as described
in Book 1052 of Deeds at Page 872, Deed Parcel No. 6 and No. 10 on the East; thence along said
division line South 04 deg. 02 min. 45 sec. East 203.47 feet to its point of intersection with the
division line between the said lands of The Saratoga Hospital as described in Book 1651 of Deeds
at Page 293 on the South and the said lands of Irving L. Metzger and Marcia P. Metzger d.b.a.
Metzger and Sons Deed Parcel No. 10 on the North; thence along said division line North 85 deg.
26 min. 15 sec. East 166.00 feet to its point of intersection with the Westerly boundary of a 20-
foot-wide alley (a.k.a. Medical Arts Lane), said point also being the Northwesterly terminus of said
alley; thence along said Westerly boundary South 04 deg. 02 min. 45 sec. East 350.00 feet to its
point of intersection with the Northerly boundary of a 15-foot-wide alley (a.k.a. Corey Lane), said
point also being the Southwesterly terminus of said 20-foot-wide alley (a.k.a. Medical Arts Lane);
thence along the Northerly boundary of said 15-foot-wide alley (a.k.a. Corey Lane) South 85 deg.
17
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
26 min. 15 sec. West 166.00 feet to the Northwesterly terminus of said 15-foot-wide alley (a.k.a.
Corey Lane) and marking the former Easterly boundary of North Van Rensselaer Street as
conveyed to The Saratoga Hospital in Book 1668 of Deeds at Page 317; thence along the Westerly
terminus of said 15-foot-wide alley (a.k.a. Corey Lane) and said former Easterly boundary of North
Van Rensselaer Street, South 04 deg. 02 min. 45 sec. East 15.00 feet to its point of intersection
with the division line between the lands now or formerly of The Saratoga Hospital as described in
Book 1668 of Deeds at Page 317 former Van Rensselaer Street on the West and the lands now or
formerly of J. J. Byrne as described in Book 887 of Deeds at Page 11 on the East; thence along said
division line South 04 deg. 02 min. 45 sec. East 164.28 feet to its point intersection with the
Northerly street boundary of Church Street (New York State Route 9N); thence along said
Northerly street boundary the following two (2) courses: 1) South 84 deg. 27 min. 34 sec. West
53.49 feet to a point; and 2) South 89 deg. 29 min. 56 sec. West 319.29 feet to its point of
intersection of the Northerly street boundary of Church Street (New York State Route 9N) as
described in Document No. 2009019933; thence along said Northerly and Northeasterly street
boundary the following two (2) courses: 1) North 89 deg. 14 min. 23 sec. West 156.10 feet to a
point; and 2) North 58 deg. 55 min. 08 sec. West 30.26 feet to the point or place of beginning,
containing 10.453± acres of land.
Subject to an area granted by easement for parking as described in Book 1682 of Deeds at
Page 570 and being more particularly bounded and described as follows:
BEGINNING at a point on the division line between the said lands of The Saratoga Hospital as
described in Book 1668 of Deeds at Page 317 former bed of North Van Rensselaer Street on the
West and lands now or formerly of J.J. Byrne as described in Book 887 of Deeds at Page 11 on the
East, said point being situate North 04 deg. 02 min. 45 sec. West along said division line 39.32 feet
from its intersection with the Northerly street boundary of Church Street (New York State Route
9N); thence from said point of beginning through the said lands of The Saratoga Hospital the
following twelve (12) courses: 1) South 85 deg. 57 min. 12 sec. West 9.47 feet to a point; 2) South
03 deg. 38 in. 27 sec. East 13.63 feet to a point; 3) South 85 deg. 57 min. 15 sec. West 27.91 feet
to a point; 4) North 04 deg. 02 min. 45 sec. West 52.94 feet to a point; 5) South 84 deg. 18min. 53
sec. West 15.60 feet to a point; 6) North 03 deg. 45 min. 12 sec. West 32.52 feet to a point; 7) North
86 deg. 01 min. 11 sec. East 15.43 feet to a point; 8) North 04 deg. 02 min. 45 sec. West 46.29 feet
to a point of curvature; 9) Northeasterly along a curve to the right having a radius of 14.00 feet, an
arc length of 21.99 feet and a chord bearing of North 40 deg. 57 min. 15 sec. East 19.80 feet to a
point of tangency; 10) North 85 deg. 57 min. 15 sec. East 17.36 feet to a point; 11) South 04 deg.
02 min. 45 sec. East 9.11 feet to a point; and 12) North 85 deg. 57 min. 15 sec. East 6.12 feet to a
point on the above first mentioned division line; thence along said above first mentioned division
line South 04 deg. 02 min. 45 sec. East 122.54 feet to the point or place of beginning.
Intending to describe an irregular shaped parcel to be granted by easement for parking.
Subject to any easements, covenants or restrictions of record.
18
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
APPENDIX “B”
LEGAL DESCRIPTION OF ENTIRE AMENDED PUD AREA ZONE A
All that certain tract, piece or parcel of land situate in the City of Saratoga Springs, County of
Saratoga, State of New York, lying Northerly of Church Street (New York State Route 9N) and
Easterly of Myrtle Street, and being more particularly bounded and described as follows:
BEGINNING at the point of intersection of the Northeasterly street boundary of Church Street
(New York State Route 9N) as described in Document No. 2009019933 with the Easterly street
boundary of Myrtle Street; thence from said point of beginning along said Easterly street boundary
of said Myrtle Street the following two (2) courses: 1) North 03 deg. 50 min. 09 sec. West 538.98
feet to a point; and 2) North 03 deg. 58 min. 54 sec. West 147.84 feet to its point of intersection
with the common division line between the lands now or formerly of The Saratoga Hospital as
described in Book 1525 of Deeds at Page 675, Book 991 of Deeds at Page 152, Book 990 of Deeds
at Page 792 and Book 1651 of Deeds at Page 293 on the South and the lands now or formerly of
Mary Grygiel as described in Book 1099 of Deeds at Page 3, lands now or formerly of Larry D.
Fox and Linda C. Fox as described in Book 1336 of Deeds at Page 220, lands now or formerly of
Ronald G. Conlee and Diane M. Conlee as described in Book 1054 of Deeds at P age 537, lands
now or formerly of Alice A. Smith as described in Book 1373 of Deeds at Page 745, lands now or
formerly of Margaret A. MacFarland as described in Book 1097 of Deeds at Page 471, lands now
or formerly of Raymond C. Yager and Terry A. Yager as described in Book 866 of Deeds at Page
364, lands now or formerly of Laurence Aryeh Alpern and Anna Alpern as described in Book 1241
of Deeds at Page 750 and lands now or formerly of Irving L. Metzger and Marcia P. Metzger d.b.a.
Metzger and Sons as described in Book 1052 of Deeds at Page 872 Deed Parcel No. 6 on the North;
thence along said common division line North 86 deg. 15 min. 24 sec. East 550.31 feet to its point
of intersection with the division line between the said lands of The Saratoga Hospital on the West
and the said lands of Irving L. Metzger and Marcia P. Metzger d.b.a. Metzger and Sons as described
in Book 1052 of Deeds at Page 872, Deed Parcel No. 6 and No. 10 on the East; thence along said
division line South 04 deg. 02 min. 45 sec. East 203.47 feet to its point of intersection with the
division line between the said lands of The Saratoga Hospital as described in Book 1651 of Deeds
at Page 293 on the South and the said lands of Irving L. Metzger and Marcia P. Metzger d.b.a.
Metzger and Sons Deed Parcel No. 10 on the North; thence along said division line North 85 deg.
26 min. 15 sec. East 166.00 feet to its point of intersection with the Westerly boundary of a 20 -
foot-wide alley (a.k.a. Medical Arts Lane), said point also being the Northwesterly terminus of said
alley; thence along said Westerly boundary South 04 deg. 02 min. 45 sec. East 350.00 feet to its
point of intersection with the Northerly boundary of a 15-foot-wide alley (a.k.a. Corey Lane), said
point also being the Southwesterly terminus of said 20-foot-wide alley (a.k.a. Medical Arts Lane);
thence along the Northerly boundary of said 15-foot-wide alley (a.k.a. Corey Lane) South 85 deg.
26 min. 15 sec. West 166.00 feet to the Northwesterly terminus of said 15-foot-wide alley (a.k.a.
Corey Lane) and marking the former Easterly boundary of North Van Rensselaer Street as conveyed
to The Saratoga Hospital in Book 1668 of Deeds at Page 317; thence along the Westerly terminus
of said 15-foot-wide alley (a.k.a. Corey Lane) and said former Easterly boundary of North Van
Rensselaer Street, South 04 deg. 02 min. 45 sec. East 15.00 feet to its point of intersection with the
division line between the lands now or formerly of The Saratoga Hospital as described in Book
1668 of Deeds at Page 317 former Van Rensselaer Street on the West and the lands now or formerly
of J. J. Byrne as described in Book 887 of Deeds at Page 11 on the East; thence along said division
line South 04 deg. 02 min. 45 sec. East 164.28 feet to its point intersection with the Northerly street
19
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
boundary of Church Street (New York State Route 9N); thence along said Northerly street boundary
the following two (2) courses: 1) South 84 deg. 27 min. 34 sec. West 53.49 feet to a point; and 2)
South 89 deg. 29 min. 56 sec. West 319.29 feet to its point of intersection of the Northerly street
boundary of Church Street (New York State Route 9N) as described in Document No. 2009019933;
thence along said Northerly and Northeasterly street boundary the following two (2) courses: 1)
North 89 deg. 14 min. 23 sec. West 156.10 feet to a point; and 2) North 58 deg. 55 min. 08 sec.
West 30.26 feet to the point or place of beginning, containing 10.453± acres of land.
Subject to an area granted by easement for parking as described in Book 1682 of Deeds at
Page 570 and being more particularly bounded and described as follows:
BEGINNING at a point on the division line between the said lands of The Saratoga Hospital as
described in Book 1668 of Deeds at Page 317 former bed of North Van Rensselaer Street on the
West and lands now or formerly of J.J. Byrne as described in Book 887 of Deeds at Page 11 on the
East, said point being situate North 04 deg. 02 min. 45 sec. West along said division line 39.32 feet
from its intersection with the Northerly street boundary of Church Street (New York State Route
9N); thence from said point of beginning through the said lands of The Saratoga Hospital the
following twelve (12) courses: 1) South 85 deg. 57 min. 12 sec. West 9.47 feet to a point; 2) South
03 deg. 38 in. 27 sec. East 13.63 feet to a point; 3) South 85 deg. 57 min. 15 sec. West 27.9 1 feet
to a point; 4) North 04 deg. 02 min. 45 sec. West 52.94 feet to a point; 5) South 84 deg. 18min. 53
sec. West 15.60 feet to a point; 6) North 03 deg. 45 min. 12 sec. West 32.52 feet to a point; 7) North
86 deg. 01 min. 11 sec. East 15.43 feet to a point; 8) North 04 deg. 02 min. 45 sec. West 46.29 feet
to a point of curvature; 9) Northeasterly along a curve to the right having a radius of 14.00 feet, an
arc length of 21.99 feet and a chord bearing of North 40 deg. 57 min. 15 sec. East 19.80 feet to a
point of tangency; 10) North 85 deg. 57 min. 15 sec. East 17.36 feet to a point; 11) South 04 deg.
02 min. 45 sec. East 9.11 feet to a point; and 12) North 85 deg. 57 min. 15 sec. East 6.12 feet to a
point on the above first mentioned division line; thence along said above first mentioned division
line South 04 deg. 02 min. 45 sec. East 122.54 feet to the point or place of beginning.
Intending to describe an irregular shaped parcel to be granted by easement for parking.
Subject to any easements, covenants or restrictions of record.
ZONES B, C, D & E
All that certain tract, piece or parcel of land situate in the City of Saratoga Springs, County of
Saratoga, State of New York, lying West of Myrtle Street and North of Church Street, and being
more particularly bounded and described as follows:
BEGINNING at the point of intersection of the division line between the lands now or formerly
of The Saratoga Hospital, Inc. as described in Book 1454 of Deeds at Page 41 on the South and the
lands now or formerly of Gary P. Dicresce and Nancy L. Dicresce as described in Book 1235 of
Deeds at Page 68 on the North with the Westerly street boundary of Myrtle Street and runs thence
from said point of beginning along said Westerly street boundary the following six (6) courses: 1)
South 04 deg. 12 min. 45 sec. East 223.95 feet to a point; 2) South 04 deg. 08 min.
15 sec. East 490.70 feet to a point; 3) South 03 deg. 25 min. 45 sec. East 50.01 feet to a point; 4)
South 04 deg. 30 min. 11 sec. East 19.99 feet to a point; 5) South 04 deg. 42 min. 38 sec. East
29.69 feet to a point; and 6) South 03 deg. 50 min. 09 sec. East 213.10 feet to its point of intersection
with the division line between the lands now or formerly of The Saratoga Hospital as described in
Instrument No. 2009023919 on the North and the lands now or formerly of Ronald A. Loffredo as
20
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
described in Book 1083 of Deeds at Page 520 on the South; thence along said division line South
85 deg. 34 min. 34 sec. West 99.32 feet to its point of intersection with the common division line
between the lands now or formerly of Saratoga Golf & Polo Club, Inc. as described in Book 831 of
Deeds at Page 10 to be conveyed to The Saratoga Hospital on the West and the said lands now or
formerly of Ronald A. Loffredo as described in Book 1083 of Deeds at Page 520 and other lands
now or formerly of Ronald A. Loffredo as described in Book 1174 of Deeds at Page 80 on the East;
thence along said common division line South 04 deg. 25 min. 26 sec. East 230.03 feet to its point
of intersection with the Northerly street boundary of Church Street; thence along said Northerly
street boundary the following two (2) courses: 1) North 86 deg. 18 min. 19 sec. West 7.26 feet
to a point; and 2) North 84 deg. 37 min. 10 sec. West 43.83 feet to its point of intersection with
the division line between the said lands to be conveyed to The Saratoga Hospital on the East and
remaining lands now or formerly of Saratoga Golf & Polo Club, Inc. as described in Book 831 of
Deeds at Page 10 on the West; thence along said division line North 04 deg. 25 min. 26 sec. West
464.33 feet to its point of intersection with the division line between the said lands now or formerly
of The Saratoga Hospital, Inc. as described in Book
1454 of Deeds at Page 41 on the East and the said lands now or formerly of Saratoga Golf &
Polo Club, Inc. on the West; thence along the said division line North 04 deg. 56 min. 05 sec. West
70.00 feet to its point of intersection with the division line between the said lands now or formerly
of The Saratoga Hospital, Inc. on the North and the said lands now or formerly of Saratoga Golf
& Polo Club, Inc. on the South; thence along said division line South 85 deg. 34 min. 45 sec. West
529.19 feet to its point of intersection with the division line between the said lands now or formerly
of The Saratoga Hospital, Inc. on the East and the said lands now or formerly of Saratoga Golf &
Polo Club, Inc. on the West; thence along said division line North
03 deg. 50 min. 15 sec. West 10.00 feet to its point of intersection with the division line between
the said lands now or formerly of The Saratoga Hospital, Inc. on the North and the said lands
now or formerly of Saratoga Golf & Polo Club, Inc. on the South; thence along said division line
South 85 deg. 34 min. 45 sec. West 215.95 feet to its point of intersection with the division line
between the said lands now or formerly of The Saratoga Hospital, Inc. on the Northeast and the
said lands now or formerly of Saratoga Golf & Polo Club, Inc. on the Southwest; thence along said
division line North 49 deg. 39 min. 29 sec. West 42.60 feet to its point of intersection with the
division line between the said lands now or formerly of The Saratoga Hospital, Inc. on the East and
the said lands now or formerly of Saratoga Golf & Polo Club, Inc. on the West; thence along said
division line North 04 deg. 53 min. 43 sec. West 230.65 feet to its point of intersection with the
division line between the said lands now or formerly of The Saratoga Hospital, Inc. on the South
and the lands to be conveyed by The Saratoga Hospital, Inc. to Saratoga Golf & Polo Club, Inc. on
the North; thence along said division line North 71 deg. 36 min. 56 sec. East 26.67 feet to its point
of intersection with the division line between the said lands now or formerly of The Saratoga
Hospital, Inc. on the Southeast and the said lands to be conveyed to Saratoga Golf
& Polo Club, Inc. on the Northwest; thence along said division line North 33 deg. 09 min. 50
sec. East 112.67 feet to its point of intersection with the division line between the said lands now
or formerly of The Saratoga Hospital, Inc. on the East and the said lands to be conveyed to Saratoga
Golf & Polo Club, Inc. on the West; thence along said division line North 15 deg. 57 min. 55 sec.
East 249.24 feet to its point of intersection with the division line between the said lands now or
formerly of The Saratoga Hospital, Inc. on the Northeast and the said lands to be conveyed to
Saratoga Golf & Polo Club, Inc. on the Southwest; thence along said division line North 48 deg.
47 min. 47 sec. West 167.86 feet to its point of intersection with the division line between the said
lands now or formerly of The Saratoga Hospital, Inc. on the Southeast and other lands now or
formerly of Saratoga Golf & Polo Club, Inc. on the Northwest; thence along said division line North
32 deg. 06 min. 27 sec. East 350.00 feet to its point of intersection with the above first mentioned
21
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
division line; thence along said above first mentioned division line South
70 deg. 59 min. 24 sec. East 720.70 feet to the point or place of beginning and containing 18.24
acres of land, more or less.
22
S/2024 Morgan St/PUD Legislation clean v 10 10.1.13 Update 2024 Clean Copy
APPENDIX “C”
SKETCH PLAN
(On File in the City Planning Board Office)
ADOPTED: September 8, 1987
AMENDED: April 19, 1993
AMENDED: January 21, 1997
AMENDED: October 21, 2003
AMENDED: April 7, 2009
AMENDED: March 1, 2011
AMENDED: March 25, 2013
AMENDED:
VII
Proposed CSA Site
Main Campus
Zone E-1
Proposed CSA Site
Main Campus
Zone E-1
Main Campus
Proposed CSA Site
Zone E-1
Main Campus
Zone E-1
Proposed CSA Site
VIII