S C O P E
Project Review
Placement of Pedestals, Chargers, Bollards
Signage & Stencils
Site Design
Elevation ViewContractor Installation Report
3
EV
CHARGING
ONLY
EV
CHARGING
ONLY
Dual Pedestal
Chargers will be side facing to parking space in between two
spaces
Parking sign will be in the center of each parking space facing
the car
Stencil will sit in lower third of parking space
Striping to be white, as shown
EV
CHARGING
ONLY
EV
CHARGING
ONLY
Single Pedestal
Individual Charger will be facing cars in center of each
parking space
Parking sign will be between the two parking spaces
Stencil will sit in lower third of parking space
Striping to be white, as shown
Signage and Stencils
P R E P A R A T I O N
Material Review Contractor Progress Report
XYZ
Elevation view of chargers uploaded
Before Install Photos Uploaded
Close-up of chargers and electrical gear uploaded
Schedule time for Commissioning
Permit Uploaded
Shipping Address Updated
Inspection Documents Uploaded
Item #Description Qty
AX48 Charger
AX80 Charger
7’ Pedestal
Plug & Cap for Pedestal
Cable Retractor
Large Blk Plate
Small Blk Plate
Single Spot Sign
Dual Spot Sign
Bollards
Stencil
G E T T I N G S T A R T E D
Arrival on Site
➢Project Start Date:
➢Notify Property of your arrival
Point of Contact at the Property is:
XYZ, XYZ EMAIL, XYZ Phone #
➢Take pre-construction pictures of work area
➢Manage your Subcontractors
➢Keep work area Neat & Clean
W r a p p i n g U p
Pre-Commissioning
Photos of Chargers-elevation view off charging cluster,
front & side of each charger, and electrical room
Circuit size & load sharing-confirm power being provided
by charger ID #
Upload Copy of City/town Inspection
Schedule Call with EV+ Installation team for a time when
you will be on-site
Dial into Call & support EV+ in Activating The Charger
Commissioning
✓Electrical Installation
✓Civil work and clean-up
✓Power-Up Charger
✓Installation of Signs
✓Striping & Stenciling
✓Photos and information uploaded to
Contractor Report
Prior to commissioning and project
completion, the following must be completed
Use Link to Contractor Installation Report to schedule
commissioning call & capture information needed for
commissioning