HomeMy WebLinkAbout20230267 78 Church Site Plan Franklin Park Renovation - Civic SpaceDate: March 13, 2024 NTS 1. DEBRIS REMOVAL 2. CONCRETE SIDEWALKS / SURROUNDING 3. MASONRY 4. CAULKS AND SEALANTS AS NEEDED 5. FOUNTAIN REPAIR 6. ELECTRICAL UPDATES 7. LANDSACPING UPDATES AS NEEDED 8. PLANTINGS PARK RESTORATION ITEMS: TO CONSIST OF POWER WASHING EXISTING BRICK PAVER WALKWAYS, REPLACING BROKEN BRICKS, AND ADD 2 STERNBERG LIGHTS NEAR INTERIOR WALKWAYS. ADDITIONALLY BONACIO CONSTRUCTION WILL RESTORE THE EXISTING FOUNTAIN BY ADDING A PUMP, REMOVING ALL MOSS / GRASS GROWING THROUGH THE CAST IN PLACE FOUNTAIN, POWER WASHING THE ENTIRE AREA, PARGE COATING THE CONCRETE AND EPOXY PAINTING THE BOTTOM OF FOUNTAIN AND SAND / GRINDING AND REFINISHING THE STATUE. CLEANING UP ALL EXISTING LANDSCAPE BEDS AND CUTTING BACK ALL OVERGROWN SHRUBS / PLANTINGS, RE-EDGING ALL BEDS AND ADDING NEW PLANTS / SHRUBS IS ALSO INCLUDED. SCOPE OF WORK: 2 3 5 DIVISION STREET BENJAMIN STREETFRANKLIN STREETFOUNTAIN REPAIR BRICK PAVER WALK/LANDSCAPE UPDATE BRICK PAVER WALK/LIGHTING Franklin Square Park Restorations Franklin Square, Saratoga Springs Sketch PlanSave Date: 3/14/2024 10:13 AMFile Name: G:\Proj-2022\2022062_Bonacio_Carpetland\2022062CAD\Franklin Square _ Sketch.dwgPlotted By:MATT BROBSTON Project Title:Franklin Square Community Restoration Estimators:TM MM Description Construction Analysis / Qualifications Project Overview Date 03.04.2024 Owner Attn: Tony Bonacio Architect/Engineer Of Record The L.A Group Scope of Work Based Off Per Renderings Labeled "allphases" received on 01.30.24 from The LA Group Estimate ##24-105 Project Title Franklin Square Community Restoration Job Description See Page 2 Scope of work Project Gross SF 4517 Project Manager Tony Bonacio Budget Summary Budget Revision Dates None Overhead and Profit %0.00% Contingency 0.00% Estimated Cost $29,986.77 Contingency Cost $0.00 Estimated OH & P $0.00 Total Proposed Budget $29,986.77 Legal Requirements Tax Status Capital Improvement Tax %7.00% Credits - IDA, HCF, SHPPO, ETC None assumed Prevailing Wage/Davis Bacon/Certified Payroll None required per City Other - Tax Credits None assumed - GC to not include OH&P Municipal Grants/Funding None assumed P&P Bonds None assumed Building Permit None assumed - by City Land/Property Survey Required prior to commencement Misc. Items National Grid Assumes none required Utilities Required Temp Electric - Generators will be provided as needed 3rd Party Inspections Not included by GC Hazardous Material Survey None included - will test if unknown materials/pipe wrapping is exposed during construction Winter Conditions Not Required Budget Summary - Franklin Square Community Area DATE -03.04.2024 Page 1 of 2 18 Division St Saratoga Springs, New York 12866 03.04.2024 GSF:4,517 CSI Franklin Sq.TOTAL Code Trade Description ROM Budget Per / GSF 0000 CONTRACT REQUIREMENTS/ SITE DESIGN FEE 3,500.00$0.77$ 0100 GENERAL REQUIREMENTS 1,780.00$0.39$ 2050 DEBRIS REMOVAL 500.00$0.11$ 3300 CONCRETE SIDEWALKS / SURROUND - E.T.R -$-$ 4200 MASONRY - ALL WALKWAYS TO REMAIN -$-$ 7900 CAULKS & SEALANTS 328.00$0.07$ 13000 FOUNTAIN REPAIR - includes pump, assumes reuse of waterline 8,005.02$1.77$ 26000 ELECTRICAL - SITE LED BOLLARDS 11,500.00$2.55$ 31000 EARTH WORK 2,144.00$0.47$ 32800 SITE IMPROVEMENTS 2,229.75$0.49$ Subtotal Trades 29,986.77$ 0.00%OH & P -$ 0.00%Contingency -$ Total Construction Budget Costs to Date:29,986.77$6.64$ Alternates: Alt. 1 $3,780.08 Alt. 2 $13,949.00 Qualifications & Exclusions: Description - Supply and install new benches on existing pads. Description - Replace brick surround at fountain, including subgrade/site prep. Please see add alternates for additional work that could be done by Bonacio Construction if required. Exclusions - Any curb or sidewalk work/repairs at Israel Ln, Division St. or Franklin St. Adding a concrete path that connects to the Franklin St. city sidewalk/cross section. Any items listed within the alternates, any asbestos testing (none foreseen), and any relocation of underground utilities, and new brick pavers. Scope of work ~ To consist of power washing existing brick paver walkways, replacing broken bricks, and add (4) LED bollards surrounding walkways. Additionally Bonacio Construction will restore the existing fountain by adding a pump, removing all moss/grass growing through the cast in place fountain, power washing the entire area, parge coating the concrete and epoxy painting the bottom of fountain + sand/grinding and refinishing the statue. Also included is cleaning up all existing landscape beds and cutting back all overgrown shrubs/plantings, re-edging all beds and adding new plants/shrubs. Franklin Square Community Restoration Budget Summary - Franklin Square Community Area Date - 03.04.2024 Page 2 of 2