Loading...
HomeMy WebLinkAbout20220934 Cardona's Site Plan 222 Washington Ave Plans As-Approved (3)r t ' �.. i...-• E WLbjf ._...._. F 14N fi t 44 T 3 rJd (-,A . betwec t) ;"i dot --- ..----- --- ---- ._��� 5A .. t C{J _ ...................___......... n.� t t Af_CE5S t, 1.. A SE MFNT ##� I s' M. -w.•_ ... _.-...__._....._..._... _ ?tT Kt) , ' :i ,; WASHINGTON STREET e �. _ ` K i,• by 1l•'�tKf���.11 y ............. ....._..'. L?!il ..._."......_...".�..,.... : i ti> cur stree `, x � .:. mt7 In A , AREA - .� R x REMOVE CURBING�l s P.V.- + -- INLET PROTECTION 3 \ 4 SAWCUT CURB AND -RCIVIuvr- 1 RCGo ku) ,i JI Q1 j rifd,7CE 6" \ \ F " 3 tt ; o ;I REMOVE AND SALVAGE ' `' REMOVE AND DISPOSE ASPHALT PAVEMENT AND i HANDICAP PARKING OF HANDICAP PARKING REMOVE CURB AND SIGN FOR REUSE �SIGN ASPHALT,PAVEMENT .� SAWCUT AND REMOVE SAWCUT ASPHALT I m ASPHALT PAVEMENT PAVEMENT AND j ��\, _ • CONCRETE AND a REMOVE I ,7 I !U REMOVE EXISTING RAMP?lvvx\\ REMOVE EXISTING SHED 71 m Al r tAii1._}.: - - .. �>,�.'._:%"\", C� ma's• �'"�' REMOVE EXISTING FENCE +' REMOVE TREE - TREE PROTECTION�1� 2 SILT FENCE 4 CONCRETE L-4.0 WASHOUT 17J$7 ' i.ANL) S N/ . t?F' fNS;;ri�lJtk1`FA'T Nz.r?il...7G N H�. OA; CUT, CAP, AND ABAND N EXISTING STORM PIPE {� 11 {i t€ 1+ I I I REMOVE CURBING EXISTING ELECTRICAL ? POLE, PROTECT DURING #' f` ;I 1� CONSTRUCTION SAWCUT CURB AND ASPHALT PAVEMENT AND REMOVE ASPHALT PAVEMENT SAWCUT AND REMOVE CRACKED CONCRETE SIDEWALK PANEL EXISTING SANITARY CLEAN pp OUT. CONTRACTOR TO COORDINATE REMOVAL WITH n MEP PLANS REGARDING NEW it ? Cn SANITARY ROUTING INSIDE \ -H BUILDING EXPANSION, �z m v M s EXISTING ELECTRICAL. 1^ I CONTRACTOR TO COORDINATE REMOVAL WITH LOCAL UTILITY PROVIDER AND MEP PLANS. 4�.. I "a REMOVE CURBING SAWCUTEAND REMOVE I ASPHALT PAVEMENT' 3 INLET PROTECTION L-4.0 k I{ 4 1R:W ROD "7 •-11Ni 20 10 0 5 10 15 20 Scale: 1" = 20' SITE PREPARATION NOTES: 1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL ARRANGE PRE -CONSTRUCTION MEETING WITH OWNER/OWNER'S REPRESENTATIVE TO REVIEW ALL APPLICABLE PERMIT CONDITIONS, THE CONSTRUCTION PLANS AND GENERAL CONSTRUCTION SCHEDULE. 2. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL SURVEY NOTES, UTILITY NOTES AND UTILITY LOCATING SERVICE REQUIREMENTS. NO WORK SHALL COMMENCE UNTIL UNDERGROUND UTILITIES WITHIN THE SITE HAVE BEEN IDENTIFIED AND LOCATED. 3. ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY EARTH DISTURBING ACTIVITIES. REFER TO PROJECT PLANS, NOTES AND DETAILS. 4. THE GENERAL CONTRACTOR SHALL COORDINATE ALL ADJUSTMENT OR ABANDONMENT OF UTILITIES WITH THE RESPECTIVE UTILITY COMPANY AND PAY ALL ASSOCIATED COSTS. PROTECTION NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE INSIDE AND OUTSIDE THE LIMIT OF WORK DUE TO THEIR CONTRACT OPERATIONS. 2. CONTRACTOR SHALL PROTECT AND SUSTAIN IN NORMAL SERVICE ALL EXISTING UTILITIES, STRUCTURES, EQUIPMENT, ROADWAYS AND DRIVEWAYS. 3. CONTRACTOR SHALL MAINTAIN NECESSARY TRAFFIC CONTROL DEVICES, DRUMS, DELINEATORS, SIGNS, FENCES, AND BARRICADES IN ACCORDANCE WITH THE LATEST EDITION OF THE NATIONAL MUTCD WITH NYS SUPPLEMENT TO PROPERLY PROTECT WORK, EQUIPMENT, PERSONS, AND PROPERTY FROM DAMAGE. 4, BEFORE ANY CLEARING IS DONE, THE CONTRACTOR SHALL ARRANGE A CONFERENCE ON THE SITE WITH THE LANDSCAPE ARCHITECT TO IDENTIFY TREES WHICH ARE TO BE PROTECTED OR REMOVED. DO NO CLEARING WITHOUT A CLEAR UNDERSTANDING OF EXISTING CONDITIONS TO BE PRESERVED. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING TREES AND PLANTS DESIGNATED TO REMAIN FOR THE LENGTH OF THE CONSTRUCTION PERIOD AND SHALL, AT A MINIMUM, INSTALL TREE PROTECTION FENCE IN ACCORDANCE WITH PROJECT PLANS, DETAILS AND SPECIFICATIONS. VEHICLES SHALL NOT BE PARKED WITHIN THE DRIP LINE OR WHERE DAMAGE MAY RESULT TO TREES TO BE SAVED, AND CONSTRUCTION MATERIALS SHALL NOT BE STORED BENEATH TREES TO BE SAVED. 6. THE CONTRACTOR SHALL REVIEW THE LOCATIONS OF THE TREE PROTECTION FENCING FOR APPROVAL BY THE OWNER'S REPRESENTATIVE PRIOR TO INITIATION OF SITE WORK OPERATIONS. 7. AT ALL LOCATIONS WHERE EXISTING PAVEMENT ABUTS NEW CONSTRUCTION, THE EDGE OF THE EXISTING PAVEMENT SHALL BE SAW CUT TO A CLEAN, SMOOTH AND SHARP EDGE AND PROTECTED UNTIL ABUTTING MATERIALS ARE INSTALLED. REMOVALS NOTES: 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE OWNER'S REPRESENTATIVE ON ALL MATERIALS TO BE REMOVED AND RECYCLED/DISPOSED OF OFF SITE. ALL HANDLING OF MATERIALS TO BE REMOVED, RECYCLED, OR DISPOSED OF MUST BE DONE SO IN A SAFE, LEGAL MANNER, IN ACCORDANCE WITH ALL LOCAL, COUNTY, STATE, FEDERAL AND ANY OTHER APPLICABLE REGULATIONS. 2. ALL ITEMS REQUIRING REMOVAL SHALL BE REMOVED TO FULL DEPTH TO INCLUDE BASE MATERIAL AND FOOTINGS OR FOUNDATIONS AS APPLICABLE UNLESS OTHERWISE NOTED. 3. EXISTING ITEMS INDICATED TO BE SALVAGED OR STOCKPILED SHALL BE CAREFULLY REMOVED AND STORED AS DIRECTED BY THE OWNER'S REPRESENTATIVE. 4. TREE, SHRUB AND VEGETATION REMOVAL SHALL INCLUDE THE FILLING, CUTTING, GRUBBING OUT OF ENTIRE ROOT SYSTEM AND SATISFACTORY OFF -SITE DISPOSAL OF ALL TREES, SHRUBS, STUMPS, VEGETATIVE AND EXTRANEOUS DEBRIS PRODUCED THROUGH THE REMOVAL OPERATIONS. FELL TREES IN SUCH A WAY AS TO NOT DAMAGE ADJACENT BUILDINGS OR OTHER TREES TO BE SAVED. 5. CONTRACTOR SHALL STRIP AND STOCKPILE EXISTING TOPSOIL TO FULL DEPTH WITHIN LIMIT OF GRADING BEFORE COMMENCING EXCAVATION AND GRADING OPERATIONS. TOPSOIL SHALL NOT BE REMOVED FROM THE SITE, UNLESS APPROVED BY THE OWNER'S REPRESENTATIVE. LEGEND LIMIT OF DISTURBANCE (0.2 ACRES) PROPERTY LINE SF SILT FENCE ® INLET PROTECTION REMOVE ASPHALT PAVEMENT VEGETATION REMOVAL SITE REMOVAL SAWCUT ASPHALT PAVEMENT XXXXXXXXXXXXX REMOVAL EROSION AND SEDIMENT CONTROL NOTES 1. ALL APPLICABLE EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN PLACE PRIOR TO ANY SOIL DISTURBING ACTIVITY AND/OR INSTALLATION OF PROPOSED STRUCTURES OR UTILITIES. 2. SOIL EROSION AND SEDIMENT CONTROL PRACTICES ON THIS PLAN SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF SARATOGA SPRINGS REQUIREMENTS, 3. PROPOSED LIMITS OF DISTURBANCE ARE CLEARLY INDICATED ON THE PLANS, AND SHALL BE STRICTLY ADHERED TO. IN NO CASE SHALL THE CONTRACTOR DISTURB MORE THAN 0.25 ACRE. 4. THE CONTRACTOR SHALL PERFORM ALL WORK, FURNISH ALL MATERIALS AND INSTALL ALL MEASURES REQUIRED TO REASONABLY CONTROL SOIL EROSION RESULTING FROM CONSTRUCTION OPERATIONS AND PREVENT EXCESSIVE FLOW OF SEDIMENT FROM THE CONSTRUCTION SITE. 5. THE SITE SHALL AT ALL TIMES BE GRADED AND MAINTAINED SUCH THAT ALL STORMWATER RUNOFF IS DIVERTED TO SOIL EROSION AND SEDIMENT CONTROL FACILITIES. 6. ALL CATCH BASIN INLETS SHALL BE PROTECTED FROM SEDIMENT LADEN RUNOFF. 7. ALL STORM DRAINAGE CONVEYANCES AND OUTLETS SHALL BE STABILIZED, AS REQUIRED, BEFORE THEY BECOME OPERATIONAL. 8. MULCHING IS REQUIRED ON ALL SEEDED AREAS TO PREVENT EROSION BEFORE GRASS IS ESTABLISHED AND PROMOTE FASTER VEGETATION COVER. 9. OFFSITE SEDIMENT DISTURBANCE MAY REQUIRE ADDITIONAL CONTROL MEASURES TO BE DETERMINED BY THE OWNER'S REPRESENTATIVE. 10. DUST SHALL BE CONTROLLED BY AN APPROVED METHOD ACCORDING TO NYSDEC STANDARDS AND MAY INCLUDE WATERING WITH A SOLUTION OF CALCIUM CHLORIDE AND WATER. 11. WHENEVER POSSIBLE, THE CONTRACTOR SHALL USE STAGED CONSTRUCTION METHODS TO MINIMIZE EXPOSED SURFACES. 12. SOIL STOCKPILES SHALL BE STABILIZED IN ACCORDANCE WITH NOTES AND PLANS AND SHALL BE ENCLOSED BY SILT FENCE ON THE DOWNHILL SIDE. 13. EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED IN PLACE UNTIL CONSTRUCTION IS COMPLETED AND ALL DISTURBED AREAS BECOME PERMANENTLY STABILIZED. 14. WHEN ALL DISTURBED AREAS REACH PERMANENT STABILIZATION, REMOVE AND DISPOSE ALL EROSION AND SEDIMENT CONTROL DEVICES AND STABILIZE AND RESTORE SITES DISTURBED BY REMOVAL OF EROSION CONTROL DEVICES. Planning Board # 22.0934 Approval &Pe d and r authority yP I al r f Date Signed -3 of a resolution adopted / 3 123 the City of Saratoga Sp ngs --j- Chairperson kC41JM1 The LA GROUP Landscape Architecture & Engineering P.C. Peop (e. Purpose. Place. 40 Long Alley p. 518-587-8100 Saratoga Springs f 518-587-0180 NY 12866 www.thelagroup.corn Unauthorized alteration or addition to this document is a violation of Section 7209 of the New York State Education Law. © the LA Group 2017 Prepared fora Cardona's Saratoga LLC 222 Washington Street Saratoga Springs, NY 12866 Project Title: Cardona's Market 222 Washington Street Saratoga Springs, NY 12866 Project No.: 2022049 Design: KLT Drawn: CPA Ch'k'd: DRC Date: 9/28/2022 Scale: 1"=20' Rev: Description: Date: 1 CITY COMMENT 7/17/2023 Drawing Title Site Demolition & Preparation Plan Drawing No. L - 1 . 0