Loading...
HomeMy WebLinkAbout20230267 78 Church Site Plan Plans As-Approved* 78 Church Street Redevelopment 4t- PROJECT VICINITY MAP SCALE: N.T.S. PROJECT LOCATION MAP 11 SCALE: N.T.S. 0 Site Plan Application 78 Church Street, Saratoga Springs, NY 12866 SITE STATISTICS: SHEET INDEX: PARCEL SIZE: 23,926 +/- SF, 0.55 AC. COVER TAX PARCEL ID: 165.51-1-37, 165.51-1-38 ZONE: UR-4, NC SURVEY PROPOSED USE: MIXED USE L-1.0 SITE PREP, DEMO & ESC PLAN COMMERCIAL SPACE: 1675 SF L-2.0 LAYOUT & MATERIALS PLAN COMMUNITY ROOM: 600 SF RESIDENTIAL CONDOMINIUMS: 23 UNITS L-3.0 GRADING, DRAINAGE & UTILITY PLAN L-4.0 LANDSCAPING & LIGHTING PLAN REQUIRED PROVIDED L-5.0 SITE DETAILS CIVIC SPACE - 5% OF PROPERTY LINE 1196 SF 1,460 FT L-5.1 SITE DETAILS MINIMUM % BUILD OUT: 70% 96% L-5.2 SITE DETAILS MAXIMUM BLDG. HEIGHT: 66' 66' MINIMUM YARD SETBACKS: SIDE SETBACK: 0' 2' REAR SETBACK: 0' 0.5' PARKING REQUIREMENTS RESIDENTIAL CONDOMINIUMS 1.5 / ROOM = 35 SPACES 40 SPACES COMMERCIAL SPACE 1 PER 500 SF = 3 SPACE BICYCLE 6 6 INSIDE/4 OUTSIDE ARCHITECTURAL RENDERING Olsen Associates Architects • •+ ' "' 0-I.Y OF SARATOGA SPMNGS CHUCK MARSHAL r, Chw, }` PtAN'�.IN Bf ARf MARK PINGEL. Y 0vm KCRRY MAYS BILL MCIFYGUEN', ' - City Hail - 474 Bread rap Sarmoga Springs, N-York 12866MICiiA;=l. T>v: i A SRi-35SC fax: SEr..-SPA-9411a PATTY fA."�RhC N KI'vf, TpNY S': Ei.LAT'� riuvw. s:rarova-r.�rings. erg NOTICE OF DECISION In the matter of the application - #20230267 Spring City Development Group, LLC 78 Church Street Saratoga Springs, NY 12866 Involving the premises with tax parcel no. 16S.51-1-37 & 38 in the City of Saratoga Springs, on an application for site plan review for a proposed mixed -use project including non residential space amid 23 residential units and associated site work in the Neighborhood Center (T-5) District, In accordance with 6 NYCRR Part 617, the Planning Hoard classified the action as Unlisted and issued a Negative SPQRA Declaration on January 25, 2024 passed 7-0 in favor: Marshall, Pingel, Mayo, MCTygue, Morrison, King, Stellato: And, in accordance with Site Plan Review approval standards in the Unified Development. Ordinance. Article 13.5, the Planning Board issued the following decision on January 25, 2024 passed 7-0 in favor Marshall, Pingel, Mayo, McTygue, Morrison, King. Stisliato Ai -,prove site Dian set dated October i 3, 2023'with the following revisions and conditions: , . A 6-foot .aide sidewalk shall be installed along the Church St. frontage. 2. The on -site civic space shall be removed and replaced with off -site civic space to be located at Franklin Square Park and surrounding area. 3. The northeast -co net, of the building (former civic space arena) shall be enclosed and the modified architectural design shall be approved by the Design Review Board, 4. The applicant shall submit a master plan for off -site civic space at Franklin Square Park and surrounding area to the satisfaction of DPW and Planning staff and return before the Planning Board for final review and approval within 4 months of SPR appi oval. S. The subsequent agreed -upon off -site eivic space improvements shall be installed to the satisfaction of DPW and Planning staff priorto issuance of a Certificate of Occupancy for the building. 6. Final plans shall be, provided to the satisfaction of the Cavity's designated engineer and DPW, 7. The applicant shall provide a management plan for the community space. 8. The applicant shall provide third -party verification of high performance construction. �J SCALE: N.T.S. 9, he app,irarit shall provide the fee in lie;; of dedication of r" Titauonai la ids for eadi of the resider*dal ut im (totaling $46,000). ENILW fit 1CFL 3S YL"Cytfit_(N Y9 I . provide doc:umfentaricrrt o` confo tranc with al required conditions of approval. 2. Deliver a letter of credit or cash escrow 'In dale amount approved by the City Ertginec: ^o f e City.. his must oeet r prior a final s gn tc -e by tfre Planning Board Chair. 3. Submit two _ 2) paper copies and one (1 ) electronic copy of the final .approved site plan sat for sign by the Planning Board Char mttrin,eaght n s i $i manff s of a¢ ni�afjg as pryer Article f 3.5 of this Unifies Develops-eent Ordinance_ F � i i. Note. t. is rovai shall e� re withih eighteen months of the :� ! ir- of r;�al i3r;s if i}ne .r .<nt aF#a Pr g $e gnat e p N. rn tias riot started actual construction as per Artide 13,5 of the UCtO. Date fifW- with Accour:ts Dept, Chair CITY OF SARATOGA SPRINGS STANDARD NOTES 1. ALL WORK MUST CONFORM TO ALL FEDERAL, STATE AND CITY CODES, SPECIFICATIONS, ORDINANCES, RULES AND REGULATIONS, 2. THE ELEVATION BASE FOR THE CONTOURS AND BENCHMARKS ARE BASED ON THE NATIONAL GEODETIC VERTICAL DATUM, 1929. 3. THE APPLICANT MUST SUBMIT A LETTER OF CREDIT ESTIMATE FOR PROJECT SITE WORK TO THE CITY ENGINEER FOR REVIEW AND APPROVAL. LETTER OF CREDIT FUNDS MUST BE POSTED WITH THE CITY PRIOR TO PLANNING BOARD CHAIR SIGNATURE ON FINAL PLAN. 4. THE CONTRACTOR MUST SCHEDULE A PRE -CONSTRUCTION MEETING WITH THE CITY ENGINEER PRIOR TO ANY CONSTRUCTION. CONSTRUCTION INSPECTIONS BY A DESIGNATED REPRESENTATIVE OF THE APPLICANT ARE REQUIRED. THE COST OF THE CONSTRUCTION INSPECTIONS IS THE RESPONSIBILITY OF THE APPLICANT/DEVELOPER. 5. ALL PROPOSED EASEMENTS OR RIGHT-OF-WAY DEDICATIONS MUST BE VERIFIED AND APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. 6. THE APPLICANT MUST VERIFY THAT THE PROPOSED PROJECT CAN ACCOMMODATE THE TURNING MOVEMENTS OF ANY FIRE TRUCK THAT THE FIRE DEPARTMENT DESIGNATES. 7. THE CONTRACTOR MUST OBTAIN A STREET OPENING PERMIT FROM THE DEPARTMENT OF PUBLIC WORKS FOR ANY WORK WITHIN THE STREET OR RIGHT-OF-WAY OF ANY CITY STREET, ROAD OR ALLEY. 8. CONTACT THE BUILDING INSPECTOR FOR A BLASTING PERMIT, IF BLASTING IS REQUIRED 9. ALL POINTS OF CONSTRUCTION INGRESS OR EGRESS SHALL BE MAINTAINED TO PREVENT TRACKING OR FLOWING OF SEDIMENT OR DEBRIS ONTO A PUBLIC RIGHT-OF-WAY. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES ALSO APPLY. 10. NO CERTIFICATE OF OCCUPANCY WILL BE ISSUED UNTIL ALL SITE WORK HAS BEEN COMPLETED IN ACCORDANCE WITH THE APPROVED PLANS, ALL DISTURBED SOILS OR BARE GROUND HAVE BEEN FULLY STABILIZED, AND AN AS -BUILT DRAWING HAS BEEN PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF THE CITY ENGINEER. SITE / CIVIL: LCM1 The LA O R UP G Landscape Architecture & Engineering P.C. Peop%. Purpose. Place. APPLICANT: 40 Long Alley Saratoga Springs NY 12866 p 518-587-8100 f 518-587-0180 www.thelagroup.com Spring City Development Group 78 Church Street Saratoga Springs, NY 12866 Planning Board # 20230267 AQgrovgl Approved under authority of a resolution adopted �t4de e Planni Boar of the sty f Saratoga Spri gs. igned ri t