Loading...
HomeMy WebLinkAbout20240132 120 S Broadway Site Plan Modification Narrative900 Route 146 Clifton Park, NY 12065 (P) 518.371.7621 (F) 518.371.9540 edpllp.com PROJECT NARRATIVE District @ 120 Multifamily Residential Community Revised Site Plan DATE: March 4, 2024 APPLICANT: Strategies, LLC Performing Assets 120 South Broadway Saratoga Springs, NY Please find attached a revised plan for 120 South Broadway. The applicant received approval for buildings 1 and 2 (the back buildings) at the DRB earlier this month. The applicant wishes to proceed with obtaining a modified site plan approval without building 5 (formerly the community center). The applicant has decided to remove the building 5 from the project and expand the civic space in this area instead, which now includes fireplaces and pickleball courts. Although the plans are modified from the original approval, the site layout and integral aspects of the project remain unchanged, including saving the Rosemary Spring and Gazebo. The major changes to the Site Plans are as follows: 1. There are now 74 units, 23 each in the back buildings and 14 each in the front 2 buildings. 2. Removal of the Community Center and expanded Civic Space as mentioned above. 3. Added interior garage parking in buildings 1 and 2 and access from the western side of the building to the parking garage in both buildings. 4. Added interior tandem parking behind buildings 3 and 4. 5. Removal of one row of exterior parking along building 1 to better accommodate the building placement. 6. An increase in the number of parking spaces because of the addition of interior parking, the total is now 155 spaces. This includes 53 exterior and 102 interior.