HomeMy WebLinkAbout20230992 140 Grand Demo & Construction Public Comment (2)2/28/24, 11:16 AM Zimbra
https://m.saratoga-springs.org/h/printmessage?id=26268&tz=America/New_York 1/2
From :noreply@civicplus.com
Subject :Online Form Submittal: Land Use Board Agenda Public
Comment
To :julia destino <julia.destino@saratoga-springs.org>,
amanda tucker <amanda.tucker@saratoga-springs.org>
Zimbra julia.destino@saratoga-springs.org
Online Form Submittal: Land Use Board Agenda Public Comment
Wed, Feb 28, 2024 11:16 AM
CAUTION: This email originated outside of the City network. Please contact IT Support if you need assistance
determining if it's a threat before opening attachments or clicking any links.
Land Use Board Agenda Public Comment
SUBMIT COMMENTS REGARDING CITY PROJECTS
Thank you for submitting your comments. Your feedback will be forwarded
to the City's Planning Department and Land Use Board members. NOTE:
Comments submitted later than 12:00 noon on the day before the Land Use
Board meeting may not be reviewed prior to their meeting. All comments will
be added to the project file in the Planning Department.
Land Use Board Design Review Board
Name mark t konieczny
Email Address markhrs81@gmail.com
Business Name Field not completed.
Address 81 beekman st.
City Saratoga springs
State NY
Zip Code 12866
Phone Number 5182485600
Project Name 140 Grand Partial Demolition and New Addition
Project Number 20230992
Project Address 140 Grand Ave
Comments I'm in support of the demolition of the rear 2/3 of the structure if
the following concerns can be addressed: Drainage/Proximity
2/28/24, 11:16 AM Zimbra
https://m.saratoga-springs.org/h/printmessage?id=26268&tz=America/New_York 2/2
to Sidewalk: Can the placement of the new addition will be
moved away from the sidewalk on Beekman. The house is
currently directly adjacent to the sidewalk and the roof drains
onto the sidewalk causing ice. I would like to see the new
addition drainage plans for the Beekman side of the addition.
The roof drainage patterns/plan were not readily apparent in
the documents. If the new addition is directly on the sidewalk,
construction will essentially close the sidewalk on that side of
the street during the entire construction process. Parking: If the
owner plans to maintain a minimum of two off street parking
spaces. There are currently two spaces to the left side of the
building front that enter from Grand. We have a challenging
parking situation on Beekman. Hazardous waste: That there's a
plan to safely dispose of any asbestos in the basement. Old
boilers and radiator pipes of that age typically had asbestos
insulation covering them. Looking to avoid asbestos covered
piping/materials left open and exposed during construction.
Thank you for hearing my concerns and I am glad you are able
to restore the front 1/3 of this historic building!
Attach Photo (optional)Field not completed.
Email not displaying correctly? View it in your browser.