Loading...
HomeMy WebLinkAbout20230464 174 York Second Story, Extend Footprint Updated Coverage Calculations 2021 02 04 ENGINEERING AMERICA CO. 76 WASHINGTON ST. SARATOGA SPRINGS, NY 12866 518 / 587-1340 TRANSMITTAL SHEET TO: FROM: Zoning Board of Appeals Tonya Yasenchak COMPANY: DATE: City of Saratoga Springs FEBRUARY 6, 2024 FAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVER: 1 PHONE NUMBER: SENDER’S REFERENCE NUMBER: RE: YOUR REFERENCE NUMBER: Lombard: 174 York Ave ZBA Application – Lot Calcs (Revised)  URGENT  FOR REVIEW  P LEASE COMME NT  PLEASE REPLY  AS REQUESTED To the City of Saratoga Springs Zoning Board of Appeals: Engineering America Co. herein respectfully submits the following calculations for verification of lot coverage & permeability compliance with the UDO as proposed for the development of the Lombard property at #174 York St. within a UR-2 district. - Lot Area: 6,600 sq.ft. required / 5,000 sq.ft. existing lot area - Lot Width: 60’-0 required / 50’-0 existing - Min. Side Yard: 8’-0 required / 2.1’ & 2.4’ existing / proposed - Total Side Yard: 20’-0 min. req. / 4.5’ existing / proposed Proposed Coverage: Existing House with Additions 2000 sq. ft. (+/-) = 40% = 40% max. allowed Proposed Driveway & Walks: 600 sq. ft. (+/-) Total Impermeable Area: 2,600 sq. ft. = 52 % < 70% max. allowed Thank you for your time and cooperation. Tonya Yasenchak, PE