HomeMy WebLinkAbout20230464 174 York Second Story, Extend Footprint Coverage Calculations
ENGINEERING AMERICA CO.
76 WASHINGTON ST. SARATOGA SPRINGS, NY 12866
518 / 587-1340
TRANSMITTAL SHEET
TO: FROM: Zoning Board of Appeals Tonya Yasenchak
COMPANY: DATE:
City of Saratoga Springs JANUARY 25, 2024
FAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVER: 1
PHONE NUMBER: SENDER’S REFERENCE NUMBER:
RE: YOUR REFERENCE NUMBER: Lombard: 174 York Ave
ZBA Application – Lot Calcs
URGENT FOR REVIEW P LEASE COMME NT PLEASE REPLY AS REQUESTED
To the City of Saratoga Springs Zoning Board of Appeals:
Engineering America Co. herein respectfully submits the following calculations for verification of
lot coverage & permeability compliance with the UDO as proposed for the development of the
Lombard property at #174 York St. within a UR-2 district.
- Lot Area: 6,600 sq.ft. required / 5,000 sq.ft. existing lot area
- Lot Width: 60’-0 required / 50’-0 existing
- Min. Side Yard: 8’-0 required / 2.1’ & 2.4’ existing / proposed
- Total Side Yard: 12’-0 min. req. / 4.5’ existing / proposed
Proposed Coverage: Existing House with Additions
1,960 sq. ft. (+/-) = 39.2% < 40% max. allowed
Proposed Driveway & Walks: 600 sq. ft. (+/-)
Total Impermeable Area: 2,560 sq. ft. = 51.2 % < 70% max. allowed
Thank you for your time and cooperation.
Tonya Yasenchak, PE