Loading...
HomeMy WebLinkAbout2024 01 10 DRB ROD �������( r, � ��F DRC Members �-- � - ��� C ity of Sa ratog a S p ri n g s Tamie Ehinger (Chair) '�� `� � Rob DuBoff(Vice Chair) � J#- DESIGN REVIEW BOARD �'+ � '. Chris Bennett �--' , , � �, -� a' , � � City Hall • 474 Broadway �eslie DiCarlo � � � - ��- Jeffrey Gritsavage �� • � � �,� Saratoga Springs, New York 12866 �� Tad Roemer r�����; }� �� ti � �� 518.587.3550 Ellen Sheehan www.saratoga-springs.org Karen Cavotta (Alternate) Kennedy Flack (Alternate) DESIGN REVIEW BOARD - January 10, 2024 Record of Decision Present: T. Ehinger, R. DuBoff, J. Gritsavage, T. Roemer, E. Sheehan Absent: C. Bennett, L. DiCarlo 1. Approved Meeting Minutes: 11/1/2023, 11/15/2023, 12/6/2023 2. Consent Agenda Items The intent of a consent agenda is to identify any "approvable"applications without the need for further evaluation or discussion. Agenda Project# Project Title Project Location Project Description ACTION Order 1 20230994 Courtyard Marriott 11 Excelsior Ave. Architectural Review of sign package replacement Motion to approve as presented - passed 5-0 Signage within the Neighborhood Center / T-5 District. 2 20230995 Hebe Spa Signage 28 Division St. Architectural Review of new wall signage within Motion to approve as presented - passed 5-0 the Urban Core / T-6 District. 3 20231032 U-Me Signage and 135 Ballston Ave Architectural Review of a new wall sign and a roof Motion to approve as presented - passed 5-0 Exhaust Hood mounted exhaust hood within the Gateway Urban Commercial District. 3. DRC Applications Under Consideration Agenda Project# Project Title Project Location Project Description ACTION Order � 20230877 NYS Rt29 New Mixed- NYS Route 29 Consideration of SEQRA lead agency in regards to Motion to defer SEQRA lead agent to the Use Development a new mixed-used development including multi- Planning Board - passed 5-0 family, row houses, and a hotel within the Neighborhood Center / T-5 District in an Architectural Review area. 2 20230947 73 Henry St Scupper 73 Henry St. Architectural Review of a proposed through wall Motion to approve as modified with conditions - and Downspout scupper and downspout within the Urban Core / T- passed 5-0 6 District. 3 20230944 12 Ballston Ave 12 Ballston Ave. Determination of Historic/Architectural Significance Motion to find that the structure does not have Demolition & for an existing commercial structure within the architectural/historic significance - passed 5-0; Redevelopment Neighborhood Center / T-5 District. application continued to a future meeting 4 20230920 ��� :r, � � _� ��� :r���°�_� 165 Lake Ave Architectural Review of front porch modifications No action; application continued to a future ���������_������°� including stair, lattice, railing, and column meeting replacement within the Urban Residential-3 District. 5 20230532 395 Broadway Two 395 Broadway Historic Review of the street entrance along No action; application continued to a future Story Addition Broadway within the Urban Core / T-6 District. meeting 6 20230992 140 Grand Partial 140 Grand Ave Determination of Historic/Architectural Significance No action; application continued to a future Demolition and New for an existing residential structure and discussion meeting Addition regarding proposed new additions within the Urban Residential-3 District. .,�_ . � � -��� 1/11/2024 Ch�i�, �����r� R��riev�r�ammissiar� Received by Accounts Dept.