Loading...
HomeMy WebLinkAbout20230233 Station Lane Site Plan Checklist 2023 12 21CITY OF SARATOGA SPRINGS PLANNING BOARD �.. = CITY HALL - 474 BROADWAY SARATOGA SPRINGS, NEW YORK 12866-2296 y� tih' TEL: 518-587-3550 X2533 �PaRAlM www.saratoga-springs.org SITE PLAN REVIEW SUBMITTAL CHECKLIST Listed below are the minimum submittal requirements for site plan review as set forth in The City of Saratoga Springs' Unified Development Ordinance Article 13.5. The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: *4 hard copies (1 w/original signature), 1 digital copy of ALL materials CHECK EACH ITEM In 1. Completed Site Plan Application (4 hard copies - *1 w/original signature - and 1 digital) and Fee 2. SEQR Environmental Assessment Form- short or long form as required by action. 3. Set of plans (prepared by a NYS licensed Engineer, Landscape Architect, or Architect) including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not more than 1"=50 feet), and (1) 11" x -17"-copy. One -digital -version (PDF) of ail-submittai-items-printable-to-scale 4. Basic or Full Storm Water Pollution Prevention Plan as required per Article 17. 5. Copy of signed DPW water connection agreement for all projects involving new water connections to the City system 6. Engineering Report for Water and Sanitary 0 1 7. Complete Streets Checklist 0 1 8. Project Cost Estimate for Letter of Credit (Utilize City Template) REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE: 1. Property line survey prepared by a licensed land surveyor. Site plan must reference s survey with all corners set and marked on plan. Reference NGVD 1929 datum. A cop original property survey must also be included. 0 2. North arrow and map scale 0 3. Parcel tax map number ® 4. Site location map (with title block and map key) �r 5. Incorporate the City's standard engineering details City of Saratoga Springs Site Plan Checklist 1 6. Site vicinity map (all features within 300 feet of property) ® 7. Identification of zoning district with corresponding dimensional standards 8. Building setback lines shown on plans 9. Title block with project name; name and address of applicant; and name and address of property owner (if different) 10. Project Name 11. Name of all adjacent property owners within 300 feet (Include both sides of street) 12. Parcel street address (existing and any proposed postal addresses) 13. Identification of all existing or proposed easements, covenants or legal rights -of -way on this Yes No NIA ® property 14. References to all prior variances or special use permits 15. Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary © ® P1 r FT 16. Identification of all spoil, borrow, storage, or staging areas 17. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, buffers floodplains, rock outcroppings, etc. ® F F1 18. Erosion and sediment control plan — including designated concrete truck washout area Pi19. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition) 20. Location, design specifications and construction material for all proposed site improvements (drains, culverts, retaining walls, berms, fences, etc.) 0 F1 [7 21. Location and distance to fire hydrant ® F1 F1 22. Identify size, material, elevations and slopes of all existing and proposed utilities with 400' of site I■ ■I 23. Parking lot layout plan and identification of all loading areas (number all spaces) 24. Calculation of required spaces for vehicle and bicycle parking by proposed use(s) 25. Identification of parking spaces and access points for physically impaired persons 26. Location and screening plan for dumpster or recycling bins 27. Location, design, type of construction and materials, proposed use and exterior dimensions of all buildings (existing and proposed) on site including finish floor elevations to nearest tenth foot. 28. Identification of storage of any potentially hazardous materials 29. Planting plan identifying quantity, species and size of all proposed new plant materials. Label existing plant material to be retained or removed. Identify any existing signficant trees. 30. Lighting plan showing type, location and intensity of all existing and proposed exterior lighting fixtures Checklist prepared by: Lansing Engineering Date: 12/21/2023 City of Saratoga Springs Site Plan Checklist 2