HomeMy WebLinkAbout20230233 Station Lane Site Plan Narrative 2023 12 212452 STATE ROUTE 9
301
L.ANSING ENGINEERING, PC MALTA,NYITE 1POPE)
T (51 B) 899-5243
mop, F (51 B) B99-5245
West Ave - Site Plan
PROJECT NARRATIVE
Revised: April 7, 2023
Second Revision: December 21, 2023
INTRODUCTION
The West Ave Site Plan project proposes the development of a four-story building featuring retail space,
an eating and drinking establishment, and multifamily rental units in the City of Saratoga Springs, New
York. The basement level will provide 60 indoor vehicle parking spaces as well as an indoor bike parking
area. The first floor of the building, with a footprint of approximately 22,955 SF, will include 8,330 SF retail
space, a 2,100 SF eating and drinking establishment and 10 multifamily rental units. Floors 2 through 4
will provide 61 multifamily rental units, shared amenity spaces, mechanical rooms, and circulation areas.
The applicant for the proposed development is West Station LLC, 2 Moore Ave, Saratoga Springs, NY
12866.
EXISTING CONDITIONS
Existing Land Use and Zonin;
The project site includes one parcel having an area of 2.00± acres located at the northwest corner of
Station Lane and West Ave. The tax map identification number for the parcel is 165.-2-76.2. The parcel is
zoned NC— Neighborhood Center District, as defined by the City of Saratoga Springs Unified Development
Ordinance. A general overview of the surrounding land uses in the area includes urban, commercial,
suburban residential, and multifamily residential uses. The proposed development is consistent with the
current land uses in the surrounding area.
Wetlands and Streams
The project area contains NYSDEC regulated wetlands totaling 0.029± acres and 0.523± acres of associated
NYSDEC 100' adjacent area. The wetlands continue offsite to the west.
Soils
Accordingto maps from the Natural Resources Conservation Service (NRCS) of Saratoga County, the onsite
soils are classified as follows:
Deerfield Loamy Fine Sand (DeA, DeB): This is a very deep, moderately well drained soil formed
in glacial fluvial deposits. It is found on outwash terraces, outwash plains, outwash deltas and
kame terraces. The surface runoff is negligible to low. Hydrologic Soil Group A.
Wareham Loamy Sand (Wa): This is a very deep, nearly level, poorly drained soil formed in
outwash plains. It is found on glacial outwash plains, lake plains, terraces, and deltas. The
permeability is rapid throughout the soil and the surface runoff is negligible or low. The soil has a
slight erosion hazard. Hydrologic Soil Group A/D.
Windsor Loamy Sand (WnB): This is a very deep, excessively drained soil formed in outwash or
eolian deposits. It is found on dunes, outwash plains, deltas, and outwash terraces. The surface
runoff is low. Hydrologic Soil Group A.
Onsite soil tests showed the presence of silt throughout the in -situ soils and a general lack of permeability.
As such, the soils were modeled as Hydrologic Soil Group C for the purposes of preparing the project
Stormwater Pollution Prevention Plan.
PROPOSED CONDITIONS
The West Ave Site Plan project proposes the development of a four-story mixed used building that will
provide retail space, an eating and drinking establishment, and multifamily rental units located along West
Ave and Station Lane. The gross footprint area of the 1st through 4th floors of the building is approximately
22,955 SF. The basement level will provide 60 indoor parking spaces, a bicycle parking area that complies
with the requirements of the City of Saratoga Springs Unified Development Ordinance (UDO), a
mechanical room, and access to the building stairwells and elevator. The 1't floor will provide
approximately 8,330 SF of retail space, a 2,100 SF restaurant, 10 apartments, a delivery drop and package
room, a fitness room, and circulation areas. The second through fourth floors will consist of 61
apartments, shared amenity spaces, mechanical rooms, and circulation areas. A rooftop deck will also be
provided on the 4th floor. All the proposed uses are permitted in the NC - Neighborhood Center district
and the project is consistent with the City of Saratoga Springs Comprehensive Master Plan.
The West Ave Site Plan proposes the installation of a sidewalk along the north side of Station Lane that
will link the sidewalk constructed by the adjacent Station Lane Apartments project to the sidewalk on the
west side of West Ave. An internal sidewalk network will provide connections from the parking areas to
the building entrances. Storefront access to the retail space from West Ave will be provided by an ADA-
compliant ramp, ADA-compliant stairs, and a sidewalk along the West Ave building frontage. An outdoor
eating area will be provided on the south side of the building nearthe intersection of West Ave and Station
Lane. The project also proposes a nature trail throughout the NYSDEC 100' wetland adjacent area. The
trail is proposed to meet the public civic space requirements stated in Article 9.3 of the UDO.
The UDO requires 1 parking space per 500 gross square feet of floor area for retail uses. For eating and
drinking establishments, the UDO requires a minimum of 1 parking space per 100 SF of floor space. For
multifamily residences in the NC District, the UDO requires a minimum of 1.5 parking spaces per
residential unit. The 8,330 SF retail space will require 17 spaces while the approximately 2,100 SF eating
and drinking establishment will require 21 spaces. The 71 multifamily units will require 106 parking spaces,
resulting in a total of 144 required parking spaces for the development. The UDO allows for a reduced
number of parking spaces when shared parking demands are accounted for. The required parking for
mixed -use developments is first calculated for each individual use included in the proposed development.
After the initial parking requirements are calculated, the shared parking calculations are then determined
by using Table 10-D of the UDO. For the West Ave Site Plan project, it was determined that 140 parking
spaces are needed to meet the peak parking demand during the 6pm-Midnight timeframe on weekdays.
The project proposes 60 interior parking spaces, 73 exterior parking spaces in the parking lot behind the
building, and 7 street parking spaces along the north side of Station Lane. The total number of parking
spaces to be provided is 140 spaces, which meets the required number of spaces.
In addition to the required off-street vehicle parking, the UDO requires one (1) loading space for
multifamily dwellings with 50 or more units. The project proposes a 12' x 55' loading space along the north
side of Station Lane and east of the site driveway. A sidewalk has been provided to connect the loading
space to the basement level of the building to facilitate deliveries.
2of4
ZONING VARIANCES
After a review of the project plans, City planning staff identified two (2) area variances as being needed
to allow for the proposed development. Both variances were granted by the Zoning Board of Appeals on
November 20, 2023.
PROPOSED INFRASTRUCTURE
Driveways & Access
The development will include one new curb cut along Station Lane. Existing vegetation along the north
side of Station Lane will be cleared to improve sight distances at the proposed driveway.
Preliminary Stormwater Management Drainage Plans
Stormwater will be managed on -site using green infrastructure run-off reduction practices and
stormwater management facilities. Stormwater management practices have been addressed in the
project specific Stormwater Pollution Prevention Plan (SWPPP) included with this submission. Stormwater
control practices have been designed and will be implemented in accordance with all NYSDEC technical
standards and the City of Saratoga Springs guidelines. The stormwater management systems and
appurtenances have been designed and will be constructed in accordance with all local, state, and federal
requirements and are proposed to be operated and maintained by the Owner.
Preliminary Sewer and Water Plans
The total anticipated water and sewage (wastewater) average daily demands for the project is estimated
to be 13,426 gallons per day (gpd) based on the following:
Retail Space (8,330 ft2) x (0.1 gpd/ ftz) x (0.8) = 666 gpd
Restaurant Space (50 seats) x (35 gpd/ seat) x (0.8) = 1,400 gpd
Multifamily (71 Units) x (200 gpd/ Unit) x 10.8) = 11,360 gpd
TOTAL = 13,426 gpd
There is an existing water main along the south side of Station Lane and another along the west side of
West Ave. The development proposes one new 6" service connection to the watermain along West Ave
to meet the anticipated domestic and fire protection demands of the building. Since the water main is
located close to the curb on the west side of West Ave, the disturbance required to make the service
connection, and any impacts to traffic on West Ave, are anticipated to be minimal.
There is an existing gravity sanitary sewer main that discharges to an existing pump station on Station
Lane. The development proposes a 6" lateral connection to the existing Station Lane gravity sanitary sewer
main. The gravity main in Station Lane is deeper than the gravity main located in West Ave. However, it is
anticipated that the proposed connection to the Station Lane gravity main will result in less disturbance
than would a connection to the West Ave gravity main due to the proximity of the two pipes in relation
to the project parcel. Station Lane carries a lower volume of traffic and the gravity main is located on the
north (project side) of the right-of-way, while West Ave carries a higher volume of traffic and the gravity
main is located in the eastern portion of the right-of-way.
The existing pump station was identified to have capacity deficiencies as outlined by Bergmann Associates
in an Engineer's Report dated August 16, 2017. At the time of the Bergmann Associates report, four
projects were proposed along Station Lane. One of the projects did not advance, however the remaining
three projects continued. The Intrada Development and Station Lane Apartments Development have been
3of4
completed or are nearly complete. The required upgrades to the pump station to meet the anticipated
flows generated by the three projects were completed in 2019 by the owner of the nearby Intrada
Development. The proponents of the Intrada Development, Station Lane Development, and the West Ave
Site Plan project agreed to provide a cost sharing proportionate to the contributing flows for the upgrades
to the existing pump station. The applicant is committed to providing the appropriate funds per the cost
sharing agreement for the upgrades as the project advances.
Sl1MMARY
The West Ave Site Plan is proposed in accordance with the NC zoning district requirements and the City
of Saratoga Springs Comprehensive Master Plan. The project is anticipated to meet the current
multifamily, retail, and eating and drinking establishment needs in the area, and is not anticipated to have
an adverse impact on surrounding property owners or businesses. The development will uphold the City's
vision by working with existing land features, employing existing guidelines, and appropriately enhancing
the West Ave corridor in the City of Saratoga Springs. The applicant and the applicant's engineer look
forward to advancing this project with the City of Saratoga Springs.
4of4