Loading...
HomeMy WebLinkAbout20230233 Station Lane Site Plan Engineers Report SA S SEWA ARATO Ve C Sara Enginee STATI AGE P OGA SP Pre ecino Grou 305 W Springfi Contact: B Pre The LA 40 L atoga Sprin Novem ering Re For ION LA UMP S In RINGS pared For up, New Y W Commer ield, MO 6 Bruce Adib epared By A Group, P Long Alley ngs, New Y mber 29, 20 eport ANE STATI , NEW Y r York LLC cial 65803 b-Yazdi y P.C. y York 1286 017 ION YORK 66 Engineering Report Saratoga Springs, New York Station Lane Pump Station 2017002 1 I. Introduction The wastewater generated by the Intrada Saratoga Springs project will eventually flow to the existing City of Saratoga Springs pump station on Station Lane. The City has requested an analysis of the capacity and condition of their pump station be performed. This report will offer recommendations for any repairs or upgrades necessary to handle several proposed developments that are tributary to this pump facility. Bergmann Associates has submitted a study for the adjacent Station Park project that includes three additional development proposals, including Intrada Saratoga Springs. In summary: Avg. Daily Peak Hour Intrada Saratoga Springs 26,975 gpd 76 gpm Station Park Development 54,126 gpd 146 gpm Faden Parcel Development 7,990 gpd 23 gpm Askew Parcel Development 7,920 gpd 23 gpm Total of 4 projects 97,011 gpd 251 gpm (combined peak hour)*  Peak hour flows are not cumulative, but based on a peaking factor for the total flows II. Facility Description The Station Lane Sewage Lift Station is located just west of West Avenue between Church Street and Washington Street, as shown on Attachment A. The pumping station receives sewage from the buildings fronting both sides of West Avenue between Church Street and Washington Street and conveys it southerly to a receiving sanitary manhole in the middle of West Avenue approximately 450 feet south of the Washington Street intersection. From here, the sewage flows by gravity to the collector at Glenham Road and ultimately for treatment at the Saratoga County Sewer District No. 1 Water Pollution Control Plant in Mechanicville. The Station Lane Sewage Lift Station was constructed in 2000 as part of the West Avenue Reconstruction Project (NYSDOT P.I.N. 1802.27). Information obtained from the City of Saratoga Springs indicates two Flygt submersible pumps are present. Pump #1 was replaced in 2013 with Model #3101.180, 3-phase 5HP 230-volt with a 432 impeller. Pump #2 is a Model #3102.090, 3-phase 5HP 200-volt with a 432 impeller. The station is a wet-well with separate valve chamber configuration. The station is generally in fair to good condition. The pumps were appear to be operating to meet current needs although the Pump #2 discharge pipe within the pump chamber is leaking and spraying wastewater back into the chamber every time this pump operates. The natural gas stand-by generator and transfer switch installed in 2000 are in serviceable condition and appear to be adequate for this facility. Engineering Report Saratoga Springs, New York Station Lane Pump Station 2017002 2 Photographs - View of Pump Station looking northeast from Station Lane. Looking down into sewer manhole south of pump chamber. Inlet on right side is the 12-inch sewerline from West Avenue. Inlet on left side is the 8-inch sewerline from the train station. Engineering Report Saratoga Springs, New York Station Lane Pump Station 2017002 3 Looking down into the pump chamber. The 12-inch inlet pipe is on the left side. Outlet end of valve chamber showing 4-inch gate valves, tee and 4-inch DIP discharge pipe. Engineering Report Saratoga Springs, New York Station Lane Pump Station 2017002 4 Influent flow rates have been measured, pump flow rates and capacities have been analyzed and the results are given below in Section V, Capacity Analysis. III. Existing Pump Run Data The City of Saratoga Springs Engineering Department has provided records of the elapsed pump run times for a period beginning February 27, 2017 to October 30, 2017. By using this information we were able to create the chart below showing the total pumping time for each pump and combined total of both pumps for the given period. During the period, the pumps were running for a combined total average of approximately 8.5 hours per day. Pump #2 is running approximately 3 times as long as Pump #1 (6.4 hours vs. 2.1 hours). The Pump #2 discharge pipe within the pump chamber is leaking and spraying wastewater back into the chamber every time this pump operates. This is contributing somewhat to the longer run times. See Attachment E for more information. Engineering Report Saratoga Springs, New York Station Lane Pump Station 2017002 5 IV. Pump Station Drawdown Test In conjunction with the City Engineering Department, a pump drawdown test was conducted on November 8, 2017 to determine the rate the pumps were discharging and the rate the pump chamber was refilling after the pumps shut off. Both pumps were pulled out and a visual inspection of was conducted. The inside diameter of the existing wet well was measured at 8 feet. The wet-well depth is approximately 24 feet. The total actual pumping rate is estimated to be the average rate of inflow added to the average measured rate of discharge. The pump drawdown test measured the rate that the existing pumps are operating. This was done by measuring the elapsed time it took to pump a known volume of water. Knowing these two parameters, the pumping rate was determined in gallons per minute. Assuming the only contribution to the refill rate after the pumps are turned off is from the sewer main in Station Lane, adding the fill rate to the measured pump rate will give the actual pumping rate of the pumps. Pump No. Average Re-Fill Rate (gpm) Average Measured Pump Rate (gpm) Estimated Actual Pump Rate (gpm) 1 12.6 47.0 59.6 2 23.5 7.8 31.3 1+2 25.1 53.7 78.8 It became clear during the testing that Pump #2 was not operating as efficiently as Pump #1. In fact, the measured rates indicate that Pump #2 is operating at approximately half the capacity of Pump #1. Both pumps were operated at the same time to determine the total capacity of the pumps. In this scenario, the average rate of inflow is approximately 25 gpm and the average rate of discharge is approximately 54 gpm. The total pumping rate is then approximated to be 79 gpm. Pump condition inspection: Once the pump drawdown testing was completed, the pumps were pulled out of the chamber and visually inspected to verify the condition of the impellers. Pump #1 is a 5 hp submersible Flygt Model 3101.180 with a 432 impeller operating at 1,700 rpm. The pump appeared to be in fair condition. A visual inspection of the impeller showed some minor damage to the vane which can be attributed to normal wear and tear. Pump #2 is a 5 hp submersible Flygt Model 3102.090 with a 432 impeller operating at 1,720 rpm. The pump appeared to be older than Pump #1 and in poor condition. A visual inspection of Engineering Report Saratoga Springs, New York Station Lane Pump Station 2017002 6 the impeller showed significant wear and tear and a missing seal. The Pump #2 discharge pipe within the pump chamber is leaking and spraying wastewater back into the chamber every time this pump operates. Station Lane Pump #1 Station Lane Pump #1 impeller Station Lane Pump #2 Station Lane Pump #2 impeller V. Capacity Analysis The Flygt pump sales representative was contacted and provided information on the existing pumps. The spec data page and performance curve for Flygt Model 3102.090 are included in Attachment C. According to the manufacturer, both pumps are similar and should perform equally. Given this pump performance information and superimposing a system curve over the theoretical pump curve, the operating point of the pumps can be estimated. Ground elevations have been taken from NYSDOT drawings prepared when the force main and pump station were installed in 2000 to determine the elevation head to be overcome (see profile in Attachment A). Friction Engineering Report Saratoga Springs, New York Station Lane Pump Station 2017002 7 losses for the length of the discharge pipe will be determined based on an assumed coefficient of 100 considering the age of the existing force main pipe. Minor losses for pipe fittings and valves are also included in the analysis. See Attachment B for calculations used to determine the system curve. The theoretical operating point from the above chart for one pump running and a coefficient of friction of 100 is approximately 90 gpm at 44 TDH. VI. Findings and Recommendations Existing Conditions The estimated existing maximum peak hourly inflow rate is 20.9 gpm. This estimate was derived from actual flow rates measured at the influent manhole in the period between October 11th and November 15th of this year. Taking the days with the greatest total flow, the highest flow hour was chosen and the total volume for that hour measured. Dividing the total volume by 60 minutes gave us 17.8 gpm from West Avenue and 3.1 gpm from the train station. Although these highest volume days from both directions did not coincide, we combined them together to be conservative. Refer to Attachment D for the flow test charts. Engineering Report Saratoga Springs, New York Station Lane Pump Station 2017002 8 Using manufacturer’s performance curves and a system curve developed for this location, the existing Flygt pumps should be able to pump at 90 gpm each. The diminished performance could be because of wear on the existing pumps. Repair or replacement of these pumps is recommended to bring the pump station back to original capacity. With Pump #1 currently discharging at 59.6 gpm, approximately 38.7 gpm of reserve capacity remains in the existing pump station. If the existing pumps are replaced with similar size units, the capacity would be returned to the original 90 gpm. In this case, the reserve capacity at Station Lane would be 69.1 gpm. Initial buildout (Intrada only) In the Intrada only scenario, Intrada Development is adding an additional 75.6 gpm to the peak hourly flow at the pump station. Added to the existing flow of 20.9 gpm brings the total peak hourly flow to 96.5 gpm. The existing pumps are not capable of handling this increase in peak hourly flow. The pumps will need to be replaced with new pumps and controls. Landustrie Industries Model DTP42- 30DJ, 7.7 HP, VFD controlled pumps are proposed. As proposed with a 173mm impeller, these pumps are capable of 100 gpm at 52 TDH. If additional capacity is needed in the future, a 185mm impeller would increase the capacity to 120 gpm. The existing pre-cast concrete wet- well and valve chamber are in good condition and will be retained. New pumps, guiderails, controls, gate valves, check valves and ancillary equipment will be installed. See Attachment B. Full buildout (4 projects) In the full buildout scenario, Intrada Development, Station Park, Askew Parcel and Faden Parcel are together adding an additional 251.0 gpm to the peak hourly flow at the pump station. Added to the existing flow of 20.9 gpm brings the total peak hourly flow to 271.9 gpm. The existing or replacement pumps are not capable of handling this increase in peak hourly flow. The pump station will need to be upgraded with new pumps, controls, accessories and stand-by generator. Landustrie Industries Model DWP62-32JL, 74 HP, VFD controlled pumps are proposed. Flygt pumps were considered since they are the City standard, but recent events with the industry have created a situation where the local Flygt distributer and service provider will not handle that product. The Landustrie pumps proposed are comparable in quality and performance with the added advantage of being supported by a local representative. In addition, the Landustrie pump is a vortex model which will perform better in terms of potential impeller clogging. As proposed Engineering Report Saratoga Springs, New York Station Lane Pump Station 2017002 9 with a 210mm impeller, these pumps are capable of 300 gpm at 230 TDH at top speed of 3,540 rpm. At this speed the velocity of flow in the force main is 7.7 feet per second (fps). The system vs. pump curves below depict the differing operating conditions expected with the variable speed controls. During off-peak times, the pumps will be expected to operate at a slower speed and resulting lower velocity in the force main. A typical condition will be less than 200 gallons per minute and less than 5.0 fps. The existing pre-cast concrete wet-well and valve chamber are in good condition and will be retained. New pumps, guiderails, controls and ancillary equipment will be installed. A new 150kW natural gas powered stand-by generator will be installed. See Attachment B. VII. Cost Estimates The estimated cost to upgrade the existing pump station to handle the additional flow from the Intrada Development is approximately $60,000. This includes the cost to provide temporary by- pass pumping, removals and installation of new pumps and controls. Engineering Report Saratoga Springs, New York Station Lane Pump Station 2017002 10 The estimated cost to upgrade the existing pump station to handle the additional flow from all the currently proposed projects is in the range of $225,000 - $250,000. This includes the cost to provide temporary by-pass pumping, removals and installation of new pumps, generator and controls. See Attachment F for estimate details. Attachments NYSDOT Utility Plan and Profile (Attachment A) Pump Data Sheets and Performance Curve (Attachment B) System Curve Calculations and System vs. Pump Curves (Attachment C) Flow Test Charts (Attachment D) Pump Run Data (Attachment E) Cost Estimates (Attachment F) ATTACHMENT A UTILITY PLANS AND PROFILE ASSUMED 4" DIP FORCE MAINLOCATION (NO AS-BUILTINFORMATION AVAILABLE) ATTACHMENT B PUMP DATA SHEETS AND PERFORMANCE CURVES Head Pump Efficiency Overall Efficiency Power input P1 Shaft power P2 NPSH-values 432 183mm 432 183mm 68.1% 432 183mm 432 183mm 432 183mm 432 183mm 432 183mm (P2) 432 183mm (P2) 432 183mm (P1) 432 183mm (P1) 432 183mm 432 183mm 0 4 8 12 16 20 24 28 32 36 40 44 48 52 [ft] 0 10 20 30 40 50 60 [%] 0 1 2 3 4 5 [hp] 10 20 30 40 [ft] 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 [US g.p.m.] Motor # 60 Hz Phases 3~ 230 V Number of poles 4 Rated power 5 hp Starting current Rated current 13 A Rated speed 1745 rpm C3102.181 18-11-4AL-W 5hp Stator variant Number of blades 1 Power factor CP 3102 MT 3~ 432 Suction Flange Diameter Performance curve Pump Impeller diameter 7 3/16" Throughlet diameter Motor Rated voltage 79 A Motor efficiency 1/1 Load 3/4 Load 1/2 Load 1/1 Load 3/4 Load 1/2 Load Frequency 66 0.83 85.0 % 0.77 0.67 85.5 % 84.5 % 100 mm Curve ISO Discharge Flange Diameter 3 15/16 inch 3 inch Water, pure Last updateCreated on 11/9/2017 Created byProject IDProject 6HOHFWLRQEDVHGRQGXW\'73'-+]'LDPHWHUIW 6KDIWSRZHU86*30KS86*306SHHG USP6ROLGVSDVVDJH LQFK'LVFKDUJHGLDPHWHU LQFK$GYLVHGPLQFDSDFLW\86*30)UHTXHQF\FRQWURO +]5DWHGVKDIWSRZHU KS5DWHGHOHFWULFDOSRZHU N:0RWRUHIILFLHQF\ )ORZ 86*30+HDG IW3XPSHIILFLHQF\ $EVRUEHGVKDIWSRZHU KS$EVRUEHGHOHFWULFDOSRZHU N:6KXWRII+HDG IW6WDWLFKHDG IW6SHFLILFJUDYLW\ OEIWñ/DQG\6HOKWWSZZZODQGXVWULHQOILOHDGPLQODQG\VHOODQG\VHOKWPORI$0 Selection based on dutyDWP62-32JL 60Hz Diameter 210, chart series76.9 ft, 34 Hz Speed:2006(3540)rpm Shaft power 9.81 hp147.5 USGPMhpUSGPM0007520401801807060608036036014045%5405402103072072028015900900350068.3 ft, 32 Hz Speed:1888(3540)rpm Shaft power 8.13 hp135.1 USGPMhpUSGPM0007520401801807060608036036014045%5405402103072072028015900900350060.2 ft, 30 Hz Speed:1770(3540)rpm Shaft power 6.67 hp123.3 USGPMhpUSGPM0007520401801807060608036036014045%54054021030720720280159009003500LandySel 3.0http://www.landustrie.nl/fileadmin/landysel/landysel.html1 of 111/29/2017, 8:23 AM Selection based on dutyDWP62-32JL 60Hz Diameter 210, chart series105.4 ft, 40 Hz Speed:2360(3540)rpm Shaft power 16.16 hp186 USGPMhpUSGPM0007520401801807060608036036014045%5405402103072072028015900900350095.3 ft, 38 Hz Speed:2242(3540)rpm Shaft power 13.82 hp174.4 USGPMhpUSGPM0007520401801807060608036036014045%5405402103072072028015900900350085.8 ft, 36 Hz Speed:2124(3540)rpm Shaft power 11.70 hp160.6 USGPMhpUSGPM0007520401801807060608036036014045%54054021030720720280159009003500LandySel 3.0http://www.landustrie.nl/fileadmin/landysel/landysel.html1 of 111/29/2017, 8:59 AM Selection based on dutyDWP62-32JL 60Hz Diameter 210, chart series139 ft, 46 Hz Speed:2714(3540)rpm Shaft power 24.67 hp218.6 USGPMhpUSGPM0007520401801807060608036036014045%54054021030720720280159009003500127.3 ft, 44 Hz Speed:2596(3540)rpm Shaft power 21.56 hp207.3 USGPMhpUSGPM0007520401801807060608036036014045%54054021030720720280159009003500116.1 ft, 42 Hz Speed:2478(3540)rpm Shaft power 18.72 hp196.5 USGPMhpUSGPM0007520401801807060608036036014045%54054021030720720280159009003500LandySel 3.0http://www.landustrie.nl/fileadmin/landysel/landysel.html1 of 111/29/2017, 8:58 AM Selection based on dutyDWP62-32JL 60Hz Diameter 210, chart series176.7 ft, 52 Hz Speed:3068(3540)rpm Shaft power 35.85 hp255.3 USGPMhpUSGPM0007520401801807060608036036014045%54054021030720720280159009003500163.7 ft, 50 Hz Speed:2950(3540)rpm Shaft power 31.80 hp242.6 USGPMhpUSGPM0007520401801807060608036036014045%54054021030720720280159009003500151.1 ft, 48 Hz Speed:2832(3540)rpm Shaft power 28.09 hp230.4 USGPMhpUSGPM0007520401801807060608036036014045%54054021030720720280159009003500LandySel 3.0http://www.landustrie.nl/fileadmin/landysel/landysel.html1 of 111/29/2017, 8:58 AM Selection based on dutyDWP62-32JL 60Hz Diameter 210, chart series219.2 ft, 58 Hz Speed:3422(3540)rpm Shaft power 49.92 hp290 USGPMhpUSGPM0007520401801807060608036036014045%54054021030720720280159009003500204.5 ft, 56 Hz Speed:3304(3540)rpm Shaft power 44.90 hp279.2 USGPMhpUSGPM0007520401801807060608036036014045%54054021030720720280159009003500190.2 ft, 54 Hz Speed:3186(3540)rpm Shaft power 40.24 hp268.4 USGPMhpUSGPM0007520401801807060608036036014045%54054021030720720280159009003500LandySel 3.0http://www.landustrie.nl/fileadmin/landysel/landysel.html1 of 111/29/2017, 8:57 AM Selection based on duty DWP62-32JL 60Hz Diameter 209 ft Shaft power USGPM hp USGPM 00 20 40 230 70 60 80 460 140 % 690 210 920 280 1150 350 00 230 20 460 40 690 60 920 80 1150 100 Speed 3540 rpm Solids passage 3.15 inch Discharge diameter 3.94 inch Advised min. capacity 26.3USGPM Frequency control 60 Hz Rated shaft power 73.97 hp Rated electrical power 60.66 kW Motor efficiency 91 % Flow 300.0 USGPM Head 231.3 ft Pump efficiency 31.6 % Absorbed shaftpower 54.55 hp Absorbed electrical power 44.74 kW Shut-off Head 267.2 ft Static head 25.0 ft Specific gravity 62.29 lb/ft³ Specific consumption 0.656 kWh/m³ LandySel 3.0 http://www.landustrie.nl/fileadmin/landysel/landysel.html 1 of 2 11/16/2017, 8:25 AM ATTACHMENT C SYSTEM CURVE CALCULATIONS AND SYSTEM VS. PUMP CURVES INTRADA SARATOGA VECINO GROUP, NEW YORK 11/29/2017 DETERMINE THEORETICAL DAILY AVERAGE AND PEAK HOURLY FLOWS MAX. DAILY FLOW, Q = 14,119 GPD (Based on inflow measurements) AVG. DAILY FLOW, Qav = 9.8 GPM ( 24 HOURS ) POPULATION SERVED = 190 EA (10-STATE STDS. PAGE 10-5 PEAKING FACTOR, Qp/Qav 4.16 FIG. 1, 75 GPD/PERSON) PEAK HOURLY FLOW, Qp =40.7 GPM ( AVG x 4.16 ) (CALCULATED) =20.9 GPM (EXISTING MEASURED) WET WELL SIZE CALCULATIONS MINIMUM VOLUME: TWO MINUTE PUMP RUN TIME WITH 2 MIN FM VELOCITY > 2.0 FPS 80 GPM 160 GAL OR THREE MINUTE MINIMUM REST BETWEEN 3 MIN PUMP STARTS AT PEAK FLOW 21 GPM 63 GAL MAXIMUM VOLUME: THIRTY MINUTE DETENTION TIME AT 30 MIN AVERAGE INFLOW 10 GPM 294 GAL WET WELL INSIDE DIAMETER = 8 FT (EXISTING) NO. OF PUMP STARTS PER DAY = 25 GALLONS PER PUMP START = 564 TOTAL DAILY PUMP RUN TIME = 3.92 HOURS HEIGHT BTWN ON-OFF LEVEL WITH AN 8 FT. DIA. WET WELL : 564 GAL/START/ 376.0 GAL/VLF = 1.50 FT CALCULATIONS BASED UPON INFORMATION PROVIDED STATION LANE SEWAGE PUMPING STATION CALCULATIONS FOR EXISTING CONDITIONS AS OF 11/2017 1 Attachment B INTRADA SARATOGA VECINO GROUP, NEW YORK 11/29/2017 HEAD LOSS CALCULATIONS MINOR LOSSES:TOTAL EQUIV EQUIV. QTY DESCRIPTION SIZE LNGTH LENGTH (IN) (LF) (LF) 1 GATE VALVE 4 2.40 2.40 1 CHECK VALVE 4 31.00 31.00 0 TEE (THROUGH) 4 2.20 0.00 1 TEE (SIDE) 4 10.00 10.00 2 90 DEG. ELBOW 4 4.80 9.60 4 45 DEG. ELBOW 4 2.90 11.60 0 22.5 DEG. ELBOW 4 2.00 0.00 0 11.25 DEG. ELBOW 4 1.00 0.00 1 COUPLING/UNION 4 0.50 0.50 SUB-TOTAL 65.10 PIPE FRICTION LOSSES: 4 - INCH DIP CL52 PIPE 2,099 TOTAL PIPE LENGTH 2,164 SAY 2,170 LF 2 Attachment B INTRADA SARATOGA VECINO GROUP, NEW YORK 11/29/2017 SYSTEM HEAD LOSS TABLE PIPE SIZE (I.D.)= 4 IN. "C" = 120 "C" = 100 FLOW STC HEAD FR HEAD FR HEAD T.D.H. T.D.H. (GPM) (FT.)* (FT.)** (FT)*** (FT)**(FT)*** 0 25.0 0.0 0.0 25.0 25.0 50 25.0 5.3 7.5 30.3 32.5 100 25.0 19.2 26.9 44.2 51.9 150 25.0 40.7 57.0 65.7 82.0 200 25.0 69.3 97.1 94.3 122.1 250 25.0 104.7 146.7 129.7 171.7 300 25.0 146.7 205.6 171.7 230.6 350 25.0 195.2 273.4 220.2 298.4 400 25.0 249.8 350.1 274.8 375.1 450 25.0 310.7 435.3 335.7 460.3 500 25.0 377.5 529.0 402.5 554.0 550 25.0 450.3 631.0 475.3 656.0 600 25.0 529.0 741.2 554.0 766.2 * DISCHARGE ELEVATION = 325 +/- PUMP ELEVATION = 300 +/- ** BASED ON "C" = 120 & 4 " I.D. HDPE DR-11 PIPE *** BASED ON "C" = 100 & 4 " I.D. HDPE DR-11 PIPE CHECK FLYGT SUBMERSIBLE SEWAGE PUMP, MODEL NO. CP 3102 MT, 5 HP, THREE PHASE, 460 VAC, 60 HZ. PUMP DELIVERY : 60 GPM @ TDH= 44 FT. NOTE: FLYGT SYSTEM PER SARATOGA CITY STANDARDS. 3 Attachment B INTRADA SARATOGA VECINO GROUP, NEW YORK 11/29/2017 CHECK TOTAL TIME BETWEEN PUMP STARTS AT AVG. FLOW: t = V/(D-Qav) + V/Qav where: t = (TOTAL TIME BTWN STARTS, MIN.) V = 564 GAL (VOLUME BTWN "OFF AND ON") Qav = 9.80 GPM (AVG. DAILY FLOW) D = 60 GPM (PUMP DELIVERY) t = 68.8 MIN. < 30 MIN. ? CHECK MINIMUM PUMP RUN TIME AT PEAK INFLOW: t = V/(D-Qp) where: t = (PUMP RUN TIME, MIN.) V = 564 GAL (VOLUME BTWN "OFF AND ON") Qp = 20.9 GPM (PEAK INFLOW) D = 60 GPM (PUMP DELIVERY) t = 14.4 MIN. >/= 2 MIN. ? CHECK VELOCITY IN FORCE MAIN: Velocity = (D/A)/448.8 GPM where: A = 0.09 SF (PIPE X-SECT AREA) D = 60 GPM (PUMP DELIVERY) Velocity = 1.5 FPS > 2.0 FPS ? 4 Attachment B Flygt Pump Model CP 3102 MT 3 ~ 4320.020.040.060.080.0100.0120.0140.00 50 100 150 200 250HEAD (FT)FLOW (GPM)SYSTEM VS. PUMP CURVESYSTEM CURVE C=100PUMP CURVE (1 PUMP)PUMP CURVE (2 PUMPS) Flygt Pump Model CP 3102 MT 3 ~ 4320.020.040.060.080.0100.0120.0140.00 50 100 150 200 250HEAD (FT)FLOW (GPM)SYSTEM VS. PUMP CURVESYSTEM CURVE C=100PUMP CURVE (FLYGT 5 HP)PUMP CURVE (LANDY 7.5 HP w/173)PUMP CURVE (LANDY 7.5 HP w/185) INTRADA SARATOGA VECINO GROUP, NEW YORK 11/29/2017 EXISTING MEASURED DAILY AVERAGE FLOWS MAX. DAILY FLOW, Qa = 14,119 GPD (Based on inflow measurements) DETERMINE DAILY AVERAGE AND PEAK HOURLY FLOWS STATION PARK DEVELOPMENT: DESIGN FLOW, Qb = 54,126 GPD (BERGMANN STUDY) FADEN PARCEL DEVELOPMENT: DESIGN FLOW, Qc = 7,990 GPD (LANSING ENGINEERING) ASKEW PARCEL DEVELOPMENT: DESIGN FLOW, Qd = 7,920 GPD (LANSING ENGINEERING) INTRADA DEVELOPMENT: DESIGN FLOW, Qe = 26,975 GPD (LA GROUP STUDY) MAX. DAILY FLOW, Q = 97,011 GPD (Qb through Qe) AVG. DAILY FLOW, Qav = 67 GPM (24 HRS) POPULATION SERVED = 1,300 EA (10-STATE STDS. PAGE PEAKING FACTOR, Qp/Qav 3.72 10-5, FIG. 1, BASED ON 75 GPD/PERSON) PEAK HOURLY FLOW, Qp = 251.0 GPM ( AVG. x #### ) =20.9 GPM (EXISTING, MEASURED) PEAK HOURLY FLOW, Qp = 271.9 GPM (EXISTING + PROPOSED) CALCULATIONS FOR STATION LANE SEWAGE PUMPING STATION CALCULATIONS BASED UPON INFORMATION PROVIDED PROPOSED CONDITIONS AT FULL BUILDOUT 1 Attachment B INTRADA SARATOGA VECINO GROUP, NEW YORK 11/29/2017 WET WELL SIZING CALCULATIONS MINIMUM VOLUME: TWO MINUTE PUMP RUN TIME WITH 2 MIN FM VELOCITY > 2.0 FPS 80 GPM 160 GAL OR THREE MINUTE MINIMUM REST BETWEEN 3 MIN PUMP STARTS AT PEAK FLOW 251 GPM 753 GAL MAXIMUM VOLUME: THIRTY MINUTE DETENTION TIME AT 30 MIN AVERAGE INFLOW 67 GPM 2,022 GAL WET WELL INSIDE DIAMETER = 8 FT (EXISTING) NO. OF PUMP STARTS PER DAY = 65 GALLONS PER PUMP START = 1,500 HEIGHT BTWN ON-OFF LEVEL WITH AN 8 FT. DIA. WET WELL : 1,500 GAL/START/ 376.0 GAL/VLF = 3.99 FT 2 Attachment B INTRADA SARATOGA VECINO GROUP, NEW YORK 11/29/2017 HEAD LOSS CALCULATIONS MINOR LOSSES:TOTAL EQUIV EQUIV. QTY DESCRIPTION SIZE LNGTH LENGTH (IN) (LF) (LF) 1 GATE VALVE 4 2.40 2.40 1 CHECK VALVE 4 31.00 31.00 0 TEE (THROUGH) 4 2.20 0.00 1 TEE (SIDE) 4 10.00 10.00 2 90 DEG. ELBOW 4 4.80 9.60 4 45 DEG. ELBOW 4 2.90 11.60 0 22.5 DEG. ELBOW 4 2.00 0.00 0 11.25 DEG. ELBOW 4 1.00 0.00 1 COUPLING/UNION 4 0.50 0.50 SUB-TOTAL 65.10 PIPE FRICTION LOSSES: 4 - INCH DIP CL52 PIPE 2,099 TOTAL PIPE LENGTH 2,164 SAY 2,170 LF 3 Attachment B INTRADA SARATOGA VECINO GROUP, NEW YORK 11/29/2017 SYSTEM HEAD LOSS TABLE PIPE SIZE (I.D.)= 4 IN. "C" = 120 "C" = 100 FLOW STC HEAD FR HEAD FR HEAD T.D.H. T.D.H. (GPM) (FT.)* (FT.)** (FT)*** (FT)**(FT)*** 0 25.0 0.0 0.0 25.0 25.0 50 25.0 5.3 7.5 30.3 32.5 100 25.0 19.2 26.9 44.2 51.9 150 25.0 40.7 57.0 65.7 82.0 200 25.0 69.3 97.1 94.3 122.1 250 25.0 104.7 146.7 129.7 171.7 300 25.0 146.7 205.6 171.7 230.6 350 25.0 195.2 273.4 220.2 298.4 400 25.0 249.8 350.1 274.8 375.1 450 25.0 310.7 435.3 335.7 460.3 500 25.0 377.5 529.0 402.5 554.0 550 25.0 450.3 631.0 475.3 656.0 600 25.0 529.0 741.2 554.0 766.2 * DISCHARGE ELEVATION = 325 +/- PUMP ELEVATION = 300 +/- ** BASED ON "C" = 120 & 4 " I.D. RCP PIPE *** BASED ON "C" = 100 & 4 " I.D. RCP PIPE USE LANDUSTRIE SUBMERSIBLE SEWAGE PUMP, MODEL NO. DWP62-32JL, 74 HP, THREE PHASE, 460 VAC, 60 HZ., 3540 RPM. PROGRAM THE VFD TO OPERATE THE PUMP AT 55HZ. PUMP DELIVERY : 300 GPM @ TDH= 230 FT. NOTE: LANDUSTRIE SYSTEM SPECIFIED PENDING CITY OF SARATOGA SPRINGS APPROVAL. 4 Attachment B INTRADA SARATOGA VECINO GROUP, NEW YORK 11/29/2017 CHECK TOTAL TIME BETWEEN PUMP STARTS AT AVG. FLOW: t = V/(D-Qav) + V/Qav where: t = (TOTAL TIME BTWN STARTS, MIN.) V = 1500 GAL (VOLUME BTWN "OFF AND ON") Qav = 67.4 GPM (AVG. DAILY FLOW) D = 300 GPM (PUMP DELIVERY) t = 28.7 MIN. < 30 MIN. ? CHECK MINIMUM PUMP RUN TIME AT PEAK INFLOW: t = V/(D-Qp) where: t = (PUMP RUN TIME, MIN.) V = 1500 GAL (VOLUME BTWN "OFF AND ON") Qp = 271.9 GPM (PEAK INFLOW) D = 300 GPM (PUMP DELIVERY) t = 53.3 MIN. >/= 2 MIN. ? CHECK VELOCITY IN FORCE MAIN: Velocity = (D/A)/448.8 GPM where: A = 0.09 SF (PIPE X-SECT AREA) D = 300 GPM (PUMP DELIVERY) Velocity = 7.7 FPS > 2.0 FPS ? CHECK VELOCITY IN FORCE MAIN FOR LOWER SPEEDS: Velocity = (D/A)/448.8 GPM where: A = 0.09 SF (PIPE X-SECT AREA) Velocity = 7.7 FPS, D = 300 GPM ( 3540 RPM ) 6.8 FPS, D = 265 GPM ( 3186 RPM ) 5.9 FPS, D = 230 GPM ( 2832 RPM ) 4.9 FPS, D = 190 GPM ( 2478 RPM ) 4.0 FPS, D = 155 GPM ( 2124 RPM ) 3.1 FPS, D = 120 GPM ( 1770 RPM ) 5 Attachment B Landustrie Pumps Model DWP62-32JL ~ 210mm Impeller0.0100.0200.0300.0400.0500.0600.00 100 200 300 400 500 600 700 800HEAD (FT)FLOW (GPM)SYSTEM VS. PUMP CURVESYSTEM CURVE C=100PUMP CURVE (3540 rpm)PUMP CURVE (3186 rpm)PUMP CURVE (2832 rpm)PUMP CURVE (2478 rpm)PUMP CURVE (2124 rpm)PUMP CURVE (1770 rpm) ATTACHMENT D FLOW TEST CHARTS ATTACHMENT E PUMP RUN DATA Station Lane Pump Station11/16/2017Hrs./WkDaysHrs./DayPump Rate (gal/min.)1Volume (gal/day)Hrs./WkDaysHrs./DayPump Rate (gal/min.)1Volume (gal/day)Total Hrs./DayTotal Volume (gal/day)10/30/17 606 6294 9 7 1.29 59.6 4,598 33 7 4.71 31.3 8,853 6.00 13,451 10/23/17 597 6261 10 7 1.43 59.6 5,109 35 7 5.00 31.3 9,390 6.43 14,499 10/16/17 587 6226 8 6 1.33 59.6 4,768 31 6 5.17 31.3 9,703 6.50 14,471 10/10/17 579 6195 10 7 1.43 59.6 5,109 44 7 6.29 31.3 11,805 7.71 16,913 10/3/17 569 6151 12 8 1.50 59.6 5,364 44 8 5.50 31.3 10,329 7.00 15,693 9/25/17 557 6107 9 6 1.50 59.6 5,364 34 6 5.67 31.3 10,642 7.17 16,006 9/19/17 548 6073 13 8 1.63 59.6 5,811 55 8 6.88 31.3 12,911 8.50 18,722 9/11/17 535 6018 11 6 1.83 59.6 6,556 54 6 9.00 31.3 16,902 10.83 23,458 9/5/17 524 5964 10 6 1.67 59.6 5,960 49 6 8.17 31.3 15,337 9.83 21,297 8/30/17 514 5915 16 9 1.78 59.6 6,357 65 9 7.22 31.3 13,563 9.00 19,921 8/21/17 498 5850 15 7 2.14 59.6 7,663 58 7 8.29 31.3 15,561 10.43 23,223 8/14/17 483 5792 12 7 1.71 59.6 6,130 50 7 7.14 31.3 13,414 8.86 19,545 8/7/17 471 5742 15 7 2.14 59.6 7,663 54 7 7.71 31.3 14,487 9.86 22,150 7/31/17 456 5688 15 7 2.14 59.6 7,663 49 7 7.00 31.3 13,146 9.14 20,809 7/24/17 441 5639 23 7 3.29 59.6 11,750 53 7 7.57 31.3 14,219 10.86 25,969 7/17/17 418 5586 22 7 3.14 59.6 11,239 22 7 3.14 31.3 5,902 6.29 17,141 7/10/17 396 5564 17 7 2.43 59.6 8,685 41 7 5.86 31.3 11,000 8.29 19,684 7/3/17 379 5523 26 7 3.71 59.6 13,282 20 7 2.86 31.3 5,366 6.57 18,648 6/26/17 353 5503 15 7 2.14 59.6 7,663 45 7 6.43 31.3 12,073 8.57 19,736 6/19/17 338 5458 16 7 2.29 59.6 8,174 39 7 5.57 31.3 10,463 7.86 18,637 6/12/17 322 5419 13 7 1.86 59.6 6,641 40 7 5.71 31.3 10,731 7.57 17,373 6/5/17 309 5379 15 6 2.50 59.6 8,940 42 6 7.00 31.3 13,146 9.50 22,086 5/30/17 294 5337 16 8 2.00 59.6 7,152 53 8 6.63 31.3 12,442 8.63 19,594 5/22/17 278 5284 15 7 2.14 59.6 7,663 52 7 7.43 31.3 13,951 9.57 21,614 5/15/17 263 5232 16 7 2.29 59.6 8,174 54 7 7.71 31.3 14,487 10.00 22,661 5/8/17 247 5178 14 7 2.00 59.6 7,152 48 7 6.86 31.3 12,878 8.86 20,030 5/1/17 233 5130 15 7 2.14 59.6 7,663 49 7 7.00 31.3 13,146 9.14 20,809 4/24/17 218 5081 15 7 2.14 59.6 7,663 54 7 7.71 31.3 14,487 9.86 22,150 4/17/17 203 5027 16 7 2.29 59.6 8,174 52 7 7.43 31.3 13,951 9.71 22,125 4/10/17 187 4975 16 7 2.29 59.6 8,174 52 7 7.43 31.3 13,951 9.71 22,125 4/3/17 171 4923 21 7 3.00 59.6 10,728 35 7 5.00 31.3 9,390 8.00 20,118 3/27/17 150 4888 14 7 2.00 59.6 7,152 43 7 6.14 31.3 11,536 8.14 18,688 3/20/17 136 4845 24 7 3.43 59.6 12,261 17 7 2.43 31.3 4,561 5.86 16,821 3/13/17 112 4828 13 7 1.86 59.6 6,641 46 7 6.57 31.3 12,341 8.43 18,982 3/6/17 99 4782 15 7 2.14 59.6 7,663 58 7 8.29 31.3 15,561 10.43 23,223 2/27/17 84 47242.13 7,621 6.41 12,046 19,668 Total Pump #1 and Pump #2 8.55 19,668 1. Based on pump drawdown tests conducted on 11-8-17Date EndingPump #1Pump #2Pump #1 Pump #2 Both PumpsAverage Average Location:    Date: Engineer:    Job # Test by: Witnessed by:    SHEET 1 OF 1 Pump Chamber ID = 8 feet Pump Chamber Depth = 24 feet +/- Pump #1: avg fill rate avg net pump rate est. pump rate Pump #2: avg fill rate avg net pump rate est. pump rate Pump #1 + #2: avg fill rate avg net pump rate est. pump rate 12.6 47.0 59.6 23.5 25.1 53.7 Pump No. Run No. 78.8 31.3 7.8 1 272 260 12 241 + 2 1 233 257 17.1223761 1 248 236 12 236 242 6 25.115376 14 53.7752 188 8 23.5 31 15 2.1 188 14 13.4 232 233 1 2 1 232 238 6 238 232 6 4 47.0 3 242 236 6 2 242 236 6 236 242 6 Start Finish Difference (gallons) Empty Fill Pump Fill 47.0 188 23 8.2 188 15 12.5 188 4 188 11/08/17 201702 Station Lane, Saratoga Springs Dan Desjardins Dan Desjardins City DPW Liquid Level Below Top (inches) Elapsed Time (min) Net Rate (gpm)Volume The pump drawdown test is being conducted to verify the discharge rate of the existing pumps. Both the  time to drawdown the liquid level in the pump chamber and the time it takes to fill back up to the original  level will be measured. ATTACHMENT F COST ESTIMATES PREPARED BY:    DATE CHECKED BY:    DATE SUBJECT: PROJECT NUMBER:    SHEET 1 OF 2 Full Buildout Option:Preliminary Estimated Cost: $226,300 D. Desjardins 11/28/17 Vecino Intrada ‐ Station Lane Pump Station Estimate 2017002 Under this option, the existing pumps will be removed and replaced with new pumps that will have the  capacity to handle the additional flows from the Intrada, Station Park, Askew and Faden projects. The  existing wet‐well, valve chamber and control panel structures will be retained. The existing stand‐by  generator is assumed to be insufficient to operate these new pumps. The pipe rails, internal piping and  electrical control panel will be replaced. The pump chamber access hatch will be removed and replaced  with a new model including safety grating. The internal piping, valves and check valves in the valve pit will  be removed and replaced.  ENGINEER'S ESTIMATE OF CONSTRUCTION COSTS ITEM NO. DESCRIPTION UNIT PRICE TOTAL 1 PROVIDE TEMPORARY BY-PASS PUMPING AND/OR STORAGE 5.00 DAYS $3,000.00 $15,000.00 2 REMOVE EXISTING SEWAGE PUMPS, SLIDE RAILS, PIPING AND CONTROLS 1.00 LS $1,500.00 $1,500.00 3 SUBMERSIBLE SEWAGE PUMPS - LANDUSTRIE MODEL DWP62-32JL 2.00 EA $25,000.00 $50,000.00 4 VFD CONTROL PANEL W/ ELAPSED TIME METERS AND ALARM 1.00 EA $35,000.00 $35,000.00 5 INSTALL NEW SUBMERSIBLE SEWAGE PUMPS AND CONTROLS 5.00 DAYS $3,000.00 $15,000.00 6 REMOVE EXISTING PIPING, VALVES, AND ACCESS HATCH 1.00 LS $1,500.00 $1,500.00 7 GATE VALVES, CHECK VALVES, FITTINGS, DI PIPE 1.00 LS $5,000.00 $5,000.00 8 INSTALL GATE VALVES, CHECK VALVES, FITTINGS, DI PIPE 2.00 DAYS $3,000.00 $6,000.00 9 ACCESS HATCH WITH SAFETY GRATING 1.00 LS $5,000.00 $5,000.00 10 INSTALL ACCESS HATCH WITH SAFETY GRATING 2.00 DAYS $3,000.00 $6,000.00 11 150kW STAND-BY GENERATOR COMPLETE INCL TRANSFER SWITCH 1.00 EA $41,500.00 $41,500.00 12 INSTALL NEW GENERATOR AND TRANSFER SWITCH 2.00 DAYS $3,000.00 $6,000.00 13 STATION LANE PUMP STATION TOTAL $187,500.00 $18,750.00 $20,000.00 TOTAL CONSTRUCTION COST $226,250.00 SAY $226,300 CONTINGENCY (10%) STATION LANE PUMP STATION QUANTITY/ UNIT SOFT COSTS (ENGINEERING) PROJECT: Intrada Saratoga OWNER: Vecino Group, New York, LLC ENGINEER: THE LA GROUP, P.C. DATE: 28-Nov-2017 PROJECT #: 2017002 Pump Station Full Upgrade Page 2 of 2