Loading...
HomeMy WebLinkAbout20230233 Station Lane Site Plan PS Upgrade PlansPUMP STATION KEY NOTES:1.INSTALL NEW JUNCTION BOX2.COPOLYMER POLYPROPYLENE PLASTIC STEPS @ 12” O/C TO REMAIN3.EXISTING BUTYL ROPE IN SHIPLAP JOINTS, TYP.4.EXISTING 12” PVC SDR-26 INLET PIPE INV. ELEV.= 309.05.HIGH WATER LEVEL ALARM “ON” LEVEL ELEV. = 305.106.LAG PUMP “ON” LEVEL ELEV. = 304.607.LEAD PUMP “ON” LEVEL ELEV. = 304.108.PUMP “OFF” LEVEL ELEV. = 302.109.INSTALL NEW FLOAT SWITCHES, TYP.10.DOUBLE LEAF HINGED ALUMINUM ACCESS HATCH TO REMAIN11.PRECAST CONCRETE FLAT TRAFFIC RATED TOP TO REMAIN12.INSTALL NEW GUIDE RAILS - 2” SCH 40 STAINLESS STEEL PIPE, 2 PER PUMP(INTERMEDIATE BRACES REQUIRED)13.PRECAST CONCRETE RISER SECTIONS TO REMAIN14.EXISTING ASPHALT BITUMASTIC COATING15.EXISTING FLEXIBLE CONNECTOR, TYP.16.4” DIA. D.I.P. SANITARY FORCE MAIN TO REMAIN17.4” FLOOR DRAIN TO REMAIN18.EXISTING 4” M.J. R.W. VALVE AND VALVE BOX TO REMAIN19.EXISTING PRECAST CONCRETE INTEGRAL WALL AND BASE SECTIONS TO REMAIN20.FURNISH AND INSTALL NEW SUBMERSIBLE WASTEWATER PUMPS - FLYGT MODELNP-3127.060, 3 PHASE, 208VAC, 60 HZ, CAPABLE OF DELIVERING 175 GPM @ 100' TDH,INCLUDING A FLYGT FLUSH VALVE.21.EXISTING 24" FRAME AND COVER TO REMAIN22.REMOVE AND REPLACE 4" D.I.P. DISCHARGE PIPES23.316" 316SS LIFTING CHAINALARM LIGHT (VISIBLE LOCATION)GROUT CIRCLEEXISTING DOUBLE LEAFHINGED ALUMINUM ACCESSHATCH TO REMAINEXISTING 4" D.I.P.DRAIN PIPE TO REMAININSTALL NEW 4" x 4" x 4" FLANGED TEEINSTALL NEW 4" GATE VALVE (TYP.)NEW 90° BEND (TYP.)181716INSTALL NEW 4"CHECK VALVE(TYP.)INSTALL NEW DUPLEX CONTROL PANEL, LIGHT, ANDALARM, LOCATED IN VISIBLE LOCATION ON INDIVIDUALCIRCUIT. PANEL SHALL HAVE A 304 STAINLESS STEELENCLOSURE, NEMA 4X, AND SINGLE DOOR WALL MOUNT.PROVIDE A TAMPER RESISTANT LOCK.EXISTING CONDUIT ANDFITTINGS TO REMAIN4" D.I.P.PIPESUPPORTS,TYP.1021121112131431516171819567894PIPE SUPPORT (TYP.)PLANSECTIONRIM = 324.60'INSIDE BOTTOMELEV. = 300.60'PUMP STATION GENERAL NOTES1.EXISTING CONDITIONS INFORMATION SHOWN ON THIS PLAN IS DERIVED FROM VARIOUSSOURCES AND NOT A CURRENT FIELD SURVEY. CONTRACTOR MUST FIELD VERIFYEXISTING CONDITIONS PRIOR TO ORDERING MATERIALS FOR THE INSTALLATION.2.THE LOCATION OF UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE FORINFORMATION ONLY, AND MUST BE VERIFIED. ALL UTILITIES MAY NOT BE SHOWN. THECONTRACTOR SHALL CONTACT DIG SAFELY NEW YORK (1-800-962-7962) AND THE PROPERLOCAL AUTHORITIES OR RESPECTIVE UTILITY COMPANY HAVING JURISDICTION TOCONFIRM THE LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. ANYCOSTS INCURRED BY THE CONTRACTOR DUE TO FAILURE TO CONTACT THE PROPERAUTHORITIES SHALL BECOME THE RESPONSIBILITY OF THE CONTRACTOR.3.EXTEND DESIGNATED LIMIT OF WORK AS NECESSARY TO ACCOMPLISH UTILITY WORK ASREQUIRED BY THESE DRAWINGS.4.ALL STATION COMPONENTS SHALL BE IN ACCORDANCE WITH THE CITY OF SARATOGASPRINGS REQUIREMENTS.5.A COMPLETE SHOP DRAWING SUBMITTAL SHALL BE REVIEWED AND APPROVED BY THEENGINEER PRIOR TO THE RELEASE OF THE STATION FOR FABRICATION.6.THE STATION INSTALLER SHALL DEMONSTRATE TO THE CITY`S SATISFACTIONSUCCESSFUL OPERATION OF THE STATION AND ALL RELATED COMPONENTS.7.EXISTING STANDBY GENERATOR AND AUTOMATIC TRANSFER SWITCH TO REMAIN.8.SPARE WIRES TO BE PULLED FROM ALL COMPONENTS REQUIRING ELECTRICAL POWER.9.CONTACT INFORMATION FOR PUMP EQUIPMENT IS MIKE HOYT, XYLEM, INC., (518) 417-9270,MIKE.HOYT@XYLEMINC.COM10.FLOWS MUST BE MAINTAINED THROUGHOUT THE INSTALLATION USING APPROVEDMETHODS OF BY-PASS PUMPING. NO INTERRUPTION OF FLOWS IS ALLOWED WITHOUTAPPROVAL FROM THE CITY.PUMP STATION POWER AND CONTROL NOTES1.ALL ELECTRICAL WORK SHALL BE INSTALLED BY A NYS LICENSED ELECTRICIANACCORDING TO THE NATIONAL ELECTRICAL CODE AND THE NYS BUILDING CODE.2.THREE PHASE ELECTRICAL POWER WILL BE PROVIDED BY NATIONAL GRID.CONTRACTOR IS RESPONSIBLE FOR CONNECTING ALL WIRING BETWEEN THE PUMPSTATION AND THE POWER SUPPLY. THE STATION ELECTRICAL SERVICE WILL BESIZED BY THE ENERGY PROVIDER. THE PUMP SUPPLIER WILL COORDINATE THEELECTRICAL REQUIREMENTS.3.RIGID CONDUIT BETWEEN THE PUMP STATION AND THE POWER SUPPLY IS EXISTING.4.PROVIDE A DUPLEX PUMP CONTROL PANEL WITH VARIABLE FREQUENCY DRIVE (VFD)CONTROLS HOUSED IN A NEMA 4X RATED ENCLOSURE MOUNTED ON THE EXISTINGPANEL BOARD.5.THE CONTROL PANEL SHALL PROVIDE SAFE AND RELIABLE OPERATION OF THEPUMPING STATION AND SHALL PROVIDE, BUT IS NOT LIMITED TO THE FOLLOWINGFUNCTIONS:5.A.CONTROL THE STARTING, STOPPING AND ALTERNATION OF THE PUMPS.5.B.MONITOR THE PUMPS TO VERIFY THAT THERE IS NO LEAKAGE OR EXCESSIVETEMPERATURE IN THE MOTOR WINDINGS.5.C.THE PANEL SHALL BE EQUIPPED WITH LED TYPE LIGHTS INDICATING THEOPERATIONAL FUNCTIONS AND THE ALARM STATUS.5.D.PROVIDE AN ANNUNCIATOR PANEL TO DISPLAY THE STATION OPERATION ANDANY ACTIVE ALARMS.5.E.THE CONTROL PANEL SHALL OPERATE THE PUMPS WITH FLOAT SWITCHES.FLOATS TO TURN PUMPS ON AND OFF AT PRESET LEVELS, TO ACTIVATE ANALARM SIGNAL AND TO ALTERNATE AFTER EACH PUMPING CYCLE.5.F.THE LEVEL FLOATS SHALL BE MERCURY AND LEAD FREE, COMPATIBLE WITH THELATEST ENVIRONMENTAL LAWS.5.G.THE FLOATS SHALL BE MOUNTED ON A STAINLESS STEEL GUIDE RAIL AND EACHFLOAT SHALL BE SUPPLIED WITH AN ADJUSTABLE VERTICAL SUPPORT.7'-0"5'-0"8'-0" I.D.5'-0"6"TYP.7'-0" I.D.8"8'-0" I.D.8"12"204" D.I.P. TO REMAIN90°VENT PIPE12" PVC INLETTO REMAINEXISTING MANHOLE FRAME &COVER TO REMAINEXISTING PANEL BOARD TO REMAIN222223VALVE VAULTPUMP CHAMBER12" PVC 4" D.I.P.STATION LANE8" PVC12" PVC© the LA Group 2017Unauthorized alteration or addition to thisdocument is a violation of Section 7209 of theNew York State Education Law.Vecino Group,New York, LLC305 W CommercialSpringfield, MO 65803G:\Proj-2017\2017002_Vecino_Group_Housing\2017002CAD\08SLPSU\L-01_SLPSU.dwg IntradaSaratoga SpringsProject Title:Prepared for:Drawing TitleDrawing No.Rev:Description:Date:Project No.:Design:Drawn:Date:Scale:Ch'k'd:20170025/13/19Per City Comments1NTS03/14/19DPDHSMDPDL-01UpgradesPump StationStation Lane3PUMP STATION UPGRADESSCALE: NTS2SITE PLAN1LOCATION MAP SCALE: NTSWORK DESCRIPTION:1.SET-UP AND INITIATE BY-PASS PUMPING OPERATION.2.DEMOLISH AND REMOVE PUMP STATION EQUIPMENT INCLUDING PUMPS, GUIDE RAILS, DISCHARGE PIPING, FLOAT SWITCHES, LIFTING CHAINS, CABLES,JUNCTION BOXES, ELECTRICAL CONROL PANEL, SIGNAL WIRES, POWER CABLES, CHECK VALVES AND GATE VALVES.3.THOROUGHLY CLEAN INTERIOR OF PUMP CHAMBER AND VALVE VAULT, INSPECT INTERIOR SURFACES AND PATCH / REPAIR ANY DAMAGE OBSERVED.4.FURNISH AND INSTALL NEW COMPONENTS AS SHOWN.5.PERFORM TESTING AND START-UP SERVICES.6.REMOVE BY-PASS.WASHINGTON STCHURCH ST9NWEST AVE STATION LANEPROJECTSITE8642510100Scale: 1" = 10'LEGENDSANITARY FORCE MAINEXISTING WATER LINESANITARY SEWER LINEEXISTING GAS LINEEXISTING ELECTRIC / TELEPHONE LINEEXISTING SANITARY SEWER LINE