Loading...
HomeMy WebLinkAbout20231022 146 Adams SUP Modification Cost EstimateCost Estimate for Letter of Credit (Note: This is not an all inclusive list. Please adjust for project specifics.) Planning Board No.: Project: Location: Saratoga Springs, NY Date: 12/12/2023 Firm Name & Preparer: On Site (All infrastructure & amenities on private property) Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Clearing & Grubbing 1 LS $3,000.00 $3,000.00 0%$3,000.00 2 Rough Grading 1 LS $3,000.00 $3,000.00 0%$3,000.00 3 Erosion and sediment control measures 1 LS $1,000.00 $1,000.00 0%$1,000.00 Demolition 4 Concrete Removal 45 SF $3.00 $135.00 0%$135.00 5 Tree Removal 2 LS $300.00 $600.00 0%$600.00 Hard Scape 6 Stone Gravel 2,200 SF $3.00 $6,600.00 0%$6,600.00 7 Asphalt Pavement 160 SF $35.00 $5,600.00 0%$5,600.00 8 Concrete Pad 45 SF $35.00 $1,575.00 0%$1,575.00 Site Amenities 9 Traffic Signs 2 EA $350.00 $700.00 0%$700.00 10 Striping 1 LS $300.00 $300.00 0%$300.00 Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Stormwater Management 11 Drywell 1 EA $5,000.00 $5,000.00 0%$5,000.00 Landscaping 12 Topsoil/Seed/Mulch 1 LS $1,200.00 $1,200.00 0%$1,200.00 Total onsite Work $28,710.00 $28,710.00 Total onsite X.25 $7,177.50 $7,177.50 Off Site (All infrastructure & amenities to be dedicated to the City) Misc. 13 As-built Drawing 1 LS $2,000.00 $2,000.00 0%$2,000.00 Total offsite Work $2,000.00 $2,000.00 Total On-Site Work X25%$7,177.50 Private Horse Barn Expansion 146 Adams Street The LA Group / Jessica Mink, L.D. LOC Example Template 2-4-21 Total Off-Site work $2,000.00 Total LOC Amount = $9,177.50 * New LOC Reduced Amount = $9,177.50 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $2,294.38 LOC Example Template 2-4-21