Loading...
HomeMy WebLinkAbout20230524 12 Ballston Chipotle Site Plan Traffic Impact Assessment 2023 11 22 501 Main Street, Suite 2A 11 Vanderbilt Avenue, Suite 204 Monroe, CT 06468 Norwood, MA 02062 Office: (203) 880-5455 Office: (708) 352-8491 www.SolliEngineering.com April 05, 2023 Revised November 22, 2023 John J. Roche / Director Atlantic Retail 55 Huntington Avenue Boston, MA 02199 (617) 369-5925 RE: Traffic Impact Assessment Proposed Chipotle 12 Ballston Avenue, Saratoga Springs, NY Project Number: 21206201 Dear John, Solli Engineering, LLC has prepared this assessment to provide an analysis of the potential traffic impacts associated with the proposed redevelopment located at 12 Ballston Avenue (Route 50) in Saratoga Springs, New York with site access provided from Ballston Avenue (Route 50) and Hamilton Street. The evaluation has been completed in accordance with the City of Saratoga Springs requirements as well as standard traffic engineering methodology. Our investigation concludes that the proposed development will not have an adverse impact on the area roadway network. Project Description: The property is located along Ballston Avenue (Route 50) in Saratoga Springs, New York at the corner of Ballston Avenue (Route 50) and Hamilton Street. The site is currently improved with a vacant 2,703± square-foot building formerly occupied by Paddy Duggan’s Irish Pub. The project site is bound by Ballston Avenue (Route 50) to the north and west, Hamilton Street to the east, and a commercially developed property occupied by Saratoga Strike Zone Bowling Alley to the south. Refer to Figure 1, Site Location Map, for more details on the project location. The project proposes to repurpose the existing 2,703 square-foot building on-site for a 2,388± square-foot quick-service restaurant with associated parking. The parcel is located within the NC Neighborhood Center District (T-5) Zoning District within the City of Saratoga Springs. Site access is proposed via a proposed stop-controlled 22-foot-wide driveway off Hamilton Street and the existing stop-controlled 31-foot-wide driveway off Ballston Avenue (Route 50). See the Site Layout Plan for more details on the proposed site configuration. Existing Conditions: Ballston Avenue (Route 50) is an east-west roadway located west of the project site with a posted speed limit of 30 miles per hour throughout the study area. Ballston Avenue (Route 50) is classified as a principal arterial other roadway by the New York State Department of Transportation. Across the property frontage, Ballston Avenue (Route 50) is a two (2) lane roadway with a shared center left turn lane. There are sidewalks located on both sides of the street along the property’s frontage. Hamilton Street is a north-south roadway located east of the project site. Hamilton Street is classified as an urban local street by the New York State Department of Transportation. Across the property frontage, Hamilton Street is a two (2) lane roadway. There are sidewalks located on both sides of the property’s frontage. Turning movement count data was collected between October 15, 2022 and October 18, 2022. The 2022 existing traffic volumes are illustrated in Figure 2. Proposed Conditions: The project proposed to maintain the existing 31-foot stop-controlled full-movement driveway via Ballston Avenue (Route 50) located approximately 275 feet southwest of the intersection of Ballston Avenue (Route 50) & Hamilton Street. Site access will also be provided via a proposed 22-foot stop-controlled full-movement driveway off Hamilton Street located approximately 150 feet south of the intersection of Ballston Avenue (Route 50) & Hamilton Street. The anticipated number of trips that will be generated by proposed development was estimated using data from the Institute of Transportation Engineers (ITE) Trip Generation, 11th Edition. The trip generation was calculated for the weekday PM and Saturday midday peak hours based on the proposed land uses as these are the peak periods with the greatest potential to impact the adjacent roadway network. The trip generation rate sheets are provided as a supporting document to this assessment. Table 1 below illustrates the anticipated trips to be generated by the proposed project during the weekday PM and Saturday midday peak hours. A detailed breakdown of the existing and proposed trip generation calculations are provided as a supporting document to this assessment. TABLE 1 TRIP GENERATION SUMMARY LAND USE PM PEAK HOUR SAT PEAK HOUR ENTER EXIT TOTAL ENTER EXIT TOTAL Fast Casual Restaurant (LUC 930) 2,388±sf 16 14 30 43 35 78 Total New Trips 16 14 30 43 35 78 The anticipated distribution of new traffic entering and exiting the site was developed based on area populations, existing traffic patterns, and layout of the adjacent roadway network. The following distributions were applied to the new site generated trips: • 40% to/from the east via Ballston Avenue (Route 50) • 30% to/from the west via Ballston Avenue (Route 50) • 20% to/from the north via Hamilton Street • 10% to/from the south via Hamilton Street The anticipated percent distribution of the new site generated trips is illustrated in Figure 3. The new site generated trips were assigned to the site driveway intersection based on the anticipated percent distributions illustrated in Figure 3 and the resulting trip assignment is illustrated in Figure 4. As the proposed development is anticipated to be opened in 2024, background traffic growth is estimated to account for any traffic increase as a result of regional population growth. Based on previous ADT data provided by the New York State Department of Transportation (NYSDOT), overall traffic volumes in the study area in recent years have remained relatively the same. The ADT reported for Ballston Avenue (Route 50) between Geyser Road & Avenue of the Pines and East Congress Street was 11,952 vehicles in 2011, 11,592 vehicles in 2017, and 6,568 vehicles in 2020. Reported ADT data for 2020 was much lower compared to the reported ADT for 2011 and 2017 as a result of the travel restrictions and social distancing practices associated with the outbreak of COVID-19. The existing traffic volumes on Ballston Avenue (Route 50) were projected to the 2024 design year using a conservative 2.00 percent per year growth factor. There is an approved development project located north of the project site at 269 Broadway and was included as a background generator to this study. The project could potentially include a six-story, mixed-use building with underground parking and access to Hamilton Street. The potential PM peak hour trips associated with that project have been included in the traffic impact analysis as a background generator and are illustrated in Figure 5A, Build – Trip Assignment (2024) – PM Peak. Due to the development consisting of mostly office space, the anticipated Saturday midday peak hour trip generation would be minor and likely captured by the background growth rate applied. The trip assignment volumes illustrated in Figure 4 were combined with the 2024 background volumes in Figure 5 and the background generators in Figure 5A to develop the build traffic volumes. Figure 6 illustrates the 2024 build traffic volumes. The New York State Department of Transportation was contacted to identify any ongoing or proposed projects within the study area which may impact the analysis. No projects were identified which would impact the analysis. Intersection sight distance (ISD) at the proposed site driveway on Ballston Avenue was reviewed and evaluated per guidance provided in the American Association of State Highway and Transportation Officials (AASHTO Geometric Design of Highways & Streets 2018, 7th Edition). The design speed was determined by adding 5 miles per hour to the posted speed limit of 30 miles per hour on Ballston Avenue. Based on a design speed of 35 miles per hour for vehicles traveling on Ballston Avenue, a minimum ISD of 415 feet is required for vehicles exiting the driveway. The ISD looking right is impacted by the building layout; however, the stopping site distance required for vehicles traveling on Ballston Avenue is 250’ feet, which is satisfied with the proposed site driveway layout. For more information regarding the intersection sight distance, refer to the Intersection Sight Distance Figure, included with this study. Capacity Analysis: To determine the operating conditions of the site driveways after the development has been constructed, the intersection was analyzed using the Synchro 11 capacity analysis software for the existing, background, and build peak hour conditions during the weekday PM and Saturday midday peak hours, as these are the periods which have the greatest potential for impact by the proposed development. The results of the Synchro analysis describe the traffic impact in terms of Level of Service (LOS). LOS describes the operational condition of the signalized intersection in terms of delay (in seconds per vehicle) and is expressed on a scale of A through F with LOS A being the best and LOS F being the worst. LOS A reflects intersection operations with little to no vehicle delay (less than 10 seconds per vehicle) and LOS F reflects intersection conditions that are over capacity and experience long delays (more than 80 seconds per vehicle at signalized intersections and more than 50 seconds of delay per vehicle at unsignalized intersections). At unsignalized intersections, only the delay on the stop-controlled approach is reported. TABLE 2 PEAK HOUR LEVEL OF SERVICE SUMMARY (PM/SAT) INTERSECTION 2022 Existing 2024 Background 2024 Build Hamilton Street & Ballston Avenue (Route 50) C/C C/C C/C Ballston Avenue (Route 50) & Site Driveway* A/A A/A B/B Hamilton Street & Site Driveway* - - A/A *Unsignalized Intersection Under the 2024 build condition, the existing site driveway intersection with Ballston Avenue (Route 50) will operate at a LOS B with 12.2 seconds of delay during the weekday PM peak hour and a LOS B with 12.7 seconds during Saturday midday peak hour. The proposed site driveway intersection with Hamilton Street will operate at a LOS A with 8.5 seconds of delay during the weekday PM peak hour and a LOS A with 8.5 seconds delay during the Saturday midday peak hour. Under the 2024 background condition, the signalized intersection of Hamilton Street & Ballston Avenue (Route 50) operates at a LOS C with 23.3 seconds of delay during the weekday PM peak hour and at a LOS C with 23.0 seconds of delay during the Saturday midday peak hour. Under the 2024 build condition, the signalized intersection of Hamilton Street & Ballston Avenue (Route 50) operates at a LOS C with 23.4 seconds of delay during the weekday PM peak hour and at a LOS C with 23.1 seconds of delay during the Saturday midday peak hour. This is an increase of 0.1 seconds of delay between the background and build condition for the weekday PM peak hour and Saturday midday peak hour, which is acceptable. The traffic impact analysis indicates that the anticipated minor increase in traffic volume associated with the proposed development can be accommodated without adverse impact on the operating conditions of the adjacent roadway network. Copies of the Synchro analysis reports are provided as a supporting document to this assessment. Conclusion: A traffic impact analysis of the study area intersections indicates that the proposed project can be accommodated without adverse impact on the operating conditions of the study area roadway network. The proposed project includes repurposing the existing 2,703± square-foot building formerly occupied by Paddy Duggan’s Irish Pub into a 2,356± square-foot quick-service restaurant. This project proposes access via a proposed 22-foot stop-controlled full-movement driveway off Hamilton Street and the existing 31-foot stop-controlled full-movement driveway off Ballston Avenue (Route 50). Based on the analysis, a total of 30 new trips (16 enter, 14 exit) are generated during the weekday PM peak hour and 78 new trips (43 enter, 35 exit) are generated during the Saturday midday peak hour. Under the build condition in the year 2024, the site driveways are expected to operate at level of service A during both the weekday PM and Saturday midday peak hours. It is the professional opinion of Solli Engineering that the traffic anticipated to be generated by the proposed development can be accommodated by the surrounding roadway network. There is no indication that the proposed development will have an adverse impact on the roadway network. If you have any questions or require any additional information, please call at your convenience. Sincerely, Solli Engineering, LLC Jared Hite Senior Project Manager Kevin Solli, P.E. Principal Supporting Documents: Site Location Map (Figure 1) 2022 Existing Traffic Volumes (Figure 2) Trip Distribution (Figure 3) Trip Assignment (Figure 4) 2024 Background Traffic Volumes (Figure 5) Background Generator Traffic Volumes (Figure 5A) 2024 Build Traffic Volumes (Figure 6) Site Layout Plan Intersection Site Distance Plan Trip Generation Summary ITE Trip Generation Rate Sheets Raw Turning Movement Count Data Synchro Analysis Reports B:\SE Files\Project Data\2021\21206201 - 12 Ballston Avenue - Saratoga Springs NY\Office Data\Reports\Traffic Report\Revised Per Peer Review Report\21206201 - Traffic Impact Assessment_Updated.docx ENGINEERING 21206201Project #: Plan Date: Scale:12 BALLSTON AVENUE SARATOGA SPRINGS, NEW YORK Figure: 11 Vanderbilt Ave, Norwood, MA 02062 T: (781) 352-8491 F: (203) 880-9695 1,000 0 1,000 11/18/22 1" = 1,000' 500 SITE LOCATION MAP 1 PROJECT SITE NOTE: BASE MAP INFORMATION TAKEN FROM USGS SARATOGA SPRINGS, NEW YORK QUADRANGLE 7.5-MINUTE SERIES. NGA REF. NO. USGSX24K39968 ENGINEERINGDrawn By:21206201Project #:Plan Date:Scale:SHEET #:Sheet Title:Rev. #:DateDescriptionProject:PROPOSED REDEVELOPMENTSARATOGA SPRINGS, NEW YORKChecked By:KMS12 BALLSTON AVENUE501 Main Street, Monroe, CT 06468T: (203) 880-5455 F: (203) 880-969512/09/22NTSJEPFIG. 22022 EXISTINGTRAFFIC VOLUMESLEGENDUNSIGNALIZED INTERSECTIONEXISTING ROADWAYPM(SAT)SIGNALIZED INTERSECTIONPROJECTSITE300(355)7(15)HAMILTON STREET 5(7)14(21)113(104)98(54) 80(93) 105(105)75(72)3(3)3(10)334(289)BALLSTON AVENUE(ROUTE 50)BALLSTON AVENUE(ROUTE 50)BALLSTON AVENUE(ROUTE 50)HAMILTON STREET BALLSTON AVENUE(ROUTE 50)SITE DRIVEWAY0(0)382(442)0(0)437(350)0(0)0(0) ENGINEERINGDrawn By:21206201Project #:Plan Date:Scale:SHEET #:Sheet Title:Rev. #:DateDescriptionProject:PROPOSED REDEVELOPMENTSARATOGA SPRINGS, NEW YORKChecked By:KMS12 BALLSTON AVENUE501 Main Street, Monroe, CT 06468T: (203) 880-5455 F: (203) 880-969512/09/22NTSJEPFIG. 3TRIP DISTRIBUTIONLEGENDUNSIGNALIZED INTERSECTIONEXISTING ROADWAYSIGNALIZED INTERSECTIONPROJECTSITE(30%)HAMILTON STREET (10%)(10%)10% 10%(10%)10%30%HAMILTON STREETSITE DRIVEWAY30%40%(40%)(30%)HAMILTON STREET SITE DRIVEWAY(10%)(20%)10%20% BALLSTON AVENUE(ROUTE 50)BALLSTON AVENUE(ROUTE 50)BALLSTON AVENUE(ROUTE 50)BALLSTON AVENUE(ROUTE 50)PM(SAT)PROPOSED ROADWAY ENGINEERINGDrawn By:21206201Project #:Plan Date:Scale:SHEET #:Sheet Title:Rev. #:DateDescriptionProject:PROPOSED REDEVELOPMENTSARATOGA SPRINGS, NEW YORKChecked By:KMS12 BALLSTON AVENUE501 Main Street, Monroe, CT 06468T: (203) 880-5455 F: (203) 880-969512/09/22NTSJEPFIG. 4TRIP ASSIGNMENTLEGENDUNSIGNALIZED INTERSECTIONEXISTING ROADWAYSIGNALIZED INTERSECTIONPROJECTSITE4(10)HAMILTON STREET 2(4)1(3)1(4) 2(4)1(4)1(5)5(13)HAMILTON STREETSITE DRIVEWAY5(12)6(17)5(14)4(10)HAMILTON STREET SITE DRIVEWAY1(4)3(7)2(4)3(9) BALLSTON AVENUE(ROUTE 50)BALLSTON AVENUE(ROUTE 50)BALLSTON AVENUE(ROUTE 50)BALLSTON AVENUE(ROUTE 50)0(0)0(0)0(0)0(0)0(0)0(0)0(0)0(0)PM(SAT)PROPOSED ROADWAY ENGINEERING CD ] 0 > � <,... <,... " L >-I ii' ] l �...."",...: (X) er ...., :,: / ., CD L �u:: / � <,... f >-�" ] � a, � ...."",...: (X) er ....,:,: g, ;§ ,g g­�"' CD � O...:,: I 0... �*-er" �::l / ST AND ARD DISTRIBUTION ::.::: 0:: I--<o a... ..J (./) <.!) (./) :z w ..... 0:: ::.::: <.!) 0:: :z <oa... u L - CONGRESS ST -------..:::_!..._..2��--;-::-------�+l .--5 __J i t r W CIRCULAR ST -c3 c3 15 -. !:'.J ::::: + ;::::: LO C � �+l B__J --. ....... r--- -� � t; 1---­ V) :z0 1---­ ..J .....� < ::z::: 0 l_(40)N l .(52) tr to N L 4-.- itr 'SI"" ....... L .._ ,-------1 269 BROAOWf{'L GARAGE :___________, PEAK -4:30 PM TO 5:30 PM ;i � t1'l !; �:l LEGEND .t�i # = ENTERING ,,, 0 _:;� 1l (#) = EXITING I BUILD -TRIP ASSIGNMENT (2024) -PM PEAK I II II II ww�t------------------------------,,----.._------------1 :,::,:w it::gi MJ987.04-269 BROADWAY wW G!� SARATOGA SPRINGS, SARATOGA COUNTY, NEW YORK FIGURE NO. 5A SCALE DATE NONE MAY2021 ENGINEERING CIRF CIRF WV WV TR TR G One Story Wood Frame Building2" Craba p p l e 2" Craba p p l e 2" Crabapple 2" Cedar ( 4 T r e e s ) 4" Elm Clump 4" Elm Clump Area 13959.8 Sq. Feet 0.32 Acres Lands N/F of Saratoga 16 LLC B:1759 P:260 165.83-1-42 3 PROPOSED 2,344± SF 31'32' 74' FFE = 319.00 7 11 2 BALLST O N A V E N U E HAMILTON STREET244.9' 85.0' BUILD-OUT PERCENTAGE = 85 FT / 244.9 FT = 34.7%119.8'27.6'BUILD-OUT PERCENTAGE = 27.6 FT / 119.8 FT = 23.0% CIRF CIRF TR TR G One Story Wood Frame BuildingG 2" Crab a p pl e 2" Crab a p pl e 2" Crabapple 2" Ceda r ( 4 T r e e s ) 4" Elm Clump 4" Elm Clump 320320320320 31 5 317 318 318 317 319 318316 317 318 319 318317317318Area 13959.8 Sq. Fe e t 0.32 Acres Lands N/F of Saratoga 16 LL C B:1759 P:260 165.83-1-4231'A B PROTECT & MAINTAIN EXISTING DUMPSTER LOCATION PROPOSED PATIO AREA 12' BUILD-TO LINE (TYP.) PROPOSED 5' CONCRETE SIDEWALK REMOVE EXISTING BRICK PLANTER REMOVE EXISTING BRICK PLANTER PROPOSED 70' CONCRETE DUMPSTER PAD W/ 6' HIGH TREATED WOOD FENCE ENCLOSURE 3 PROPOSED PERPETUAL EASEMENT AREA = 3,134 SF 4' 8'9' PROPOSED 2,344± SF 31'32' 74' 3' 3' PROPOSED BENCHES BALLST O N A V E N U E HAMILTON STREETPROPOSED CONCRETE STEPS W/ HANDRAIL PROPOSED BRICK PLANTER LIMITS OF PERPETUAL EASEMENT (TYP.) PROPOSED BITUMINOUS CONCRETE CURB PROPOSED PATIO RAILING (TYP.) PROPOSED CONCRETE BOLLARD (TYP.) PROPOSED PAINTED ARROW PAVEMENT MARKINGS (TYP.)17' 17'5' 5'11' 9' (TYP.) 18'(TYP.)6'8'8' ADA ACCESSIBLE RAMPS APPLY 4" SSWL 2' O.C. @ 45° ANGLE (TYP.)24'PROPOSED PAINTED ADA PARKING SYMBOL 4' 6' PROPOSED BITUMINOUS CONCRETE CURB R1 0 'R6'24'R15' R15' PROPOSED BITUMINOUS CONCRETE CURB TIE PURPOSED SIDEWALK INTO EXISTING SIDEWALK (MATCH GRADE) TIE PURPOSED SIDEWALK INTO EXISTING SIDEWALK (MATCH GRADE) FFE = 319.00 R20' TIE PURPOSED SIDEWALK INTO EXISTING SIDEWALK (MATCH GRADE) INSTALL DETECTABLE WARNING STRIP WITHIN R.O.W. (TYP.) PROPOSED MONUMENT SIGN PROPOSED CONCRETE CURB 4" SSWL (TYP.) PROPOSED PAVEMENT SAWCUT (TYP.) 4" SSWL (TYP.) R 3 ' 4" SSWL (TYP.) PROTECT AND MAINTAIN EXISTING TREE R34' 5' 5'5'5' 7 11 2 TIE PURPOSED SIDEWALK INTO EXISTING SIDEWALK (MATCH GRADE) PROTECT AND MAINTAIN EXISTING TRAFFIC SIGNHAMILTON STREETBALLST O N A V E N U E PROPERTY LINE (TYP.) 300' PROPERTY BUFFER (TYP.) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (21) (22) (17)(18) (19) (20) (23) BUILDING OVERHANG LINE / CANOPY PAVEMENT ARROW MARKINGS PARKING SPACE COUNT15 LEGEND PROPERTY LINE RIGHT-OF-WAY LINE ADJOINING LOT LINE BUILD-TO-LINE LANDSCAPE BUFFER LIMIT OF EASEMENT CONCRETE CURB SIDEWALK LIMITS BUILDING LIMITS BUILDING HATCH PAVEMENT STRIPING - WHITE STANDARD AND ADA PARKING SPACES CONCRETE SIDEWALK / PAVEMENT CONCRETE BOLLARD BUILDING DOOR PATIO RAILING PATIO SEARTING PAVEMENT SAWCUT 501 Main Street, Monroe, CT 06468 11 Vanderbilt Ave, Norwood, MA 02062 Sheet Title:Sheet #: Project: Drawn By: Checked By: Approved By: Project #: Plan Date: Scale: PROPOSED CHIPOTLE 12 BALLSTON AVENUE (M-B-L: 165.83-1-3) SARATOGA SPRINGS, NEW YORK OWNER: SARATOGA PRIME PROPERTIES LLC / 215 BALLARD ROAD, WILTON NY 12831 APPLICANT: COLLABDEV 2 LLC / 529 MAIN STREET, BOSTON, MA 02129 Graphic Scale: Rev. #:Date Description KMS 21206201 ENGINEERING Kevin Solli, P.E. NY 092156 T: (203) 880-5455 F: (203) 880-9695 T: (781) 352-8491 F: (203) 880-9695 10 0 10 20 AWC CJB 06/09/23 1" = 10' SITE LAYOUT SKETCH PLAN 2.112,343± SFPROPOSED RESTAURANT CITY PARKING REQUIREMENT 1 SPACE / 100 SF OF GFA REQUIRED 23 SPACES PROVIDED 23 SPACES PARKING SUMMARY GFA/SEATS/OCCUPANCYPROPERTY 12 BALLSTON AVENUE (SUBJECT SITE) USE ZONING COMPLIANCE TABLE ZONE: NC NEIGHBORHOOD DISTRICT (T-5) ZONING REQUIREMENT EXISTING CONDITIONS ZONING STANDARD 1.1 TIMES THE R.O.W. OR 50 FT (WHICHEVER IS LESS) < 50 FT PROPOSED CONDITIONS < 50 FTMAXIMUM BUILDING HEIGHT 24 FT < 24 FT 24 FT MINIMUM SETBACK FROM PUBLIC R.O.W. 3,000 SF 2,703 SF 2,344 SF MINIMUM BUILD OUT PERCENTAGE (BALLSTON) 0 FT TO 12 FT BUILD TO ZONE 0 FT 0 FT MINIMUM SIDE/REAR YARD SETBACK 70%0%34.7%* 0 FT 7 FT 50 FT MINIMUM BUILDING HEIGHT MAXIMUM CUMULATIVE BUILDING AREA (ONE-STORY STRUCTURES) MINIMUM BUILD OUT PERCENTAGE (HAMILTON)70%60%23.0%* LIST OF ADJACENT PROPERTY OWNERS 1.MAP-BLOCK-LOT: 165.83-1-42 / OWNER: SARATOGA 16 LLC 2.MAP-BLOCK-LOT: 165.83-1-17 / OWNER: BLUE STAR ENTERPRISES LLC 3.MAP-BLOCK-LOT: 165.83-1-16 / OWNER: BLUE STAR ENTERPRISES LLC 4.MAP-BLOCK-LOT: 165.83-1-15 / OWNER: BLUE STAR ENTERPRISES LLC 5.MAP-BLOCK-LOT: 165.83-1-12 / OWNER: DALBEY, JEFFERY A 6.MAP-BLOCK-LOT: 165.83-1-11 / OWNER: CB ENTERPRISES OF SARATOGA INC 7.MAP-BLOCK-LOT: 165.83-1-10 / OWNER: CB ENTERPRISES OF SARATOGA INC 8.MAP-BLOCK-LOT: 165.83-1-39 / OWNER: J LARRY FUGATE REV TRUST 9.MAP-BLOCK-LOT: 165.83-1-4 / OWNER: J LARRY FUGATE REV TRUST 10.MAP-BLOCK-LOT: 165.83-1-21 / OWNER: BLUE STAR ENTERPRISES LLC 11.MAP-BLOCK-LOT: 165.83-1-38 / OWNER: MICZEK, RICHARD J 12.MAP-BLOCK-LOT: 165.83-1-7 / OWNER: CB ENTERPRISES OF SARATOGA INC 13.MAP-BLOCK-LOT: 165.83-1-6 / OWNER: BROADWAY SARATOGA CO 14.MAP-BLOCK-LOT: 165.83-1-5.1 / OWNER: CROWN OIL #1 COMPANY INC 15.MAP-BLOCK-LOT: 165.75-1-18 / OWNER: STONE, TARA L 16.MAP-BLOCK-LOT: 165.75-1-48 / OWNER: JAKUBIAK, MARK A 17.MAP-BLOCK-LOT: 165.75-1-21 / OWNER: SMITH, WALTER J 18.MAP-BLOCK-LOT: 165.75-1-22 / OWNER: RIVER FUNCHEON LLC 19.MAP-BLOCK-LOT: 165.75-1-23 / OWNER: WALSH, DAVID M 20.MAP-BLOCK-LOT: 165.75-1-24 / OWNER: MARY FRANCES JORDAN IRR TRUST 21.MAP-BLOCK-LOT: 165.83-1-40 / OWNER: JENKS, JOSIAH D 22.MAP-BLOCK-LOT: 165.83-1-41 / OWNER: MINALODA FARM LLC 23.MAP-BLOCK-LOT: 165.83-1-1 / OWNER: RW HOUSING DEVELOPMENT, FUND COMPANY INC SITE VICINITY MAP SCALE: 1" = 150' GENERAL NOTES 1.THESE PLANS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT FOR CONSTRUCTION. NO CONSTRUCTION OR DEMOLITION SHALL BEGIN UNTIL APPROVAL OF THE FINAL PLANS IS GRANTED BY ALL GOVERNING AND REGULATORY AGENCIES. 2.ALL PROPOSED SITE WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL PERMITS, APPROVALS, AND CONDITIONS OF APPROVALS ISSUED BY LOCAL, STATE AND/OR FEDERAL REVIEWING AGENCIES. 3.EXISTING BOUNDARY INFORMATION TAKEN FROM A PLAN TITLED "MAP OF A TOPOGRAPHIC SURVEY MADE FOR SOLLI ENGINEERING, CITY OF SARATOGA SPRINGS, SARATOGA COUNTY, NEW YORK", SCALE: 1" = 20', DATED OCTOBER 24, 2022, PREPARED BY VAN DUSEN & STEVES LAND SURVEYORS. *RELIEF REQUIRED FROM THE CITY OF SARATOGA SPRINGS. RELIEF REQUIRED ·§4.4 (TABLE 4-C) - 70% MINIMUM BUILD-OUT PERCENTAGE ABUTTING ANY PUBLIC RIGHT-OF-WAY. SITE PLAN NOTES 1.PRIOR TO DEMOLITION OR CONSTRUCTION, THE CONTRACTOR SHALL CONTACT "DIG SAFE" 72 HOURS BEFORE THE COMMENCEMENT OF WORK AT "811" AND VERIFY ALL UTILITY AND STORM DRAINAGE SYSTEM LOCATIONS. INFORMATION ON EXISTING UTILITIES AND STORM DRAINAGE SYSTEMS HAS BEEN COMPILED FROM AVAILABLE INFORMATION INCLUDING UTILITY PROVIDER AND MUNICIPAL RECORD MAPS AND/OR FIELD SURVEY AND IS NOT GUARANTEED CORRECT OR COMPLETE. UTILITIES AND STORM DRAINAGE SYSTEMS ARE SHOWN TO ALERT THE CONTRACTOR TO THEIR PRESENCE AND THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DETERMINING ACTUAL LOCATIONS AND ELEVATIONS OF ALL UTILITIES AND STORM DRAINAGE SYSTEMS INCLUDING SERVICES. 2.SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED, EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONSULT THE ENGINEER OF RECORD IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 3.CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SAFETY AND SECURITY OF THE SITE DURING ALL PHASES OF CONSTRUCTION. THE ARCHITECT ANDENGINEER OF RECORD HAVE NO CONTRACTUAL DUTY TO CONTROL THE SAFEST METHODS OR MEANS OF THE WORK, JOB SITE RESPONSIBILITIES, SUPERVISION OR TO SUPERVISE SAFETY AND DOES NOT VOLUNTARILY ASSUME ANY SUCH DUTY OR RESPONSIBILITY. 4.THE OWNER IS RESPONSIBLE FOR OBTAINING ALL NECESSARY ZONING PERMITS REQUIRED BY GOVERNMENT AGENCIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE PERMITS. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE AND PROVIDE TRAFFIC CONTROLS NECESSARY FOR THIS PROJECT. 5.CONTRACTOR SHALL REFERENCE ARCHITECTURAL PLANS FOR EXACT DIMENSIONS AND CONSTRUCTION DETAILS OF BUILDING AND SIDEWALKS ADJACENT TO THE BUILDING. 6.TRAFFIC CONTROL SIGNAGE SHALL CONFORM TO THE STATE DOT STANDARD DETAIL SHEETS AND THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. SIGNS SHALL BE INSTALLED PLUMB WITH THE EDGE OF THE SIGN 2' OFF THE FACE OF THE CURB, AND WITH 7' VERTICAL CLEARANCE UNLESS OTHERWISE DETAILED OR NOTED. 7.PAVEMENT MARKING KEY: 4" SSWL 4" SINGLE SOLID WHITE LINE 4" DSYL 4" DOUBLE SOLID YELLOW LINE 12" SSWSB 12" SINGLE SOLID WHITE STOP BAR 24" SSWSB 24" SINGLE SOLID WHITE STOP BAR 8.PARKING SPACES SHALL BE STRIPED WITH 4" SSWL; HATCHED AREA SHALL BE STRIPED WITH 4” SSWL AT A 45° ANGLE, 2' ON CENTER. HATCHING, SYMBOLS, AND STRIPING FOR HANDICAPPED SPACES SHALL BE PAINTED BLUE AND WHITE. OTHER MARKINGS SHALL BE PAINTED WHITE OR AS NOTED. 9.THE CONTRACTOR SHALL RESTORE ANY DRAINAGE STRUCTURE, PIPE, UTILITY, PAVEMENT, CURBS, SIDEWALKS, LANDSCAPED AREAS OR SIGNAGE DISTURBED DURING CONSTRUCTION TO THEIR ORIGINAL CONDITION OR BETTER, AS APPROVED BY THE ENGINEER OF RECORD. DURING CONSTRUCTION CONTRACTOR IS TO HAVE THE SITE MAINTAINED FREE OF ALL TRASH, LITTER, DEBRIS, AND OVERGROWN VEGETATION. 10.THE OWNER SHALL BE RESPONSIBLE TO HAVE THE SITE MAINTAINED FREE OF ALL TRASH, LITTER, DEBRIS AND OVERGROWN VEGETATION. 11.PAVEMENT MARKINGS SHALL BE HOT APPLIED TYPE IN ACCORDANCE WITH NEW YORK DOT SPECIFICATIONS, UNLESS WHERE EPOXY RESIN PAVEMENT MARKINGS ARE INDICATED. BUILD-OUT PERCENTAGE INSET MAP SCALE: 1" = 40' SIGN LEGEND A SIZES (IN)SUPPORTS 30"1R1-1 MUTCD # SIZES (IN)SUPPORTS MUTCD # SIZES (IN)SUPPORTS 12"x18" 12"x6"1R7-8 R7-8A B PARKING RESERVED ACCESSIBLE VAN WVWVWVWVWVGGFF=321.22'FF=320.72'G2" Crabappl e2" Crabappl e2" CrabappleRim=316.58'Rim=316.71'Rim=316.40'Rim=315.75'Rim = 3 1 6.9 7'BM Bolt @ Arrow=318.45'320 320 320 3203153153163173183183 1 7 316319318 316317318319318 317 317 318Rim=316.77'8" PVC IN Inv.=312.38'6" PVC IN Inv.=311.79'8" PVC OUT Inv.=311.41'ENGINEERING VariableLUCEnterExitTotalEnterExitTotalFast Casual Restaurant2.38930161430433578Total New Trips161430433578Source: ITE Trip Generation, 11th EditionTrip Generation Summary Proposed Chipotle, 12 Ballston Avenue, Saratoga Springs, New YorkSAT Peak HourPM Peak Hour4/7/2023 Land Use: 930 Fast Casual Restaurant Description A fast casual restaurant is a sit-down restaurant with no (or very limited) wait staff or table service. A customer typically orders off a menu board, pays for food before the food is prepared, and seats themselves. The menu generally contains higher-quality, made-to-order food items with fewer frozen or processed ingredients than at a fast-food restaurant. Most patrons eat their meal within the restaurant, but a significant proportion of the restaurant sales can be carry-out orders. A fast casual restaurant typically serves lunch and dinner; some serve breakfast. A typical duration of stay for an eat-in customer is 40 minutes or less. Fine dining restaurant (Land Use 931), high-turnover (sit-down) restaurant (Land Use 932), and fast-food restaurant without drive- through window (Land Use 933) are related uses. Additional Data The fast casual restaurant study sites included in this land use did not have a drive-through window. The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/trip- and-parking-generation/). The sites were surveyed in the 2010s in Minnesota, South Carolina, Washington, and Wisconsin. Source Numbers 861, 869, 939, 959, 962, 1048 638 Trip Generation Manual 11th Edition • Volume 5 Fast Casual Restaurant(930) Vehicle Trip Ends vs:1000 Sq.Ft.GFA On a:Weekday Setting/Location:General Urban/Suburban Number of Studies:1 Avg.1000 Sq.Ft.GFA:1 Directional Distribution:50%entering,50%exiting Vehicle Trip Generation per 1000 Sq.Ft.GFA Average Rate Range of Rates Standard Deviation 97.14 97.14 -97.14 *** Data Plot and Equation Caution –Small Sample Size 0 1 20 100 200 Average RateStudySite Fitted Curve Equation:Not Given R²=*** X =1000 Sq.Ft.GFAT = Trips Ends639General Urban/Suburban and Rural (Land Uses 800–999) Fast Casual Restaurant(930) Vehicle Trip Ends vs:1000 Sq.Ft.GFA On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location:General Urban/Suburban Number of Studies:1 Avg.1000 Sq.Ft.GFA:1 Directional Distribution:50%entering,50%exiting Vehicle Trip Generation per 1000 Sq.Ft.GFA Average Rate Range of Rates Standard Deviation 1.43 1.43 -1.43 *** Data Plot and Equation Caution –Small Sample Size 0 1 20 1 2 3 Average RateStudySite Fitted Curve Equation:Not Given R²=*** X =1000 Sq.Ft.GFAT = Trips Ends640 Trip Generation Manual 11th Edition • Volume 5 Fast Casual Restaurant(930) Vehicle Trip Ends vs:1000 Sq.Ft.GFA On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location:General Urban/Suburban Number of Studies:15 Avg.1000 Sq.Ft.GFA:3 Directional Distribution:55%entering,45%exiting Vehicle Trip Generation per 1000 Sq.Ft.GFA Average Rate Range of Rates Standard Deviation 12.55 5.94 -27.40 5.52 Data Plot and Equation 0 2 4 60 20 40 60 80 100 Average RateStudySiteFittedCurve Fitted Curve Equation:T =17.96(X)-15.94 R²=0.65 X =1000 Sq.Ft.GFAT = Trips Ends641General Urban/Suburban and Rural (Land Uses 800–999) Fast Casual Restaurant(930) Vehicle Trip Ends vs:1000 Sq.Ft.GFA On a:Weekday, AM Peak Hour of Generator Setting/Location:General Urban/Suburban Number of Studies:1 Avg.1000 Sq.Ft.GFA:1 Directional Distribution:63%entering,37%exiting Vehicle Trip Generation per 1000 Sq.Ft.GFA Average Rate Range of Rates Standard Deviation 5.71 5.71 -5.71 *** Data Plot and Equation Caution –Small Sample Size 0 1 20 2 4 6 8 10 Average RateStudySite Fitted Curve Equation:Not Given R²=*** X =1000 Sq.Ft.GFAT = Trips Ends642 Trip Generation Manual 11th Edition • Volume 5 Fast Casual Restaurant(930) Vehicle Trip Ends vs:1000 Sq.Ft.GFA On a:Weekday, PM Peak Hour of Generator Setting/Location:General Urban/Suburban Number of Studies:1 Avg.1000 Sq.Ft.GFA:1 Directional Distribution:62%entering,38%exiting Vehicle Trip Generation per 1000 Sq.Ft.GFA Average Rate Range of Rates Standard Deviation 18.57 18.57 -18.57 *** Data Plot and Equation Caution –Small Sample Size 0 1 20 10 20 30 Average RateStudySite Fitted Curve Equation:Not Given R²=*** X =1000 Sq.Ft.GFAT = Trips Ends643General Urban/Suburban and Rural (Land Uses 800–999) Fast Casual Restaurant(930) Vehicle Trip Ends vs:1000 Sq.Ft.GFA On a:Saturday,Peak Hour of Generator Setting/Location:General Urban/Suburban Number of Studies:2 Avg.1000 Sq.Ft.GFA:5 Directional Distribution:55%entering,45%exiting Vehicle Trip Generation per 1000 Sq.Ft.GFA Average Rate Range of Rates Standard Deviation 32.64 32.26 -33.00 *** Data Plot and Equation Caution –Small Sample Size 0 2 4 60 100 200 Average RateStudySite Fitted Curve Equation:Not Given R²=*** X =1000 Sq.Ft.GFAT = Trips Ends644 Trip Generation Manual 11th Edition • Volume 5 Start Time Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn4:00 PM 18 32 22 0 1 68 3 0 0 17 4 0 14 77 3 04:15 PM 20 32 15 0 1 61 1 0 1 22 5 0 16 69 4 04:30 PM 19 25 37 0 1 80 0 0 1 25 2 0 14 81 1 04:45 PM 19 29 18 0 0 64 1 0 2 25 4 0 24 72 1 05:00 PM 20 22 19 0 1 89 0 0 0 32 4 0 18 76 2 05:15 PM 22 29 24 0 1 81 2 0 2 30 4 0 19 65 3 05:30 PM 10 34 19 0 0 67 1 0 1 16 5 0 11 69 2 05:45 PM 15 37 15 0 1 81 3 0 0 35 0 0 12 53 2 0Southbound Westbound Northbound EastboundHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1.- BALLSTON AVE & HAMILTON ST-TUEStart Date10-18-2022Start Time4:00 PM Start Time Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn4:00 PM 1 0 0 0 0 3 0 0 0 0 0 0 0 2 0 04:15 PM 0 0 0 0 0 12 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 6 0 0 0 1 0 0 0 0 0 04:45 PM 0 0 0 0 0 2 0 0 0 0 0 0 0 1 0 05:00 PM 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 05:15 PM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 05:30 PM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 05:45 PM 0 1 0 0 0 1 0 0 0 0 0 0 0 1 0 0Southbound Westbound Northbound EastboundHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1.- BALLSTON AVE & HAMILTON ST-TUEStart Date10-18-2022Start Time4:00 PM Start Time Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn4:00 PM 0 0 0 0 1 2 0 0 0 0 0 0 0 2 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 04:30 PM 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 04:45 PM 0 0 0 0 0 4 0 0 0 0 0 0 0 1 0 05:00 PM 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 1 0 0 0 0 0 0 0 3 0 05:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 05:45 PM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 00 0 0 0 0 10 0 0 0 0 0 0 0 4 0 0Southbound Westbound Northbound EastboundHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1.- BALLSTON AVE & HAMILTON ST-TUEStart Date10-18-2022Start Time4:00 PM Start TimePeds CCWPeds CWPeds CCWPeds CWPeds CCWPeds CWPeds CCWPeds CW4:00 PM 2 0 0 0 0 0 0 04:15 PM 0 0 1 0 0 0 0 04:30 PM 0 0 0 1 0 0 0 04:45 PM 0 0 0 1 0 0 1 05:00 PM 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 05:30 PM 0 0 0 0 0 0 0 05:45 PM 0 0 0 0 0 0 0 0Southbound Westbound Northbound EastboundHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1.- BALLSTON AVE & HAMILTON ST-TUEStart Date10-18-2022Start Time4:00 PM Start TimePeds CCWPeds CWPeds CCWPeds CWPeds CCWPeds CWPeds CCWPeds CW4:00 PM 4 2 0 5 0 1 2 04:15 PM 2 1 0 0 1 0 1 04:30 PM 0 0 2 0 0 0 1 04:45 PM 4 2 0 0 0 0 1 15:00 PM 0 0 0 1 0 1 0 25:15 PM 0 5 1 0 0 3 0 05:30 PM 0 0 0 0 0 5 0 15:45 PM 1 2 0 0 0 0 0 0Southbound Westbound Northbound EastboundHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1.- BALLSTON AVE & HAMILTON ST-TUEStart Date10-18-2022Start Time4:00 PM Start Time Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn 1-hr Volumes4:00 PM 19 32 22 0 2 73 3 0 0 17 4 0 14 81 3 04:15 PM 20 32 15 0 1 73 1 0 1 22 5 0 16 71 4 04:30 PM 19 25 37 0 1 88 0 0 1 26 2 0 14 81 1 04:45 PM 19 29 18 0 0 70 1 0 2 25 4 0 24 74 1 0 10935:00 PM 20 22 19 0 1 93 0 0 0 32 4 0 18 77 2 0 11115:15 PM 22 29 24 0 1 83 2 0 2 30 4 0 19 68 3 0 11375:30 PM 10 34 19 0 0 68 1 0 1 16 5 0 11 70 2 0 10795:45 PM 15 38 15 0 1 83 3 0 0 35 0 0 12 54 2 0 10704:30 - 5:30 80 105 98 0 3 334 3 0 5 113 14 0 75 300 7 0 11:30 - 12:30 0% 0% 0% #DIV/0! 0% 3% 0% #DIV/0! 0% 0% 0% #DIV/0! 0% 1% 0% #DIV/0!Pass-by Site Westbound 437Pass-by Site Eastbound 382Peak Hour Factors0.87 0.90 0.92 0.96Southbound Westbound Northbound EastboundPeak Hour Volumes by MovementPeak Hour Truck Percentages by MovementHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1.- BALLSTON AVE & HAMILTON ST-TUEStart Date10-18-2022Start Time4:00 PM Start Time Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn11:00 AM 16 14 13 0 2 73 3 0 2 9 5 0 17 108 0 0 11:15 AM 7 23 13 0 2 88 2 0 2 24 5 0 14 79 3 011:30 AM 8 24 10 0 1 81 2 0 4 34 1 0 19 82 8 011:45 AM 15 21 18 0 3 91 0 0 2 29 5 0 17 77 7 012:00 PM 18 21 12 0 3 63 1 0 1 18 4 0 19 85 7 012:15 PM 28 33 14 0 4 74 1 0 1 21 6 0 18 76 5 012:30 PM 23 28 11 0 2 66 0 0 2 34 4 0 14 89 1 012:45 PM 24 23 17 0 0 81 1 0 2 30 7 0 21 101 2 0Southbound Westbound Northbound EastboundHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1- BALLSTON AVE & HAMILTON ST-SATStart Date10-15-2022Start Time11:00 AM Start Time Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 011:15 AM 0 0 0 0 0 0 0 0 1 1 0 0 0 1 0 011:30 AM 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 011:45 AM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 012:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 012:15 PM 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 012:30 PM 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 012:45 PM 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 0Southbound Westbound Northbound EastboundHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1- BALLSTON AVE & HAMILTON ST-SATStart Date10-15-2022Start Time11:00 AM Start Time Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn11:00 AM 0 1 0 0 0 0 0 0 0 1 1 0 0 0 0 011:15 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 011:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 011:45 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 012:00 PM 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 012:15 PM 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 012:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 012:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 2 0 0 0 0 0 0 0 2 0 0Southbound Westbound Northbound EastboundHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1- BALLSTON AVE & HAMILTON ST-SATStart Date10-15-2022Start Time11:00 AM Start TimePeds CCWPeds CWPeds CCWPeds CWPeds CCWPeds CWPeds CCWPeds CW11:00 AM 0 0 0 1 0 0 0 011:15 AM 0 0 1 0 0 0 0 011:30 AM 0 0 1 0 0 0 0 011:45 AM 0 0 0 0 0 0 0 012:00 PM 0 0 0 0 0 0 0 012:15 PM 0 0 0 0 0 0 0 012:30 PM 0 0 0 0 0 0 0 012:45 PM 0 0 0 0 0 0 0 0Southbound Westbound Northbound EastboundHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1- BALLSTON AVE & HAMILTON ST-SATStart Date10-15-2022Start Time11:00 AM Start TimePeds CCWPeds CWPeds CCWPeds CWPeds CCWPeds CWPeds CCWPeds CW11:00 AM 0 0 0 1 0 0 0 011:15 AM 0 0 0 0 0 1 0 011:30 AM 0 1 0 0 4 4 0 111:45 AM 0 3 0 2 0 1 0 012:00 PM 1 1 0 1 1 0 0 012:15 PM 0 2 0 2 2 0 4 012:30 PM 1 3 2 0 0 2 0 112:45 PM 1 1 2 0 0 0 0 0Southbound Westbound Northbound EastboundHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1- BALLSTON AVE & HAMILTON ST-SATStart Date10-15-2022Start Time11:00 AM Start Time Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn 1-hr Volumes11:00 AM 16 15 13 0 2 73 3 0 2 10 6 0 17 108 0 011:15 AM 7 24 13 0 2 88 2 0 3 25 5 0 14 80 3 011:30 AM 8 24 10 0 1 82 2 0 4 34 1 0 19 83 8 011:45 AM 15 22 18 0 3 92 0 0 2 29 5 0 17 77 7 0 109412:00 PM 18 21 12 0 3 64 1 0 1 18 4 0 19 87 7 0 108412:15 PM 28 33 14 0 5 76 1 0 1 21 6 0 18 77 5 0 110312:30 PM 23 28 11 0 2 67 0 0 3 34 4 0 14 89 1 0 110312:45 PM 24 23 17 0 0 82 1 0 2 31 7 0 21 102 2 0 112812:00 - 1:00 93 105 54 0 10 289 3 0 7 104 21 0 72 355 15 011:30 - 12:30 0% 0% 0% #DIV/0! 0% 1% 0% #DIV/0! 0% 0% 0% #DIV/0! 0% 1% 0% #DIV/0!Pass-by Site Westbound 350Pass-by Site Eastbound 442Peak Hour Factors0.84 0.91 0.80 0.88Southbound Westbound Northbound EastboundPeak Hour Volumes by MovementPeak Hour Truck Percentages by MovementHAMILTON ST BALLSTON AVE HAMILTON ST BALLSTON AVESite CodeStudy Name1- BALLSTON AVE & HAMILTON ST-SATStart Date10-15-2022Start Time11:00 AM Lanes, Volumes, Timings 12 Ballston Avenue, Saratoga Springs, New York 4: Hamilton Street & Ballston Avenue (Route 50)2022 Existing PM Solli Engineering Synchro 11 Report 11/22/2023 Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 75 300 7 3 334 3 5 113 14 80 105 98 Future Volume (vph) 75 300 7 3 334 3 5 113 14 80 105 98 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 11 13 12 12 12 12 12 12 12 12 11 12 Storage Length (ft) 125 0 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.996 0.999 0.986 0.953 Flt Protected 0.950 0.998 0.986 Satd. Flow (prot) 1745 1937 0 0 1844 0 0 1870 0 0 1726 0 Flt Permitted 0.303 0.997 0.990 0.872 Satd. Flow (perm) 557 1937 0 0 1838 0 0 1855 0 0 1526 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 2 7 31 Link Speed (mph) 30 30 30 25 Link Distance (ft) 271 370 664 238 Travel Time (s) 6.2 8.4 15.1 6.5 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 0% 0% 0% Adj. Flow (vph) 82 330 8 3 367 3 5 124 15 88 115 108 Shared Lane Traffic (%) Lane Group Flow (vph) 82 338 0 0 373 0 0 144 0 0 311 0 Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 8 4 Permitted Phases 2 6 8 4 Detector Phase 5 2 6 6 8 8 4 4 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 10.0 4.0 4.0 4.0 4.0 Minimum Split (s) 11.0 15.0 15.0 15.0 9.0 9.0 9.0 9.0 Total Split (s) 20.0 56.0 36.0 36.0 34.0 34.0 34.0 34.0 Total Split (%) 22.2% 62.2% 40.0% 40.0% 37.8% 37.8% 37.8% 37.8% Maximum Green (s) 15.0 51.0 31.0 31.0 29.0 29.0 29.0 29.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C-Min C-Min C-Min Max Max Max Max Act Effct Green (s) 39.6 39.6 28.9 40.4 40.4 Actuated g/C Ratio 0.44 0.44 0.32 0.45 0.45 v/c Ratio 0.23 0.40 0.63 0.17 0.44 Control Delay 14.8 17.6 31.5 16.5 19.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 14.8 17.6 31.5 16.5 19.3 LOS B B C B B Lanes, Volumes, Timings 12 Ballston Avenue, Saratoga Springs, New York 4: Hamilton Street & Ballston Avenue (Route 50)2022 Existing PM Solli Engineering Synchro 11 Report 11/22/2023 Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Approach Delay 17.0 31.5 16.5 19.3 Approach LOS B C B B Queue Length 50th (ft) 26 124 185 45 106 Queue Length 95th (ft) 45 162 258 96 205 Internal Link Dist (ft) 191 290 584 158 Turn Bay Length (ft) 125 Base Capacity (vph) 443 1098 639 835 701 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.19 0.31 0.58 0.17 0.44 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 59 (66%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.63 Intersection Signal Delay: 21.9 Intersection LOS: C Intersection Capacity Utilization 73.8% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 4: Hamilton Street & Ballston Avenue (Route 50) HCM Signalized Intersection Capacity Analysis12 Ballston Avenue, Saratoga Springs, New York 4: Hamilton Street & Ballston Avenue (Route 50)2022 Existing PM Solli Engineering Synchro 11 Report 11/22/2023 Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 75 300 7 3 334 3 5 113 14 80 105 98 Future Volume (vph) 75 300 7 3 334 3 5 113 14 80 105 98 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 11 13 12 12 12 12 12 12 12 12 11 12 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.95 Flt Protected 0.95 1.00 1.00 1.00 0.99 Satd. Flow (prot) 1745 1937 1843 1870 1726 Flt Permitted 0.30 1.00 1.00 0.99 0.87 Satd. Flow (perm) 556 1937 1839 1854 1526 Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 82 330 8 3 367 3 5 124 15 88 115 108 RTOR Reduction (vph) 0 1 0 0 0 0 0 4 0 0 17 0 Lane Group Flow (vph) 82 337 0 0 373 0 0 140 0 0 294 0 Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 0% 0% 0% Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 8 4 Permitted Phases 2 6 8 4 Actuated Green, G (s) 39.6 39.6 27.9 40.4 40.4 Effective Green, g (s) 39.6 39.6 27.9 40.4 40.4 Actuated g/C Ratio 0.44 0.44 0.31 0.45 0.45 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 333 852 570 832 685 v/s Ratio Prot 0.02 c0.17 v/s Ratio Perm 0.09 c0.20 0.08 c0.19 v/c Ratio 0.25 0.40 0.65 0.17 0.43 Uniform Delay, d1 16.8 17.1 26.9 14.8 16.9 Progression Factor 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.4 1.4 5.8 0.4 2.0 Delay (s) 17.2 18.5 32.6 15.2 18.9 Level of Service B B C B B Approach Delay (s) 18.2 32.6 15.2 18.9 Approach LOS B C B B Intersection Summary HCM 2000 Control Delay 22.3 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.52 Actuated Cycle Length (s) 90.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 73.8% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM Unsignalized Intersection Capacity Analysis12 Ballston Avenue, Saratoga Springs, New York 1: Ballston Avenue (Route 50) & Site Driveway 2022 Existing PM Solli Engineering Synchro 11 Report 11/21/2023 Page 1 Movement WBL WBR NET NER SWL SWT Lane Configurations Traffic Volume (veh/h) 0 0 382 0 0 437 Future Volume (Veh/h) 0 0 382 0 0 437 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 415 0 0 475 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 271 pX, platoon unblocked 0.82 vC, conflicting volume 890 415 415 vC1, stage 1 conf vol 415 vC2, stage 2 conf vol 475 vCu, unblocked vol 760 415 415 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) 5.4 tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 531 642 1155 Direction, Lane # WB 1 NE 1 SW 1 Volume Total 0 415 475 Volume Left 0 0 0 Volume Right 0 0 0 cSH 1700 1700 1155 Volume to Capacity 0.00 0.24 0.00 Queue Length 95th (ft) 0 0 0 Control Delay (s) 0.0 0.0 0.0 Lane LOS A Approach Delay (s) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 26.3% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 4: Hamilton Street & Ballston Avenue (Route 50) Synchro 11 Report 11/22/2023 Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 72 355 15 10 289 3 7 104 21 93 105 54 Future Volume (vph) 72 355 15 10 289 3 7 104 21 93 105 54 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 11 13 12 12 12 12 12 12 12 12 11 12 Storage Length (ft) 125 0 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.994 0.999 0.979 0.971 Flt Protected 0.950 0.998 0.997 0.982 Satd. Flow (prot) 1745 1933 0 0 1876 0 0 1855 0 0 1751 0 Flt Permitted 0.316 0.980 0.983 0.829 Satd. Flow (perm) 580 1933 0 0 1843 0 0 1828 0 0 1478 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 4 1 11 16 Link Speed (mph) 30 30 30 25 Link Distance (ft) 271 370 664 238 Travel Time (s) 6.2 8.4 15.1 6.5 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0% Adj. Flow (vph) 84 413 17 12 336 3 8 121 24 108 122 63 Shared Lane Traffic (%) Lane Group Flow (vph) 84 430 0 0 351 0 0 153 0 0 293 0 Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 8 4 Permitted Phases 2 6 8 4 Detector Phase 5 2 6 6 8 8 4 4 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 10.0 4.0 4.0 4.0 4.0 Minimum Split (s) 11.0 15.0 15.0 15.0 9.0 9.0 9.0 9.0 Total Split (s) 20.0 56.0 36.0 36.0 34.0 34.0 34.0 34.0 Total Split (%) 22.2% 62.2% 40.0% 40.0% 37.8% 37.8% 37.8% 37.8% Maximum Green (s) 15.0 51.0 31.0 31.0 29.0 29.0 29.0 29.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C-Min C-Min C-Min Max Max Max Max Act Effct Green (s) 38.7 38.7 27.8 41.3 41.3 Actuated g/C Ratio 0.43 0.43 0.31 0.46 0.46 v/c Ratio 0.24 0.52 0.61 0.18 0.43 Control Delay 15.4 20.3 31.8 15.6 19.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 15.4 20.3 31.8 15.6 19.4 LOS B C C B B Lanes, Volumes, Timings 4: Hamilton Street & Ballston Avenue (Route 50) Synchro 11 Report 11/22/2023 Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Approach Delay 19.5 31.8 15.6 19.4 Approach LOS B C B B Queue Length 50th (ft) 28 171 175 46 102 Queue Length 95th (ft) 45 205 232 92 185 Internal Link Dist (ft) 191 290 584 158 Turn Bay Length (ft) 125 Base Capacity (vph) 443 1097 635 845 687 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.19 0.39 0.55 0.18 0.43 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 59 (66%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.61 Intersection Signal Delay: 22.3 Intersection LOS: C Intersection Capacity Utilization 73.3% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 4: Hamilton Street & Ballston Avenue (Route 50) HCM Signalized Intersection Capacity Analysis 4: Hamilton Street & Ballston Avenue (Route 50) Synchro 11 Report 11/22/2023 Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 72 355 15 10 289 3 7 104 21 93 105 54 Future Volume (vph) 72 355 15 10 289 3 7 104 21 93 105 54 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 11 13 12 12 12 12 12 12 12 12 11 12 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.98 0.97 Flt Protected 0.95 1.00 1.00 1.00 0.98 Satd. Flow (prot) 1745 1933 1877 1855 1751 Flt Permitted 0.32 1.00 0.98 0.98 0.83 Satd. Flow (perm) 580 1933 1843 1828 1479 Peak-hour factor, PHF 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Adj. Flow (vph) 84 413 17 12 336 3 8 121 24 108 122 63 RTOR Reduction (vph) 0 2 0 0 1 0 0 6 0 0 9 0 Lane Group Flow (vph) 84 428 0 0 350 0 0 147 0 0 284 0 Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0% Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 8 4 Permitted Phases 2 6 8 4 Actuated Green, G (s) 38.7 38.7 26.9 41.3 41.3 Effective Green, g (s) 38.7 38.7 26.9 41.3 41.3 Actuated g/C Ratio 0.43 0.43 0.30 0.46 0.46 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 337 831 550 838 678 v/s Ratio Prot 0.02 c0.22 v/s Ratio Perm 0.09 c0.19 0.08 c0.19 v/c Ratio 0.25 0.51 0.64 0.18 0.42 Uniform Delay, d1 17.2 18.8 27.3 14.3 16.3 Progression Factor 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.4 2.3 5.6 0.5 1.9 Delay (s) 17.6 21.0 32.9 14.8 18.2 Level of Service B C C B B Approach Delay (s) 20.5 32.9 14.8 18.2 Approach LOS C C B B Intersection Summary HCM 2000 Control Delay 22.6 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.52 Actuated Cycle Length (s) 90.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 73.3% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM Unsignalized Intersection Capacity Analysis 1: Ballston Avenue (Route 50) & Site Driveway Synchro 11 Report 11/21/2023 Page 1 Movement WBL WBR NET NER SWL SWT Lane Configurations Traffic Volume (veh/h) 0 0 442 0 0 350 Future Volume (Veh/h) 0 0 442 0 0 350 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 480 0 0 380 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 271 pX, platoon unblocked 0.85 vC, conflicting volume 860 480 480 vC1, stage 1 conf vol 480 vC2, stage 2 conf vol 380 vCu, unblocked vol 747 480 480 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) 5.4 tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 540 590 1093 Direction, Lane # WB 1 NE 1 SW 1 Volume Total 0 480 380 Volume Left 0 0 0 Volume Right 0 0 0 cSH 1700 1700 1093 Volume to Capacity 0.00 0.28 0.00 Queue Length 95th (ft) 0 0 0 Control Delay (s) 0.0 0.0 0.0 Lane LOS A Approach Delay (s) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 26.6% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings Chipotle - Saratoga Springs, NY 4: Hamilton Street & Ballston Avenue (Route 50)2024 Background PM Solli Engineering, LLC Synchro 11 Report 11/22/2023 Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 83 312 7 3 347 3 5 127 15 90 126 113 Future Volume (vph) 83 312 7 3 347 3 5 127 15 90 126 113 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 11 13 12 12 12 12 12 12 12 12 11 12 Storage Length (ft) 125 0 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.997 0.999 0.987 0.954 Flt Protected 0.950 0.998 0.986 Satd. Flow (prot) 1745 1939 0 0 1844 0 0 1872 0 0 1728 0 Flt Permitted 0.295 0.997 0.990 0.866 Satd. Flow (perm) 542 1939 0 0 1838 0 0 1857 0 0 1517 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 2 7 31 Link Speed (mph) 30 30 30 25 Link Distance (ft) 271 370 664 238 Travel Time (s) 6.2 8.4 15.1 6.5 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 0% 0% 0% Adj. Flow (vph) 91 343 8 3 381 3 5 140 16 99 138 124 Shared Lane Traffic (%) Lane Group Flow (vph) 91 351 0 0 387 0 0 161 0 0 361 0 Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 8 4 Permitted Phases 2 6 8 4 Detector Phase 5 2 6 6 8 8 4 4 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 10.0 4.0 4.0 4.0 4.0 Minimum Split (s) 11.0 15.0 15.0 15.0 9.0 9.0 9.0 9.0 Total Split (s) 20.0 56.0 36.0 36.0 34.0 34.0 34.0 34.0 Total Split (%) 22.2% 62.2% 40.0% 40.0% 37.8% 37.8% 37.8% 37.8% Maximum Green (s) 15.0 51.0 31.0 31.0 29.0 29.0 29.0 29.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C-Min C-Min C-Min Max Max Max Max Act Effct Green (s) 40.2 40.2 29.3 39.8 39.8 Actuated g/C Ratio 0.45 0.45 0.33 0.44 0.44 v/c Ratio 0.26 0.40 0.65 0.20 0.53 Control Delay 14.8 17.3 31.8 17.2 21.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 14.8 17.3 31.8 17.2 21.6 LOS B B C B C Lanes, Volumes, Timings Chipotle - Saratoga Springs, NY 4: Hamilton Street & Ballston Avenue (Route 50)2024 Background PM Solli Engineering, LLC Synchro 11 Report 11/22/2023 Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Approach Delay 16.8 31.8 17.2 21.6 Approach LOS B C B C Queue Length 50th (ft) 29 128 193 52 133 Queue Length 95th (ft) 48 165 268 107 251 Internal Link Dist (ft) 191 290 584 158 Turn Bay Length (ft) 125 Base Capacity (vph) 442 1099 642 824 687 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.21 0.32 0.60 0.20 0.53 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 59 (66%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.65 Intersection Signal Delay: 22.4 Intersection LOS: C Intersection Capacity Utilization 78.5% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 4: Hamilton Street & Ballston Avenue (Route 50) HCM Signalized Intersection Capacity Analysis Chipotle - Saratoga Springs, NY 4: Hamilton Street & Ballston Avenue (Route 50)2024 Background PM Solli Engineering, LLC Synchro 11 Report 11/22/2023 Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 83 312 7 3 347 3 5 127 15 90 126 113 Future Volume (vph) 83 312 7 3 347 3 5 127 15 90 126 113 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 11 13 12 12 12 12 12 12 12 12 11 12 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.95 Flt Protected 0.95 1.00 1.00 1.00 0.99 Satd. Flow (prot) 1745 1938 1843 1872 1728 Flt Permitted 0.29 1.00 1.00 0.99 0.87 Satd. Flow (perm) 542 1938 1839 1856 1517 Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 91 343 8 3 381 3 5 140 16 99 138 124 RTOR Reduction (vph) 0 1 0 0 0 0 0 4 0 0 17 0 Lane Group Flow (vph) 91 350 0 0 387 0 0 157 0 0 344 0 Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 0% 0% 0% Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 8 4 Permitted Phases 2 6 8 4 Actuated Green, G (s) 40.2 40.2 28.2 39.8 39.8 Effective Green, g (s) 40.2 40.2 28.2 39.8 39.8 Actuated g/C Ratio 0.45 0.45 0.31 0.44 0.44 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 335 865 576 820 670 v/s Ratio Prot 0.02 c0.18 v/s Ratio Perm 0.10 c0.21 0.08 c0.23 v/c Ratio 0.27 0.40 0.67 0.19 0.51 Uniform Delay, d1 16.6 16.8 26.9 15.3 18.1 Progression Factor 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.4 1.4 6.1 0.5 2.8 Delay (s) 17.1 18.2 33.0 15.8 20.9 Level of Service B B C B C Approach Delay (s) 18.0 33.0 15.8 20.9 Approach LOS B C B C Intersection Summary HCM 2000 Control Delay 22.8 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 90.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 78.5% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM Unsignalized Intersection Capacity Analysis Chipotle - Saratoga Springs, NY 1: Ballston Avenue (Route 50) & Site Driveway 2024 Background PM Solli Engineering, LLC Synchro 11 Report 11/21/2023 Page 1 Movement WBL WBR NET NER SWL SWT Lane Configurations Traffic Volume (veh/h) 0 0 402 0 0 455 Future Volume (Veh/h) 0 0 402 0 0 455 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 437 0 0 495 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 271 pX, platoon unblocked 0.82 vC, conflicting volume 932 437 437 vC1, stage 1 conf vol 437 vC2, stage 2 conf vol 495 vCu, unblocked vol 806 437 437 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) 5.4 tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 515 624 1134 Direction, Lane # WB 1 NE 1 SW 1 Volume Total 0 437 495 Volume Left 0 0 0 Volume Right 0 0 0 cSH 1700 1700 1134 Volume to Capacity 0.00 0.26 0.00 Queue Length 95th (ft) 0 0 0 Control Delay (s) 0.0 0.0 0.0 Lane LOS A Approach Delay (s) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 27.3% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings 4: Hamilton Street & Ballston Avenue (Route 50) Synchro 11 Report 11/22/2023 Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 75 369 16 10 301 3 7 108 22 97 109 56 Future Volume (vph) 75 369 16 10 301 3 7 108 22 97 109 56 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 11 13 12 12 12 12 12 12 12 12 11 12 Storage Length (ft) 125 0 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.994 0.999 0.978 0.971 Flt Protected 0.950 0.998 0.998 0.982 Satd. Flow (prot) 1745 1933 0 0 1876 0 0 1854 0 0 1751 0 Flt Permitted 0.310 0.981 0.983 0.824 Satd. Flow (perm) 569 1933 0 0 1844 0 0 1827 0 0 1470 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 4 1 11 16 Link Speed (mph) 30 30 30 25 Link Distance (ft) 271 370 664 238 Travel Time (s) 6.2 8.4 15.1 6.5 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0% Adj. Flow (vph) 87 429 19 12 350 3 8 126 26 113 127 65 Shared Lane Traffic (%) Lane Group Flow (vph) 87 448 0 0 365 0 0 160 0 0 305 0 Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 8 4 Permitted Phases 2 6 8 4 Detector Phase 5 2 6 6 8 8 4 4 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 10.0 4.0 4.0 4.0 4.0 Minimum Split (s) 11.0 15.0 15.0 15.0 9.0 9.0 9.0 9.0 Total Split (s) 20.0 56.0 36.0 36.0 34.0 34.0 34.0 34.0 Total Split (%) 22.2% 62.2% 40.0% 40.0% 37.8% 37.8% 37.8% 37.8% Maximum Green (s) 15.0 51.0 31.0 31.0 29.0 29.0 29.0 29.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C-Min C-Min C-Min Max Max Max Max Act Effct Green (s) 39.3 39.3 28.4 40.7 40.7 Actuated g/C Ratio 0.44 0.44 0.32 0.45 0.45 v/c Ratio 0.25 0.53 0.63 0.19 0.45 Control Delay 15.2 20.2 31.8 16.1 20.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 15.2 20.2 31.8 16.1 20.3 LOS B C C B C Lanes, Volumes, Timings 4: Hamilton Street & Ballston Avenue (Route 50) Synchro 11 Report 11/22/2023 Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Approach Delay 19.3 31.8 16.1 20.3 Approach LOS B C B C Queue Length 50th (ft) 28 178 181 49 110 Queue Length 95th (ft) 45 211 239 97 197 Internal Link Dist (ft) 191 290 584 158 Turn Bay Length (ft) 125 Base Capacity (vph) 444 1097 638 832 674 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.20 0.41 0.57 0.19 0.45 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 59 (66%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.63 Intersection Signal Delay: 22.5 Intersection LOS: C Intersection Capacity Utilization 75.6% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 4: Hamilton Street & Ballston Avenue (Route 50) HCM Signalized Intersection Capacity Analysis 4: Hamilton Street & Ballston Avenue (Route 50) Synchro 11 Report 11/22/2023 Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 75 369 16 10 301 3 7 108 22 97 109 56 Future Volume (vph) 75 369 16 10 301 3 7 108 22 97 109 56 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 11 13 12 12 12 12 12 12 12 12 11 12 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.98 0.97 Flt Protected 0.95 1.00 1.00 1.00 0.98 Satd. Flow (prot) 1745 1932 1877 1854 1751 Flt Permitted 0.31 1.00 0.98 0.98 0.82 Satd. Flow (perm) 569 1932 1844 1827 1470 Peak-hour factor, PHF 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Adj. Flow (vph) 87 429 19 12 350 3 8 126 26 113 127 65 RTOR Reduction (vph) 0 2 0 0 1 0 0 6 0 0 9 0 Lane Group Flow (vph) 87 446 0 0 364 0 0 154 0 0 296 0 Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0% Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 8 4 Permitted Phases 2 6 8 4 Actuated Green, G (s) 39.3 39.3 27.4 40.7 40.7 Effective Green, g (s) 39.3 39.3 27.4 40.7 40.7 Actuated g/C Ratio 0.44 0.44 0.30 0.45 0.45 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 338 843 561 826 664 v/s Ratio Prot 0.02 c0.23 v/s Ratio Perm 0.09 c0.20 0.08 c0.20 v/c Ratio 0.26 0.53 0.65 0.19 0.45 Uniform Delay, d1 17.0 18.6 27.1 14.7 16.9 Progression Factor 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.4 2.4 5.7 0.5 2.2 Delay (s) 17.4 20.9 32.9 15.2 19.1 Level of Service B C C B B Approach Delay (s) 20.4 32.9 15.2 19.1 Approach LOS C C B B Intersection Summary HCM 2000 Control Delay 22.8 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.55 Actuated Cycle Length (s) 90.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 75.6% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM Unsignalized Intersection Capacity Analysis 1: Ballston Avenue (Route 50) & Site Driveway Synchro 11 Report 11/21/2023 Page 1 Movement WBL WBR NET NER SWL SWT Lane Configurations Traffic Volume (veh/h) 0 0 460 0 0 364 Future Volume (Veh/h) 0 0 460 0 0 364 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 500 0 0 396 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 271 pX, platoon unblocked 0.84 vC, conflicting volume 896 500 500 vC1, stage 1 conf vol 500 vC2, stage 2 conf vol 396 vCu, unblocked vol 784 500 500 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) 5.4 tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 526 575 1075 Direction, Lane # WB 1 NE 1 SW 1 Volume Total 0 500 396 Volume Left 0 0 0 Volume Right 0 0 0 cSH 1700 1700 1075 Volume to Capacity 0.00 0.29 0.00 Queue Length 95th (ft) 0 0 0 Control Delay (s) 0.0 0.0 0.0 Lane LOS A Approach Delay (s) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 27.5% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings Chipotle - Saratoga Springs, NY 4: Hamilton Street & Ballston Avenue (Route 50)2024 Build PM Solli Engineering, LLC Synchro 11 Report 11/22/2023 Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 84 316 7 4 352 3 5 128 17 90 128 114 Future Volume (vph) 84 316 7 4 352 3 5 128 17 90 128 114 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 11 13 12 12 12 12 12 12 12 12 11 12 Storage Length (ft) 125 0 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.997 0.999 0.984 0.954 Flt Protected 0.950 0.999 0.998 0.987 Satd. Flow (prot) 1745 1938 0 0 1842 0 0 1866 0 0 1729 0 Flt Permitted 0.294 0.996 0.990 0.866 Satd. Flow (perm) 540 1938 0 0 1836 0 0 1851 0 0 1517 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 2 8 31 Link Speed (mph) 30 30 30 25 Link Distance (ft) 271 370 157 238 Travel Time (s) 6.2 8.4 3.6 6.5 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 0% 0% 0% Adj. Flow (vph) 92 347 8 4 387 3 5 141 19 99 141 125 Shared Lane Traffic (%) Lane Group Flow (vph) 92 355 0 0 394 0 0 165 0 0 365 0 Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 7 3 Permitted Phases 2 6 7 3 Detector Phase 5 2 6 6 7 7 3 3 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 10.0 4.0 4.0 4.0 4.0 Minimum Split (s) 11.0 15.0 15.0 15.0 9.0 9.0 9.0 9.0 Total Split (s) 20.0 56.0 36.0 36.0 34.0 34.0 34.0 34.0 Total Split (%) 22.2% 62.2% 40.0% 40.0% 37.8% 37.8% 37.8% 37.8% Maximum Green (s) 15.0 51.0 31.0 31.0 29.0 29.0 29.0 29.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C-Min C-Min C-Min Max Max Max Max Act Effct Green (s) 40.5 40.5 29.6 39.5 39.5 Actuated g/C Ratio 0.45 0.45 0.33 0.44 0.44 v/c Ratio 0.26 0.41 0.65 0.20 0.54 Control Delay 14.7 17.2 31.7 17.3 22.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 14.7 17.2 31.7 17.3 22.0 LOS B B C B C Lanes, Volumes, Timings Chipotle - Saratoga Springs, NY 4: Hamilton Street & Ballston Avenue (Route 50)2024 Build PM Solli Engineering, LLC Synchro 11 Report 11/22/2023 Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Approach Delay 16.7 31.7 17.3 22.0 Approach LOS B C B C Queue Length 50th (ft) 29 129 196 54 136 Queue Length 95th (ft) 48 166 272 110 257 Internal Link Dist (ft) 191 290 77 158 Turn Bay Length (ft) 125 Base Capacity (vph) 444 1099 643 816 682 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.21 0.32 0.61 0.20 0.54 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 59 (66%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.65 Intersection Signal Delay: 22.5 Intersection LOS: C Intersection Capacity Utilization 79.4% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 4: Hamilton Street & Ballston Avenue (Route 50) HCM Signalized Intersection Capacity Analysis Chipotle - Saratoga Springs, NY 4: Hamilton Street & Ballston Avenue (Route 50)2024 Build PM Solli Engineering, LLC Synchro 11 Report 11/22/2023 Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 84 316 7 4 352 3 5 128 17 90 128 114 Future Volume (vph) 84 316 7 4 352 3 5 128 17 90 128 114 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 11 13 12 12 12 12 12 12 12 12 11 12 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.98 0.95 Flt Protected 0.95 1.00 1.00 1.00 0.99 Satd. Flow (prot) 1745 1938 1843 1868 1728 Flt Permitted 0.29 1.00 1.00 0.99 0.87 Satd. Flow (perm) 539 1938 1837 1852 1517 Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 92 347 8 4 387 3 5 141 19 99 141 125 RTOR Reduction (vph) 0 1 0 0 0 0 0 4 0 0 17 0 Lane Group Flow (vph) 92 354 0 0 394 0 0 161 0 0 348 0 Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 0% 0% 0% Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 7 3 Permitted Phases 2 6 7 3 Actuated Green, G (s) 40.5 40.5 28.5 39.5 39.5 Effective Green, g (s) 40.5 40.5 28.5 39.5 39.5 Actuated g/C Ratio 0.45 0.45 0.32 0.44 0.44 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 336 872 581 812 665 v/s Ratio Prot 0.02 c0.18 v/s Ratio Perm 0.10 c0.21 0.09 c0.23 v/c Ratio 0.27 0.41 0.68 0.20 0.52 Uniform Delay, d1 16.5 16.7 26.8 15.5 18.4 Progression Factor 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.4 1.4 6.3 0.5 2.9 Delay (s) 16.9 18.1 33.0 16.1 21.3 Level of Service B B C B C Approach Delay (s) 17.8 33.0 16.1 21.3 Approach LOS B C B C Intersection Summary HCM 2000 Control Delay 22.9 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 90.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 79.4% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM Unsignalized Intersection Capacity Analysis Chipotle - Saratoga Springs, NY 1: Ballston Avenue (Route 50) & Site Driveway 2024 Build PM Solli Engineering, LLC Synchro 11 Report 11/21/2023 Page 1 Movement WBL WBR NET NER SWL SWT Lane Configurations Traffic Volume (veh/h) 4 5 402 5 6 455 Future Volume (Veh/h) 4 5 402 5 6 455 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 4 5 437 5 7 495 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 271 pX, platoon unblocked 0.82 vC, conflicting volume 948 440 442 vC1, stage 1 conf vol 440 vC2, stage 2 conf vol 509 vCu, unblocked vol 824 440 442 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) 5.4 tF (s) 3.5 3.3 2.2 p0 queue free % 99 99 99 cM capacity (veh/h) 506 622 1129 Direction, Lane # WB 1 NE 1 SW 1 Volume Total 9 442 502 Volume Left 4 0 7 Volume Right 5 5 0 cSH 564 1700 1129 Volume to Capacity 0.02 0.26 0.01 Queue Length 95th (ft) 1 0 0 Control Delay (s) 11.5 0.0 0.2 Lane LOS B A Approach Delay (s) 11.5 0.0 0.2 Approach LOS B Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 38.7% ICU Level of Service A Analysis Period (min) 15 HCM Unsignalized Intersection Capacity Analysis Chipotle - Saratoga Springs, NY 2: Hamilton Street & Site Driveway 2024 Build PM Solli Engineering, LLC Synchro 11 Report 11/21/2023 Page 2 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 3 1 2 147 136 3 Future Volume (Veh/h) 3 1 2 147 136 3 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 3 1 2 160 148 3 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 157 pX, platoon unblocked vC, conflicting volume 314 150 151 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 314 150 151 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 682 902 1442 Direction, Lane # EB 1 NB 1 SB 1 Volume Total 4 162 151 Volume Left 3 2 0 Volume Right 1 0 3 cSH 727 1442 1700 Volume to Capacity 0.01 0.00 0.09 Queue Length 95th (ft) 0 0 0 Control Delay (s) 10.0 0.1 0.0 Lane LOS A A Approach Delay (s) 10.0 0.1 0.0 Approach LOS A Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 19.3% ICU Level of Service A Analysis Period (min) 15 Lanes, Volumes, Timings Chipotle - Saratog Springs, NY 4: Hamilton Street & Ballston Avenue (Route 50)2024 Build SAT Solli Engineering, LLC Synchro 11 Report 11/22/2023 Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 79 380 16 15 313 3 7 112 26 97 113 60 Future Volume (vph) 79 380 16 15 313 3 7 112 26 97 113 60 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 11 13 12 12 12 12 12 12 12 12 11 12 Storage Length (ft) 125 0 0 0 0 0 0 0 Storage Lanes 1 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.994 0.999 0.976 0.970 Flt Protected 0.950 0.998 0.998 0.982 Satd. Flow (prot) 1745 1933 0 0 1877 0 0 1851 0 0 1749 0 Flt Permitted 0.435 0.974 0.980 0.768 Satd. Flow (perm) 799 1933 0 0 1831 0 0 1817 0 0 1368 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 4 13 17 Link Speed (mph) 30 30 30 25 Link Distance (ft) 271 370 157 238 Travel Time (s) 6.2 8.4 3.6 6.5 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0% Adj. Flow (vph) 92 442 19 17 364 3 8 130 30 113 131 70 Shared Lane Traffic (%) Lane Group Flow (vph) 92 461 0 0 384 0 0 168 0 0 314 0 Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 8 4 Permitted Phases 2 6 8 4 Detector Phase 5 2 6 6 8 8 4 4 Switch Phase Minimum Initial (s) 6.0 10.0 10.0 10.0 5.0 5.0 5.0 5.0 Minimum Split (s) 11.0 15.0 15.0 15.0 34.0 34.0 34.0 34.0 Total Split (s) 20.0 56.0 36.0 36.0 34.0 34.0 34.0 34.0 Total Split (%) 22.2% 62.2% 40.0% 40.0% 37.8% 37.8% 37.8% 37.8% Maximum Green (s) 15.0 51.0 31.0 31.0 29.0 29.0 29.0 29.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C-Min C-Min C-Min None None None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 55.9 55.9 45.4 24.1 24.1 Actuated g/C Ratio 0.62 0.62 0.50 0.27 0.27 v/c Ratio 0.16 0.38 0.42 0.34 0.83 Control Delay 9.2 10.8 18.8 24.8 47.2 Lanes, Volumes, Timings Chipotle - Saratog Springs, NY 4: Hamilton Street & Ballston Avenue (Route 50)2024 Build SAT Solli Engineering, LLC Synchro 11 Report 11/22/2023 Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 9.2 10.8 18.8 24.8 47.2 LOS A B B C D Approach Delay 10.5 18.8 24.8 47.2 Approach LOS B B C D Queue Length 50th (ft) 19 118 138 70 159 Queue Length 95th (ft) 46 211 250 103 214 Internal Link Dist (ft) 191 290 77 158 Turn Bay Length (ft) 125 Base Capacity (vph) 654 1216 923 607 462 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.14 0.38 0.42 0.28 0.68 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 59 (66%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 22.6 Intersection LOS: C Intersection Capacity Utilization 74.4% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 4: Hamilton Street & Ballston Avenue (Route 50) HCM Signalized Intersection Capacity Analysis Chipotle - Saratog Springs, NY 4: Hamilton Street & Ballston Avenue (Route 50)2024 Build SAT Solli Engineering, LLC Synchro 11 Report 11/22/2023 Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 79 380 16 15 313 3 7 112 26 97 113 60 Future Volume (vph) 79 380 16 15 313 3 7 112 26 97 113 60 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 11 13 12 12 12 12 12 12 12 12 11 12 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.98 0.97 Flt Protected 0.95 1.00 1.00 1.00 0.98 Satd. Flow (prot) 1745 1933 1876 1850 1750 Flt Permitted 0.43 1.00 0.97 0.98 0.77 Satd. Flow (perm) 798 1933 1832 1818 1368 Peak-hour factor, PHF 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Adj. Flow (vph) 92 442 19 17 364 3 8 130 30 113 131 70 RTOR Reduction (vph) 0 2 0 0 0 0 0 10 0 0 12 0 Lane Group Flow (vph) 92 459 0 0 384 0 0 158 0 0 302 0 Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0% Turn Type pm+pt NA Perm NA Perm NA Perm NA Protected Phases 5 2 6 8 4 Permitted Phases 2 6 8 4 Actuated Green, G (s) 55.9 55.9 44.4 24.1 24.1 Effective Green, g (s) 55.9 55.9 44.4 24.1 24.1 Actuated g/C Ratio 0.62 0.62 0.49 0.27 0.27 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 564 1200 903 486 366 v/s Ratio Prot 0.01 c0.24 v/s Ratio Perm 0.09 c0.21 0.09 c0.22 v/c Ratio 0.16 0.38 0.43 0.33 0.82 Uniform Delay, d1 7.9 8.5 14.6 26.4 31.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.1 0.9 1.5 0.4 13.9 Delay (s) 8.1 9.4 16.1 26.8 44.9 Level of Service A A B C D Approach Delay (s) 9.2 16.1 26.8 44.9 Approach LOS A B C D Intersection Summary HCM 2000 Control Delay 21.0 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.56 Actuated Cycle Length (s) 90.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 74.4% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM Unsignalized Intersection Capacity Analysis Chipotle - Saratog Springs, NY 1: Ballston Avenue (Route 50) & Site Driveway 2024 Build SAT Solli Engineering, LLC Synchro 11 Report 11/21/2023 Page 1 Movement WBL WBR NET NER SWL SWT Lane Configurations Traffic Volume (veh/h) 10 14 460 12 17 364 Future Volume (Veh/h) 10 14 460 12 17 364 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 11 15 500 13 18 396 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 271 pX, platoon unblocked 0.88 vC, conflicting volume 938 506 513 vC1, stage 1 conf vol 506 vC2, stage 2 conf vol 432 vCu, unblocked vol 861 506 513 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) 5.4 tF (s) 3.5 3.3 2.2 p0 queue free % 98 97 98 cM capacity (veh/h) 505 570 1063 Direction, Lane # WB 1 NE 1 SW 1 Volume Total 26 513 414 Volume Left 11 0 18 Volume Right 15 13 0 cSH 540 1700 1063 Volume to Capacity 0.05 0.30 0.02 Queue Length 95th (ft) 4 0 1 Control Delay (s) 12.0 0.0 0.5 Lane LOS B A Approach Delay (s) 12.0 0.0 0.5 Approach LOS B Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 43.0% ICU Level of Service A Analysis Period (min) 15 HCM Unsignalized Intersection Capacity Analysis Chipotle - Saratog Springs, NY 2: Hamilton Street & Site Driveway 2024 Build SAT Solli Engineering, LLC Synchro 11 Report 11/21/2023 Page 2 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 7 4 4 138 135 9 Future Volume (Veh/h) 7 4 4 138 135 9 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 8 4 4 150 147 10 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 157 pX, platoon unblocked vC, conflicting volume 310 152 157 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 310 152 157 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 99 100 100 cM capacity (veh/h) 685 900 1435 Direction, Lane # EB 1 NB 1 SB 1 Volume Total 12 154 157 Volume Left 8 4 0 Volume Right 4 0 10 cSH 744 1435 1700 Volume to Capacity 0.02 0.00 0.09 Queue Length 95th (ft) 1 0 0 Control Delay (s) 9.9 0.2 0.0 Lane LOS A A Approach Delay (s) 9.9 0.2 0.0 Approach LOS A Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 20.5% ICU Level of Service A Analysis Period (min) 15