HomeMy WebLinkAbout20230267 78 Church Site Plan Application 2023 10 18DocuSign Envelope ID: 09B4D87F-EF9D-48BF-AA1C-843055588938
nr,rvuvv Ri I I cIv r,rri-i ,m i i�rvo MILL Ivv I oc r,u c:PTED"
[FOR OFFICE USEI
CITY OF SARATOGA SPRINGS
PLANNING BOARD
CITY HALL - 474 BROADWAY
JA�
SARATOGA SPRINGS, NEWYORK 12866-2296
TEL:518-587-3550 X2533
www.saratoga-springs.org
APPLICATION FOR:
SITE PLAN REVIEW
(INCLUDING PUD)
(Application *)
(Date received)
(Project Title)
Staff Review
**Application Check List - All submissions must include completed application check list and all required items.'*
Property 78 Church Street
Address/Location:
Tax Parcel #: 165.51-1-37, 165.51-1-38
(for example: 165.52-4-37)
Zoning District: UR-4, NC
Project Description:
The proposed project involves the demolition of the existing retail business to make room for a multi -use, residential and
with vehicular access trom Glinton btreet.
Date special use permit granted (if any): Date zoning variance granted (if any):
Has a previous application been filed with PB for this property?:
If YES, include Application TYPE
Is property located within (check all that apply)?:
FVJNO ❑IYES
and DATE:
❑ Historic District IN Architectural Review District
❑ 500' of a State Park, city boundary, or county/state
highway
APPLICANT(S)* OWNER(S) (If not applicant) ATTORNEY/AGENT
Name Spring City Development Group, LLC. 78 Church Street LLC The LA Group, PLLC
Address 18 Division Street, Suite 401, SS, NY 12866 18 Division Street, Suite 401, SS, NY 12866 40 Long Alley, SS, NY 12866
Phone 518-992-4406 x401 518-584-9007 518-587-8100
Email amber@springcitydev.com
Identify primary contact person: ❑ Applicant ❑ Owner B Agent
* An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in
question.
Revised 8/2022
City of Saratoga Springs- Site Plan Review Application
DocuSign Envelope ID: 09B4D87F-EF9D-48BF-AA1C-843055588938
REQUIRED ITEMS: *4 hard copies (1 wloriginal signature), 1 digital copy of ALL materials (all maps,
drawings, or image documents as separate files to maintain their original scale and image resolution).
Application Fee: Make checks payable to the "Commissioner of Finance".
REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT.
Check City's website (www.saratooa-sprinas.oro) for meeting dates.
Does any City officer, employee or family member thereof have a financial interest (as defined by General
Municipal Law Section 809) in this application? YES NO _X_. If YES, a statement disclosing the
name, residence, nature and extent of this interest must be filed with this application.
I, the undersigned owner, leasee or purchaser under contract for the property, hereby request Site
Plan Review by the Planning Board for the identified property above. I agree to meet all requirements
under Article 13 of the Unified Development Ordinance of the City of Saratoga Springs.
Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property
associated with this application for purposes of conducting any necessary site inspections relating to this
application.
DOCUSIgned by:
Applicant Signature: Li�4- ",au w Date: 4/4/2023
28FB2E8E65E6438_.
If applicant is not current W1g &,gyiner must also sign.
�Q.,�
Owner Signature: 9'C�6 1/DIAA66 Y. Date: 4/4/2023
13531A E528430-.
City of Saratoga Springs- Site Plan Review Application
CITY OF SARATOGA SPRINGS
PLANNING BOARD
CITY HALL - 474 BROADWAY
SARATOGA SPRINGS, NEW YORK 12866-2296
TEL: 518-587-3550 X2533
10?1-1'Eo �9 www.saratoga-springs.org
SITE PLAN REVIEW SUBMITTAL CHECKLIST
Listed below are the minimum submittal requirements for site plan review as set forth in The City of
Saratoga Springs' Unified Development Ordinance Article 13.5. The Planning Board reserves the
right to request additional information, as necessary, to support an application. The Board also
reserves the right to reject the application if these minimum requirements are not met. Please
complete the checklist below and provide with your submission.
REQUIRED ITEMS: °4 hard copies (1 w/original signature), 1 digital copy of ALL materials
CHECK EACH ITEM
®
1.
Completed Site Plan Application (4 hard copies - *1 w/original signature - and 1 digital) and Fee
®
2.
SEAR Environmental Assessment Form- short or long form as required by action.
®
3. Set of plans (prepared by a NYS licensed Engineer, Landscape Architect, or Architect) including: (3)
large scale plans (sheets must be 24" x 36", drawn to a scale of not more than 1"=50 feet), and (1) 11" x
�I�Vpy�-Wdig#tal
®
J
4.
version (PDF) of all submittal tenis printable to scale
Basic or Full Storm Water Pollution Prevention Plan as required per Article 17.
®
5.
Copy of signed DPW water connection agreement for all projects involving new water
connections to the City system
®
6.
Engineering Report for Water and Sanitary
®
7.
Complete Streets Checklist
®
8.
Project Cost Estimate for Letter of Credit (Utilize City Template)
REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE:
®
1.
Property line survey prepared by a licensed land surveyor. Site plan must reference such
survey with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the
original property survey must also be included.
®
2.
North arrow and map scale
®
3.
Parcel tax map number
®
4.
Site location map (with title block and map key)
Q
5.
Incorporate the City's standard engineering details
City of Saratoga Springs Site Plan Checklist
DowSign Envelope ID: 09B4D87F-EF9D-48BF-AA7C-843055588938
®
6. Site vicinity map (all features within 300 feet of property)
®
7. Identification of zoning district with corresponding dimensional standards
®
8. Building setback lines shown on plans.
®
9. Title block with project name; name and address of applicant; and name and address of
property owner (if different)
10. Project Name
®
11. Name of all adjacent property owners within 300 feet (Include both sides of street)
®
12. Parcel street address (existing and any proposed postal addresses)
Yes
11
No
®
N/A
13
13. Identification of all existing or proposed easements, covenants or legal rights -of -way on this
property
0
®
14. References to all prior variances or special use permits
®®
15. Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary
®�
16. Identification of all spoil, borrow, storage, or staging areas
❑13
®
17. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, buffers
floodplains, rock outcroppings, etc.
®
18. Erosion and sediment control plan — including designated concrete truck washout area
®
®®
19. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and
condition)
11
®�
20. Location, design specifications and construction material for all proposed site improvements
(drains, culverts, retaining walls, berms, fences, etc.)
®
E3
C1
21. Location and distance to fire hydrant
®
[3
22. Identify size, material, elevations and slopes of all existing and proposed utilities with 400' of site
®
[3
23. Parking lot layout plan and identification of all loading areas (number all spaces)
®
EJ
U
24. Calculation of required spaces for vehicle and bicycle parking by proposed use(s)
®
C
m
25. Identification of parking spaces and access points for physically impaired persons
❑
®
[3
26. Location and screening plan for dumpster or recycling bins
Ei
®
(3
27. Location, design, type of construction and materials, proposed use and exterior dimensions of
all buildings (existing and proposed) on site including finish floor elevations to nearest tenth foot.
❑
®
®
28. Identification of storage of any potentially hazardous materials
®�
29. Planting plan identifying quantity, species and size of all proposed new plant materials.
Label existing plant material to be retained or removed. Identify any existing signficant trees.
®�
30. Lighting plan showing type, location and intensity of all existing and proposed exterior
lighting fixtures
Checklist prepared by:
City of Saratoga Springs Site Plan Checklist
DocuSign Envelope ID: 09B4D87F-EF9D-48BF-AA1C-843055588938
City of Saratoga Springs
OFFICE OF PLANNING AND ECONOMIC DEVELOPMENT FEES -2023
Gorllprenensive Plan amendment $1,800+$300/aoi
Zoning Ordinance amendment $800 + $300/acre
Application to Zoning Board ofAppeals
Use Variance
$1,400 + $50/app
Area Variance - Residential
$350/1st var+$50/app+$150/ea add variance
Area Variance - Non-residential
$1000/1 at var+ $501 $200/ as add variance
Interpretations
$650 + $50/app
Post Work Application Fee
Application Fee x 2+$50/app
Variance extensions
50%ofApplication fee +$50/a
Application
to Design Review Commission
Demolition
$500
Residential Structures
Principal
$70
Accessory
$70
Extension
$35
Modification
$55
Mufti -Family, Comm, Mixed -Use Structures
Sketch
$200
Principal
$650
Extension
$250
Modification
$400
Mufti -Family, Comm, Mixed -Use Accessory, Signs, Awnings
Principal
$150
Extension
$100
Modification
$150
Post Work Application Fee
Application Fee x 2
Application to Planning Board
Special Use Permit
$1200 + $50/app
Temporary Use Permit
$500
Special Use Permit - extension
$400
Special Use Permit - motlficMion
$550 + $50/app
Site Plan Review- Incl. PUD:
Sketch Plan
$400 per sketch
Site Plan Full
Residential
S400 + $250/unit
Non-residential
$800 + $150/1000 at
Administrative SPR
Residential
$400
Non-residential
$800
Extension
Residential
$250
Non-residential
$350
Subdivision - incl. PUD:
Sketch Plan
$400 per sketch
PreliminaryApproval
Residential: 1-5 lots
$700+S50/app
Residential: 6-10 lots
$1100+$50/app
Residential: 11-20 lots
$1450 + $50/app
Residential: 2l+lots
$1800 + $50/app
Residential -extension
$350
Final Approval
Residential
$1,550 + $20011ot + $50/app
Non- Residential
$2,400/lot+ $50/app
Final Approval Modification
Residential
$400+$50/app
Non- Residential
$800 + $50/app
Final Approval Extension
Residential
$250
Non- Residential
$350
Other.
Lot Line AdjustmentlSubdivision Administrative Actioi
$400
Letter of Credit- modification or extension
$400
Letter of Credit - collection
up to l%of LoC
Recreation Fee
$2000/lot or unit
Land Disturbance
$750+$35/acm
Watercourse/Welland Permit
$750
SEORA EIS Review Draft 8 Final
TBD
OPED Fees 5
Page 1 of 1