Loading...
HomeMy WebLinkAbout20230267 78 Church Site Plan Application 2023 10 18DocuSign Envelope ID: 09B4D87F-EF9D-48BF-AA1C-843055588938 nr,rvuvv Ri I I cIv r,rri-i ,m i i�rvo MILL Ivv I oc r,u c:PTED" [FOR OFFICE USEI CITY OF SARATOGA SPRINGS PLANNING BOARD CITY HALL - 474 BROADWAY JA� SARATOGA SPRINGS, NEWYORK 12866-2296 TEL:518-587-3550 X2533 www.saratoga-springs.org APPLICATION FOR: SITE PLAN REVIEW (INCLUDING PUD) (Application *) (Date received) (Project Title) Staff Review **Application Check List - All submissions must include completed application check list and all required items.'* Property 78 Church Street Address/Location: Tax Parcel #: 165.51-1-37, 165.51-1-38 (for example: 165.52-4-37) Zoning District: UR-4, NC Project Description: The proposed project involves the demolition of the existing retail business to make room for a multi -use, residential and with vehicular access trom Glinton btreet. Date special use permit granted (if any): Date zoning variance granted (if any): Has a previous application been filed with PB for this property?: If YES, include Application TYPE Is property located within (check all that apply)?: FVJNO ❑IYES and DATE: ❑ Historic District IN Architectural Review District ❑ 500' of a State Park, city boundary, or county/state highway APPLICANT(S)* OWNER(S) (If not applicant) ATTORNEY/AGENT Name Spring City Development Group, LLC. 78 Church Street LLC The LA Group, PLLC Address 18 Division Street, Suite 401, SS, NY 12866 18 Division Street, Suite 401, SS, NY 12866 40 Long Alley, SS, NY 12866 Phone 518-992-4406 x401 518-584-9007 518-587-8100 Email amber@springcitydev.com Identify primary contact person: ❑ Applicant ❑ Owner B Agent * An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. Revised 8/2022 City of Saratoga Springs- Site Plan Review Application DocuSign Envelope ID: 09B4D87F-EF9D-48BF-AA1C-843055588938 REQUIRED ITEMS: *4 hard copies (1 wloriginal signature), 1 digital copy of ALL materials (all maps, drawings, or image documents as separate files to maintain their original scale and image resolution). Application Fee: Make checks payable to the "Commissioner of Finance". REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT. Check City's website (www.saratooa-sprinas.oro) for meeting dates. Does any City officer, employee or family member thereof have a financial interest (as defined by General Municipal Law Section 809) in this application? YES NO _X_. If YES, a statement disclosing the name, residence, nature and extent of this interest must be filed with this application. I, the undersigned owner, leasee or purchaser under contract for the property, hereby request Site Plan Review by the Planning Board for the identified property above. I agree to meet all requirements under Article 13 of the Unified Development Ordinance of the City of Saratoga Springs. Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property associated with this application for purposes of conducting any necessary site inspections relating to this application. DOCUSIgned by: Applicant Signature: Li�4- ",au w Date: 4/4/2023 28FB2E8E65E6438_. If applicant is not current W1g &,gyiner must also sign. �Q.,� Owner Signature: 9'C�6 1/DIAA66 Y. Date: 4/4/2023 13531A E528430-. City of Saratoga Springs- Site Plan Review Application CITY OF SARATOGA SPRINGS PLANNING BOARD CITY HALL - 474 BROADWAY SARATOGA SPRINGS, NEW YORK 12866-2296 TEL: 518-587-3550 X2533 10?1-1'Eo �9 www.saratoga-springs.org SITE PLAN REVIEW SUBMITTAL CHECKLIST Listed below are the minimum submittal requirements for site plan review as set forth in The City of Saratoga Springs' Unified Development Ordinance Article 13.5. The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: °4 hard copies (1 w/original signature), 1 digital copy of ALL materials CHECK EACH ITEM ® 1. Completed Site Plan Application (4 hard copies - *1 w/original signature - and 1 digital) and Fee ® 2. SEAR Environmental Assessment Form- short or long form as required by action. ® 3. Set of plans (prepared by a NYS licensed Engineer, Landscape Architect, or Architect) including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not more than 1"=50 feet), and (1) 11" x �I�Vpy�-Wdig#tal ® J 4. version (PDF) of all submittal tenis printable to scale Basic or Full Storm Water Pollution Prevention Plan as required per Article 17. ® 5. Copy of signed DPW water connection agreement for all projects involving new water connections to the City system ® 6. Engineering Report for Water and Sanitary ® 7. Complete Streets Checklist ® 8. Project Cost Estimate for Letter of Credit (Utilize City Template) REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE: ® 1. Property line survey prepared by a licensed land surveyor. Site plan must reference such survey with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the original property survey must also be included. ® 2. North arrow and map scale ® 3. Parcel tax map number ® 4. Site location map (with title block and map key) Q 5. Incorporate the City's standard engineering details City of Saratoga Springs Site Plan Checklist DowSign Envelope ID: 09B4D87F-EF9D-48BF-AA7C-843055588938 ® 6. Site vicinity map (all features within 300 feet of property) ® 7. Identification of zoning district with corresponding dimensional standards ® 8. Building setback lines shown on plans. ® 9. Title block with project name; name and address of applicant; and name and address of property owner (if different) 10. Project Name ® 11. Name of all adjacent property owners within 300 feet (Include both sides of street) ® 12. Parcel street address (existing and any proposed postal addresses) Yes 11 No ® N/A 13 13. Identification of all existing or proposed easements, covenants or legal rights -of -way on this property 0 ® 14. References to all prior variances or special use permits ®® 15. Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary ®� 16. Identification of all spoil, borrow, storage, or staging areas ❑13 ® 17. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, buffers floodplains, rock outcroppings, etc. ® 18. Erosion and sediment control plan — including designated concrete truck washout area ® ®® 19. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition) 11 ®� 20. Location, design specifications and construction material for all proposed site improvements (drains, culverts, retaining walls, berms, fences, etc.) ® E3 C1 21. Location and distance to fire hydrant ® [3 22. Identify size, material, elevations and slopes of all existing and proposed utilities with 400' of site ® [3 23. Parking lot layout plan and identification of all loading areas (number all spaces) ® EJ U 24. Calculation of required spaces for vehicle and bicycle parking by proposed use(s) ® C m 25. Identification of parking spaces and access points for physically impaired persons ❑ ® [3 26. Location and screening plan for dumpster or recycling bins Ei ® (3 27. Location, design, type of construction and materials, proposed use and exterior dimensions of all buildings (existing and proposed) on site including finish floor elevations to nearest tenth foot. ❑ ® ® 28. Identification of storage of any potentially hazardous materials ®� 29. Planting plan identifying quantity, species and size of all proposed new plant materials. Label existing plant material to be retained or removed. Identify any existing signficant trees. ®� 30. Lighting plan showing type, location and intensity of all existing and proposed exterior lighting fixtures Checklist prepared by: City of Saratoga Springs Site Plan Checklist DocuSign Envelope ID: 09B4D87F-EF9D-48BF-AA1C-843055588938 City of Saratoga Springs OFFICE OF PLANNING AND ECONOMIC DEVELOPMENT FEES -2023 Gorllprenensive Plan amendment $1,800+$300/aoi Zoning Ordinance amendment $800 + $300/acre Application to Zoning Board ofAppeals Use Variance $1,400 + $50/app Area Variance - Residential $350/1st var+$50/app+$150/ea add variance Area Variance - Non-residential $1000/1 at var+ $501 $200/ as add variance Interpretations $650 + $50/app Post Work Application Fee Application Fee x 2+$50/app Variance extensions 50%ofApplication fee +$50/a Application to Design Review Commission Demolition $500 Residential Structures Principal $70 Accessory $70 Extension $35 Modification $55 Mufti -Family, Comm, Mixed -Use Structures Sketch $200 Principal $650 Extension $250 Modification $400 Mufti -Family, Comm, Mixed -Use Accessory, Signs, Awnings Principal $150 Extension $100 Modification $150 Post Work Application Fee Application Fee x 2 Application to Planning Board Special Use Permit $1200 + $50/app Temporary Use Permit $500 Special Use Permit - extension $400 Special Use Permit - motlficMion $550 + $50/app Site Plan Review- Incl. PUD: Sketch Plan $400 per sketch Site Plan Full Residential S400 + $250/unit Non-residential $800 + $150/1000 at Administrative SPR Residential $400 Non-residential $800 Extension Residential $250 Non-residential $350 Subdivision - incl. PUD: Sketch Plan $400 per sketch PreliminaryApproval Residential: 1-5 lots $700+S50/app Residential: 6-10 lots $1100+$50/app Residential: 11-20 lots $1450 + $50/app Residential: 2l+lots $1800 + $50/app Residential -extension $350 Final Approval Residential $1,550 + $20011ot + $50/app Non- Residential $2,400/lot+ $50/app Final Approval Modification Residential $400+$50/app Non- Residential $800 + $50/app Final Approval Extension Residential $250 Non- Residential $350 Other. Lot Line AdjustmentlSubdivision Administrative Actioi $400 Letter of Credit- modification or extension $400 Letter of Credit - collection up to l%of LoC Recreation Fee $2000/lot or unit Land Disturbance $750+$35/acm Watercourse/Welland Permit $750 SEORA EIS Review Draft 8 Final TBD OPED Fees 5 Page 1 of 1