Loading...
HomeMy WebLinkAbout20220339 120 S. Broadway Site Plan Review Phasing PlanCRESERVEDE.V. STATIONC RESERVED E.V. STATION 20 LF @ 3.75% 8" PVC SDR-26 113 LF @ 0.49% 15" ADS N-12 15 LF @ 3.53% 8" PVC SDR-26 30 LF @ 3.83% 8" PVC SDR-26 94 LF @ 0.71% 15" ADS N-12 40 LF @ 0.62% 8" PVC SDR-2612" ADS N-12 81 LF @ 1.23% 39 LF @ 0.59% 8" PVC SDR-26132 LF 8" PVC SDR-26 @ 0.50%112 LF 6" PVC SDR-26/35SDR-26/35 @ 1.04%108 LF 6" PVC SDR-26/35 @ 2.13%C.O.C.O.C.O.C.O.C.O.8" D.I.P. CLASS 52 WATER MAIN 18 LF @ 1.39% 12" ADS N-12 33 LF @ 9.32% SOLID 6" PVCSDR-35 61 LF @ 2.46% 8" PVC SDR-2645° PVCGASKETEDBEND 3 LF @ 4.00% 12" ADS N-12 9 LF @ 0.56% 15" ADS N-12 2 LF @ 15.00% 15" ADS N-12 2 LF @ 1.00% 15" ADS N-12W.S.8"x8"x6"x6"M.J. CROSS8"x6"REDUCERHYDRANTASSEMBLYM.J.BEND W/THRUST BLOCK6" D.I.P. OR AS PER ARCHWATER SERVICE6" D.I.P. OR AS PER ARCHWATER SERVICEG.V.G.V.(4)M.J.BEND W/THRUST BLOCK6" D.I.P. OR AS PER ARCHWATER SERVICE6" D.I.P. OR AS PER ARCHWATER SERVICE6" D.I.P. OR ASPER ARCH WATERSERVICE6" PVC SDR-26/35OR AS PER ARCHSEWER SERVICE6" PVC SDR-26/35OR AS PER ARCHSEWER SERVICE6" PVC SDR-26/35OR AS PER ARCHSEWER SERVICE6" PVC SDR-26/35OR AS PER ARCHSEWER SERVICEG.V.G.V.G.V.8"x8" M.J. TEEW/ VALVE ANDTHRUST BLOCK194 LF 12" PVC SDR-26 @ 0.40%50 LF 12" PVC SDR-26 @ 0.40%6" 45° PVC SDR-35GASKETED BEND45° PVCGASKETEDBEND 15 LF @ 4.00% 8" PVC SDR-26900 Route 146 Clifton Park, New York 12065 edpllp.com(518) 371-7621 ENVIRONMENTAL DESIGN PARTNERSHIP, LLP.120 SOUTH BROADWAY (NYS ROUTE 9) MULTI-FAMILY RESIDENTIAL COMMUNITY LAYOUT FOR DISTRICT @ 120 STRATEGIES, LLC PERFORMING ASSETS CITY OF SARATOGA SPRINGS SARATOGA COUNTY, NEW YORK TAX MAP: 178.35-1-6 APRIL 14, 2022NOT FORCONSTRUCTIOND. BRIEN RAGONEL.A. #002135PB# 2019 03191 of 11" = 20'PHASING PLANUTILITY PLAN LEGEND:W.S.C.O.Approved by the Saratoga Springs Planning Board under authority of a resolutionadopted _______________________________Chairperson: _________________________________Date _________________········PHASE ONE LINEPHASE ONE LINEPHASE ONE LINE