HomeMy WebLinkAbout20230868 2356 State Route 50 Sketch Site Plan Narrative GRACE FELLOWSHIP – SITE PLAN
PROJECT NARRATIVE
October 12, 2023
INTRODUCTION
The proposed project is located at 2356 State Route 50 on a 5.09 acre parcel having a tax ID of 191.-1-50.
The proposed Grace Fellowship Site Plan proposes the development of a 30,450 square foot church in the
City of Saratoga Springs, New York. The proposed site plan includes one (1) two story building with a
footprint of 20,300 sf, associated parking areas, utilities and landscaping. One half of the proposed church
will consist of 20,300 sf of office and administration space on two stories for operating the church and its
activities. The second half of the church will be a 10,150 sf place of worship with cathedral ceilings. The
applicant for the proposed development is Dave Triller, 1487 Saratoga Road, Ballston Spa, NY 12020.
EXISTING CONDITIONS
Existing Land Use and Zoning
The project site includes one parcel located at 2356 State Route 50 having an area of ± 5.09 acres. The tax
map identification number for the parcel is 191.-1-50. The parcel is zoned GC-R – Gateway Rural
Commercial District as defined by the City of Saratoga Springs Zoning Ordinance. A general overview of
the surrounding land uses in the area includes commercial, and forest. The proposed development is
consistent with the current land uses in the surrounding area.
Wetlands and Streams
The project area contains ACOE regulated wetlands totaling 0.042± acres. The wetlands continue offsite
to the southeast.
Soils
According to maps from the Natural Resources Conservation Service (NRCS) of Saratoga County, the onsite
soils are classified as follows:
• Deerfield Loamy Fine Sand: This is a very deep, moderately well drained soil formed in glacial
fluvial deposits. It is found on outwash terraces, outwash plains, outwash deltas and kame
terraces. The surface runoff is negligible to low. Hydrologic Soil Group A.
• Windsor Loamy Sand: This is a very deep, excessively drained soil formed in outwash or eolian
deposits. It is found on dunes, outwash plains, deltas, and outwash terraces. The surface runoff is
low. Hydrologic Soil Group A.
PROPOSED CONDITIONS
The proposed Grace Fellowship Site Plan proposes the development of a 30,450 square foot church in the
City of Saratoga Springs, New York. The proposed site plan includes one (1) two story building with a
footprint of 20,300 square feet, associated parking areas, utilities and landscaping. One half of the
proposed church will consist of 20,300sf of office and administration space on two stories for operating
the church and its activities. The second half of the church will be a 10,150 sf place of worship with
cathedral ceilings.
2 of 2
For a place of worship, the City of Saratoga Springs Zoning Code requires 1 parking stall per 10 seats. For
office space, the City of Saratoga Springs Zoning Code requires a minimum of 1 parking stall per 300-sf of
floor space. There is a total of 350 seats which will require 35 stalls, and 20,300 sf of office space which
will require 68 stalls for a total of 103 stalls required. The applicant has indicated that the proposed 144
stalls is needed based off of similar sized facilities.
PROPOSED INFRASTRUCTURE
Driveways & Access
The development will include one new curb cut along NYS Route 50, directly across from the New York
State Environmental Conservation Office. The curb cut is proposed to be a two way entrance designed to
meet the standards and specifications of the NYSDOT.
Preliminary Stormwater Management Drainage Plans
Stormwater will be managed on-site using green infrastructure run-off reduction practices and
stormwater management facilities. Stormwater management practices will be addressed in a project
specific Stormwater Pollution Prevention Plan (SWPPP). Stormwater control practices will be designed
and implemented in accordance with all NYSDEC technical standards and the City of Saratoga guidelines.
The stormwater management systems and appurtenances will be designed and constructed in accordance
with all local, state, and federal requirements and are proposed to be operated and maintained by the
Owner.
Preliminary Sewer and Water Plans
There is an existing water main along the northwest side of NYS Route 50. The development proposes one
new connection to the watermain along NYS 50 to service the proposed building. There is currently no
public sanitary sewer along the frontage of the property on Route 50. The project proposes a sanitary
extension south east along Route 50, and east along Hutchins Road, ultimately connecting to the existing
manhole at the intersection of Hutchins Road and Hathorn Boulevard. The sanitary extension will be
designed and coordinated with the City of Saratoga Springs DPW, NYSDOT and the Saratoga County Sewer
District No.1.
SUMMARY
The Grace Fellowship Site Plan is proposed in accordance with the GC-R zoning requirements and the City
of Saratoga Springs Comprehensive Master Plan. The project is not anticipated to have an adverse impact
on surrounding property owners or businesses. The development will uphold the City’s vision by working
with existing land features, employing requirements guidelines, and appropriately enhancing the West
Ave corridor in the City of Saratoga Springs. The applicant and the applicant’s engineer look forward to
advancing this project with the City of Saratoga Springs.