HomeMy WebLinkAbout20230868 2356 State Route 50 Sketch Site Plan Water Sewer Letter Report&'4h-" LANSIPJQ ENGINEERING PC October 12, 2023 Mr. Mark Torpey, Planning Board Chairman City of Saratoga Springs City Hall 474 Broadway Saratoga Springs, NY 12866 RE: Water/Sewer Letter Report — Grace Fellowship Site Plan Dear Mr. Torpey: 2452 STATE ROUTE 9 SUITE 201 MALTA, NY 12020 T (51 S] S 5-5242 F (S 1 B)BBB-5245 The proposed Grace Fellowship Site Plan proposes the development of a 30,450 square foot church in the City of Saratoga Springs, New York. The proposed site plan includes one (1) two story building with a footprint of 20,300 square feet, associated parking areas, utilities and landscaping. This letter/report will describe the water use and wastewater generation for the proposed development. Public water service is proposed to be provided by the City of Saratoga Springs Department of Public Works. WASTEWATER DEMANDS The total new wastewater demands have been calculated based on the 10 State Standards of 0.1 gallons per day per square foot (gpd/sf) for commercial use, and the NYSDEC Hydraulic loading rate of 3 gallons per seat for a church. The Average Daily Wastewater Flow and Peak Hour Wastewater Flow generated for the proposed development is 3,080 gpd and 9.63 gpm, respectively. A detailed outline of the wastewater flow calculations is included within Appendix A of this letter/report. WATER DEMANDS The water usage for the proposed development has been calculated for cumulative uses in the building based on the 10 State Standards of 0.1 gallons per day per square foot (gpd/sf) for commercial use, and the NYSDEC hydraulic loading rate of 3 gallons per day per seat. The Average Day, Max Day, and Max Hour water usage rates for the existing site have been calculated to be 2.1 gpm, 4.3 gpm, and 7.5 gpm, respectively. A detailed outline of the water demand calculations is included within Appendix A of this report. The water service for the proposed development will be provided by the existing water main location along NYS Route 50. The estimated increase in water usage and wastewater flows for the Grace Fellowship Sketch Plan are relatively insignificant in comparison with the water and wastewater capacity in the area. Therefore, it is expected that the increase in water and sanitary sewer demands will not have an adverse impact on the existing utilities. Page 2 Please review this letter/report and pending your approval please provide an approval letter for this connection. Please contact me at 899-5243 ext. 102 if you have any questions or require any additional information. Thank you. Sincerely, LANSIN© ENGINEERING, PC I J son Dell, PE, CPESC, CPSWQ Cc: Page 3 Appendix A Water System & Sewer System Demand Calculations Water System Demand Rates Project:1 Grace Fellowship Church Date: 10/10/2023 Project Water Demand gpd = Gallons Per Day Residential Flow = Units x Residents per Unit x Per Capita Flow Comercial Flow = Square Feet x Flow per Square Feet Average Day = Average Per Capita Flow Percentage Max Day = Maximum Per Capita Flow Percentage Peak Day = Peak Per Capita Flow Percentage in One Hour Per Capita Flow 3 girl Flow Per Sq Ft 0.1 gpd Total Population 350 Average Day 100 % Max Day, 200 % Peak Day 350 % Project Area Type Residents/Unit Units Square Feet Flow 7L 1 Commercial 20,300 2,030 gpd 1.41 gpm 2 Residential 350.0 1 1,050 gpd 0.73 gpm 3 0 gpd 0.00 gpm 4 0 gpd 0.00 gpm 5 0 gpd 0.00 gpm Total Water Demand for Service Area = 3,080.0 gpd 2.1 gpm Total Average Day Water Demand for Service Area = 3,080.0 gpd 2.1 gpm Total Max Day Water Demand for Service Area = 6,160.0 gpd 4.3 gpm Total Peak Hour Water Demand for Service Area = 10,780.0 gpd 7.5 gpm Fire Flow Demands gpm = Galons Per Minute SF = Square Feet gpm = gpd / 1,440 (Minutes Per Day) Total Fire -Flow Calculation Area (SF)= SF Building Construction Type: In accordance with IBC Building Use: In accordance with IFC Appendix B Compliant Automatic Sprinkler System: In accordance with IFC Section 903.3 Minimum Fire -Flow [gpm} =1 0 gpm :::]. Flow Duration (hours) =1 0.00 hours LANSING ENGINEERING, RC Hydraulic Capacity Calculations Project: Grace Fellowship Church Date: 10/10/2023 Gravity: Yes Forcemain: IYes Project Design Average Wastewater Flow gpd = Gallons Per Day Per Capita Flow Residential Flow = Units x Residents per Unit x Per Capita Flow Flow Per Sq Ft Comercial Flow = Square Feet x Flow per Square Feet Flow Per Seat Restaurant Flow = Number of Seats x Flow Per Seat Total Population 100 0.1 3 0 gpd gpd gpd Project Area Type Residents/Unit Units Square Feet Seats Flow 1 Restaurant 0.0 0 350 1,050 gpd 2 Commercial 20,300 2,030 gpd 3 0 gpd 4 0 gpd 5 0 Igpd Total Design Average Daily Wastewater Flow =1 3,080 Igpd Contributing Area Design Average Wastewater Flow gpd = Gallons Per Day Per Capita Flow Residential Flow = Units x Residents per Unit x Per Capita Flow Flow Per 5q Ft Comercial Flow = Square Feet x Flow per Square Feet Flow Per Seat Restaurant Flow = Number of Seats x Flow Per Seat Total Population 100 0.1 35 0 gpd gpd gpd Contributing Area Type Residents/Unit Units Square Feet Seats Flow 1 0 gpd 2 0 gpd 3 0 gpd 4 0 gpd 5 0 Igpd Total Design Average Daily Wastewater Flow = 0 gpd Project Wastewater System Capacity Design gpm = Galons Per Minute PHF = Peak Hour Factor gpm = gpd / 1,440 (Minutes Per Day) P = Population in Thousands Peak Hour Factor Total Design Average Daily Wastewater Flow = 3,080 gpd PHF = (18 + piiz) (4+ pi/2) Total Design Average Daily Wastewater Flow (gpm) = 2.14 gpm Total Population = 0 PHF = 4.50 Total Population in Thousands (P)= 0 Cumulative Peak Hour Wastewater Flow Cumulative Peak Hour Wastewater Flow = Total Design Average Daily Flow x Peak Hour Factor Cumulative Peak Hour Wastewater Flow = 1 13,860 Igpd Cumulative Peak Hour Wastewater Flow = 9.63 gpm ILANSING ENGINEERING, PC