HomeMy WebLinkAbout20230032 Crescent & Jefferson Site Plan TreatmentPlantCapacityConfirmation_Memo MEMORANDUM TO: William Bills Saratoga County Sewer District #1 FROM: Sara Drury, EIT LaBella Associates DATE: September 28, 2023 RE: Liberty at Saratoga Treatment Plant Capacity The Liberty at Saratoga development project proposes to gravity flow the project sanitary sewer from the site to a private on-site pump station. The on-site pump station would discharge via a pressurized force main to the City of Saratoga municipal sanitary sewer within Jefferson Street. The Jefferson Street City sewer then flows gravity to the existing pump station at the intersection of Crescent Avenue and Jefferson Street, owned and maintained by Saratoga County Sewer District No. 1 (SCSD). Once entering the SCSD network, wastewater is conveyed to the SCSD Wastewater Treatment Plant (WWTP) located in Mechanicville, New York. On September 12, 2023, you noted via email, that NYSDEC will require confirmation that the existing SCSD Wastewater Treatment Plant can support the additional demand created by the Liberty at Saratoga development project. The information provided below documents that the WWTP has adequate capacity to support the proposed project. The State Pollutant Discharge Elimination System (SPDES) discharge permit for the SCSD WWTP (SPDES Number: NY0028240) indicates that the WWTP is currently permitted to discharge a monthly average of 22 MGD of effluent to the Hudson River. This value was reduced from 43 MGD in March 2022 as reflected in the permit. Per the effluent chart provided by the US EPA Enforcement and Compliance History Online (ECHO) database, the monthly average effluent flow from the WWTP for the month of July 2023 was 18.2 MGD. Therefore, under the current permit, the WWTP operates below permitted capacity. The table below shows the reported effluent flow from the WWTP from August 2022 to July 2023. Monthly Average Effluent Flow from SCSD WWTP Date Measure Value (MGD) Date Measure Value (MGD) August 2022 15.2 February 2023 14.3 September 2022 15.2 March 2023 17.7 October 2022 14.4 April 2023 17.1 November 2022 14.4 May 2023 16.1 December 2022 15.6 June 2023 14.7 January 2023 15.7 July 2023 18.2 The anticipated average daily wastewater demand for the project site is approximately 34,320 GPD (0.03 MGD) with a peak hourly rate of approximately 137,280 GPD (0.14 MGD). Added to the reported discharge rates above, the anticipated effluent discharge from the plant would remain below 22 MGD. Therefore, the SCSD WWTP can support the proposed project. A submission will be made to NYSDEC with this information for their concurrence. SED