HomeMy WebLinkAbout20230773 182 Excelsior Site Plan Transmittal
TO: Susan B. Barden, AICP
Principal Planner
City of Saratoga Springs
474 Broadway
Saratoga Springs, NY 12866
WE ARE SENDING: Attached Separate Cover via regular mail the following items:
Shop Drawings Prints Plans Samples Specifications
Copy of Letter Change Order CD Other
Copies Date No. Description
4 9/8/2023 1 Site Plan Application
4 9/8/2023 2 Water Service Agreement
4 9/8/2023 3 Complete Streets Checklist
4 9/8/2023 4 SEAF
4 9/8/2023 5 SWPPP
4 9/8/2023 6 Geotechnical Report
4 9/8/2023 7 Water and Sewer Report
4 9/8/2023 8 Architectural Renderings (2 Sheets)
3 9/8/2023 9 Preliminary Plan Set (24x36)
1 9/8/2023 10 Preliminary Plan Set (11x17)
1 9/8/2023 11 Trip Generation Assessment
1 9/8/2023 12 Check #1225, $10,900.00
ITEMS ARE TRANSMITTED as checked below:
For approval Approved as submitted Resubmit copies for approval
For your use Approved as noted Submit copies for distribution
As requested Returned for corrections Resubmit corrected prints
For review and comment Prints returned after loan to us
For bids due Other:
Comments:
Susan,
Please find the enclosed site plan application submission for the above-mentioned project. We look forward to presenting
this project to the Planning Board at your next available agenda.
cc: file Signed:
Walter Lippmann, PE
Date: MJ #: Contract:
9/8/2023 1583.01
Attention: PIN:
Susan B. Barden, AICP
Project:
182 Excelsior Ave
RE: Preliminary Site Plan Submission
1533 Crescent Road, Clifton Park, NY 12065
Phone: 518.371.0799 / Fax: 518.371.0822
www.mjels.com
LETTER OF TRANSMITTAL