Loading...
HomeMy WebLinkAbout20230773 182 Excelsior Site Plan Transmittal TO: Susan B. Barden, AICP Principal Planner City of Saratoga Springs 474 Broadway Saratoga Springs, NY 12866 WE ARE SENDING: Attached Separate Cover via regular mail the following items: Shop Drawings Prints Plans Samples Specifications Copy of Letter Change Order CD Other Copies Date No. Description 4 9/8/2023 1 Site Plan Application 4 9/8/2023 2 Water Service Agreement 4 9/8/2023 3 Complete Streets Checklist 4 9/8/2023 4 SEAF 4 9/8/2023 5 SWPPP 4 9/8/2023 6 Geotechnical Report 4 9/8/2023 7 Water and Sewer Report 4 9/8/2023 8 Architectural Renderings (2 Sheets) 3 9/8/2023 9 Preliminary Plan Set (24x36) 1 9/8/2023 10 Preliminary Plan Set (11x17) 1 9/8/2023 11 Trip Generation Assessment 1 9/8/2023 12 Check #1225, $10,900.00 ITEMS ARE TRANSMITTED as checked below: For approval Approved as submitted Resubmit copies for approval For your use Approved as noted Submit copies for distribution As requested Returned for corrections Resubmit corrected prints For review and comment Prints returned after loan to us For bids due Other: Comments: Susan, Please find the enclosed site plan application submission for the above-mentioned project. We look forward to presenting this project to the Planning Board at your next available agenda. cc: file Signed: Walter Lippmann, PE Date: MJ #: Contract: 9/8/2023 1583.01 Attention: PIN: Susan B. Barden, AICP Project: 182 Excelsior Ave RE: Preliminary Site Plan Submission 1533 Crescent Road, Clifton Park, NY 12065 Phone: 518.371.0799 / Fax: 518.371.0822 www.mjels.com LETTER OF TRANSMITTAL