Loading...
HomeMy WebLinkAbout20230422 12 Ballston Avenue Area Variance NOD �TOG,4 CITY OF SARATOGA Gage Simpson,Chair QUA Brad Gallagher,Vice Chair Cheryl Grey t SPRINGS Emily Bergmann ZONING BOARD OF APPEALS Shafer Gaston Brendan Dailey LJ µ` CITY HALL-474 BROADWAY JohnDaley,Alternate ccRPo�ASE� ��1h SARATOGA SPRINGs,NEW YORK 12866 Alice Smith,Alternate 518-587-3550 W W W.SARATOGA-SPRINGS.ORG 920230422 IN THE MATTER OF THE APPEAL OF CollabDev 2 LLC 529 Main Street, Suite 107 Boston, MA 02129 from the determination of the Building Inspector involving the premises at 12 Ballston Avenue in the City of Saratoga Springs,New York being tax parcel number 165.83-1-3 on the Assessment Map of said City. The applicant having applied for an area variance under the Unified Development Ordinance (UDO) of said City to permit the demolition of the existing structure and reconstruct a one-story restaurant building in the Transect-5 (T-5) District and public notice having been duly given of a hearing on said application held on July 24, 2023 through August 28, 2023. In consideration of the balance between benefit to the applicant with detriment to the health, safety and welfare of the community, I move that the following area variances for the following amounts of relief: TYPE OF REQUIREMENT DISTRICT DIMENSIONAL PROPOSED RELIEF REQUESTED REQUIREMENT BUILD OUT PERCENTAGE(BALLSTON AVE) 70% 34.7% 35.3%(OR 50.4%) BUILD OUT PERCENTAGE (HAMILTON 70% 23% 47%(OR 67.1%) STREET As per the submitted plans or lesser dimensions, be approved for the following reasons: 1. The applicant has demonstrated this benefit cannot be achieved by other means feasible to the applicant. Per the applicant, the proposed project includes the demotion of the pre-existing, non- conforming vacant building and replacing it with a new building. According to the applicant, the variances requested are necessary because of the unusual shape of the parcel and limited area to accommodate on-site parking. The applicant stated that alternative proposals were considered and explored with the City. The applicant submits that the current plans best conform to the UDO requirements with the exception of the build-out requirements and increases safety related to parking and moving vehicles. 2. The applicant has demonstrated that granting this variance will not create an undesirable change in neighborhood character or detriment to nearby properties. Per the applicant, the existing structure is vacant, deteriorating and non-conforming. The applicant submits that the new structure will be conforming except the build-out percentage and improve access, landscape and Page 1 of 2 storm-water management. 3. The Board finds these variances to be substantial on a percentage basis; however, the substantiality is mitigated by the fact the lot is of an unusual shape and size and that the propose plan will, according to the applicant, improve safety across the site. 4. These variances will not have significant adverse physical or environmental effect on the neighborhood or district. The applicant submitted that the new building will improved the site through the demolition of a non-confirming, deteriorating structure, while also improving the storm-water management, site landscaping and safety across the site. 5. The alleged difficulty is self-created insofar as the applicants desire to construct the proposed addition, but this is not necessarily fatal to the application. Note: The ZBA conducted SEQR and found no significant impact resulting in a Negative SEQR Declaration on August 28, 2023 It is so moved. Dated: August 28, 2023 Adopted by the following votes: AYES: 6 (G. Simpson, C, Grey, E. Bergmann, S. Gaston, B. Dailey) NAYES: 0 This variance shall expire 18 months following the filing date of such decision unless the necessary building permit has been issued and actual construction begun as per the Unified Development Ordinance. I hereby certify the above to be a full, true and correct copy of a resolution duly adopted by the Zoning Board of Appeals of the City of Saratoga Springs on the date above mentioned, six members of the Board being present. SIGNATURE: 08/30/2023 CHAIR DATE RECEIVED BY ACCOUNTS DEPT. Page 2 of 2