Loading...
HomeMy WebLinkAbout20230524 12 Ballston Chipotle Site Plan Cost EstimateCost Estimate for Letter of Credit (12 Ballston Avenue) Planning Board No.: Project: Proposed Chipotle Location: 12 Ballston Avenue Saratoga Springs, NY Date: 7/17/2023 Firm Name & Preparer: Kevin Solli, P.E. / Solli Engineering, LLC On Site (All infrastructure & amenities on private property) Item # Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Site Clearing 0.32 Acres $5,000.00 $1,600.00 0% $1,600.00 Demolition 2 Building Removal 2,703 SF $2.50 $6,757.50 0% $6,757.50 3 Asphalt Removal 10,600 SF $0.50 $5,300.00 0% $5,300.00 Sediment/Erosion Control 4 Silt Fence 586 LF $7.00 $4,102.00 0% $4,102.00 5 Construction Entrance 100 Ton $35.00 $3,500.00 0% $3,500.00 6 Inlet Protection 2 EA $300.00 $600.00 0% $600.00 7 Maintenance 1 LS $4,000.00 $4,000.00 0% $4,000.00 Hard Scape 8 Asphalt Paving 925 SY $35.00 $32,375.00 0% $32,375.00 9 Concrete Curbing 488 LF $15.00 $7,320.00 0% $7,320.00 10 Concrete Sidewalk 2,449 SF $5.50 $13,469.50 0% $13,469.50 Site Amenities 11 Traffic Signs 2 EA $350.00 $700.00 0% $700.00 12 Bollards 2 EA $1,250.00 $2,500.00 0% $2,500.00 13 Striping 600 LF $1.00 $600.00 0% $600.00 14 Bench 2 EA $1,000.00 $2,000.00 0% $2,000.00 15 Site Lighting 2 EA $4,500.00 $9,000.00 0% $9,000.00 16 Landscaping 1 LS $20,000.00 $20,000.00 0% $20,000.00 17 Temporary Construction Fencing 568 LF $20.00 $11,360.00 0% $11,360.00 18 Dumpster Enclosure 1 EA $2,000.00 $2,000.00 0% $2,000.00 Site Water 19 Domestic Water Pipe 80 LF $50.00 $4,000.00 0% $4,000.00 20 Domestic Water Meter 1 EA $5,500.00 $5,500.00 0% $5,500.00 21 Domestic Service Valve 1 EA $2,500.00 $2,500.00 0% $2,500.00 Item # Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Sanitary LOC Example Template.xls 22 4" Sanitary Line 68 LF $45.00 $3,060.00 0% $3,060.00 23 6" Sanitary Line 68 LF $55.00 $3,740.00 0% $3,740.00 24 Manhole Structure 1 EA $3,500.00 $3,500.00 0% $3,500.00 25 Grease Interceptor 1 EA $4,500.00 $4,500.00 0% $4,500.00 26 Cleanouts 1 EA $1,250.00 $1,250.00 0% $1,250.00 Site Storm 27 6" Pipe 9 LF $20.00 $180.00 0% $180.00 28 12" Pipe 133 LF $25.00 $3,325.00 0% $3,325.00 29 Catch Basin 1 EA $3,000.00 $3,000.00 0% $3,000.00 30 Water Quality Unit 1 EA $10,000.00 $10,000.00 0% $10,000.00 31 Underground Stormwater System 1 LS $25,000.00 $25,000.00 0% $25,000.00 Total onsite Work $196,739.00 $196,739.00 Total onsite X.25 $49,184.75 $49,184.75 Off Site (All infrastructure & amenities to be dedicated to the City) Item # Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Road Construction 32 Concrete Curbing 93 LF $15.00 $1,395.00 0% $1,395.00 33 Concrete Sidewalk 668 SF $5.50 $3,674.00 0% $3,674.00 Off Site Utilities 34 S.S. Tapping Sleeve and Valve Connection 1 EA $1,000.00 $1,000.00 0% $1,000.00 35 Tapping Valve & Valve Box 0 EA $1,275.00 $0.00 0% $0.00 36 6" Sanitary Line 28 LF $55.00 $1,540.00 0% $1,540.00 37 Domestic Water Pipe 11 LF $50.00 $550.00 0% $550.00 38 As Built Drawings 1 LS $3,000.00 $3,000.00 0% $3,000.00 Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Total offsite Work $11,159.00 $11,159.00 Total On-Site Work X25%$49,184.75 Total Off-Site work $11,159.00 Total LOC Amount = $60,343.75 * New LOC Reduced Amount = $60,343.75 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $15,085.94 LOC Example Template.xls