HomeMy WebLinkAbout20230032 Crescent & Jefferson Site Plan Traffic AssessmentENGINEERS PLANNERS May 2, 2019 SURVEYORS Mr. Dan Hershberg, P.E. & L.S. Hershberg & Hershberg 18 Locust Street Albany NY 12203 � Creighton � Manning RE: Traffic Assessment, Saratoga Affordable Housing, Bunny Lake Drive, City of Saratoga Springs, Saratoga County, New York; CM Project No. 118-256 Dear Mr. Hershberg, Creighton Manning Engineering, LLP has completed a traffic assessment for the proposed Saratoga Affordable Housing project located in the northwest quadrant of the Crescent Avenue/Bunny Lake Drive intersection in the City of Saratoga Springs. This evaluation is based on information provided in the "Proposed Site Plan," last revised by Hershberg & Hershberg on May 24, 2018 (See Attachment A). The project location is shown on Figure 1. 1.0 Project Description The proposed project involves the construction of a residential apartment development with 192 total units. The project will be developed in two phases that both include the construction of a four story building with 96 units each. A separate full access driveway will be provided for each building that will intersect Bunny Lake Drive north of Crescent Avenue. Phase 1 of the project is anticipated to be constructed and occupied in 2021 while Phase 2 of the project will be constructed and occupied in 2023. 2.0 Existing Conditions Roadways Serving the Site Crescent Avenue (County Road 22) is primarily an east -west roadway that travels from US Route 9 to Union Avenue and is classified as an urban major collector in the vicinity of the site. Crescent Avenue provides one 11-foot wide travel lane in each direction with three to four - foot wide paved shoulders. An approximate 160 foot long sidewalk is provided on the south side of Crescent Avenue near US Route 9 in front of the Saratoga Honda car dealership. In addition, an approximate 700 foot long sidewalk is also provided on the south side of Crescent Avenue along the Four Winds Hospital property. The posted speed limit is 35-mph. Traffic volume data recorded by the New York State Department of Transportation (NYSDOT) shows that Crescent Avenue currently serves approximately 5,740 vehicles per day (vpd) near US Route 9 while the 85th percentile speed was measured to be approximately 48-mph near Jefferson Street. Land uses along Crescent Avenue in the project vicinity include a mix of commercial (Saratoga Honda and the Saratoga Casino and Raceway), educational/medical (Four Winds Hospital), residential, or undeveloped land. Crescent Avenue provides access to a southbound entrance ramp to Interstate 87 (1-87). Bunny Lake Drive is a private road that provides direct access to the Saratoga Casino and Raceway. Bunny Lake Drive is approximately 24 to 28-feet wide and provides a single travel lane in each direction with no paved shoulders. There are no sidewalks along Bunny Lake Drive 2 Winners Circle and the city speed limit of 30-mph would apply to this roadway. Traffic volume data recorded Albany, NY 12205 518.446.0396 (p) 518.446.0397 (f) www.cmelip.com Mr. Dan Hershberg May 2, 2019 Page 2 of 11 by the Creighton Manning shows that Bunny Lake Drive currently serves approximately 1,850 vehicles per day (vpd) while the 85th percentile speed was measured to be approximately 30- mph north of Crescent Avenue. Land along Bunny Lake Drive is undeveloped with the exception of the Saratoga Casino and Raceway. Study Area Intersections • US Route 9/Crescent Avenue intersection — This is a three-way intersection operating under an actuated traffic signal. The northbound US Route 9 approach provides two through lanes with shared right -turn movements while the southbound US Route 9 approach provides an exclusive left turn lane and two through lanes. The westbound Crescent Avenue approach provides a single lane for shared left and right turn movements. A multi -use path is provided on the eastbound approach to the intersection that provides direct access into the Saratoga Spa State Park. Marked crosswalks and pedestrian countdown timers and indicators are provided on the north and east legs of the intersection. An approximate 60 foot long sidewalk is provided on the west side of US Route 9 that connects the marked crosswalk to the multi -use path while an approximate 150 foot long sidewalk is provided on the south side of Crescent Avenue. In addition, a sidewalk is provided on the east side of US Route 9. • Crescent Avenue/Bunny Lake Drive -This is a three-way intersection operating under stop - sign control on the southbound Bunny Lake Drive approach. A single lane is provided on each intersection approach for shared travel movements with no marked pedestrian crosswalks. • Crescent Avenue/Nelson Avenue - This is a four-way intersection operating under all -way stop -sign control. A single lane is provided on the eastbound Crescent Avenue approach and on the northbound and southbound Nelson Avenue approaches. The westbound Crescent Avenue approach provides a single lane for shared left-turn/though movements and a flared right -turn lane. No marked pedestrian crosswalks are provided at this intersection. Transit and Pedestrians The Capital District Transportation Authority (CDTA) provides transit service adjacent to the site on Crescent Avenue and Bunny Lake Drive. The Saratoga Visitors Trolley line (#875) runs between the Saratoga Courtyard Marriott and the Saratoga Casino and Raceway. This route provides service seven days a week on approximately 30 minute headways. The nearest bus stop associated with this route is located at the casino which is approximately 600 feet north of the project No pedestrians or bicyclists were observed during the turning movement count on US Route 9. Data Collection Turning movement counts were conducted at the following study area intersections on Wednesday, February 13, 2019 and on Thursday, February 14, 2019 during the morning peak period from 7:00 to 9:00 a.m. and during the afternoon peak period from 4:00 to 6:00 p.m. which coincides with peak operating conditions of the site and adjacent street traffic: • US Route 9/Crescent Avenue • Crescent Avenue/Bunny Lake Drive Mr. Dan Hershberg May2, 2019 Page 3 of 11 • Crescent Avenue/Nelson Avenue The existing traffic volumes were increased by a 1.143 factor based on seasonal variation factors provided by the City of Saratoga Springs to estimate June conditions. The adjusted traffic volumes for the AM and PM peak hours shown on Figure 2 provide base year 2019 conditions and form the basis for all traffic forecasts. The raw turning movement count data is included under Attachment B. 3.0 Traffic Assessment Trip Generation Trip generation determines the quantity of traffic expected to travel to and from a given site. The Institute of Transportation Engineers' (ITE) Trip Generation, 10th Edition, is the industry standard used for estimating trip generation for proposed land uses based on data collected at similar uses. The trip generation for the proposed project was estimated for Phase 1 and Phase 2 development of the site using land use code (LUC) 221 for Multifamily Housing (Mid - Rise). Table 1 summarizes the trip generation estimate for the AM and PM peak hours. Table 1—Trip Generation Summary Land Use I Units LUc Peak Hour PM Peak Hour LE.:,:erA7M, Exit I Total 11 Enter I Exit Total Phase 1—Apartments 96 221 9 24 1 33 11 26 17 43 Phase 2 —Apartments 96 221 9 24 33 26 17 43 Total Phase 1 and Phase 2 192 18 48 66 52 34 1 86 Table 1 shows that after Phase 1 development, the site will generate 33 new trips during the AM peak hour (9 entering and 24 exiting) and 43 new trips during the PM peak hour (26 entering and 17 exiting). After full build -out of the development, the site will generate a total of 66 new trips during the AM peak hour (18 entering and 48 exiting) and a total of 86 new trips during the PM peak hour (52 entering and 34 exiting). It is noted that the distribution of travel in and out of the site will result in a maximum increase of approximately 44 new trips on any one approach to the study area intersections. This is less than the NYSDOT and ITE threshold of 100 site generated vehicles on any one approach for off -site intersection analysis. This guidance was developed as a tool to identify locations where the magnitude of traffic generated has the potential to impact operations at off -site intersections and screen out locations that are unlikely to have impacts. The three study area intersections were included in this assessment based on comments received from the City of Saratoga Springs Planning Board. Additional off -site intersections were not included since the 100 vehicle trip threshold would not be met. Future Traffic Volumes To evaluate the impact of the proposed development, traffic projections were prepared for the Phase 1 (2021) and Phase 2 (2023) expected years of completion. Historical traffic volume data found in the latest version of the Traffic Data Report, published by NYSDOT, indicates that traffic volume growth in the vicinity of the site has varied from approximately''/< to 1%: percent per year over the last several years. To provide a conservative estimate, traffic projections were prepared for the anticipated year of completion by applying a 1%: percent per year growth rate to the 2019 Existing traffic volumes. In addition to general background traffic Mr. Dan Hershberg May 2, 2019 Page 4 of 11 growth, vehicle trips associated with other developments in the project area were considered when developing the No -Build traffic volumes. The City of Saratoga Springs Planning Department indicated that the following three developments would contribute to future background traffic volumes near the project site: • Pet Lodge — US Route 9 • Faden Mixed -Use Development —South Broadway 0 153 South Broadway Redevelopment Project —South Broadway The 2021 and 2023 No -Build traffic volumes are shown on Figure 3 and Figure 4 and represent the expected traffic volumes in 2021 and 2023 without development of the Saratoga Affordable Housing project. Traffic generated by the proposed project was distributed to the adjacent roadways based on existing observed travel patterns in the project area and the probable travel routes for residents of the proposed development. In order to provide a worst -case assessment, all site generated traffic was assigned to one site driveway on Bunny Lake Drive. It is expected that approximately 90 percent of the proposed development traffic will travel to and from the south on Bunny Lake Drive toward Crescent Avenue. The remaining 10 percent of site generated traffic will travel to and from the north on Bunny Lake Drive through the Saratoga Casino and Raceway development in order to access locations via Jefferson Street and Nelson Avenue. The trip distribution patterns for the proposed development are shown on Figure 5 while the associated site -generated traffic volumes are shown on Figure 6 and Figure 7. The site -generated trips were then added to the 2021 and 2023 No -Build traffic volumes, resulting in the 2021 Build traffic volumes for Phase 1 and the 2023 Build traffic volumes for Phase 1 and 2 (Figure 8 and Figure 9). Traffic Operations Intersection Level of Service (LOS) and capacity analysis relate traffic volumes to the physical characteristics of an intersection. Intersection evaluations were made using Synchro version 10 software which automates the procedures contained in the Highway Capacity Manual. Table 2 and Table 3 summarize the results of the level of service calculations for the proposed project for Phase 1 and Phase 2 conditions. The detailed level of service analyses are included under Attachment C. Mr. Dan Her5hberg May 2, 2019 Page 5 of 11 Table 2 - Level of Service Summary (Phase 1) Q AM Peak Hour PM Peak Hour 2019 2021 2022 2019 2021 2021 Intersection t 0 u Existing No -Build Build Existing No -Build Build US Route 9/Crescent Avenue S C (26.0) C (26.5) C (25.9) C (25.6) C (27.2) C (27.6) Crescent Ave WB LR US Route 9 NB T,TR A (9.4) A (9.6) A (10.0) B (10.7) B (11.0) B (11.4) US Route 9 SB L A (5.7) A (6.0) A (6.3) A (7.0) A (7.7) A (8.1) T,T A (3.3) A (3.4) A (3.6) A (4.1) A (4.3) A (4.4) Overall A 7.7) A (7.8) A (8.2) A (8.9) A (9.3) A (9.6) Crescent Ave./Bunny Lake Dr. U A (7.4) A (7.4) A (7.4) A (7.5) A (7.5) A (7.5) Crescent Avenue EB L Bunny Lake Drive SB LR A (9.5) A (9.5) A (9.6) B (10.1) B (10.1) B (10.5) Crescent Ave./Nelson Ave. A A (8.6) A (8.6) A (8.7) A (8.9) A (9.0) A (9.1) Crescent Avenue EB LTR Crescent Avenue WB LT A (8.9) A (8.9) A (9.0) A (8.2) A (8.3) A (8.3) R A (7.2) A (7.2) A (7.2) A (7.2) A (7.2) A (7.2) Nelson Avenue NB LTR A (7.9) A (7.9) A (7.9) A (7.9) A (7.9) A (7.9) Nelson Avenue SB LTR A (8.6) A (8.6) A (8.7) A (8.5) A (8.6) A (8.6) Overall A (8.5) A (8.5) A (8.6) A (8.5) A (8.6) A (8.7) Bunny Lake Dr./Site Driveway S. U A (7.2) A (7.4) Bunny Lake Drive NB L Site Driveway South EB LR A (8.4) - A (8.7) S, A, U =Traffic Signal, All -Way Stop, or Unsignalized intersection EB, WB, NB, SB = Eastbound, Westbound, Northbound, and Southbound intersection approaches L, T, R = Left -turn, Through, and/or Right -turn movements X (Y.Y) = Level of service (Average delay in seconds per vehicle) Table 3 - Level of Service Summary (Phase 1 and 2) AMPeak Hour PM Peak Hour Intersection 11951 2019 2023 2023 2019 2023 2023 Existing No -Build Build Existing No -Build Build US Route 9/Crescent Avenue S C (26.0) C (26.8) C (25.9) C (25.6) C (27.8) C (28.6) Crescent Ave WB LR US Route 9 NB T,TR A (9.4) A (9.7) B (10.5) B (10.7) B (11.3) B (12.1) US Route 9 SB L A (5.7) A (6.2) A (6.8) A (7.0) A (8.1) A (9.2) T,T A (3.3) A (3.4) A (3.9) A (4.1) A (4.4) A (4.7) Overall A (7.7) A (7.9) A (8.7) A (8.9) A (9.5) B (10.3) Crescent Ave./Bunny Lake Dr. U A (7.4) A (7.4) A (7.4) A (7.5) A (7.5) A (7.6) Crescent Avenue EB L Bunny Lake Drive SB LR A (9.5) A (9.6) A (9.8) B (10.1) B 10.2) B (11.0) Crescent Ave./Nelson Ave. A A (8.6) A (8.7) A (8.9) A (8.9) A (9.1) A (9.3) Crescent Avenue EB LTR Crescent Avenue WB LT A (8.9) A (9.0) A (9.0) A (8.2) A (8.3) A (8.3) R A (7.2) A (7.2) A (7.2) A (7.2) A (7.2) A (7.3) Nelson Avenue NB LTR A (7.9) A (7.9) A (8.0) A (7.9) A (7.9) A (8.0) Nelson Avenue SB LTR A (8.6) A (8.7) A (8.8) A (8.5) A (8.7) A (8.7) Overall A (8.5) A (8.6) A (8.7) A (8.5) A (8.7)17A A (8.8) Bunny Lake Dr./Site Driveway S. U -- - A (7.2) (7.4) Bunny Lake Drive NB L Site Driveway South EB LR -- - A (8.6) A (8.8) S, A, U =Traffic Signal, All -Way Stop, or Unsignalized intersection EB, WB, NB, SB = Eastbound, Westbound, Northbound, and Southbound intersection approaches L, T, R = Left -turn, Through, and/or Right -turn movements X (Y.Y) = Level of service (Average delay in seconds per vehicle) Mr. Dan Hershberg May 2, 2019 Page 6 of 11 The impact of the project can be described by comparing the analysis of the No -Build and Build operating conditions. The following observations are evident from this analysis: ■ US Route 9/Crescent Avenue —The level of service summary indicates that this intersection currently operates at an overall LOS A during both peak hours with all movements operating at LOS C or better. During No -Build conditions (2021 and 2023), this intersection will continue to operate similar to Existing conditions during both peak hours. After build - out of Phase 1 of the proposed development, this intersection will continue to operate at similar levels of service as No -Build conditions with an increase in average vehicle delay less than one second. After build -out of Phase 2, this intersection will operate at LOS A/B during the AM and PM peak hours with an increase in average vehicle delay of approximately one second or less. No mitigation is recommended at this intersection. Crescent Avenue/Bunny Lake Drive — The level of service summary indicates that southbound Bunny Lake Drive approach currently operates at LOS A/B during the AM and PM peak hours and will continue to operate at similar levels of service through Build conditions for both phases. A review of the eastbound left -turn movement on Crescent Avenue indicates that this movement will continue to operate at LOS A after full build -out of the proposed development. Mitigation at this intersection is not recommended as a result of the project ■ Crescent Avenue/Nelson Avenue — The level of service summary indicates that this intersection will operate at an overall LOS A during the AM and PM peak hours with all movements operating at LOS A through full build -out of the project Mitigation at this intersection is not recommended as a result of the project. ■ Bunny Lake Drive/Site Driveways — At full build -out of the residential development, the eastbound Site Driveway approaches on Bunny Lake Drive are expected to operate at LOS A during both peak hours for both Build conditions with average vehicle delays of approximately nine seconds or less. It is recommended that the Site Driveways operate as unsignalized intersections with a single lane entering and exiting the site with stop signs on the exiting driveway approach. The level of service analysis also indicates that the northbound Bunny Lake Drive left -turn movements will operate at LOS A during both peak hours for both Build conditions. Transit and Pedestrian Connections The Saratoga Affordable Housing project will construct walking trails behind the apartment buildings and along a portion of Crescent Avenue. The trails will provide access to the lower portion of Bunny Lake Drive and to the parking lot of the Saratoga Casino and Raceway which will enable residents of the apartment buildings to access this development without walking on Bunny Lake Drive. It is noted that the Saratoga Greenbelt Trail is a green infrastructure plan that will provide multi -use connections throughout the City of Saratoga Springs via existing and new routes. The proposed Crescent Avenue Connector (shown on Diagram 1 from the Saratoga Greenbelt Trail plan) is a proposed multi -use trail that would connect the existing Saratoga Spa National Park trail to locations on the eastern part of the City as it crosses the bridge over 1-87. The Crescent Avenue Connector is a shared use path that would be constructed on the south side of the road. The plan recommends a mid -block crossing be Mr. Dan Hershberg May 2, 2019 Page 7 of 11 installed near the Bunny Lake Drive intersection in order to provide direct access to the Saratoga Casino and Raceway; therefore, extending the proposed walking trails associated with the Saratoga Affordable Housing project to Crescent Avenue at the Bunny Lake Drive intersection should be considered. This would provide a connection to the future mid -block crossing proposed as part of the Saratoga Greenbelt Trail. Users of the trail would then have access to the Saratoga Affordable Housing walking trails allowing them to access the casino parking area without traversing Bunny Lake Drive which does not have sidewalks. This is a key component of the Saratoga Greenbelt Trail plan. It is noted that the construction of the proposed Saratoga Affordable Housing development would not prelude the expansion of the Saratoga Greenbelt Trail or impact the proposed recommendations. Lp.nd' Mid -Block �r.a.r.. Crosswalk: New mid- block crosswalk on s ■ Tw Parmc Crescent Avenue will ® vrwa.aT. '1 provide direct ftpc mw connection to the I i,r. cj- o- 8 w n Wr�MMW l ~-: Saratoga proposed 6 y� T I saratoga spa Casino and Raceway. ur.�nvH.+n l State Park E bDC"' a<aw. aarea rry .... .f ..� ri,a.e:ei ca.eerr 17 wJ i C SPrt Aark 7ro it A Ane � slenda GwMon Psnum ,ffi„� - Hnnl ryeMrr><Y rr,u ■ ■ Diagram 1- Crescent Avenue Connector (West Section) proposed as part of the Saratoga Greenbelt Trail As noted above, a bus stop associated with the Saratoga Visitors Trolley route is provided at the casino. Residents of the apartment complex can access the CDTA system via this bus stop. 4.0 Sight Distance Evaluation The available intersection sight distance from the Site Driveway intersections on Bunny Lake Drive was measured from the perspective of a motorist looking in both directions along Bunny Lake Drive. The intersection sight distance looking straight ahead for passenger vehicles traveling north on Bunny Lake Drive and turning left into the Site Driveways was also measured, as illustrated in Diagram 2. The available intersection sight distance on a side street should provide drivers a sufficient view of the intersecting highway to allow vehicles to enter or exit the intersection without excessively slowing vehicles traveling at or near the operating speed on the intersecting mainline. Mr. Dan Hershberg May 1, 2019 Page 8 of 11 Stopping sight distance (the length of roadway ahead that is visible to the driver) was also measured on Bunny Lake Drive at the Site Driveways. The available stopping sight distance on a roadway should be of sufficient length to enable a vehicle traveling at or near the operating speed to stop before reaching a stationary object in its path. The following diagram illustrates these sight distance measurements. C,= S; NT DeSTANCE L 00i ING 5, R AIGHT SSD _ STrWiNG 51W D1STWE 3SD = STWIRG SIGN T I DISTANCti - L�' --0 L11E Cr SIGH', = n LINE F SiGHT 513-T DISTANCT D�= S:GHi DISTANCE "ISC !EFT LCDRING a:GHr Diagram #2 - Intersection and Stopping Sight Distance I Speed data collected by Creighton Manning (included under Attachment B) indicates the 85th percentile speed on Bunny Lake Drive is 30- mph. The available sight distances were compared to the guidelines presented in AASHTO A Policy on Geometric Design of Highways and Streets, 2011 and NYSDOT design guidance (EB 17-007) for the 30-mph operating speed on Bunny Lake Drive and are summarized in Table 4. Table 4 — Sight Distance Summary (Feet) Intersection Intersection Sight Distance ' Stopping Sight Distance' Right -Turn Left -Turn from left-Tum from from Site Driveway Bunny lake Site Driveway Looking Looking Drive I SSDna SSDSe (Do Left (Da• Right (DR)' (DS) Bunny Lake Dr/ Available 140 [>300] 140 [>300] 370 200 [>300] 285 380 Site Driveway N. Recommended' 290 335 335 245 175 175 Bunny Lake Dr/ Available 395 395 445 405 420 380 Recommended' 290 335 335 245 175 175 Site Driveway S. 1= Intersection sight distance is measured at 14.5 feet back from the travel way at an eye height of 3.5-ft and object height of 3.5-ft. 2 = Stopping sight distance measured for a 2-foot object located in the path of northbound and southbound vehicles on Bunny Lake Dr. 3 = Sight distance measurements are compared to AASHTO recommended distances for a 30-mph operating speed on Bunny Lake Dr. XX [XX] = Available Sight Distance [Sight Distance with Removal of Vegetation] The sight distance analysis indicates the following: Mr. Dan Hershberg May Z 2019 Page 9 of 11 • Site Driveway North — The sight distance analysis indicates that the available intersection sight distance looking right to make a left turn from the Site Driveway and the available stopping sight distances at the proposed Site Driveway intersection meet AASHTO guidelines for the 30- mph operating speed. The available intersection sight distance looking left to make a left or right turn from the Site Driveway (Photograph #1) and looking straight along Bunny Lake Drive to make a left turn into the site are limited by existing vegetation. It is recommended that the trees and brush located approximately 30 feet from the edge of pavement be cleared in order to maximize sight lines. It is noted that the available sight distance looking left and looking straight on Bunny Lake Drive will increase by approximately 100 to 160 feet which will meet AASHTO guidelines in order to make a right turn from the Site Driveway and to turn left into the site from Bunny Lake Drive; however, the sight distance looking left to make a left -turn from the Site Driveway may still be less than the recommended guideline by approximately 35 feet due to parking located within the Saratoga Casino and Raceway parking lot. Photograph #1—Sight Distance Looking Left ® = Intersection Sight Distance Looking Left NONEEE MEENIONNUMENEW Figure 2C-101 found in the New York 0 State Supplement (NYS Supplement) to 0 5 10 ]s 20 25 30 35 40 45 50 55 60 the National Manual for Uniform E5th PercentHe0.yA &Speed (mph) Traffic Control Devices (NMUTCD) Figure 2C-101— Guide for Intersection Warning Sign provides guidance for the installation of "Intersection Warning" signs as mitigation for sight distance. A review of Figure 2C-101 (see figure) indicates that the available sight distance looking to the left at the Site Driveway is less than desirable, but not critically limited; therefore, an "Intersection Warning" sign is not needed. • Site Driveway South — The sight distance analysis indicates that the available intersection and stopping sight distances at the southern Site Driveway intersection meet AASHTO 65 7o Mr. Dan Hershberg May 2, 2019 Page 10 of 11 guidelines for the 30-mph operating speed. No sight distance related mitigation is recommended. It is recommended that any proposed vegetation and/or signage related to the site be placed a minimum of 15-feet back from the edge of the travel lane so that adequate sight lines are maintained along the site frontage on Bunny Lake Drive. 5.0 Conclusions The proposed project includes construction of a residential apartment development with 192 total units. The project will be developed in two phases that both include the construction of a four story building with 96 units each. The development is expected to generate 66 new vehicle trips during the AM peak hour and 86 new vehicle trips during the PM peak hour after full build -out of the site. A separate full access driveway will be provided for each building that will intersect Bunny Lake Drive north of Crescent Avenue. Phase 1 of the project is anticipated to be constructed and occupied in 2021 while Phase 2 of the project will be constructed and occupied in 2023. The following is noted regarding the proposed project: • The US Route 9/Crescent Avenue intersection will operate at acceptable levels of service through Phase 2 Build conditions during both peak periods. No capacity related mitigation is recommended at this intersection as a result of the proposed project. • The unsignalized intersections on Crescent Avenue at Bunny Lake Drive and Nelson Avenue will operate at acceptable levels of service through Phase 2 Build conditions during both peak periods. No capacity related mitigation is recommended as a result of the proposed project. • Acceptable operating conditions will be provided at the site driveway intersections on Bunny Lake Drive as unsignalized intersections with single lanes entering and exiting the site and stop signs on the exiting approaches. • Walking trails will be constructed behind the apartment buildings and along a portion of Crescent Avenue. The trails will provide access to the lower portion of Bunny Lake Drive and to the parking lot of the Saratoga Casino and Raceway which will enable residents of the apartment buildings to access this development without walking on Bunny Lake Drive. The extension of the proposed walking trails associated with the Saratoga Affordable Housing project to Crescent Avenue at the Bunny Lake Drive intersection should be considered. This would provide a connection to the future mid - block crossing proposed as part of the Saratoga Greenbelt Trail. Users of the trail would then have access to the Saratoga Affordable Housing walking trails allowing them to access the casino parking area without traversing Bunny Lake Drive which does not provide sidewalks. ■ Residents of the apartment complex can access the CDTA system via a bus stop associated with the Saratoga Visitors Trolley route provided at the casino. • The sight distance analysis indicates that the available intersection and stopping sight distances at the proposed southern Site Driveway intersection on Bunny Lake Drive meet AASHTO guidelines for the operating speed. • The available intersection sight distance at the northern Site Driveway on Bunny Lake Drive looking left to make a left or right turn from the Site Driveway and looking straight along Bunny Lake Drive to make a left turn into the site are limited by existing vegetation. It is recommended that the trees and brush located approximately 30 feet from the edge of pavement be cleared in order to maximize sight lines. No additional Mr. Dan Hershberg May 2, 2019 Page 11 of 11 mitigation is recommended at the northern Site Driveway. • It is recommended that any proposed vegetation and/or signage related to the site be placed a minimum of 15-feet back from the edge of the travel lane so that adequate sight lines are maintained along the site frontage on Bunny Lake Drive. Please call our office if you have any questions or comments regarding the above analysis. Respectfully submitted, Creighton Manning Engineering, LLP Mark D. Nadolny Associate N:\Projects\2018\118-256 Hershberg - Saratoga Apartments\Working\Traffic\118256_Itr rpt_20190502.docx Thoroughbred Dove9.-�w[ ��gc�— - yz. treat t{Q sash❑e prWe. `I+ fit. . �y� '� - ; �• '4`!�� ` • } :.' SN Street ^ I ` ° q . 1 a- '� m _ � �l��r -:• �sx // Till I � %g9em. ` •y rr� � T� ,r + •ram y;u.i40. •LIL q I--. . } 4:•4-M I � _. • �` . - lI uik Laney �• ❑ ''w. [Bridle Pat R i ::`a� day .+� cb 40 .. s Parking Lot C+'escerl� q�'e� nu^ c t PROJECT e f 1. LOCATION 41, WWI OM 57 Of fi + j f.,•' '� � . y:..,. SOS r V0 . 1 f 4•• 1' v . yn . t'' ■` � dd � � �e it � � .�r�}.' $�• y4 .v. I ! i 22 STUDY AREA INTERSECTIONS ' a� .v�i Abe' T.��Y •M¢.. •. �i#. h;�• c-._ _ _s�4hti:: c2 PROJECT LOCATION -11111 Creighton SARATOGA AFFORDABLE HOUSING WVMonning CITY OF SARATOGA SPRINGS, NEW YORK PROJECT: 118-256 1 DATE: 04/2019 1 FIGURE: 1 AM PEAK HOUR Of o > W Y ¢ Z ¢ J O � r Z Z J W Z 7 t. 89 CV c�7 * I 21 N co F67 y �27 ■ ► _ �' 1 �..� -6 CRESCENT AVE a~i co 1351 w 1071 0,a24) 0Z 0 PM PEAK HOUR a 9 W W Q Z O } Z J W Z Z m rn m L111 H N { 3 17 ran 47 rf �► F67 1 ■ v + � —• 38 31 * ' i CRESCENT AVE 152—► 127-0 r Ncr+ 4 G L 16� EXISTING 2019 TRAFFIC VOLUMES Creighton 042 Manning SARATOGA AFFORDABLE HOUSING CITY OF SARATOGA SPRINGS NEW YORK PROJECT: 118-256 DATE: 04/2019 1 FIGURE: 2 0 • 0 AM PEAK HOUR cl: w o > w Y Z J O Z J w Z Z 7 00 `� 04 n � 1 L 22 N � 00 —69 1 ► -211 I 111*. •9.0 r] 1 L. i 11 & Fl� 5 + 20 + ` 'L r CRESCENT AVE rn W 139� 110-► rncn n OD 0 PM PEAK HOUR b q w o > a w Y g O + } Z Z 0 J w Z D 00 6 kg B b o L114 18 _o co N 3 �rocn n *--48 1 57 2 1— r ►i t : p. 39� 32- +- T [- CRESCENT AVE b o v 157-* 131-* J+ N 0 fl 0 m O 10 w s NO -BUILD 2021 TRAFFIC VOLUMES .�� Creighton ♦ Manning SARATOGA AFFORDABLE HOUSING n CITY OF SARATOGA SPRINGS NEW YORK PROJECT: 118-256 DATE: 04/2019 1 FIGURE: 3 • 0 AM PEAK HOUR 9' W w w Y Q Z O J (n } Z J W Z Z m ru)m r� rn i'v�Orn r-71 1 �29 r 1* 5 20-- T CRESCENT AVE m 143� 114-► owu7 rn 4� 0 PM PEAK HOUR 4 o a Y Z g O J r z W Z Z 00 N CO 118 N �3 �`rn r-50 �22 ` 40 T 33 t �� .� CRESCENT AVE M r: 161 135� ell a o m NO -BUILD 2023 TRAFFIC VOLUMES .�� Creighton Manning a SARATOGA AFFORDABLE HOUSING CITY OF SARATOGA SPRINGS PROJECT: 118-256 DATE: 04/2019 j FIGURE: 4 NEW YORK 0 • ENTERING -t 9 ' uw ❑ W > Y g Z 0 } Z C9 J W Z o m Z O m SITE 1 DRWY _ r 0 rn o � CRESCENTAVE 0 1 1 Lo Q EXITING a qi ❑ W > o W Y g Z o 0 } Z Z J W Z 00 ar SITE 5 DRWY _41 iD9a� 4I I �,• 9d°Ia � 3 C 23 Ln 5%� � • : � CRESCENT AVE —, 30%1 i u L m TRIP DISTRIBUTION PHASE 1 AND 2 Creighton 0450Manning SARATOGA AFFORDABLE HOUSING a CITY OF SARATOGA SPRINGS NEW YORK PROJECT: 118-256 1 DATE: 04/2019 1 FIGURE: 5 0 • AM PEAK HOUR 9� 0' W o w > Q Y n Z O } Z J W Z Z D m SITE l DRWY (2) co � 8 ��1/�' • 1 CRESCENT AVE Li rpy-} lU1 7 ENTERING (EXITING) Q PM PEAK HOUR 9' o w > c g o Z co J W Z Z D m e M SITE DRWY (2) Fi t a (15)--,, .ry a F pp a 1 j �' 22�1 ': CRESCENT AVE r � a Z F d ENTERING (EXITING) m TRIP ASSIGNMENT PHASE 1 .pi Creighton A Manning $ SARATOGA AFFORDABLE HOUSING :a CITY OF SARATOGA SPRINGS NEW YORK PROJECT: 118-256 1 DATE: 04/2019 1 FIGURE. 6 AM PEAK HOUR tq oLu w Z J O (n i Z Z J W Z D m SITE _ 04 .1 DRWY� (5) (A3) . L(17) ry �_ 1 a 4-- T �► 15� (2)J F Trp CRESCENT AVE ENTERING (EXITING) 0 PM PEAK HOUR o > w Y Z g co a - } Z Z J W Z a0 SITE_ uO _ DRWY (3) + + R (31) + e x °r° (12) 01 N 3 r, •— I E t 44--+ (2]] T ' CRESCENT AVE n N L1 Q)--► a N m ENTERING (EXITING) TRIP ASSIGNMENT 2 Creighton PHASE 1 AND .�� Manning SARATOGA AFFORDABLE HOUSING CITY OF SARATOGA SPRINGS PROJECT: 118-256 DATE: 04/2019 1 FIGURE: 7 NEW YORK 0 AM PEAK HOUR q{ o W ¢ W Y ¢ Z O } Z J W Z Z 7 00 Lo 1 SITE _ DRWY . , t x, m o . L22 co100 00 Nam ■-69 1 • i 33 �. �� 90 �- • 3 1--6 1 1* 13� 21� 1 t F* CRESCENT AVE rn rn 139� 11$ ► mra n SO ❑ Q PM PEAK HOUR 9 o a Y Z 0 } Z J W Z Z N r) LO m SITE _ DRWY � 15� N v 120 cr) v �k mmc� �18 cm co tea$ I 33 * CRESCENTAVE o m 157� 136� ri N'° v a 0 LP b - BUILD 2021 (PHASE 1) TRAFFIC VOLUMES .�� Creighton Manning SARATOGA AFFORDABLE HOUSING CITY OF SARATOGA SPRINGS PROJECT: 118-256 DATE: 04/2019 1 FIGURE: 8 NEW YORK 0 AM PEAK HOUR w Q Y Z O J 9 z Z Z W Z D m N Lo SITE _ -.1_l DRWY .5a,r 43--1 co co rL0m k t 111 000 2 N`91 t 71 1 ■■ 38 0-"2 +j1L.,--6 1 ° 20--t * 22—t 'I F° CRESCENT AVE rn 1431 rn 129—► o rn m 0� PM PEAK HOUR a w Y Z O r Z J w Z Z D [+] m Ln Ln a SITE_ DRWY a.� F 1 n 31 i a v n F o N ` 130 v v Ls 18 mro� t50 1 �.: I-y F71 1 �■ �2 4j 4j - ` B4 35--t T CRESCENT AVE o 0 161—* 145� n 0 P n' 17 m a BUILD 2023 (PHASE 1 AND 2) TRAFFIC VOLUMES .�� Creighton Manning SARATOGA AFFORDABLE HOUSING CITY OF SARATOGA SPRINGS PROJECT: 118-256 DATE: 04/2019 1 FIGURE: 9 NEW YORK 0 Attachment A Site Plan Saratoga Affordable Housing City of Saratoga Springs, New York )ISO), M3N t S -�s 30 31VIS 'VDOIYdYS 30 AiNnoo 'SON18dS VDOIVSVS JO LLID 9-9-00*6L1 # dVI4 XVI ll� NVId RM IS Odoikl du No X. 31iY Attachment B Turning Movement Counts and Automatic Traffic Recorders Saratoga Affordable Housing City of Saratoga Springs, New York Saratoga Affordable Apartments - TMC Wed Feb 13, 2019 Full Length (7 AM-9 AM, 4 PM-6 PM) All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) AllMovements ID: 619917, Location:43.058674,-73.787797, Site Code:118-256 Creighton 50 Manning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US Leg Direction US Route 9 Southbound Crescent Ave Westbound 1US Route 9 Northbound 'Time T L U App Ped` R L U App Ped- R T U App Ped* Int 2019-02-13 4:OOPM 167 22 0 189 0 28 10 0 38 0 20 151 0 171 0 398 4:15PM 156 26 0 182 0 13 14 0 27 0 37 146 0 183 0 392 4:30PM 190 17 0 207 l 33 13 0 46 0 34 173 0 207 0 460 4:45PM 192 26 0 218 0 24 11 0 35 0 25 196 1 222 0 475 Hourly Total 705 91 0 796 0 98 48 0 146 0 116 666 1 783 0 1725 5:OOPM 229 21 0 250 0 26 15 0 41 0 34 191 0 225 0 516 5:15PM 198 21 0 219 0 14 9 0 23 0 34 242 0 276 (I 518 5:30PM 141 34 0 175 0 17 9 0 26 0 33 178 0 211 0 412 5:45PM 122 34 0 156 0 29 6 0 35 0 36 195 0 231 0 422 Hourly Total 690 110 0 800 0 86 39 0 125 0 137 806 0 943 0 1868 6:OOPM 1 0 0 1 0 0 0 0 0 0 0 2 0 2 0 3 Hourly Total 1 0 0 1 0 0 0 0 0 0 0 2 0 2 0 3 2019-02-14 7:OOAM 189 21 0 210 0 6 5 0 11 0 14 125 0 139 0 360 7:15AM 182 14 0 196 0 18 3 0 21 0 7 148 0 155 0 372 7:30AM 180 20 0 200 0 27 8 0 35 0 15 187 0 202 0 437 7:45AM 155 24 0 179 0 18 5 0 23 0 15 236 0 251 0 453 Hourly Total 706 79 0 785 0 69 21 0 90 0 51 696 0 747 0 1622 8:00AM 192 20 0 212 0 19 4 0 23 D 15 144 0 159 0 394 8:15AM 161 18 0 179 0 14 7 0 21 0 28 165 0 193 0 393 8:30AM 153 19 0 172 0 14 9 0 23 0 33 162 0 195 0 390 8:45AM 138 21 0 159 0 25 4 0 29 0 36 186 0 222 0 410 Hourly Total 644 78 0 722 0 72 24 0 96 0 112 657 0 769 0 1587 9:00AM 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 Hourly Total 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 Total 2747 358 0 3105 0 325 132 0 457 0 416 2827 1 3244 0 6806 % Approach 88.5% 11.5% 0% - - 71.1% 28.9% 0% - 12.8% 87.1% 0% - %Total 40.4% 5.3% 0% 45.6% 4.8% 1.9% 0% 6.7% 6.1% 41.5% 0% 47.7% - Lights 2667 352 0 3019 311 128 0 439 409 2738 1 3148 6606 %Lights 97.1% 98.3% 0% 97.2% :95.7% 97.0% 0% 96.1% 98.3% 96.9% 100% 97.0% 97.1% Articulated Trucks and Single -Unit Trucks 74 2 0 76 6 0 0 6 6 70 0 76 158 % Articulated Trucks and Single -Unit Trucks 2.7% 0.6% 0% 2.4% l.8% 0% 0% 1.3% 1.4% 2.5% 0% 2.3% 2.3% Buses 6 4 0 10 8 4 0 12 1 19 0 20 42 % Buses 0.2% 1.1% 0% 0.3% 2.5% 3.0% 0% 2.6% 0.2% 0.7% 0% 0.6% - 0.6% Bicycles on Road 0 0 0 0 - 0 0 0 0 0 0 0 0 0 %Bicycles on Road 0% 0% 0% 0% - 0% 0% 0% 0% 0% 0% 0% 0% 0% Pedestrians - - - 0 - - - - 0 - - - 0 .o PL'desnians - w - - - - - - - - - - - - Bicycles on Clossw'alk - _ 0 -. - - 0 - - - - 0 00 Bicycles on Crosswalk - - - - - - - - - - - - - - Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 1 of 6 Saratoga Affordable Apartments - TMC Wed Feb 13, 2019 Full Le n g th (7 AM-9 AM, 4 PM-6 PM) All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) All Movements ID: 619917, Location:43.058674,-73.787797, Site Code:118-256 [N] US Route 9 Total: 6257 In:3105 Out:3152 00 LO r` Cl)N rl- co N Co N Out: 2880 In: 3244 Total: 6124 [S] US Route 9 Creighton Manning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US a) > a 325 CO 132 c r v r U o W 2 of 6 Saratoga Affordable Apartments - TMC Wed Feb 13, 2019 PM Peak (Feb 13 2019 4:30PM - 5:30 PM) - OverallPe ak Hour All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) AllMovements ID: 619917, Location:43.058674,-73.787797, Site Code: 118-256 Creighton Manning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US Leg Direction 'US Route 9 :So uthbound 'Crescent Ave 'Westbound US Route 9 Northbound 'rime T L U App Ped* R L U App Ped" R T U App Ped* lnt 2019-02-13 4:30PM 190 17 0 207 0 33 13 0 46 0 34 173 0 207 0 460 4:45PM 192 26 0 218 0 24 11 0 35 0 25 196 1 222 0 475 S:OOPM 229 21 0 250 0 26 15 0 41 0 34 t91 0 225 0 516 5:15PM 198 21 0 219 0 14 9 0 23 0 34 242 0 276 0 518 Total 809 85 0 894 0 97 48 0 145 0 127 802 1 930 0 MMMMO 1969 % Approach 90.5% 9.5% 0% - • 166.9% 33.1% 0% - 13.7% 86.2% 0.1% - - % Total 41.1% 4.3% 0% 45.4 % 4.9% 2.4% 0% 7.4 % 6.4% 40.7% 0.1% 47.2% - PHF 0.883 0.817 - 0.894 0.735 0.800 - 0.788 0.934 0.829 0.250 0.842 - 0.950 Lights 794 85 0 879 93 48 0 141 127 787 1 915 - 1935 %Lights 98.1% 100% 0% 98.3% -95.9% 100% 0% 97.2% - 100% 98.1% 100% 98.4%-98.3% Articulated Trucks and Single-UnitTrucks 14 0 0 14 1 0 0 1 0 11 0 11 - 26 %Articulated Trucks and Single -Unit Trucks 1.7% 0% 0% 1.6% 1.0% 0% 0% 0.7% O% 1.4% 0% 1.2% - 1.3% Buses 1 0 0 1 3 0 0 3 0 4 0 4 - 8 % Buses 0.1% 0% 0% 0.1% 3-1% 0% 0% 2.1% 0% 0.5% 0% 0.4 % 0.4% Bicycles on Road 0 0 0 0 - 0 0 0 0 0 0 0 0 0 % Bicycles on Road 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Pedestrians - - - - D - - - - 0 - - - - 0 L Pedesn ians - - - - Bicvcles on Crosswalk - - - 01 0 - 0 Bicvcles on Crosswalk - -1 - - - *Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 3of6 Saratoga Affordable Apartments - TMC Wed Feb 13, 2019 PM Peak (Feb 13 2019 4:30PM - 5:30 PM) - Overall Peak Hour All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) All Movements ID: 619917, Location:43.058674,-73.787797, Site Code:118-256 [N] US Route 9 Total:1793 In:894 Out:899 M 0 00 00 N I� O N 00 r Out: 858 In: 930 Total :1788 [S] US Route 9 `,� Creighton � Manning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US N Ln > v Q 97 48 co (1) - C) al N N N N (� O W line Im Saratoga Affordable Apartments - TMC Thu Feb 14, 2019 AM Pe ak (Feb 14 2019 7:30AM - 8:30 AM) All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) AllMovements ID: 619917, Location:43.058674,-73.787797, Site Code: 118-256 Creighton Manning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US Leg Direction US Route 9 Southbound ICrescentAve 'Westbound 1US Route 9 Northbound Time T L U App Ped* R L U App Ped* R T U App Ped" Int 2019-02-14 7:30AM 180 20 0 200 0 27 8 0 35 0 15 187 0 202 0 437 7:45AM 155 24 0 179 0 18 5 0 23 0 15 236 0 251 0 453 8:00AM 192 20 0 212 0 19 4 0 23 0 15 144 0 159 0 394 8:15AM 161 18 0 179 0 14 7 0 21 0 28 165 0 193 0 393 Total 688 82 0 770 0 78 24 0 102 0 73 732 0 805 0 1677 % Approach 89.4% 10.6% 0% --'76.5% 23.5% 0% - - 9.1% 90.9% 0% - %Total 41.0% 4.9% 0% 45.9% 4.7% 1.4% 0% 6.1% - 4,4% 43.6% 0% 48.0% PBF 0.896 0.854 - 0.908 0.722 0.750 - 0.729 - 0.652 0.775 - 0.802 0.925 Lights 673 82 0 755 74 23 0 97 - 71 707 0 778 1630 % Lights '97.8% 100% 0% 98.1% 94.9% 95.8% 0% 95.1% - 97.3% 96.6% 0% 96.6% - 97.2% Articulated Trucks and Single -Unit Trucks 15 0 0 15 3 0 0 3 - 2 21 0 23 41 %Articulated Trucks and Single -Unit Trucks 2.2% 0% 0% 1.9% 3.8% 0% 0% 2.9% 2.7% 2.9% 0% 2.9% 2.4% Buses 0 0 0 0 1 1 0 2 0 4 0 4 - 6 %Buses 0% 0% 0% 0% 1.3% 4.2% 0% 2.0% 0% 0.5% 0% 0.5% - 0.4% Bicycles on Road 0 0 0 0 - 0 0 0 0 0 0 0 0 - 0 %Bicycles on Road 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% - 0% Pedestrians % Pedesu'ians - - - - - _ Bicvcles on Qosswall( - - - - 0 0 - - - 0 Bicycles on Crosswall - - - - - - *Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 5of6 Saratoga Affordable Apartments - TMC Thu Feb 14, 2019 AM Peak (Feb 14 2019 7:30AM - 8:30 AM) All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) All Movements ID: 619917, Location: 43.058674,-73.787797, Site Code: 118-256 [N] US Route 9 Total:1580 In:770 Out:810 00 N O 00 CO N C9 Co r- n Out: 712 In: 805 Total :1517 [S] US Route 9 `�� Creighton ♦ Manning Provided by: Creighton Manning Engineering, LIP 2 Winners Circle, Albany, NY, 12205, US .W N O 78 C r- 24 — N �n LO H o M O U W 6of6 Creighton hl? )of-,ing Project No.: 118-256 Counted By: NSB Location: Crescent Ave/Bunny Lake Dr Comments: File Name : tm118256a2 real T Site Code : 01182562 Start Date : 2/14/2019 Page No : 1 Groups Printed- Passenger Veh - Heavy Veh - School Buses Crescent Ave Crescent Ave Bunny Lake Dr Eastbound Westbound Southbound Start Time Left Thru RTOR AAp Total Thru Right RTOR App Total Left Right RTOR Anp Total Factor 1.ta 1.0 _ 1.0 1-0 1.0 1.0 1.0 1.0 07.00 AM 0 34 0 34 9 0 0 9 0 0 0 0 07:15 AM 2 29 0 31 26 0 0 26 1 0 0 1 58 07:30 AM 0 27 0 27 21 0 0 21 1 1 0 2 50 07-45 AM 2 28 0 30 20 1 0 21 1 1 0 2 53 Total 4 118 0 122 76 1 0 77 3 2 8 204 08:00 AM 1 22 0 23 I 18 0 0 18 1 1 0 2 43 08:15 AM 4 17 0 21 29 0 0 29 0 0 0 0 50 08:30 AM i 2 19 0 21 13 0 0 13 1 0 0 1 35 08:45 AM 8 23 0 31 ; 26 0 0 26 0 1 0 1 58 Total 15 - ------ 81 0 -- - -- 96 - --- 86 - 0 - 0 86 2 2 0 4 186 Grand Total 19 199 0 218 162 1 0 163 5 4 0 9 390 Apprch % 8.7 91.3 0 99.4 0.6 0 55.6 44.4 0 Total % 4.9 51 0 55.9 41.5 03 0 418 1.3 1 0 Passenger Veh; 19 190 0 209 159 1 0 160 5 4 0 378 % Passenger Veh 100 95.5 0 95.9 98.1 100 0 98.2 100 100 0 100 96.9 Heavy Veh 0 4 0 4 0 0 0 0 0 0 0 0 4 °Io Heavy Veh 0 2 0 1.8 0 0 0 0 0 0 0 _ 1 School Buses 0 5 0 5 3 0 0 3 0 0 0 8 Jo School Buses 0 25 0 2.3 1.9 0 0 1.8 0 0 0 0 2.1 �r Creighton ' inning Project No.: 118-256 Counted By: NSB Location: Crescent Ave/Bunny Lake Dr Comments: Crescent Ave Eastbound Start Time Left Thru RTOR Apo. Total Thru Peak Hour Analysis From 7:00:00 AM to 8.45-00 AM - Peak 1 of 1 Peak Houf for Entire Intersection Begins at 7:00:00 AM 7:00:00 AM 0 34 0 34 9 7:15:00 AM 2 29 0 31 26 7:30:00 AM 0 27 0 27 21 7:45 00 AM 2 28 0 30 20 Total Volume 4 118 0 122 76 % App. Total 3.3 95.7 0 96.7 PHF 500 .868 .000 .097 .731 Passenger Veh 4 112 0 116 75 % Passenger Veh 100 94.9 0 95.1 98.7 Heavy Veh 0 1 0 1 0 % Heavy Veh 0 0.8 0 0.8 0 School Buses 0 5 0 5 1 % School Buses 0 4.2 0 4.1 1.3 Crescent Ave Westbound Right RTOR Apo Total File Name : tm118256a2_real Site Code : 01182562 Start Date : 2/14/2019 Page No :2 Bunny Lake Or Southbound Left Right RTOR App. Total Int Total 0 0 9 0 0 0 0 43 0 0 26 1 0 0 1 58 0 0 21 1 1 0 2 50 1 0 21 1 1 0 2 53 1 0 77 3 2 0 5 204 1.3 0 60 40 0 .250 .000 .740 .750 500 .000 .625 .879 1 0 76 3 2 0 5 197 100 0 98.7 100 100 0 100 96.6 0 0 OI 0 0 0 0 1 0 0 0; 0 0 0 0 0.5 0 0 1 0 0 0 0 6 0 0 1.3;! 0 0 0 0 2.9 unny a c r Out In total _.. 5' 10 0i 01 8 Oi Oi 0 r— Si t. 10 2---3 --' 0 ❑ 0 0 ❑ 0 0 2 3 0 Right Lett RTOR li Peak Hour Data pp voo-: North — s �� v. , m: m c m — wM N .N.^ Peak Hour Begins a1 07:00 AM -� o o �• m r ' + 7 PassengerVeh 2 u> a ti+ a Heavy Veh � o cVii o o o a o School Buses 1 ?ea000 � m e 6i u Creighton Project No.: 118-256 Counted By: NSB Location: Bunny Lake Dr/Crescent Ave Comments: File Name : tm118256p2 Site Code : 01182562 Start Date : 2/13/2019 Page No : 1 Groups Printed- Passenger Veh - Heavy Veh - School Buses Crescent Ave Crescent Ave Bunny Lake Or Eastbound Westbound 5outhbound Start Time Left Thru RTCR App Talal Thru Right RTOR App TOW Left Right RTQR App Total Int. Total - Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 04'p0 PM 4 33 0 37 7 1 0 8 10 5 0 15 ~ 80 04:15 PM 5 30 0 35 8 0 0 8 8 3 0 11 54 04:30 PM 7 25 0 32 17 0 0 17 6 4 0 10 59 04:45 PM 3 38 0 41 2 0 0 12 ' - 6 4 0 10i ! 63 Total 19 126 0 14 1�- -- 1 - Ci 45 -50 16 0 46 1 236 05:00 PM 10 32 0 42 19 0 0 19 : 9 6 0 15 76 05:15 PM 5 29 0 34 6 1 0 7 •, 3 4 0 7 48 05:30 PM 8 39 0 47 15 1 0 16 5 4 0 9 i 72 05:45 PM 10 33 0 43 19 1 0 20 7 6 0 13 76 Total 33 0 166 59 _ 3 0 _ 62 24 20 0 44. 272 Grand Total 52 259 0 311 103 4 0 107 54 36 0 90 508 Apprch % 15.7 83.3 0 96.3 3.7 0 60 40 0 Total % 10.2 51 0 61.2 20.3 0.8 0 21.1 10.6 7.1 0 17.7 _ _ Passenger Veh _ 50 256 0 306 .101 4 0 105 54 34 0 88' 499 * Passenger Veh 96.2 98 8 0 98.4 98.1 100 0 98.1 100 94A 0 97.8 98.2 Heavy Veh 1 2 0 3 0 0 0 0 0 0 0 0 3 % Heavy Veh 1 9 0.8 0 1 0 0 0 0 0 0 0 0.6 5chool Buses 1 1 0 i _ 2 0 2 0 2 0 2 6 % .School Buses 1 9 0.4 0 0.6 1.9 0 1.9 0 5.6 0 2.2 1.2 Creighton Manning Project No.: 118-256 Counted By: NSB Location: Bunny Lake Dr/Crescent Ave Comments: Crescent Ave Crescent Ave Eastbound Westbound Start Time Left Thru RTDR App Total Thru FZ6gh_ t I RTDR App. Total Peak Hour Analysis From 4 00:00 PM to 5:45700 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 5:00:00 PM 5:00:00 PM 10 32 0 42 19 0 0 19 5:15:00 PM { 5 29 0 34 6 1 0 7 5:30:00 PM 8 39 0 47 15 1 0 16 5:4_5:00 PM 10 33 0 43 19 1 0 20 e Tolai Volum" _ 33 133 0 165 59 3 0 52 % App Total 19.9 80.1 0 95.2 4,8 0 PHF m .653 .1300 .883 776 .750 .000 Passenger Veh 31 132 0 163 57 3 11 • Passenger Veh 93.9 99.2 0 98-2 96.6 100 0 968 Heavy Veh 1 1 0 2 0 0 0 0 % Heavy Veh 3.0 0,8 0 1-2 0 0 0 0 School Buses 1 0 0 1 2 0 0 2 • School Buses 3.0 0 0 0.6 3.4 0 0 3 2 File Name : tm118256p2 Site Code : 01182562 Start Date : 2/13/2019 Page No :2 Bunny Lake Dr Sout_hbound Left. Right RTDR App Total Int. Total 9 6 0 15+ 76 3 4 0 7 48 5 4 0 9 72 7 6 0 13 76 24 20 0 44 272 54.5 45.5 0 667 833 000 733 895 24 19 0 43 268 100 95.0 0 97.7 97.8 0 0 0 0 2 0 0 0 0 0.7 0 1 0 1 4 0 5.0 0 2.3 1.5 unny Lake Ur Oul In Tolel 34 43 77 1 0 1 1 1 2 36 44 so 19 24 0 ❑ 0 0 1 0 0 20 24 0 Reghl LeR RTDR Peak Hour Data r v CAI- Nonn o o w w ry -- o m Peak Hour Beglris at 05:00 PM =' C r- m r� 2 5$t _w PaSsargar Vah 4 -- C 0N O -4N 3 N O C 7 m Heavy Vah m v <i w v o o:o a sc"ol Buses -4 S r p a Mnaon Ng7 47N-+pl^ Saratoga Affordable Apartments - TMC Thu Feb 14, 2019 Full Length (7 AM-9 AM) All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) AllMovements ID:619915, Location:43.057032,-73.768708, Site Code: 118-256 1 Creighton V Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US Leg Direction Nelson .Southbound Ave Crescent Ave 'Westbound Nelson Ave Northbound Crescent Ave 1=astbound Time R T L U App Ped- R T L U App Pe d" R T L U App Pell' R T L U App Pcd' Int 2019-02-14 7:OOAM 2 1 15 0 18 0 1 4 0 0 5 0 1 1 3 0 5 0 2 31 0 0 33 U 61 7:15AM 4 1 24 0 29 0 5 20 1 0 26 0 2 G 1 0 9 Il D 23 4 0 27 9 91 7:30AM 3 0 13 0 16 0 4 17 1 0 22 Il 1 4 3 0 6 (j 0 28 2 0 30 i) 76 7:45AM 5 2 22 0 29 0 8 16 2 1 27 0 0 4 0 0 4 0 0 21 8 1 30 0 90 Hourly Total 14 4 74 0 92 0 18 57 4 1 60 0 4 is 7 0 26 0 2 103 14 1 120 0 318 8:00AM 7 10 15 0 32 0 1 6 1 0 8 fl 1 2 4 0 7 0 0 22 3 0 25 0 72 8:15AM 10 2 11 0 23 U 1 16 2 0 19 0 0 3 2 0 5 0 1 14 1 0 16 0 63 8:30AM 4 1 17 0 22 (l 2 11 1 0 14 D 2 4 0 0 6 0 2 15 5 0 22 U 64 8:45AM 7 3 8 0 18 0 2 16 1 0 19 U 0 4 3 0 7 0 0 23 2 0 2S D 69 Hourly Total 28 16 51 0 95 0 6 49 5 0 60 0 3 13 9 0 25 0 3 74 li 0 88 0 268 9:00AM 0 0 0 0 0 II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Hourly Total 0 0- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U 0 Total 42 20 125 0 187 0 24 106 9 1 140 0 7 28 16 0 51 D 5 177 25 1 208 0 586 Approach 22.5% 10.7% 66-8 % 0% 17.1% 75-7% 6,4% 0,7% - - 13,7% 54_9% 31_4% 0% - 2J4% 85,1% 12-09; 0.5% - - %Total 7.2% 3.4'.'6 21-3% U% 31.9 % - 4-11'. 18.1% 1.5'!6 U.2'1� 23.9 % - 1_2% 4-8°6 2-7'% U'!6 8.7 % - 0-91". 30.2% 4.3°� 0.29fi 35.5 % - Lights 42 20 123 0 185 - 22 104 7 0 133 7 26 14 0 47 - 4 171 23 1 199 564 % Lights 1009'� 1009f, 9S.494, 0% 98.9 % - 91,791 98, 1% 77,8% 0% 95.0 % - 100% 92-9% 87.51/. 0% 92.2 % - 80 0% 96,G% 92.096 1009. 95.7%-'96,2% Articulated Trucks and Single -Unit Trucks 0 0 '2 0 2 - 1 0 1 1 3 0 1 0 0 1 1 1 0 0 2 - 8 % Articulated Trucks and Single -Unit Trucks 09. 091. 1-P. 091 1.1% - 4.29L 0% 11.1% 100% 2.1% - 0% 3.695 0% 0% 2.0% 200"� 0.6% 09� 09B 1.0% - 1.496 Buses 0 0 0 0 0 1 2 1 0 4 - 0 1 2 0 3 0 5 2 0 7 - 14 % Buses 0% 0% P. 0% 0% - 4,2% 1.9 % I1.1% 09� 2.9 % - 0% 3.G91 12.5% 0% 5.9 % 0% 2.8% 8-0% 0% 3.4 % - 2.4% Bicycles on Road 0 0 0 0 0 0 0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 - 0 % Bicycles on Road 0% 096 0% 091 0% 09G 0% 0% 09. 0% 0% 091. 0% 011. 0% 091, 0% 0% 0% 0% - 0-1. P de[ r6ns - - - it _ _ 0 - _ 0 _ _ _ _ _ 0 nnn Cro w..11: _ _ _ _ _ 0 _ 0 _ 0 _ _ _ _ _ 0 Pedestrians and Bicycles on CrossWall:,.L: Leh, R: Right, T: Thru, U: U-Turn 1 of 4 Saratoga Affordable Apartments - TMC Thu Feb 14, 2019 Full Length (7 AM-9 AM) All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) AllMovements ID: 619915, Location:43.057032,-73.768708, Site Code:118-256 N coo Q co O UCO a) - U OD O N 1 25 177 5 [N] Nelson Ave Total: 264 In:187 Out:77 N O N � CM Out: 34 In: 51 Total: 85 [S] Nelson Ave Creighton Manning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US 24 106 r > 9 c 1 � a) - U Cz co U w M 7 O 2 of 4 Saratoga Affordable Apartments - TMC Thu Feb 14, 2019 AM Peak (7:15 AM- 8:15 AM) -Overall Peak Hour AllClasses (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) All Move me nts ID:619915, Location:43.057032,-73.768708, Site Code: 118-256 �4 Creighton 50 Monning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US Le Direction Nelson Southbound Ave Crescent Ave Westbound INelson Ave (Northbound Crescent Ave Eastbound 'rime R T L U App Ped- R T L U App Ped` R T L U App Ped` R T L U App Pcd - '.htt 2019-02-14 7:15AM 4 t 24 0 29 0 5 20 l 0 26 0 2 6 1 0 9 0 0 23 4 0 27 0 91 7:30AM 3 0 13 0 16 0 4 17 l 0 22 0 1 4 3 0 8 0 0 28 2 0 30 0 76 7:45AM 5 2 22 D 29 0 8 16 2 1 27 0 0 4 0 0 4 U 0 21 8 1 30 D 90 8:00AM 7 10 i5 0 32 0. 1 6 1 0 8 0 1 2 4 0 7 0 0 22 3 0 25 0 72 Total l9 13 74 0 106 0 18 59 5 1 83 0 4 16 8 0 28 0 0 94 17 1 112 D 329 % Approach 17.9% 12.3% 69.8% 0% - 21.7% 71.1% 6.00% 1.2% - - 14-3% 57-1 % 28_6% 0% - • 0% 83.9% 15.2% 0.99. - - - % Total 5.8% 4.0% 22.5% 0% 32.2% - 5.5% 17.996 1.5% 0.3% 25.2 % - 1.2 % 4.9 % 2.4 % 0% 8.5 % - 0% 26.6% 5.2% 0.3% 34.0 % PBF 0.679 0.325 0-771 - 0.828 0.563 0,738 0 625 0 250 0.769 - 0.500 0.667 0.500 - 0.778 - 0.839 0.531 0.250 0.933 0.904 lights 19 13 73 0 105 - 17 59 4 0 80 - 4 14 7 0 25 0 93 17 1 111 321 % lights 100% 10096 98.6% 09,6 99.1 % - 94.4% 100% 80.0% 0% 96.4 % - 100% 87.5% 87.5% 0% 89.3 % - D% 98,9% 100% 100% 99.1% - 1)7.696 Articulated Trucks and Single -Unit Trucks 0 0 1 0 1 1 0 1 1 3 0 1 0 0 1 - 0 0 0 0 0 5 %Articulated Trucks and Single -Unit Trucks 0% 0% 1.4%0% 0.9% 5.6% 09; 20,09'.100% 3.6% - 0% 6.3% 0% 0% 3.6% 0% 0% 0% 09. 0% 1.5% Buses 0 0 0 0 0 0 0 0 0 0 0 1 1 0 2 - 0 1 0 0 1 3 % Buses 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% - 0% 6.3 % 12-5 % 0% 7.1 % D% 1-1% 0% 0% 0.9 % - 0 9% Bicycles on Road 0 0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 - 0 0 0 0 0 0 % Bicycles on Road 0% 0% 0% 0% 0% 0% 096 0% 0% 0% - 0% 0 0% 0'Y. 0% - 01% D% 0% 0% 0% 0'J6 PL'deitrians - - IJ - - - - - 0 0 - Bicvcles on 0 _ 0 'Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 3of4 Saratoga Affordable Apartments - TMC Thu Feb 14, 2019 AM Peak (7:15 AM - 8:15 AM) - Overall Peak Hour All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) All Movements ID: 619915, Location:43.057032,-73.768708, Site Code: 118-256 CD rl- > 00 a } rn O N r U .. CD ca U0 C) U N 1 17 94 [N] Nelson Ave Total: 157 In:106 Out:51 rn e2 � r r � ao co It Out: 18 In: 28 Total: 46 [S] Nelson Ave A Creighton � Manning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US 0 4of4 Saratoga Affordable Apart ments-TMC Wed Feb 13, 2019 Full Length (4 PM-6 PM) All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) All Movements TD: 619916, Location:43.057032,-73.768708, Site Cade: 118-256 Creighton Manning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US Leg Direction Nelson Ave Southbound _rescent Ave 'Westbound Nelson Ave Northbound Crescent Ave Eastbound 'Time R T L U App Ped R T L U App Peil' R T L U App Ped- R T L U App Ped* Int 2019-02-13 4:OOPM 3 0 12 0 15 0 4 6 0 0 10 0 2 5 0 0 7 0 0 38 6 0 44 D 76 4:15PM 3 3 12 1 19 0 2 5 1 0 8 0 0 8 0 0 8 0 1 33 1 0 35 0 70 4:30PM 1 4 16 0 21 0 1 13 0 0 14 D 0 4 1 0 5 0 3 24 6 0 33 0 73 4:45PM 3 4 15 0 22 n 5 9 0 0 14 0 3 3 1 0 7 0 9 22 11 0 42 n 85 Hourly Total 10 11 55 1 77 0 12 33 1 0 46 0 5 20 2 0 27 0 13 117 24 0 154 0 304 5:OOPM 5 4 19 0 28 0 7 14 1 0 22 0 0 3 0 0 3 0 1 32 9 0 42 0 95 5:15PM 1 2 11 0 14 0 2 4 1 0 7 0 2 4 1 0 7 0 1 27 5 0 33 U 61 5:30PM 1 2 8 0 11 0 3 6 0 0 9 a 2 3 6 0 11 0 6 27 8 0 41 0 72 5:45PM 2 1 12 0 15 U 6 13 1 0 20 0 0 4 5 0 9 0 4 30 7 0 41 II 85 Hourly Total 9 9 50 0 68 0 18 37 3 0 58 01 4 14 12 0 30 0 12 116 29 0 157 0 313 6:00PM 0 0 0 0 0 U 0 0 0 0 0 Il 0 0 0 0 0 0 0 0 0 0 0 n 0 Hourly Total. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 19 20 105 1 145 tl 30 70 4 0 104 0 9 34 14 0 57 0 25 233 53 0 311 U 617 %Approach 13.191 13.8°d 72.4% 0.7% - -28.8% 67.3% 3.8% 0% - - 15.8% 59.6% 24.69L 0% - - 8.0% 74.9% 17.0% 0% - - - % Total 3.19. 3.2% 17,01,. 0,2% 23.5 % - 4,9% 11.3% 0.G% 0% 16.9 % - 1.596 5.5% 2.3% 0% 9.2% _ 4,19' 37_8 % 8_G% 0% 50.4 % - Lights 19 20 105 1 145 - 30 68 4 0 102 - 9 33 14 0 56 25 230 53 0 308 - 611 % Lights 100% 1009� 100% 100% 100% 100% 97.1% 100% 0% 98.1% - 100% 97,1% 100% 09. 98.2 % - 100% 98.7% 100% 0% 99.9 % - 199.0% Articulated Trucks and Single -Unit Trucks 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 0 2 0 0 2 2 % Articulated Trucks and Single -Unit Trucks 0% 096 09L 0%, 0% - 0% 0% 0% 0% 0% - 096 0°6 096 0% 0% = 09L 0.9% 0% 00/.. 0.6% - 0.3% Buses 0 0 0 0 0 - 0 2 0 0 2 0 1 0 0 1 0 1 0 0 1 - 4 % Buses 0% 0% 0% 0% 0% - 0% 2.9% 096 0% 1.9% 09'0 2.9% 095 0% 1.8 % - 095 0.4% 0% 0% 0.3 % - 0,6% Bicycles on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 % Bicycles on Road 0' 0 0% 01% 0'% 0% - 0% 0% 0% 0% 0% - 0% 0% 01% 01110 0% - 0';0 0% 0'% 0'Y 0% - 0'Y Bicvcles on ;l nscwall: _. _ 01 p L Ric•.cic, an Ci nrs•edll. - - - - - _ _ _ _ _ _ _ _ _ _ _ PedesIrion.s anti Bicycles on Crosswdll<, L: Left, R:Rig ht, T:Thru, U: U-Turn 1 of 4 Saratoga Affordable Apartments - TMC Wed Feb 13, 2019 Full Length (4 PM-6 PM) All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) All Movements ID: 619916, Location:43.057032,-73.768708, Site Code:118-256 [N] Nelson Ave Total: 263 In:145 Out:118 N O r Cl) > o E v O N U P 0 53 C) ~_ M E 233 25 CO Out: 49 In: 57 Total: 106 [S] Nelson Ave Creighton � Manning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US 30 1-t > o Q 70 ;r, c 4 v - U co coco O 2 of 4 Saratoga Affordable Apartments - TMC Wed Feb 13, 2019 PM Peak (4:15 PM- 5:15 PM) - OverallPeak Hour All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) All Movements ID: 619916, Location: 43.057032,-73.768708, Site Code: 118-256 ` Creighton Manning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US Leg Direction Nelson Ave Southbound Crescent Ave Westbound Nelson Ave Northbound 'Crescent Ave ;Eastbound Time R T L U App Ped° R T L U App Ped- R T L U App Ped" R T L U App PeP Int 2019-02-13 4:15PM 3 3 12 1 19 LI 2 5 1 0 8 0 0 8 0 0 8 0 1 33 1 0 35 0 70 4:30PM 1 4 16 0 21 0 1 13 0 0 14 0 0 4 t 0 5 0 3 24 6 0 33 0 73 4:45PM 3 4 15 0 22 0 5 9 0 0 14 0 3 3 1 0 7 0 9 22 11 0 42 0 85 5:OOPM 5 4 19 0 28 0 7 14 l 0 22 0 0 3 0 0 3 0 1 32 9 0 42 0 95 Total 12 15 fit 1 90 0 15 41 2 0 SO 0 3 18 2 0 23 0 14 ill 27 0 152 0 323 %Approach 13.3% 16.7% 68.9°% 1.1% --.25.996 70.79. 3.4%. 0% - - 13.0% 78.3% 8.7% 0% - . 9.296 73.0% 17.8% 0% - %Total 3.7% 4.6% 19.29'. 0.3% 27.9 % 4.6% 12.7% 0,69. 0% 18.0% - 0.9% 5.6% 0.6% 0% 7.1% - 4,39. 34.4% 8.4% 0% 47.1% - P1-1F 0.600 0.938 0,816 0.250 0.804 - 0.536 0.732 0.500 - 0.659 - 0.250 0.563 0.500 - 0.719 - 0-389 0,841 0.614 - 0.905 - 0.850 lights 12 15 62 1 90 - 1s 40 2 0 57 3 17 2 0 22 14 110 27 0 151 320 % Lights 100% 100% 100% 1009'. 100% 10096 97.696 100% 0% 98.3% - 100% 94-4% 100% 0% 95.7 % - 10095 99.1% 100% 09. 99.3 % - 9. V. Articulated Trucks and Single-UnitTrucks 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 1 0 0 1 - 1 % Articulated Trucks and Single -Unit Trucks O% 0% 090 V. 0% - 0% 0% 0% 0'Yo 0% - 0% 0% 0'Y. O.Y. 0% 0% 0.9%� 0% V. 0.7 % - 0.398 Buses 0 0 0 0 0 - 0 1 0 0 1 0 1 0 0 1 - 0 0 0 0 0 2 % Buses 0% 0% V. 090 0% 0% 2,49. 0% 0% 1.7% - 0% 5.6% 0% 0% 4.3 % 0'7b 0% 0% 0% 0% - 0.69. Bicycles on Road D 0 0 D 0 - 0 0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 0 % Bicycles on Road U% 0% 096 01!. 0% - 0'!0 0% 0",0 0% 0% 0% 01% 0% 0% 0% 0% 0% 0% 0"0 0% 01% Pedesu-ians - - - it - - - - 0 - - - 0 - - - - - ') esit Idns Bicycles oil Cms,\,dlk 0 - - - - - 0 _ _ 0- 'S Bicycle, on Crasswnll: - - - _ Pedestrians and Bicycles on Crosswallc L: Left, R: Right, T: Tllru. U: U-Turn 3of4 Saratoga Affordable Apartments - TMC Wed Feb 13, 2019 PM Peak (4:15 PM- 5:15 PM) - Overall Peak Hour All Classes (Lights, Articulated Trucks and Single -Unit Trucks, Buses, Pedestrians, Bicycles on Road, Bicycles on Crosswalk) AllMovements ID: 619916, Location:43.057032,-73.768708, Site Code:118-256 [N] Nelson Ave Total:151 In:90 Out:61 C > LO ,n Q C o O Q) U N Cn N o 27 U ~ N LO � 111 14 N tf) N r r CO r --qmgpmwl— N 00 Cl) Out: 31 In: 23 Total: 54 [S] Nelson Ave Creighton Manning Provided by: Creighton Manning Engineering, LLP 2 Winners Circle, Albany, NY, 12205, US 15 a) Q 41 LD C m 2 a U M co N � � U r W O 4of4 MetroCount Traffic Executive Weekly Vehicle Counts (Virtual Week) VirtWeeki Vehicle-498 -- En lish ENU Datasets: Site: Attribute: Direction: Survey Duration: Zone: File: Identifier: Algorithm: Data type: Profile: Filter time: Included classes: Speed range: Direction: Separation: Name: Scheme: Units: In profile: [118-256] Located on Bunny Lake Drive Saratoga Affordable 7 - North bound A>B, South bound B>A. Lane: 1 14:13 Wednesday, February 13, 2019 => 8:31 Wednesday, February 20, 2019, 118-256 0 2019-02-20 0832.EC1 (Plus ) R519M98M MC56-1-5 [MC55] (c)Microcom 19Oct04 Factory default axle (v4.06) Axle sensors - Paired (Class/Speed/Count) 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 (4) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 5 - 100 mph. North, South (bound), P = North Headway > 0 sec, Span 0 - 300 ft Default Profile Vehicle classification (Scheme F3) Non metric (ft, mi, ft/s, mph, lb, ton) Vehicles = 8812 / 9280 (94.96%) Weekly Vehicle Counts (Virtual Week) VirtWeeklyVeh icle-498 Site: 118-256.1.2NS Description: Located on Bunny Lake Drive Filter time: 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 Scheme: Vehicle classification (Scheme F3) Filter: Cls(1 2 3 4 5 6 7 8 9 10 11 12 13 ) Dir(NS) Sp(5,100) Headway(>0) Span(0 - 300) Hour 0000-0100 0100-0200 0200-0300 0300-0400 0400-0500 0500-0600 0600-0700 0700-0800 0800-0900 0900-1000 1000-1100 1100-1200 1200-1300 1300-1400 1400-1500 1500-1600 1600-1700 1700-1800 1800-1900 1900-2000 2000-2100 2100-2200 2200-2300 2300-2400 Totals 0700-1900 0600-2200 0600-0000 0000-0000 AM Peak PM Peak * - No data. Mon Tue Wed Thu Fri Sat Sun * * * 27.0 35.0 70.0 92.0 * * * 8.0 16.0 40.0 49.0 * * * 7.0 6.0 23.0 21.0 * * * 4.0 11..0 11.0 11.0 * * * 4.0 12.0 8.0 14.0 * * * 12.0 10.0 12.0 5.0 * * * 7.0 6.0 4.0 6.0 * * * 11.-0 13.0 15.0 14.0 * * * 20.0 13.0 18.0 34.0 * * * 33.0 49.0 38.0 63.0 * * * 75.0 67.0 84.0 123.0 * * * 94.0 118.0 106.0 270.0 * * * 115.0 147.0 166.0 243.0 * * * 129.0 196.0 153.0 226.0 * * * 131.0 192.0 167.0 263.0 * * * 146.0 195.0 196.0 255.0 * * * 138.0 210.0 197.0 239.0 * * * 130.0 172-0 187.0 172.0 * * * 142.0 136-0 190.0 155.0 * * 60.0 112.0 148.0 187.0 * * 54.0 105.0 140.0 149.0 * * 50.0 108.0 134.0 134.0 * * 38.0 92.0 107..0 151.0 * * 18.0 67.0 82.0 99.0 * * * 1164.0 1508.0 1517.0 2057,0 * * * 1496.0 1936.0 1991.0 * * * 1655.0 2125.0 2241.0 * * * 1717.0 2215.0 2405.0 * * * 1100 1100 1100 1100 * * * 94.0 118.0 106.0 270.0 * * * 1500 1600 1600 * * * 146.0 210.0 197.0 Averages 1 - 5 1 - 7 I 31,0 56.0 1 12.0 28.3 6.5 14.3 7,5 9.3 8.0 9..5 11.0 9=8 6.5 5.8 12.0 13.3 16.5 21.3 41.0 45.8 71.0 87.3 106.0 147.0 1 131.0 167.8 1 162.5 176.0 1 161.5 188.3 1 170.5 198.0 174.0 196.0 151.0 165.3 139.0 155.8 106.7 126.8 99.7 112.0 97.3 106.5 79.0 97.0 55.7 66.5 1336.0 1561.5 1646.2 1912.5 1780.8 2076.0 1856.8 2203.0 MetroCount Traffic Executive Weekly Vehicle Counts (Virtual Week) VirtWeeklvVehicle-499 -- English (ENU) Datasets: Site: Attribute: Direction: Survey Duration: Zone: File: Identifier: Algorithm: Data type: Profile: Filter time: Included classes Speed range: Direction: Separation: Name: Scheme: Units: In profile: [118-256] Located on Bunny Lake Drive Saratoga Affordable 7 - North bound A>B, South bound B>A. Lane: 1 14:13 Wednesday, February 13, 2019 => 8:31 Wednesday, February 20, 2019, 118-256 0 2019-02-20 0832.EC1 (Plus ) R519M98M MC56-1-5 [MC55] (c)Microcom 19Oct04 Factory default axle (v4.06) Axle sensors - Paired (Class/Speed/Count) 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 (4) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 5 - 100 mph. AB Headway > 0 sec, Span 0 - 300 ft Default Profile Vehicle classification (Scheme F3) Non metric (ft, mi, ft/s, mph, lb, ton) Vehicles = 3761 / 9280 (40.53%) Weekly Vehicle Counts (Virtual Week) Vi rtWeeklyVeh icle-499 Site: 118-256.1.2NS Description: Located on Bunny Lake Drive Filter time: 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 Scheme: Vehicle classification (Scheme F3) Filter: Cls(1 2 3 4 5 6 7 8 9 10 11 12 13 ) Dir(NB) Sp(5,100) Headway(>0) Span(0 - 300) Hour 0000-0100 0100-0200 0200-0300 0300-0400 0400-0500 0500-0600 0600-0700 0700-0800 0800-0900 0900-1000 1000-1100 1100-1200 1200-1300 1300-1400 1400-1500 1500-1600 1600-1700 1700-1800 1800-1900 1900-2000 2000-2100 2100-2200 2200-2300 2300-2400 Totals 0700-1900 0600-2200 0600-0000 0000-0000 AM Peak PM Peak * - No data_ Mon Tue Wed Thu Fri Sat Sun * * * 6.0 5.0 8..0 7.0 * * * 2.0 2.0 6>:0 8.0 * * * 3.0 2.0 1..0 0.0 * * * 2.0 3.0 0•: 0 2.10 * * * 1.. 0 4.0 2•. 0 3.,, 0 * * * 5, 0 5.0 3.: 0 1-:0 * * * 6. 0 6.0 2 , 0 2,0 * * * 6..0 8.0 8::0 8.0 * * * 16.0 8.0 11;,0 26.0 * * * 23.0 35.0 25::0 48.0 * * * 54.0 44.0 54.0 89.0 * * * 56.0 81.0 77.0 212.0 * * * 65..0 97.0 110:0 169.0 * * * 56.0 82.0 80..0 103.0 * * * 67.0 81.0 89.0 110..0 * * * 54.0 74.0 90.0 78.0 * * * 60.0 79.0 78..0 57..0 * * * 58.0 69.0 75..0 41.0 * * * 69:,0 60.0 88•;0 47.0 * * 210 40.0 63.0 81.0 * * 18.0 31:;0 53.0 55-10 * * 7.0 18_0 48.0 33..0 * * 14.0 14:0 22.0 30:0 * * 2-.0 7..0 17.0 15.0 y * * 584.0 718.0 785.0 988.0 * * 679.0 B88.0 956.0 * * 700.0 927.0 1001.0 * * 719.0 948.0 1021.0 * * * 1100 1100 1100 1100 * * * 56.0 81.0 77.0 212.0 * * * 1800 1200 1200 * * * 69.0 97.0 110.0 Averages 1 - 5 1 - 7 1 5..- 5 6....5 2.0 4-.5 1 2.. 5 1:, 5 1 2..5 1.:8 1 2.5 2-5 I 5.0 3.:5 1 6.,.0 4.0 l 7.0 7.5 1 12:0 15.,3 I 29,0 32•.8 1 49.0 60.3 f 68.5 106.5 1 81.0 110..3 1 69.0 80.3 1 74.0 86..8 1 64.0 74,0 1 69,.5 68.5 1 63.5 60.8 1 64:,5 66.0 1 41_ 3 51.3 1 34.0 39.3 1 24.3 26.5 1 16.7 20.0 1 8.7 10.3 651.0 768.8 756.7 889.8 782.0 920.0 802.0 940.3 MetroCount Traffic Executive Weekly Vehicle Counts (Virtual Week) VirtWeekl Vehicle-500 -- En lists ENU Datasets: Site: Attribute: Direction: Survey Duration: Zone: File: Identifier: Algorithm: Data type: Profile: Filter time: Included classes: Speed range: Direction: Separation: Name: Scheme: Units: In profile: [118-256] Located on Bunny Lake Drive Saratoga Affordable 7 - North bound A>B, South bound B>A. Lane: 1 14:13 Wednesday, February 13, 2019 => 8:31 Wednesday, February 20, 2019, 118-256 0 2019-02-20 0832.EC1 (Plus) R519M98M MC56-1-5 [MC55] (c)Microcom 19Oct04 Factory default axle (v4.06) Axle sensors - Paired (Class/Speed/Count) 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 (4) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 5 - 100 mph. BA Headway > 0 sec, Span 0 - 300 ft Default Profile Vehicle classification (Scheme F3) Non metric (ft, mi, ft/s, mph, lb, ton) Vehicles = 5051 / 9280 (54.43%) Weekly Vehicle Counts (Virtual Week) VirtWeeklyVeh icle-500 Site: 118-256.1.2NS Description: Located on Bunny Lake Drive Filter time: 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 Scheme: Vehicle classification (Scheme F3) Filter: Cls(1 2 3 4 5 6 7 8 9 10 11 12 13 ) Dir(SB) Sp(5,100) Headway(>0) Span(0 - 300) Mon Tue Wed Thu Fri Sat Sun Averages 1 - 5 1 - 7 Hour 1 0000-0100 * * * 21,0 30.0 62.0 85.0 I 25-5 49.5 0100-0200 * * * 640 14.0 34.0 41.0 1 10.0 23.8 0200-0300 * * * 4.0 4.0 22.0 21.0 1 4.0 12,8 0300-0400 * * * 2.0 8.0 11.0 9.0 1 5.0 7-.5 0400-0500 * * * 3.0 8-0 6.0 11.0 { 5.5 7...0 0500-0600 * * * 7.0 5..0 9.0 4.0 1 6.0 6:3 0600-0700 * * * 1.0 0.0 2.0 4.0 1 0.5 1.8 0700-0800 * * * 5.0 5..0 7.0 6.0 1 5-_ 0 5-8 0800-0900 * * * 4.0 5.0 7.0 8,0 1 4.5 6.0 0900-1000 * * * 10.0 14.0 13.0 15.0 J 12.0 13.0 1000-1100 * * * 21.0 23.0 30.0 34.0 1 22.0 27.0 1100-1200 * * * 38.0 37.0 29.0 58.0 1 37.5 40.5 1200-1300 * * * 50.0 50.0 56.0 74.0 1 50.0 57.5 1300-1400 * * * 73.0 114.0 73.0 123.0 I 93.5 95.8 1400-1500 * * * 64.0 111.0 78.0 153.0 1 87.5 101.5 1500-1600 * * * 92.0 121.0 106.0 177.0 1 106.5 124.0 1600-1700 * * * 78.0 131.0 119.0 182.0 1 104.5 127.5 1700-1800 * * * 72.0 103.0 112.0 131.0 1 87.5 104.5 1800-1900 * * * 73.0 76.0 102.0 108.0 1 74.5 89.8 1900-2000 * * 39.0 72.0 85.0 106.0 * 1 65.3 75.5 2000-2100 * * 36.0 74.0 87.0 94.0 * 1 65.7 72.8 2100-2200 * * 43.0 90.0 86.0 101.0 * 1 73.0 80.0 2200-2300 * * 24.0 78.0 85.0 121.0 * 1 62.3 77:0 2300-2400 * * 16.0 60.0 65.0 84.0 * 1 47.0 56.3 Totals 0700-1900 * * 580.0 790.0 732.0 1069.0 0600-2200 * * 817.0 1048.0 1035.0 0600-0000 * * 955.0 1198.0 1240.0 0000-0000 * * 998.0 1267.0 1384.0 AM Peak * * 1100 1100 0000 0000 * * 38.0 37.0 62.0 85.0 PM Peak * * 1500 1600 2200 * 92.0 131.0 121.0 * - No data. I 685.0 792.8 I 889.5 1022.8 I 998.8 1156.0 11054.8 1262.8 MetroCount Traffic Executive Speed Statistics SpeedStat-504 -- English (ENU) Datasets: Site: Attribute: Direction: Survey Duration Zone: File: Identifier: Algorithm: Data type: Profile: Filter time: Included classes: Speed range: Direction: Separation: Name: Scheme: Units: In profile: [118-256] Located on Bunny Lake Drive Saratoga Affordable 7 - North bound A>B, South bound B>A. Lane: 1 14:13 Wednesday, February 13, 2019 => 8:31 Wednesday, February 20, 2019, 118-256 0 2019-02-20 0832.EC1 (Plus) R519M98M MC56-L5 [MC55] (c)Microcom 19Oct04 Factory default axle (v4.06) Axle sensors - Paired (Class/Speed/Count) 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 (4) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 5 - 100 mph. North, South (bound), P = North Headway > 0 sec, Span 0 - 300 ft Default Profile Vehicle classification (Scheme F3) Non metric (ft, mi, ft/s, mph, lb, ton) Vehicles = 8812 / 9280 (94.96%) Speed Statistics SpeedStat-504 Site: 118-256.1.2NS Description: Located on Bunny Lake Drive Filter time: 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 Scheme: Vehicle classification (Scheme F3) Filter: Cls(1 2 3 4 5 6 7 8 9 10 11 12 13 ) Dir(NS) Sp(5,100) Headway(>0) Span(0 - 300) Vehicles = 8812 Posted speed limit = 15 mph, Exceeding = 8774 (99.57%), Mean Exceeding = 27.46 mph Maximum = 48.0 mph, Minimum = 7.5 mph, Mean = 27.4 mph 85% Speed = 31.5 mph, 95% Speed = 34.2 mph, Median = 27.3 mph 10 mph Pace = 22 - 32, Number in Pace = 6832 (77.53%) Variance = 18 58, Standard Deviation = 4.31 mph Speed Speed I Bin_ J Below I Above I Energy I vMult I n* vMult 0- 5 1 0 0.0% 1 0 0.0% I 8812 100.0% 1 0.00 1 0.00 1 0.00 5- 10 1 8 0.1°% 1" 8 0-1% 1 8804 99.9% 1 0.00 1 0.00 1 0.00 10 - 15 1 30 0.3% 38 0.4% 1 8774 99.6% 0.00 1 0.00 1 0.00 15 - 20 1 317 3.6% l.. 355 4rr0% 1 8457 ,1 96.0% 1 0.00 I 0.00 I 0.00 20 - 25 I 2133 24.2% ( 2488 28.2% 1; 6324 71.8% I 0.00 I 0.00 I 0.00 25 - 30 J 4043 45.9% 1 6531 74,1% 1' 2281 25.9% l 0.00 1 0.00 0.00 30 - 35 1 1933 21.9°% 8464 96-1% 1 348 3.9% I' 0.00 j 0.00 I 0.00 35 - 40 J 317 3.6% I. 8781 99..6% 1 31 0.4% I, 0.00 1 0.00 I 0.00 40 - 45 1 29 0.3% 8810 100.:0% 1 2 0.0% I 0.00 j 0.00 l 0.00 45 - 50 1 2 0.0% I 8812 100..0% I 0 0.0% I 0.00 j 0.00 l 0.00 50 - 55 1 0 0.0% 8812 100_:0% 1 0 0.0% 1 0.00 0.00 1 0.00 55 - 60 1 0 0.0% J 8812 1000 % 1 0 0.0% f 0.00 0.00 I 0:00 60 - 65 J 0 0.0°% l 8812 100:0% 1 0 0.0% 1 0.00 j 0.00 I 0.00 65 - 70 1 0 0.0% 1 8812 100,:0% 1 0 0.0% 1 0.00 1 0.00 1 0.00 70 - 75 1 0 0.0% 1 8812 100:,0% 1 0 0.0% 1 0.00 j 0.00 1 0.00 75 - 80 1 0 0.0% I. 8812 100..0% 1 0 0.0% J 0.00 1 0.00 1 0.00 80 - 85 1 0 0.0% 1 8812 100:.03. 1 0 0.0% 1 0.00 1 0.00 1 0.00 85 - 90 1 0 0.0% I': 8812 100.:0% I 0 0.0% ! 0.00 I 0.00 0.00 90 - 95 1 0 0.0% 8812 100,0°% 1 0 0.0% 1 0.00 { 0.00 1' 0,00 95 - 100 0 0.40% 8812 100wo% I 0 0.0% 1 0.00 1 0.00 I 0..00 Total Speed Rating = 0.00 Total Moving Energy (Estimated) = 0.00 Speed limit fields I Limit I Below I Above 0 1 15 (PSL) 1 38 0.4% 1 8774 99.6% MetroCount Traffic Executive Speed Statistics SpeedStat-505 -- English (ENU) Datasets: Site: Attribute: Direction: Survey Duration Zone: File: Identifier: Algorithm: Data type: Profile: Filter time: Included classes: Speed range: Direction: Separation: Name: Scheme: Units: In profile: [118-256] Located on Bunny Lake Drive Saratoga Affordable 7 - North bound A>B, South bound B>A. Lane: 1 14:13 Wednesday, February 13, 2019 => 8:31 Wednesday, February 20, 2019, 118-256 0 2019-02-20 0832.EC1 (Plus) R519M98M MC56-L5 [MC55] (c)Microcom 19Oct04 Factory default axle (v4.06) Axle sensors - Paired (Class/Speed/Count) 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 (4) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 5 - 100 mph. AB Headway > 0 sec, Span 0 - 300 ft Default Profile Vehicle classification (Scheme F3) Non metric (ft, mi, ft/s, mph, lb, ton) Vehicles = 3761 / 9280 (40.53%) Speed Statistics SpeedStat-505 Site: 118-256.1.2N S Description: Located on Bunny Lake Drive Filter time: 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 Scheme: Vehicle classification (Scheme F3) Filter: Cls(1 2 3 4 5 6 7 8 9 10 11 12 13 ) Dir(NB) Sp(5,100) Headway(>0) Span(0 - 300) Vehicles = 3761 Posted speed limit = 15 mph, Exceeding = 3742 (99.49%), Mean Exceeding = 27.62 mph Maximum = 48.0 mph, Minimum = 7.5 mph, Mean = 27.5 mph 85% Speed = 32.0 mph, 95% Speed = 34.7 mph, Median = 27.5 mph 10 mph Pace = 23 - 33, Number in Pace = 2849 (75 75%) Variance = 20 23, Standard Deviation = 4.50 mph Speed Bins Sgasd I Sin_ I Below I Above I Energy I vMult I n* vMult 0- 5 1 0 0.0% 1 0 0.0% 3761 100.0% 1 0.00 I 0.00 J 0.00 5- 10 1 7 0.2% 1 7 0.2% J 3754 99.8% 1 0.00 I 0.00 1 0.00 10 - 15 1 12 0.3% 1 19 0.5% 3742 99.5% 1 0.00 I 0.00 1 0.00 15 - 20 1 158 4.2% 1 177 4.7% J 3584 95.3% 1 0.00 I 0.00 1 0.00 20 - 25 1 861 22.9% [.. 1038 27...6% 1 2723 72.4% I 0.00 I 0.00 0.00 25 - 30 I 1653 44.0% 2691 71.6% J 1070 28.49. 1 0.00 1 0.00 1 0.00 30 - 35 I 899 23.9% 1 3590 95.5% 171 4.5% 1 0.00 ,1 0.00 0.00 35 - 40 i 155 4.1% 1 3745 99.6% 1 16 0.4% j 0.00 0.00 0.00 40 - 45 I 15 0.4% I 3760 100.0% I' 1 0.0% 1 0.00 1 0.00 1 0.00 45 - 50 I 1 0.0% 1. 3761 100.0% j 0 0.0% [. 0.00 J 0.00 1 0.00 50 - 55 I 0 0.0% 1 3761 100.0% 0 0:_0% [ 0.00 0.00 I 0.00 55 - 60 I 0 0.0% I 3761 100.0% 1 0 0..0% l 0.00 1 0-00 0.00 60 - 65 1 0 0.0% 1 3761 100.0% 1• 0 0,,0% 1 0.00 1 0.00 I 0.00 65 - 70 I 0 0.0°% I: 3761 100..0% h 0 0:0% 0.00 1 0.00 1 0.00 70 - 75 I 0 0.0% [ 3761 100.0% I 0 0:::0% l 0.00 0.00 1 0.00 75 - 80 I 0 0.0% 1: 3761 100.0% 1 0 0..0% 1 0.00 I 0.00 i 0.00 80 - 85 I 0 0.0% 1 3761 100,:0% 1 0 01:0% I 0.00 'I 0.00 I 0.00 85 - 90 1 0 0.0% 1 3761 100,0% 1 0 0.0% I 0.00 .1 0.00 0.00 90 - 95 0 0.0% 1 3761 100,,:0% 1: 0 0:..0% I 0.00 1 0,:00 1 0.00 95 - 100 0 0.0% 1 3761 100..0% j 0 0.•0% I 0.00 1 0.00 I 0.00 Total Speed Rating = 0.00 Total Moving Energy (Estimated) = 0.00 Speed limit fields I Limit Below 1 Above 0 1 15 (PSL) 19 0.5% 3742 99.5% MetroCount Traffic Executive Speed Statistics SpeedStat-506 -- English (ENU) Datasets: Site: Attribute: Direction: Survey Duration: Zone: File: Identifier: Algorithm: Data type: Profile: Filter time: Included classes: Speed range: Direction: Separation: Name: Scheme: Units: In profile: [118-256] Located on Bunny Lake Drive Saratoga Affordable 7 - North bound A>B, South bound B>A. Lane: 1 14:13 Wednesday, February 13, 2019 => 8:31 Wednesday, February 20, 2019, 118-256 0 2019-02-20 0832.EC1 (Plus) R519M98M MC56-1-5 [MC55] (c)Microcom 19Oct04 Factory default axle (v4.06) Axle sensors - Paired (Class/Speed/Count) 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 (4) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 5 - 100 mph. BA Headway > 0 sec, Span 0 - 300 ft Default Profile Vehicle classification (Scheme F3) Non metric (ft, mi, ft/s, mph, lb, ton) Vehicles = 5051 / 9280 (54.43%) Speed Statistics SpeedStat-506 Site: 118-256.1.2NS Description: Located on Bunny Lake Drive Filter time: 19:00 Wednesday, February 13, 2019 => 19:00 Sunday, February 17, 2019 Scheme: Vehicle classification (Scheme F3) Filter: Cls(1 2 3 4 5 6 7 8 9 10 11 12 13 ) Dir(SB) Sp(5,100) Headway(>0) Span(0 - 300) Vehicles = 5051 Posted speed limit = 15 mph, Exceeding = 5032 (99.62%), Mean Exceeding = 27.34 mph Maximum = 46.6 mph, Minimum = 8.0 mph, Mean = 27 3 mph 85% Speed = 31.3 mph, 95% Speed = 34.0 mph, Median = 27.1 mph 10 mph Pace = 22 - 32, Number in Pace = 3991 (79.01 %) Variance = 17.32, Standard Deviation = 4.16 mph Speed Bins Speed I Bin I Below I Above I Energy I vMult I n* vMul_t 0- 5 1 0 0.0% 1 0 0.0% 1 5051 100.0% I 0..00 1 0.00 I 0.00 5- 10 1 0.0% 1 1 0,.0% 1 5050 100.0% 1 0.00 1 0.00 1 0.00 10 - 15 18 0.4% I 19 0:4% I 5032 99.6% 1 0.00 '1 0.00 0.00 15 - 20 j:, 159 3.1% I 178 3.5% 1 4873 96.5% 1 0.00 1 0.00 I 0.00 20 - 25 l; 1272 25.2% 1 1450 28.,7% j 3601 71.3°% ;J 0.00 0.00 0.00 25 - 30 1. 2390 47.3% 1 3840 76..0% 1 1211 24.0% j 0..00 j 0.00 ', 0.00 30 - 35 1034 20.5% 1 4874 96.5% 1 177 3.5% 0.00 0.00 1 0.00 35 - 40 j 162 3.2% J 5036 99.7% 1 15 0.3°% 0:00 0.00 1 0.00 40 - 45 14 0.3% 1 5050 100.0% 1 1 0.0% J 0.00 j 0.00 1 0.00 45 - 50 1 0.0% 1 5051 100.0% 1 0 0.0% •I 0.00 0.00 I 0.00 50 - 55 0 0.0% 1 5051 100.0% 1 0 0.0% 1 0.00 1 0.00 I 0.00 55 - 60 0 0.0% 1 5051 100.0% 1 0 0.0% 0..00 0.00 0.00 60 - 65 0 0.0°% 1 5051 100.0% 1 0 0.0% 0.00 I 0.00 I 0.00 65 - 70 0 0.0% 1 5051 100.0% i 0 0.0% 0..00 J 0.00 1 0.00 70 - 75 0 0.0% 1. 5051 100.0% 1. 0 0.0% 0.00 0.00 0.00 75 - 80 0 0.0% 5051 100.0% 0 0.0% 1 0.00 1 0.00 0.00 80 - 85 0 0.0% I 5051 100.0% 1 0 0.0% 1 0.00 1 0.00 0.00 85 - 90 0 0.0% 5051 100.0% I 0 0.0% 1 0.00 1 0.00 '1 0.00 90 - 95 0 0.0% 1 5051 100.0% j' 0 0.0% 1 0.00 1 0.00 j 0.00 95 - 100 0 0.0% I 5051 100.0% 1 0 0.0°% 1 0.00 1 0.00 1 0.00 Total Speed Rating = 0.00 Total Moving Energy (Estimated) = 0.00 Speed limit fields I Limit Below 1 Above 0 1 15 (PSL) 19 0.4% 5032 99.6% Attachment C Level of Service Analyses Saratoga Affordable Housing City of Saratoga Springs, New York LOS Definitions The following is an excerpt from the Highway Capacity Manual 6" Edition (HCM)_ Level of Service for Signalized Intersections Level of Service (LOS) can be characterized for the entire intersection, each intersection approach, and each lane group. Control delay alone is used to characterize LOS for the entire intersection or an approach. Control delay and volume -to -capacity (v/c) ratio are used to characterize LOS for a lane group. Delay quantifies the increase in travel time due to traffic signal control. It is also a surrogate measure of driver discomfort and fuel consumption. The v/c ratio quantifies the degree to which a phase's capacity is utilized by a lane group. The following paragraphs describe each LOS. LOS A describes operations with a control delay of 10 s/veh or less and a v/c ratio no greater than 1.0. This level is typically assigned when the v/c ratio is low and either progression is exceptionally favorable or the cycle length is very short. If it is due to favorable progression, most vehicles arrive during the green indication and travel through the intersection without stopping. LOS B describes operations with control delay between 10 and 20 s/veh and a v/c ratio no greater than 1.0. This level is typically assigned when the v/c ratio is low and either progression is highly favorable or the cycle length is short. More vehicles stop than with LOS A. LOS C describes operations with control delay between 20 and 35 s/veh and a v/c ratio no greater than 1.0. This level is typically assigned when progression is favorable or the cycle length is moderate. Individual cycle failures (i.e., one or more queued vehicles are not able to depart as a result of insufficient capacity during the cycle) may begin to appear at this level. The number of vehicles stopping is significant, although many vehicles still pass through the intersection without stopping. LOS D describes operations with control delay between 35 and 55 s/veh and a v/c ratio no greater than 1.0. This level is typically assigned when the v/c ratio is high and either progression is ineffective or the cycle length is long. Many vehicles stop and individual cycle failures are noticeable. LOS E describes operations with control delay between 55 and 80 s/veh and a v/c ratio no greater than 1.0. This level is typically assigned when the v/c ratio is high, progression is unfavorable, and the cycle length is long. Individual cycle failures are frequent. LOS F describes operations with control delay exceeding 80 s/veh or a v/c ratio greater than 1.0. This level is typically assigned when the v/c ratio is very high, progression is very poor, and the cycle length is long. Most cycles fail to clear the queue. A lane group can incur a delay less than 80 s/veh when the v/c ratio exceeds 1.0. This condition typically occurs when the cycle length is short, the signal progression is favorable, or both. As a result, both the delay and v/c ratio are considered when lane group LOS is established. A ratio of 1.0 or more indicates that cycle capacity is fully utilized and represents failure from a capacity perspective (just as delay in excess of 80 s/veh represents failure from a delay perspective). Average control delay and queue length at roundabout controlled intersections are calculated using SIDRA Intersection. The physical geometry such as entry lane width and approach flare, and traffic volume at the roundabout are factors that influence the intersection's performance. The average delay reported using SIDRA Intersection is based on the signalized HCM Method of Delay for Level -of -Service. Level of Service Criteria for Unsignalized Intersections Level of service (LOS) for Two -Way Stop -Controlled (TWSC) intersections is determined by the computed or measured control delay. For motor vehicles, LOS is determined for each minor -street movement (or shared movement) as well as major -street left turns by using criteria given in Exhibit 20-2. LOS is not defined for the intersection as a whole or for major -street approaches for three primary reasons: (a) major -street through vehicles are assumed to experience zero delay; (b) the disproportionate number of major -street through vehicles at a typical TWSC intersection skews the weighted average of all movements, resulting in a very low overall average delay for all vehicles; and (c) the resulting low delay can mask important LOS deficiencies for minor movements. LOS F is assigned to the movement if the volume -to -capacity (v/c) ratio for the movement exceeds 1.0, regardless of the control delay. The LOS criteria for TWSC intersections are somewhat different from the criteria used in Chapter 18 for signalized intersections, primarily because user perceptions differ among transportation facilitytypes. The expectation is that a signalized intersection is designed to carry higher traffic volumes and will present greater delay than an unsignalized intersection. Unsignalized intersections are also associated with more uncertainty for users, as delays are less predictable than they are at signals, which can reduce users' delay tolerance. The LOS criteria for All -Way Stop -Controlled (AWSC) intersections are given in Exhibit 21-8. LOS F is assigned if the v/c ratio of a lane exceeds 1.0, regardless of the control delay. For assessment of LOS at the approach and intersection levels, LOS is based solely on control delay. Exhibits 20-2/21-8: Level -of -Service Criteria for Stop Controlled Intersections Control Delay (s/veh) LOS by Volume -to -Capacity Ratio v/c < 1.0 v/c > 1.0 10.0 A F >10.0 and < 15.0 B F >15.0 and < 25.0 C F >25.0 and < 35.0 D F >35.0 and < 50.0 E F >50.0 F F HCM 6th Signalized Intersection Summary 1: US Route 9 & Crescent Ave 118-256 Saratoga Affordable Apts 2019 Existing AM r t T �► 1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y t1� 'i tt Traffic Volume (veh/h) 27 89 837 83 94 786 Future Volume (veh/h) 27 89 837 83 94 786 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1,00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, vehmlln 1900 1900 1856 1856 1900 1870 Adj Flow Rate, veh/h 29 96 900 89 101 845 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 0 0 3 3 0 2 Cap, veh/h 37 123 1459 144 464 2328 Arrive On Green 0.10 0.10 0.45 0.45 0.08 0.66 Sat Flow, veh/h 366 1211 3333 320 1810 3647 Grp Volume(v), veh/h 126 0 490 499 101 845 Grp Sat Flow(s),vehmfln 1590 0 1763 1798 1810 1777 Q Serve(g_s), s 3.2 0.0 8.7 8.7 1.0 4.4 Cycle Q Clear(g_c), s 3.2 0.0 8.7 8.7 1.0 4.4 Prop In Lane 0.23 0.76 0.18 1.00 Lane Grp Cap(c), veh/h 161 0 794 810 464 2328 V/C Ratio(X) 0.78 0.00 0.62 0.62 0.22 0.36 Avail Cap(c_a), veh/h 774 0 1931 1969 754 3892 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 18.0 0.0 8.6 8.6 5.5 3.2 Incr Delay (d2), s/veh 8.0 0.0 0.8 0.8 0.2 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.4 0.0 2.5 2.5 0.2 0.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 26.0 0.0 9.4 9.4 5.7 3.3 LnGrp LOS C A A A A A Approach Vol, veh/h 126 989 946 Approach Delay, s/veh 26.0 9.4 3.6 Approach LOS C A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 8.4 23.5 31.9 9.2 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 45.0 45.0 20.0 Max Q Clear Time (g_c+l1), s 3.0 10.7 6.4 5.2 Green Ext Time (p-c), s 0.1 7.8 7.2 0.3 Intersection Summary HCM 6th Chi Delay 7.7 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. Creighton Manning Engineering, LLP Synchro 10 Report EXam.syn Page 1 HCM 6th Signalized Intersection Summary 1: US Route 9 & Crescent Ave 118-256 Saratoga Affordable Apts 2021 No -Build AM - Phase 1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y T1a 'i tt Traffic Volume (veh1h) 28 92 893 86 97 851 Future Volume (veh/h) 28 92 893 86 97 851 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, vehlh/ln 1900 1900 1856 1856 1900 1870 Adj Flow Rate, veh/h 30 99 960 92 104 915 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 0 0 3 3 0 2 Cap, vehlh 38 127 1515 145 448 2360 Arrive On Green 0.10 0.10 0.47 0.47 0.08 0.66 Sat Flow, veh/h 367 1211 3344 311 1810 3647 Grp Volume(v), veh/h 130 0 521 531 104 915 Grp Sat Flow(s),veh/h/In 1590 0 1763 1799 1810 1777 Q Serve(g_s), s 3.4 0.0 9.7 9.7 1.1 5.0 Cycle Q Clear(g_c), s 3.4 0.0 9.7 9.7 1.1 5.0 Prop In Lane 0.23 0.76 0.17 1.00 Lane Grp Cap(c), veh/h 167 0 821 839 448 2360 V/C Ratio(X) 0.78 0.00 0.63 0.63 0.23 0.39 Avail Cap(c_a), veh/h 735 0 1833 1871 717 3696 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 18.9 0.0 8.8 8.8 5.7 3.3 Incr Delay (d2), s/veh 7.7 0.0 0.8 0.8 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.5 0.0 2.8 2.9 0.2 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 26.5 0.0 9.6 9.6 6.0 3.4 LnGrp LOS C A A A A A Approach Vol, veh/h 130 1052 1019 Approach Delay, s/veh 26.5 9.6 3.7 Approach LOS C A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 8.6 25.2 _ 33.7 9.5 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 45.0 45.0 20.0 Max Q Clear Time (g_c+l1), s 3.1 11.7 7.0 5.4 Green Ext Time (p_c), s 0.1 8.5 8.0 0.3 Intersection Summary _ HCM 6th Ctrs Delay 7.8 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. Creighton Manning Engineering, LLP Synchro 10 Report NB-P1am.syn Page 1 HCM 6th Signalized Intersection Summary 1: US Route 9 & Crescent Ave 118-256 Saratoga Affordable Apts 2023 No -Build AM - Phase 1+2 t Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y TT. 'i tt Traffic Volume (veh/h) 29 94 919 88 100 875 Future Volume (veh/h) 29 94 919 88 100 875 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/hAn 1900 1900 1856 1856 1900 1870 Adj Flow Rate, veh/h 31 101 988 95 108 941 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 0 0 3 3 0 2 Cap, veh/h 40 130 1537 148 440 2374 Arrive On Green 0.11 0.11 0.47 0.47 0.08 0.67 Sat Flow. veh/h 371 1207 3342 312 1810 3647 Grp Volume(v), veh/h 133 0 536 547 108 941 Grp Sat Flow(s),veh/hAn 1590 0 1763 1799 1810 1777 Q Serve(g_s), s 3.6 0.0 10.3 10.3 1.1 5.3 Cycle Q Clear(g_c), s 3.6 0.0 10.3 10.3 1.1 5.3 Prop In Lane 0.23 0.76 0.17 1.00 Lane Grp Cap(c), veh/h 171 0 834 851 440 2374 V/C Ratio(X) 0.78 0.00 0.64 0.64 0.25 0.40 Avail Cap(c_a), veh/h 714 0 1781 1818 696 3591 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 19.4 0.0 8.9 8.9 5.9 3.3 Incr Delay (d2), s/veh 7.4 0.0 0.8 0.8 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 °tile BackOfQ(50%),veh/ln 1.5 0.0 3.0 3.1 0.3 0.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 26.8 0.0 9.7 9.7 6.2 3.4 LnGro LOS C A A A A A Approach Vol, veh/h 133 1083 1049 Approach Delay, s/veh 26.8 9.7 3.7 Approach LOS C A A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 8.7 26.1 34.7 9.8 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 45.0 45.0 20.0 Max Q Clear Time (g_c+ll), s 3.1 12.3 7.3 5.6 Green Ext Time (p_c), s 0.1 8.8 8.3 0.3 Intersection Summary HCM 6th CM Delay 7.9 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. Creighton Manning Engineering, LLP Synchro 10 Report NB-P2am.syn Page 1 HCM 6th Signalized Intersection Summary 1: US Route 9 & Crescent Ave 118-256 Saratoga Affordable Apts 2021 Build AM - Phase 1 ,(- t Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y t13 'i 4t Traffic Volume (veh/h) 33 100 893 91 100 851 Future Volume (veh/h) 33 100 893 91 100 851 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/In 1900 1900 1856 1856 1900 1870 Adj Flow Rate, veh/h 35 108 960 98 108 915 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 0 0 3 3 0 2 Cap, vehm 45 139 1497 153 440 2341 Arrive On Green 0.12 0.12 0.46 0.46 0.08 0.66 Sat Flow, veh/h 387 1194 3322 330 1810 3647 Grp Volume(v), veh/h 144 0 524 534 108 915 Grp Sat Flow(s),veh/h/In 1592 0 1763 1796 1810 1777 Q Serve(g_s), s 3.9 0.0 10.1 10.1 1.2 5.3 Cycle Q Clear(g_c), s 3.9 0.0 10.1 10.1 1.2 5.3 Prop In Lane 0.24 0.75 0.18 1.00 Lane Grp Cap(c), veh/h 186 0 817 833 440 2341 V/C Ratio(X) 0.78 0.00 0.64 0.64 0.25 0.39 Avail Cap(c_a), veh/h 715 0 1782 1816 697 3593 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 19.1 0.0 9.1 9.1 6.0 3.5 Incr Delay (d2), s/veh 6.8 0.0 0.8 0.8 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.6 0.0 3.0 3.0 0.3 0.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 25.9 0.0 10.0 9.9 6.3 3.6 LnGrp LOS C A A A A A Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs 144 25.9 C 1 2 1058 9.9 A 1023 3.9 A 6 8 Phs Duration (G+Y+Rc), s 8.7 25.6 34.3 10.2 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 45.0 45.0 20.0 Max Q Clear Time (g_c+ll), s 3.2 12.1 7.3 5.9 Green Ext Time (p-c), s 0.1 8.5 8.0 0.3 Intersection Summary HCM 6th Ctrl Delay 8.2 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement Creighton Manning Engineering, LLP Synchro 10 Report BU-P1am.syn Page 1 HCM 6th Signalized Intersection Summary 1: US Route 9 & Crescent Ave 118-256 Saratoga Affordable Apts 2023 Build AM - Phase 2 4- 4- Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y 0 Vi tt Traffic Volume (veh/h) 38 111 919 97 106 875 Future Volume (veh/h) 38 111 919 97 106 875 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/hAn 1900 1900 1856 1856 1900 1870 Adj Flow Rate, veh/h 41 119 988 104 114 941 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 0 0 3 3 0 2 Cap, veh/h 53 153 1505 158 424 2334 Arrive On Green 0.13 0.13 0.47 0.47 0.08 0.66 Sat Flow, veh/h 406 1178 3311 339 1810 3647 Grp Volume(v), veh/h 161 0 541 551 114 941 Grp Sat Flow(s),veh/hAn 1594 0 1763 1795 1810 1777 Q Serve(g_s), s 4.6 0.0 11.1 11.1 1.3 5.8 Cycle Q Clear(g_c), s 4.6 0.0 11.1 11.1 1.3 5.8 Prop In Lane 0.25 0.74 0.19 1.00 Lane Grp Cap(c),veh/h 207 0 824 839 424 2334 V/C Ratio(X) 0.78 0.00 0.66 0.66 0.27 0.40 Avail Cap(c_a), veh/h 680 0 1691 1722 661 3410 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 19.7 0.0 9.6 9.6 6.5 3.8 Incr Delay (d2), s/veh 6.1 0.0 0.9 0.9 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 1.9 0.0 3.4 3.4 0.3 1.1 Unsig. Movement Delay, slveh LnGrp Delay(d),s/veh 25.9 0.0 10.5 10.5 6.8 3.9 LnGrp LOS C A B B A A Approach Vol, veh/h 161 1092 1055 Approach Delay, s/veh 25.9 10.5 4.2 Approach LOS C B A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 8.9 26.9 35.8 11.1 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 45.0 45.0 20.0 Max Q Clear Time (g_c+l1), s 3.3 13.1 7.8 6.6 Green Ext Time (p_c), s 0.1 8.9 8.3 0.4 interseclion Summary HCM 6th Ctrs Delay 8.7 - HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement Creighton Manning Engineering, LLP Synchro 10 Report BU-P2am.syn Page 1 HCM 6th Signalized Intersection Summary 1: US Route 9 & Crescent Ave 118-256 Saratoga Affordable Apts 2019 Existing 4- t t Movement WBL WBR NBT NBR SBL SST Lane Configurations Y 0 'i tt Traffic Volume (veh/h) 55 111 917 145 97 925 Future Volume (veh/h) 55 111 917 145 97 925 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/hAn 1900 1900 1870 1870 1900 1870 Adj Flow Rate, veh/h 58 117 965 153 102 974 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 2 2 0 2 Cap, veh/h 75 151 1453 230 407 2323 Arrive On Green 0.14 0.14 0.47 0.47 0.08 0.65 Sat Flow, veh/h 538 1086 3166 487 1810 3647 Grp Volume(v), veh/h 176 0 558 560 102 974 Grp Sat Flow(s),vehmM 1633 0 1777 1783 1810 1777 Q Serve(g_s), s 5.0 0.0 11.6 11.7 1.2 6.3 Cycle Q Clear(g_c), s 5.0 0.0 11.6 11.7 1.2 6.3 Prop In Lane 0.33 0.66 0.27 1.00 Lane Grp Cap(c), veh/h 227 0 840 843 407 2323 V/C Ratio(X) 0.77 0.00 0.66 0.66 0.25 0.42 Avail Cap(c_a), veh/h 677 0 1656 1662 642 3312 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 20.0 0.0 9.8 9.8 6.7 4.0 Incr Delay (d2), s/veh 5.5 0.0 0.9 0.9 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),vehlln 2.1 0.0 3.6 3.6 0.3 1.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),slveh 25.6 0.0 10.7 10.7 7.0 4.1 LnGrp LOS C A B B A A Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs 176 25.6 C 1 2 1118 10.7 B 1076 4.4 A 6 8 Phs Duration (G+Y+Rc), s 8.7 27.8 36.6 11.7 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 45.0 45.0 20.0 Max Q Clear Time (g_c+l l ), s 3.2 13.7 8.3 7.0 Green Ext Time (p_c), s 0.1 9.2 8.6 0.4 Intersection Summary HCM 6th Ctrt Delay 8.9 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. Creighton Manning Engineering, LLP Synchro 10 Report EXpm.syn Page 1 HCM 6th Signalized Intersection Summary 1: US Route 9 & Crescent Ave 118-256 Saratoga Affordable Apts 2021 No -Build PM - Phase 1 'r 'I- t �► 1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y T7k g TT Traffic Volume (veh/h) 57 114 1008 149 100 1000 Future Volume (veh/h) 57 114 1008 149 100 1000 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/hAn 1900 1900 1870 1870 1900 1870 Adj Flow Rate, veh/h 60 120 1061 157 105 1053 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 2 2 0 2 Cap, veh/h 77 154 1539 227 382 2368 Arrive On Green 0.14 0.14 0.50 0.50 0.07 0.67 Sat Flow, veh/h 541 1083 3199 459 1810 3647 Grp Volume(v), veh/h 181 0 606 612 105 1053 Grp Sat Flow(s),veh/hAn 1634 0 1777 1788 1810 1777 Q Serve(g_s), s 5.6 0.0 13.6 13.7 1.3 7.3 Cycle Q Clear(g_c), s 5.6 0.0 13.6 13.7 1.3 7.3 Prop In Lane 0.33 0.66 0.26 1.00 Lane Grp Cap(c), veh/h 232 0 880 886 382 2368 V/C Ratio(X) 0.78 0.00 0.69 0.69 0.27 0.44 Avail Cap(c_a), veh/h 626 0 1533 1543 593 3066 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.6 0.0 10.1 10.1 7.3 4.1 Incr Delay (d2), s/veh 5.6 0.0 1.0 1.0 0.4 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.3 0.0 4.3 4.4 0.3 1.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 27.2 0.0 11.0 11.1 7.7 4.3 LnGrp LOS C A B B A A Approach Vol, vehm 181 1218 1158 Approach Delay, s/veh 27.2 11.1 4.6 Approach LOS C B A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 8.9 30.8 39.7 12.4 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 45.0 45.0 20.0 Max Q Clear Time (g_c+l1), s 3.3 15.7 9.3 7.6 Green Ext Time (p_c), s 0.1 10.2 9.6 0.4 Intersection Summary _ HCM 6th Cbi Delay 9.3 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement Creighton Manning Engineering, LLP Synchro 10 Report NB-P1pm.syn Page 1 HCM 6th Signalized Intersection Summary 1: US Route 9 & Crescent Ave 118-256 Saratoga Affordable Apts 2023 No -Build PM - Phase 1+2 f- t t �► 1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y +I* tt Traffic Volume (veh/h) 58 118 1036 154 103 1029 Future Volume (veh/h) 58 118 1036 154 103 1029 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/hAn 1900 1900 1870 1870 1900 1870 Adj Flow Rate, veh/h 61 124 1091 162 108 1083 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 2 2 0 2 Cap, veh/h 78 158 1558 231 372 2378 Arrive On Green 0.15 0.15 0.50 0.50 0.07 0.67 Sat Flow, veh/h 535 1089 3198 460 1810 3647 Grp Volume(v), veh/h 186 0 623 630 108 1083 Grp Sat Flow(s),veh/h/In 1633 0 1777 1788 1810 1777 Q Serve(g_s), s 5.9 0.0 14.5 14.6 1.3 7.8 Cycle Q Clear(g_c), s 5.9 0.0 14.5 14.6 1.3 7.8 Prop In Lane 0.33 0.67 0.26 1.00 Lane Grp Cap(c), veh/h 237 0 892 897 372 2378 V/C Ratio(X) 0.78 0.00 0.70 0.70 0.29 0.46 Avail Cap(c_a), veh/h 606 0 1484 1493 574 2968 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.2 0.0 10.3 10.3 7.6 4.2 Incr Delay (d2), s/veh 5.6 0.0 1.0 1.0 0.4 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOFQ(50%),veh/In 2.4 0.0 4.6 4.7 0.4 1.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 27.8 0.0 11.3 11.3 8.1 4.4 LnGro LOS C A B B A A Approach Vol, veh/h 186 1253 1191 Approach Delay, s/veh 27.8 11.3 4.7 Approach LOS C B A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 9.0 32.0 41.1 12.8 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 45.0 45.0 20.0 Max Q Clear Time (g_c+l1), s 3.3 16.6 9.8 7.9 Green Ext Time (p_c), s 0.1 10.5 9.9 0.4 Intersection Summary HCM 6th Ctrl Delay 9.5 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. Creighton Manning Engineering, LLP Synchro 10 Report NB-P2pm.syn Page 1 HCM 6th Signalized Intersection Summary 1: US Route 9 & Crescent Ave 118-256 Saratoga Affordable Apts 2021 Build PM - Phase 1 Movement f WBL WBR t NBT /P. NBR \I. SBL SBT Lane Configurations `sr tt, tt Traffic Volume (veh1h) 60 120 1008 162 109 1000 Future Volume (veh/h) 60 120 1008 162 109 1000 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1900 1900 1870 1870 1900 1870 Adj Flow Rate, veh/h 63 126 1061 171 115 1053 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 2 2 0 2 Cap, veh/h 80 160 1520 245 377 2365 Arrive On Green 0.15 0.15 0.50 0.50 0.08 0.67 Sat Flow, veh/h 542 1083 3159 493 1810 3647 Grp Volume(v), veh/h 190 0 614 618 115 1053 Grp Sat Flow(s),veh/h/In 1633 0 1777 1782 1810 1777 Q Serve(g_s), s 6.0 0.0 14.3 14.4 1.4 7.6 Cycle Q Clear(g_c), s 6.0 0.0 14.3 14.4 1.4 7.6 Prop In Lane 0.33 0.66 0.28 1.00 Lane Grp Cap(c), veh/h 242 0 881 884 377 2365 V/C Ratio(X) 0.79 0.00 0.70 0.70 0.30 0.45 Avail Cap(c_a), veh/h 609 0 1490 1494 576 2980 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.0 0.0 10.4 10.4 7.7 4.3 Incr Delay (d2), s/veh 5.6 0.0 1.0 1.0 0.5 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.5 0.0 4.6 4.6 0.4 1.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 27.6 0.0 11.4 11.5 8.1 4.4 LnGrp LOS C A B B A A Approach Vol, veh/h 190 1232 1168 Approach Delay, s/veh 27.6 11.4 4.8 Approach LOS C B A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 9.1 31.6 40.7 12.9 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 45.0 45.0 20.0 Max Q Clear Time (g_c+l1), s 3.4 16.4 9.6 8.0 Green Ext Time (p-c), s 0.1 10.2 9.5 0.4 Intersection Summary_ HCM 6th Ctrl Delay 9.6 HCM 6th LOS A Notes User approved volume balancing among the lanes for turning movement. Creighton Manning Engineering, LLP Synchro 10 Report BU-P1pm.syn Page 1 HCM 6th Signalized Intersection Summary 1: US Route 9 & Crescent Ave 118-256 Saratoga Affordable Apts 2023 Build PM - Phase 1+2 Movement 4- WBL t WBR t NBT "*� NBR \b- SBL SBT Lane Configurations Y Ti. 14 T4 Traffic Volume (veh/h) 65 130 1036 180 121 1029 Future Volume (veh/h) 65 130 1036 180 121 1029 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, vehmM 1900 1900 1870 1870 1900 1870 Adj Flow Rate, veh/h 68 137 1091 189 127 1083 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 2 2 0 2 Cap, veh/h 85 172 1522 263 361 2367 Arrive On Green 0.16 0.16 0.50 0.50 0.08 0.67 Sat Flow, veh/h 539 1086 3123 523 1810 3647 Grp Volume(v), veh/h 206 0 639 641 127 1083 Grp Sat Flow(s),veh/h/In 1633 0 1777 1776 1810 1777 Q Serve(g_s), s 6.9 0.0 15.9 16.0 1.7 8.3 Cycle Q Clear(g_c), s 6.9 0.0 15.9 16.0 1.7 8.3 Prop In Lane 0.33 0.67 0.29 1.00 Lane Grp Cap(c), veh/h 259 0 893 892 361 2367 V/C Ratio(X) 0.80 0.00 0.72 0.72 0.35 0.46 Avail Cap(c a), veh/h 573 0 1404 1403 541 2807 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.1 0.0 11.0 11.0 8.6 4.6 Incr Delay (d2), s/veh 5.6 0.0 1.1 1.1 0.6 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 °/wile BackOfQ(50%),vehM 2.9 0.0 5.2 5.3 0.5 1.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 28.6 0.0 12.1 12.1 9.2 4.7 LnGrp LOS C A B B A A Approach Vol, veh/h 206 1280 1210 Approach Delay, s/veh 28.6 12.1 5.2 Approach LOS C B A Timer - Assigned Phs 1 2 6 8 Phs Duration (G+Y+Rc), s 9.3 33.6 42.9 14.0 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 45.0 45.0 20.0 Max Q Clear Time (g_c+I1), s 3.7 18.0 10.3 8.9 Green Ext Time (p_c), s 0.1 10.6 9.9 0.5 Intersection Summary HCM 6th Cht Delay 10.3 HCM 6th LOS B Notes User approved volume balancing among the lanes for turning movement. Creighton Manning Engineering, LLP Synchro 10 Report BU-P2pm.syn Page 1 HCM 6th TWSC 2: Crescent Ave & Bunny Lake Dr 118-256 Saratoga Affordable Apts 2019 Existing AM Intersection Int Delay, s/veh 0.4 Movement E8L EBT WBT WBR SBL SBR Lane Configurations 4 13 Y Traffic Vol, veh/h 5 135 87 1 3 2 Future Vol, veh/h 5 135 87 1 3 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 0 5 1 0 0 0 Mvmt Flow 6 153 99 1 3 2 Major/Minor Ma or1 Major2 Minor2 Conflicting Flow All 100 0 0 265 100 Stage 1 - - - 100 Stage 2 - - 165 - Critical Hdwy 4.1 - 6.4 6.2 Critical Hdwy Stg 1 - - 5.4 - Critical Hdwy Stg 2 - - 5.4 - Follow-up Hdwy 2.2 - 3.5 3.3 Pot Cap-1 Maneuver 1505 - 728 961 Stage 1 - 929 Stage 2 - 869 - Platoon blocked, % Mov Cap-1 Maneuver 1505 725 961 Mov Cap-2 Maneuver - 725 - Stage 1 - 925 - Stage 2 869 - Approach EB WB SB HCM Control Delay, s 0.3 0 9.5 HCM LOS A Minor LanelMaior Mvmt EBL EBT WST WBR SBLn1 Capacity (veh/h) 1505 - - 804 HCM Lane V/C Ratio 0.004 - 0.007 HCM Control Delay (s) 7.4 0 - 9.5 HCM Lane LOS A A - A HCM 95th %tile Q(veh) 0 - - - 0 Creighton Manning Engineering, LLP Synchro 10 Report EXam.syn Page 1 HCM 6th TWSC 2: Crescent Ave & Bunny Lake Dr 118-256 Saratoga Affordable Apts 2021 No -Build AM - Phase 1 Intersection Int Delay, s/veh Movement 0.4 EBL EBT WBT WBR SBL SBR Lane Configurations 4 1* Y Traffic Vol, vehlh 5 139 90 1 3 2 Future Vol, veh/h 5 139 90 1 3 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length - - 0 Veh in Median Storage, # - 0 0 0 Grade, % - 0 0 0 Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 0 5 1 0 0 0 Mvmt Flow 6 158 102 1 3 2 Major/Minor Maiori Ma'ar2 MinoQ Conflicting Flow All 103 0 0 273 103 Stage 1 - - - 103 - Stage 2 - 170 - Critical Hdwy 4.1 - 6.4 6.2 Critical Hdwy Stg 1 - - 5.4 Critical Hdwy Stg 2 - 5.4 - Follow-up Hdwy 2.2 - 3.5 3.3 Pot Cap-1 Maneuver 1502 - 721 957 Stage 1 926 - Stage 2 865 - Platoon blocked, % Mov Cap-1 Maneuver 1502 718 957 Mov Cap-2 Maneuver - 718 - Stage 1 - 922 - Stage 2 865 Approach EB WB SB HCM Control Delay, s 0.3 0 9.5 HCM LOS A Minor Lane/Major Mvmt EBL EST WBT WBR SBLn1 Capacity (veh#r) 1502 798 HCM Lane V/C Ratio 0.004 - 0 007 HCM Control Delay (s) 7.4 0 9.5 HCM Lane LOS A A A HCM 95th %tile Q(veh) 0 - 0 Creighton Manning Engineering, LLP Synchro 10 Report NB-P1am.syn Page 1 HCM 6th TWSC 2- Crescent Ave & Bunny Lake Dr 118-256 Saratoga Affordable A is 2023 No -Build AM - Phase 1+2 Intersection Int Delay, s/veh movement 0.4 EBL EBT WBT VV8R SBL SBR Lane Configurations -T 1= Y Traffic Vol, veh/h 5 143 92 1 3 2 Future Vol, veh/h 5 143 92 1 3 2 Conflicting Peds, Nhr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 0 5 1 0 0 0 Mvmt Flow 6 163 105 1 3 2 MajorlMinor Majorl Major2 Minor2 Conflicting Flow All 106 0 0 281 106 Stage 1 - 106 - Stage 2 175 - Critical Hdwy 4.1 - 6.4 6.2 Critical Hdwy Stg 1 - 5.4 - Critical Hdwy Stg 2 - 5.4 - Follow-up Hdwy 2.2 3.5 3.3 PotCap-1 Maneuver 1498 713 954 Stage 1 923 - Stage 2 - 860 - Platoon blocked, % Mov Cap-1 Maneuver 1498 710 954 Mov Cap-2 Maneuver 710 - Stage 1 - 919 Stage 2 860 - EB WB SS HGM Controi Delay. s 0.3 0 9.6 HCM LOS A Minor LanelVa o OWM_ EBL EBT VAT WBR 89tn1 Capacity (veh/h) 1498 - 791 HCM Lane V/C Ratio 0.004 - 0 007 HCM Control Delay (s) 7.4 0 9.6 HCM Lane LOS A A A HCM 95th %tile a(veh) 0 - 0 Creighton Manning Engineering, LLP Synchro 10 Report NB-P2am.syn Page 1 HCM 6th TWSC 2- Crescent Ave & Bunny Lake Dr 118-256 Sarato a Affordable Apts 2021 Build AM - Phase 1 Interseclion Int Delay, s/veh Movement 1.3 EBL EBT WBT WBR SBL SBR Lane Configurations 4 T. Y Traffic Vol, veh/h 13 139 90 1 12 15 Future Vol, veh/h 13 139 90 1 12 15 Conflicting Peds, #fhr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None None - None Storage Length - - 0 Veh in Median Storage, # - 0 0 - 0 Grade, % 0 0 0 Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 0 5 1 0 0 0 Mvmt Flow 15 158 102 1 14 17 Major/Minor Ma or1 Ma'or2 Minar2 Conflicting Flow All 103 0 0 291 103 Stage 1 - - 103 - Stage 2 - - 188 - Critical Hdwy 4.1 - 6.4 6.2 Critical Hdwy Stg 1 - 5.4 - Critical Hdwy Stg 2 - - 5.4 - Follow-up Hdwy 2.2 - 3.5 3.3 Pot Cap-1 Maneuver 1502 - 704 957 Stage 1 - 926 - Stage 2 - - 849 - Platoon blocked, % Mov Cap-1 Maneuver 1502 696 957 Mov Cap-2 Maneuver - 696 - Stage 1 - 916 - Stage 2 849 - Approach EB WB SB HCM Control Delay, s 0.6 0 9.6 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1502 - 820 HCM Lane V/C Ratio 0.01 - 0.037 HCM Control Delay (s) 7.4 0 9.6 HCM Lane LOS A A A HCM 95th %file Q(veh) 0 - 0.1 Creighton Manning Engineering, LLP Synchro 10 Report BU-P1am.syn Page 1 HCM 6th TWSC 2- Crescent Ave & Bunny Lake Dr 118-256 Saratoga Affordable Apts 2023 Build AM - Phase 1+2 Intersection Int Delay, s/veh 2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 1a Y Traffic Vol, veh/h 20 143 92 2 20 28 Future Vol, veh/h 20 143 92 2 20 28 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 0 Veh in Median Storage, # - 0 0 - 0 Grade, % - 0 0 0 - Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 0 5 1 0 0 0 Mvmt Flow 23 163 105 2 23 32 Major/Minor Ma'orl Ma'or2 Minor2 Conflicting Flow All 107 0 0 315 106 Stage 1 - - - 106 - Stage 2 - - 209 - Critical Hdwy 4.1 - 6.4 6.2 Critical Hdwy Stg 1 - - 5.4 - Critical Hdwy Stg 2 - - 5.4 - Follow-up Hdwy 2.2 3.5 3.3 Pot Cap-1 Maneuver 1497 - 682 954 Stage 1 - - 923 - Stage 2 - - - 831 - Platoon blocked, % Mov Cap0 Maneuver 1497 670 954 Mov Cap-2 Maneuver - 670 - Stage 1 - 907 - Stage 2 831 - Approach Eta WB SB HCM Control Delay, s 0.9 0 9.8 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLril Capacity (veh1h) 1497 - 811 HCM Lane WC Ratio 0.015 - 0.067 HCM Control Delay (s) 7.4 0 9.8 HCM Lane LOS A A A HCM 95th %tile Q(veh) 0 - 0.2 Creighton Manning Engineering, LLP Synchro 10 Report BU-P2am.syn Page 1 HCM 6th TWSC 2: Crescent Ave & Bunny Lake Dr 118-256 Saratoga Affordable Apts 2019 Existing Intersection Int Delay, s/veh 2.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations *T 1+ Y Traffic Vol, veh/h 38 152 67 3 27 23 Future Vol, veh/h 38 152 67 3 27 23 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - 0 Veh in Median Storage, # - 0 0 - 0 - Grade, % 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 6 1 3 0 0 5 Mvmt Flow 42 169 74 3 30 26 Major/Minor Ma or1 Ma'or2 Minor2 Conflicting Flow All 77 0 0 329 76 Stage 1 - - - - 76 - Stage 2 - 253 - Critical Hdwy 4.16 6.4 6.25 Critical Hdwy Stg 1 - 5.4 - Critical Hdwy Stg 2 - 5.4 - Follow-up Hdwy 2.254 3.5 3.345 Pot Cap-1 Maneuver 1497 670 977 Stage 1 - 952 - Stage 2 - 794 - Platoon blocked, % Mov Cap-1 Maneuver 1497 649 977 Mov Cap-2 Maneuver - 649 - Stage 1 - 922 Stage 2 794 Approach E8 WB SB HCM Control Delay, s 1.5 0 10.1 HCM LOS B Minor Lane/Maior Mvmt E81- EBT WBT VVBR SBLni Capacity (veh/h) 1497 - - 768 HCM Lane V/C Ratio 0.028 - - 0.072 HCM Control Delay (s) 7.5 0 - 10.1 HCM Lane LOS A A - B HCM 95th °ktile Q(veh) 0.1 - - 0.2 Creighton Manning Engineering, LLP Synchro 10 Report EXpm.syn Page 1 HCM 6th TWSC 2- Crescent Ave & Bunny Lake Dr 118-256 Saratoga Affordable Apts 2021 No -Build PM - Phase 1 Intersection Int Delay, s/veh 2.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 13 Y Traffic Vol, vehm 39 157 69 3 28 24 Future Vol, veh/h 39 157 69 3 28 24 Conflicting Peds, #Ihr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 6 1 3 0 0 5 Mvmt Flow 43 174 77 3 31 27 Major/Minor Ma'or1 Ma'or2 Minor2 Conflicting Flow All 80 0 0 339 79 Stage 1 - - 79 - Stage 2 - 260 - Critical Hdwy 4.16 6.4 6.25 Critical Hdwy Stg 1 - 5.4 - Critical Hdwy Stg 2 - 5.4 - Follow-up Hdwy 2.254 3.5 3.345 Pot Cap-1 Maneuver 1493 661 973 Stage 1 - 949 - Stage 2 - 788 - Platoon blocked, % Mov Cap-1 Maneuver 1493 640 973 Mov Cap-2 Maneuver - 640 - Stage 1 - 919 - Stage 2 788 - Ap roach E B WB SB HCM Control Delay, s 1.5 0 10.1 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh1h) 1493 - 760 HCM Lane V/C Ratio 0.029 - - 0.076 HCM Control Delay (s) 7.5 0 - 10.1 HCM Lane LOS A A - B HCM 95th %tile Q(veh) 0.1 - - 0.2 Creighton Manning Engineering, LLP Synchro 10 Report NB-P1pm.syn Page 1 HCM 6th TWSC 2: Crescent Ave & Bunny Lake Dr 118-256 Saratoga Affordable Apts 2023 No -Build PM - Phase 1+2 Intersection Int Delay, s/veh Movement 2.6 EBL EBT WBT WBR SBL SBR Lane Configurations 4 1+ Y Traffic Vol, veh/h 40 161 71 3 29 24 Future Vol, veh/h 40 161 71 3 29 24 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - 0 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 6 1 3 0 0 5 Mvmt Flow 44 179 79 3 32 27 Major/Minor Major1 MAor2 M_inor2 Conflicting Flow All 82 0 0 348 81 Stage 1 - - - 81 - Stage 2 - - 267 - Critical Hdwy 4.16 - 6.4 6.25 Critical Hdwy Stg 1 - - 5.4 - Critical Hdwy Stg 2 - - 5.4 - Follow-up Hdwy 2.254 3.5 3 345 Pot Cap-1 Maneuver 1490 653 971 Stage 1 - 947 - Stage 2 - 782 - Platoon blocked, % Mov Cap-1 Maneuver 1490 631 971 Mov Cap-2 Maneuver - 631 - Stage 1 - 916 - Stage 2 - 782 - Approach EB WB SB HCM Control Delay, s 1.5 0 10.2 HCM LOS B Minor lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1490 - 750 HCM Lane V/C Ratio 0.03 - - 0.079 HCM Control Delay (s) 7.5 0 - - 10.2 HCM Lane LOS A A - B HCM 95th %file Q(veh) 0.1 - - 0.3 Creighton Manning Engineering, LLP Synchro 10 Report NB-P2pm.syn Page 1 HCM 6th TWSC 2: Crescent Ave & Bunny Lake Dr 118-256 Saratoga Affordable Apts 2021 Build PM - Phase 1 Intersection Int Delay, s/veh Movement 3.2 E8L EBT WBT WBR SBL SBR Lane Configurations 4 T+ Y Traffic Vol, veh/h 61 157 69 4 34 33 Future Vol, veh/h 61 157 69 4 34 33 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 6 1 3 0 0 5 Mvmt Flow 68 174 77 4 38 37 Majflr)Minor Majorl Major2 Minor2 Conflicting Flow All 81 0 0 389 79 Stage 1 - - - 79 - Stage 2 - - 310 - Critical Hdwy 4.16 - 6.4 6.25 Critical Hdwy Stg 1 - - 5.4 - Critical Hdwy Stg 2 - - 5.4 - Follow-up Hdwy 2.254 - 3.5 3.345 Pot Cap-1 Maneuver 1492 - 619 973 Stage 1 - - 949 - Stage 2 - - 748 - Platoon blocked, % Mov Cap-1 Maneuver 1492 588 973 Mov Cap-2 Maneuver - 588 - Stage 1 - 902 - Stage 2 748 A mach EB WB SB - HCM Control Delay, s 2.1 0 10.5 HCM LOS B Minor LanelMajor Mvmt EBL EST WBT WBR SBLn1 Capacity (vehm) 1492 - 730 HCM Lane V/C Ratio 0.045 - 0.102 HCM Control Delay (s) 7.5 0 - 10.5 HCM Lane LOS A A - B HCM 95th %tile Q(veh) 0.1 - - 0.3 Creighton Manning Engineering, LLP Synchro 10 Report BU-P1pm.syn Page 1 HCM 6th TWSC 2: Crescent Ave & Bunny Lake Dr 118-256 Saratoga Affordable Apts 2023 Build PM - Phase 1+2 Intersection Int Delay, s/veh Movement 3.8 EBL EBT WBT WBR SBL SBR Lane Configurations 4 1 Y Traffic Vol, veh/h 84 161 71 6 41 43 Future Vol, veh/h 84 161 71 6 41 43 Conflicting Peds, #ahr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - 0 Veh in Median Storage, # - 0 0 - 0 Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 6 1 3 0 0 5 Mvmt Flow 93 179 79 7 46 48 Major/Minor Maori Ma or2 Minor2 Conflicting Flow All 86 0 0 448 83 Stage 1 - - - 83 - Stage 2 - 365 - Critical Hdwy 4.16 6.4 6.25 Critical Hdwy Stg 1 - 5.4 - Criflcal Hdwy Stg 2 - 5.4 - Follow-up Hdwy 2.254 3.5 3.345 Pot Cap-1 Maneuver 1485 572 968 Stage 1 - 945 - Stage 2 - 707 - Platoon blocked, % Mov Cap-1 Maneuver 1485 - 532 968 Mov Cap-2 Maneuver - 532 Stage 1 - 879 Stage 2 - 707 Approach EB WB SB HCM Control Delay, s 2.6 0 11 HCM LOS B Minor LaneWajor Mvmt EBL EBT WBT WBR SBLn1 Capacity (vehm) 1485 - - 691 HCM Lane V/C Ratio 0.063 - - 0.135 HCM Control Delay (s) 7.6 0 - - 11 HCM Lane LOS A A - B HCM 95th %file 0(veh) 0.2 - - - 0.5 Creighton Manning Engineering, LLP Synchro 10 Report BU-P2pm.syn Page 1 HCM 6th AWSC 3: Nelson Ave & Crescent Ave 118-256 Saratoga Affordable Apts 2019 Existing AM Intersection Intersection Delay, s/veh 8.5 Intersection LOS A Movement EBL EST EBR WBL WBT WBR NBL NBT NBR SHL SBT SBR Lane Configurations 4* d if 4* 41 Traffic Vol, vehm 19 107 0 6 67 21 9 18 5 85 15 22 Future Vol, veh/h 19 107 0 6 67 21 9 18 5 85 15 22 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles, % 0 1 0 20 0 6 0 13 13 1 0 0 Mvmt Flow 21 119 0 7 74 23 10 20 6 94 17 24 Number of Lanes 0 1 0 0 1 1 0 1 0 0 1 0 Approach ES W8 NB S6 Opposing Approach WB EB SB NB Opposing Lanes 2 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 2 1 HCM Control Delay 8.6 8.5 7.9 8.6 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % 28% 15% 8% 0% 70% Vol Thru, % 56% 85% 92% 0% 12% Vol Right, % 16% 0% 0% 100% 18% Sign Control Stop Stop Stop Stop Stop Traffic Vol by Lane 32 126 73 21 122 LT Vol 9 19 6 0 85 Through Vol 18 107 67 0 15 RT Vol 5 0 0 21 22 Lane Flow Rate 36 140 81 23 136 Geometry Grp 2 5 7 7 2 Degree of Util (X) 0.046 0.178 0.122 0.028 0.173 Departure Headway (Hd) 4.619 4.568 5.406 4.32 4.583 Convergence, Y/N Yes Yes Yes Yes Yes Cap 775 785 663 829 784 Service Time 2.648 2.593 3.134 2.047 2.606 HCM Lane VIC Ratio 0.046 0.178 0.122 0.028 0.173 HCM Control Delay 7.9 8.6 8.9 7.2 8.6 HCM Lane LOS A A A A A HCM 95th-tile Q 0.1 0.6 0.4 0.1 0.6 Creighton Manning Engineering, LLP Synchro 10 Report EXam.syn Page 1 HCM 6th AWSC 3: Nelson Ave & Crescent Ave 118-256 Saratoga Affordable Apts 2021 No -Build AM - Phase 1 Intersection Intersection Delay, s/veh 8.5 Intersection LOS A Movement EBL EBT EBR WSL V BT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4� 4 i' 4 Traffic Vol, veh/h 20 110 0 6 69 22 9 19 5 88 15 23 Future Vol, veh/h 20 110 0 6 69 22 9 19 5 88 15 23 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles, % 0 1 0 20 0 6 0 13 13 1 0 0 Mvmt Flow 22 122 0 7 77 24 10 21 6 98 17 26 Number of Lanes 0 1 0 0 1 1 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 2 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 2 1 HCM Control Delay 8.6 8.5 7.9 8.6 HCM LOS A A A A Lane NBLn1 EBLn1 W8Ln1 WBLn2 SBLn1 Vol Left, % 27% 15% 8% 0% 70% Vol Thru, % 58% 85% 92% 0% 12% Vol Right, % 15% 0% 0% 100% 18% Sign Control Stop Stop Stop Stop Stop Traffic Vol by Lane 33 130 75 22 126 LT Vol 9 20 6 0 88 Through Vol 19 110 69 0 15 RT Vol 5 0 0 22 23 Lane Flow Rate 37 144 83 24 140 Geometry Grp 2 5 7 7 2 Degree of Util (X) 0.047 0.184 0.126 0.029 0.179 Departure Headway (Hd) 4.645 4.588 5.426 4.34 4.602 Convergence, Y/N Yes Yes Yes Yes Yes Cap 770 783 662 825 780 Service Time 2.676 2.612 3.152 2.065 2.626 HCM Lane V/C Ratio 0.048 0.184 0.125 0.029 0.179 HCM Control Delay 7.9 8.6 8.9 7.2 8.6 HCM Lane LOS A A A A A HCM 95th-tile Q 0.1 0.7 0.4 0.1 0.6 Creighton Manning Engineering, LLP Synchro 10 Report NB-P1am.syn Page 1 HCM 6th AWSC 3: Nelson Ave & Crescent Ave 118-256 Saratoga Affordable Ai3ts 2023 No -Build AM - Phase 1+2 Intersection Intersection Delay, s/veh 8.6 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations *11� 4 T 4� 4, Traffic Vol, veh/h 20 114 0 6 71 22 10 19 5 90 16 23 Future Vol, veh/h 20 114 0 6 71 22 10 19 5 90 16 23 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles, % 0 1 0 20 0 6 0 13 13 1 0 0 Mvmt Flow 22 127 0 7 79 24 11 21 6 100 18 26 Number of Lanes 0 1 0 0 1 1 0 1 0 0 1 0 Approach ES WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 2 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 2 1 HCM Control Delay 8.7 8.6 7.9 8.7 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % Vol Thru, % Vol Right, % Sign Control Traffic Vol by Lane LT Vol Through Vol RT Vol Lane Flow Rate Geometry Grp Degree of Util (X) Departure Headway (Hd) Convergence, Y/N Cap Service Time HCM Lane VIC Ratio HCM Control Delay HCM Lane LOS HCM 95th-tile Q Creighton Manning Engineering, LLP NB-P2am.syn 29% 15% 8% 0% 70% 56% 85% 92% 0% 12% 15% 0% 0% 100% 18% Stop Stop Stop Stop Stop 34 134 77 22 129 10 20 6 0 90 19 114 71 0 16 5 0 0 22 23 38 149 86 24 143 2 5 7 7 2 0.049 0.19 0.129 0.03 0.184 4.678 4.603 5.442 4.357 4.625 Yes Yes Yes Yes Yes 765 780 660 822 777 2.707 2.629 3.169 2.084 2.649 0.05 0.191 0.13 0.029 0.184 7.9 8.7 9 7.2 8.7 A A A A A 0.2 0.7 0.4 0.1 0.7 Synchro 10 Report Page 1 HCM 6th AWSC 3: Nelson Ave & Crescent Ave 118-256 Sarato a Affordable Apts 2021 Build AM - Phase 1 1 n lersedion Intersection Delay, s/veh 8.6 Intersection LOS A Movement EBL EST EBR WBi_ WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4b 4 r 4* 41 Traffic Vol, veh/h 21 118 0 6 69 22 9 19 5 88 15 23 Future Vol, veh/h 21 118 0 6 69 22 9 19 5 88 15 23 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles, % 0 1 0 20 0 6 0 13 13 1 0 0 Mvmt Flow 23 131 0 7 77 24 10 21 6 98 17 26 Number of Lanes 0 1 0 0 1 1 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 2 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 2 1 HCM Control Delay 8.7 8.6 7.9 8.7 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % 27% 15% 8% 0% 70% Vol Thru, % 58% 85% 92% 0% 12% Vol Right, % 15% 0% 0% 100% 18% Sign Control Stop Stop Stop Stop Stop Traffic Vol by Lane 33 139 75 22 126 LT Vol 9 21 6 0 88 Through Vol 19 118 69 0 15 RT Vol 5 0 0 22 23 Lane Flow Rate 37 154 83 24 140 Geometry Grp 2 5 7 7 2 Degree of Util (X) 0.048 0.197 0.126 0.03 0.18 Departure Headway (Hd) 4.671 4.589 5.437 4.351 4.626 Convergence, Y/N Yes Yes Yes Yes Yes Cap 766 781 660 823 776 Service Time 2.704 2.616 3.165 2.079 2.653 HCM Lane V/C Ratio 0.048 0.197 0.126 0.029 0.18 HCM Control Delay 7.9 8.7 9 7.2 8.7 HCM Lane LOS A A A A A HCM 95th-tile Q 0.2 0.7 0.4 0.1 0.7 Creighton Manning Engineering, LLP Synchro 10 Report BU-P1am.syn Page 1 HCM 6th AWSC 3: Nelson Ave & Crescent Ave 118-256 Saratoga Affordable Apts 2023 Build AM - Phase 1+2 Intersection Intersection Delay, s/veh 8.7 Intersection LOS A Movement ESL EBT EHR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + 4 r + + Traffic Vol, vehm 22 129 0 6 71 22 10 19 5 90 16 24 Future Vol, veh/h 22 129 0 6 71 22 10 19 5 90 16 24 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0,90 0.90 Heavy Vehicles, % 0 1 0 20 0 6 0 13 13 1 0 0 Mvmt Flow 24 143 0 7 79 24 11 21 6 100 18 27 Number of Lanes 0 1 0 0 1 1 0 1 0 0 1 0 Approach EB WB NB S8 Opposing Approach WB EB SB NB Opposing Lanes 2 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 2 1 HCM Control Delay 8.9 8.6 8 8.8 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 1NBLn2 SBLn1 Vol Left, % 29% 15% 8% 0% 69% Vol Thal, % 56% 85% 92% 0% 12% Vol Right, % 15% 0% 0% 100% 18% Sign Control Stop Stop Stop Stop Stop Traffic Vol by Lane 34 151 77 22 130 LT Vol 10 22 6 0 90 Through Vol 19 129 71 0 16 RT Vol 5 0 0 22 24 Lane Flow Rate 38 168 86 24 144 Geometry Grp 2 5 7 7 2 Degree of Util (X) 0.05 0.215 0.13 0.03 0.187 Departure Headway (Hd) 4.726 4.609 5.465 4.379 4.666 Convergence, Y/N Yes Yes Yes Yes Yes Cap 757 778 656 817 770 Service Time 2.76 2.637 3.195 2.11 2.693 HCM Lane VIC Ratio 0.05 0.216 0.131 0.029 0.187 HCM Control Delay 8 8.9 9 7.2 8.8 HCM Lane LOS A A A A A HCM 95th-tile Q 0.2 0.8 0.4 0.1 0.7 Creighton Manning Engineering, LLP Synchro 10 Report BU-P2am.syn Page 1 HCM 6th AWSC I Nelson Ave & Crescent Ave 118-256 Saratoga Affordable Apts 2019 Existing Intersection Intersection Delay, s/veh 8.5 Intersection LOS A Movement E8L EBT EBR WBL WST WBR NBL NBT NBR SBL SBT SBR Lane Configurations +4 4 r 4+ 4* Traffic Vol, veh/h 31 127 16 2 47 17 2 21 3 71 17 14 Future Vol, veh/h 31 127 16 2 47 17 2 21 3 71 17 14 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles, % 0 1 0 0 2 0 0 6 0 0 0 0 Mvmt Flow 36 149 19 2 55 20 2 25 4 84 20 16 Number of Lanes 0 1 0 0 1 1 0 1 0 0 1 0 Approach EB W8 NB SB Opposing Approach WB EB SB NB Opposing Lanes 2 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 2 1 HCM Control Delay 8.9 7.9 7.9 8.5 HCM LOS A A A A Lane NBLn1 EBLn1 WBLni WBLn2 SBLn1 Vol Left, % 8% 18% 4% 0% 70% Vol Thru, % 81% 73% 96% 0% 17% Vol Right, % 12% 9% 0% 100% 14% Sign Control Stop Stop Stop Stop Stop Traffic Vol by Lane 26 174 49 17 102 LT Vol 2 31 2 0 71 Through Vol 21 127 47 0 17 RT Vol 3 16 0 17 14 Lane Flow Rate 31 205 58 20 120 Geometry Grp 2 5 7 7 2 Degree of Util (X) 0.039 0.252 0.081 0.024 0.155 Departure Headway (Hd) 4.647 4,436 5.051 4.361 4.646 Convergence, Y/N Yes Yes Yes Yes Yes Cap 771 811 711 822 773 Service Time 2.674 2.453 2.77 2.08 2.667 HCM Lane VIC Ratio 0.04 0.253 0.082 0.024 0.155 HCM Control Delay 7.9 8.9 8.2 7.2 8.5 HCM Lane LOS A A A A A HCM 95th-tile Q 0.1 1 0.3 0.1 0.5 Creighton Manning Engineering, LLP Synchro 10 Report EXpm.syn Page 1 HCM 6th AWSC 3: Nelson Ave & Crescent Ave 118-256 Saratoga Affordable A is 2021 No -Build PM - Phase 1 Intersection Intersection Delay, s/veh 8.6 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 44 4 r #�k 4+ Traffic Vol, veh/h 32 131 16 2 48 18 2 22 3 73 18 14 Future Vol, veh/h 32 131 16 2 48 18 2 22 3 73 18 14 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles, % 0 1 0 0 2 0 0 6 0 0 0 0 Mvmt Flow 38 154 19 2 56 21 2 26 4 86 21 16 Number of Lanes 0 1 0 0 1 1 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 2 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 2 1 HCM Control Delay 9 8 7.9 8.6 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % 7% 18% 4% 0% 70% Vol Thru, % 81% 73% 96% 0% 17% Vol Right, % 11% 9% 0% 100% 13% Sign Control Stop Stop Stop Stop Stop Traffic Vol by Lane 27 179 50 18 105 LT Vol 2 32 2 0 73 Through Vol 22 131 48 0 18 RT Vol 3 16 0 18 14 Lane Flow Rate 32 211 59 21 124 Geometry Grp 2 5 7 7 2 Degree of Util (X) 0.041 0.26 0.083 0.026 0.16 Departure Headway (Hd) 4.675 4.453 5.068 4.378 4.669 Convergence,Y/N Yes Yes Yes Yes Yes Cap 766 809 708 818 768 Service Time 2.704 2.472 2.79 2.1 2.693 HCM Lane V/C Ratio 0.042 0.261 0.083 0.026 0.161 HCM Control Delay 7.9 9 8.3 7.2 8.6 HCM Lane LOS A A A A A HCM 95th-tile Q 0.1 1 0.3 0.1 0.6 Creighton Manning Engineering, LLP Synchro 10 Report NB-P1pm.syn Page 1 HCM 6th AWSC 3: Nelson Ave & Crescent Ave 118-256 Saratoga Affordable Apts 2023 No -Build PM - Phase 1+2 Intersection Intersection Delay, s/veh 8.7 Intersection LOS A Movement E8L EBT EBR WBL 1NBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 41 4 F 44 41 Traffic Vol, veh/h 33 135 17 2 50 18 2 22 3 75 18 15 Future Vol, veh/h 33 135 17 2 50 18 2 22 3 75 18 15 Peak Hour Factor 0.85 0.85 0.85 085 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles, % 0 1 0 0 2 0 0 6 0 0 0 0 Mvmt Flow 39 159 20 2 59 21 2 26 4 88 21 18 Number of Lanes 0 1 0 0 1 1 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 2 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 2 1 HCM Control Delay 9.1 8 7.9 8.7 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 WBLn2 SSLn1 Vol Left, % 7% 18% 4% 0% 69% Vol Thru, % 81% 73% 96% 0% 17% Vol Right, % 11 % 9% 0% 100% 14% Sign Control Stop Stop Stop Stop Stop Traffic Vol by Lane 27 185 52 18 108 LT Vol 2 33 2 0 75 Through Vol 22 135 50 0 18 RT Vol 3 17 0 18 15 Lane Flow Rate 32 218 61 21 127 Geometry Grp 2 5 7 7 2 Degree of Util (X) 0.042 0.27 0.086 0.026 0.166 Departure Headway (Hd) 4.704 4.463 5.082 4.393 4.69 Convergence, Y/N Yes Yes Yes Yes Yes Cap 761 805 705 814 765 Service Time 2.735 2.487 2.811 2.122 2.715 HCM Lane V/C Ratio 0.042 0.271 0,087 0.026 0.166 HCM Control Delay 7.9 9.1 8.3 7.2 8.7 HCM Lane LOS A A A A A HCM 95th-tile Q 0.1 1.1 0.3 0.1 0.6 Creighton Manning Engineering, LLP Synchro 10 Report NB-P2pm.syn Page 1 HCM 6th AWSC 3: Nelson Ave & Crescent Ave 118-256 Saratoga Affordable Apts 2021 Build PM - Phase 1 Intersection Intersection Delay, s/veh 8.7 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4, 4 r + 4.) Traffic Vol, veh/h 33 136 16 2 48 18 2 22 3 73 18 15 Future Vol, veh/h 33 136 16 2 48 18 2 22 3 73 18 15 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles, % 0 1 0 0 2 0 0 6 0 0 0 0 Mvmt Flow 39 160 19 2 56 21 2 26 4 86 21 18 Number of Lanes 0 1 0 0 1 1 0 1 0 0 1 0 Approach EB We NB SB Opposing Approach WB EB SB NB Opposing Lanes 2 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 2 1 HCM Control Delay 9.1 8 7.9 8.6 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % 7% 18% 4% 0% 69% Vol Thru, % 81 % 74% 96% 0% 17% Vol Right, % 11 % 9% 0% 100% 14% Sign Control Stop Stop Stop Stop Stop Traffic Vol by Lane 27 185 50 18 106 LT Vol 2 33 2 0 73 Through Vol 22 136 48 0 18 RT Vol 3 16 0 18 15 Lane Flow Rate 32 218 59 21 125 Geometry Grp 2 5 7 7 2 Degree of Util (X) 0.041 0.269 0.083 0.026 0.162 Departure Headway (Hd) 4.694 4.457 5.076 4.386 4.68 Convergence, Y/N Yes Yes Yes Yes Yes Cap 763 807 706 817 767 Service Time 2.724 2.478 2.801 2.111 2.704 HCM Lane WC Ratio 0.042 0.27 0.084 0.026 0.163 HCM Control Delay 7.9 9.1 8.3 7.2 8.6 HCM Lane LOS A A A A A HCM 95th-tile Q 0.1 1.1 0.3 0.1 0.6 Creighton Manning Engineering, LLP Synchro 10 Report BU-P1pm.syn Page 1 HCM 6th AWSC 3: Nelson Ave & Crescent Ave 118-256 Saratoga Affordable Apts 2023 Build PM - Phase 1+2 Intersection Intersection Delay, s/veh 8.8 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SST SBR Lane Configurations 4+ 4 r 4a 4, Traffic Vol, vehm 35 145 17 2 50 18 2 22 3 75 18 18 Future Vol, veh/h 35 145 17 2 50 18 2 22 3 75 18 18 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles, % 0 1 0 0 2 0 0 6 0 0 0 0 Mvmt Flow 41 171 20 2 59 21 2 26 4 88 21 21 Number of Lanes 0 1 0 0 1 1 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 2 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 2 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 2 1 HCM Control Delay 9.3 8 8 8.7 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 WBLn2 SBLn1 Vol Left, % 7% 18% 4% 0% 68% Vol Thru, % 81% 74% 96% 0% 16% Vol Right, % 11 % 9% 0% 100% 16% Sign Control Stop Stop Stop Stop Stop Traffic Vol by Lane 27 197 52 18 111 LT Vol 2 35 2 0 75 Through Vol 22 145 50 0 18 RT Vol 3 17 0 18 18 Lane Flow Rate 32 232 61 21 131 Geometry Grp 2 5 7 7 2 Degree of Util (X) 0.042 0.288 0.087 0.026 0.171 Departure Headway (Hd) 4.744 4.478 5.107 4.418 4.707 Convergence, Y/N Yes Yes Yes Yes Yes Cap 754 804 702 810 763 Service Time 2.778 2.502 2.835 2.145 2.733 HCM Lane WC Ratio 0.042 0.289 0.087 0.026 0.172 HCM Control Delay 8 9.3 8.3 7.3 8.7 HCM Lane LOS A A A A A HCM 95th-tile Q 0.1 1.2 0.3 0.1 0.6 Creighton Manning Engineering, LLP Synchro 10 Report BU-P2pm.syn Page 1 HCM 6th TWSC 13- Bunny Lake Dr & Site Drwy 118-256 Saratoga Affordable A is 2021 Build AM - Phase 1 Intersection Int Delay, s/veh Movement 5.9 EBL EBR NBL NBT SBT SBR Lane Configurations Y f- T Traffic Vol, veh/h 2 22 8 6 5 1 Future Vol, veh/h 2 22 8 6 5 1 Conflicting Peds, Nhr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - Veh in Median Storage, # 0 - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 88 .88 88 88 88 88 Heavy Vehicles, % 0 0 0 0 0 0 Mvmt Flow 2 25 9 7 6 1 Major/Minor Minor2 Ma'or1 Ma'or2 Conflicting Flow All 32 7 7 0 0 Stage 1 7 - - - - Stage 2 25 - - - Critical Hdwy 6.4 6.2 4.1 - Critical Hdwy Stg 1 5.4 - - - Critical Hdwy Sig 2 5.4 - - - Follow-up Hdwy 3.5 3.3 2.2 - Pot Cap-1 Maneuver 987 1081 1627 Stage 1 1021 - - _ - Stage 2 1003 - - Platoon blocked, % Mov Cap-1 Maneuver 981 1081 1627 Mov Cap-2 Maneuver 981 - - - �.• Stage 1 1015 - - - Stage 2 1003 - - - - - EB NB SB HCM Control Delay. s 8.4 4.1 0 HCM LOS A Minor Lane/Maior Mvmt Capacity (vehlh) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh NBL NBT EBLn1 SBT SBR - - — - 1627 1072 0.006 0.025 - 7.2 - 8.4 A - A 0 - 0.1 Creighton Manning Engineering, LLP Synchro 10 Report BU-P1am.syn Page 1 HCM 6th TWSC 13: Bunny Lake Dr & Site Drvvy 118-256 Saratoga Affordable Apts 2023 Build AM - Phase 1+2 Intersection Int Delay, s/veh Movement 69 EBL ESR NBL NBT SBT SBR Lane Configurations Y t T Traffic Vol, veh/h 5 43 16 6 5 2 Future Vol, veh/h 5 43 16 6 5 2 Conflicting Peds, #1hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 0 0 0 0 0 0 Mvmt Flow 6 49 18 7 6 2 Major/Minor Mmor2 Ma'or1 Ma'or2 Conflicting Flow All 50 7 8 0 0 Stage 1 7 - - Stage 2 43 - - Critical Hdwy 6.4 6.2 4.1 Critical Hdwy Stg 1 5.4 - - Critical Hdwy Stg 2 5.4 - Follow-up Hdwy 3.5 3.3 2.2 PotCap-1 Maneuver 964 1081 1625 Stage 1 1021 - Stage 2 985 - - Platoon blocked, % Mov Cap-1 Maneuver 953 1081 1625 Mov Cap-2 Maneuver 953 - - Stage 1 1010 - - Stage 2 985 - - - Approach EB NS SB HCM Control Delay. s 8.6 5.3 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 1625 1066 - HCM Lane V/C Ratio 0.011 0.051 HCM Control Delay (s) 7.2 8.6 HCM Lane LOS A A HCM 95th %tile Q(veh) 0 0.2 Creighton Manning Engineering, LLP Synchro 10 Report BU-P2am.syn Page 1 HCM 6th TWSC 13- Bunny Lake Dr & Site Drvvy 118-256 Saratoga Affordable A is 2021 Build PM - Phase 1 Intersection Int Delay, s/veh Movement 2.3 ESL EBR NBL NBT SBT SBR Lane Configurations Y M f Traffic Vol, veh/h 2 15 23 42 52 3 Future Vol, veh/h 2 15 23 42 52 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 0 0 0 1 2 0 Mvmt Flow 2 17 26 47 58 3 Mai/Minor Minor2 Ma or1 Ma'or2 Conflicting Flow All 159 60 61 0 0 Stage 1 60 - - - Stage 2 99 - Critical Hdwy 6.4 6.2 4.1 Critical Hdwy Stg 1 5.4 - - Critical Hdwy Stg 2 5.4 - - Follow-up Hdwy 3.5 3.3 2.2 Pot Cap-1 Maneuver 837 1011 1555 Stage 1 968 - - Stage 2 930 - - - Platoon blocked, % Mov Cap-1 Maneuver 823 1011 1555 - Mov Cap-2 Maneuver 823 - - Stage 1 952 - - - Stage 2 930 Approach EB NB SB HCM Control Delay, s 8.7 2.6 0 HCM LOS A Minor LanelMajor A4vmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1555 985 HCM Lane V/C Ratio 0.016 0.019 HCM Control Delay (s) 7.4 8.7 HCM Lane LOS A A HCM 95th %tile Q(veh) 0.1 0.1 Creighton Manning Engineering, LLP Synchro 10 Report BU-P1pm.syn Page 1