Loading...
HomeMy WebLinkAbout20230032 Crescent & Jefferson Site Plan Engineer Comments6/1/23, 9:52 AM Zimbra https://m.saratoga-springs.org/h/printmessage?id=14793&tz=America/New_York 1/4 From :Susan Barden <susan.barden@saratoga-springs.org> Subject :Fwd: Liberty at Saratoga, PB# 20230032 comments To :Julia Destino <julia.destino@saratoga-springs.org> Zimbra julia.destino@saratoga-springs.org Fwd: Liberty at Saratoga, PB# 20230032 comments Wed, May 31, 2023 04:33 PM 1 attachment This one too for Liberty. Thanks! Susan B. Barden, AICP Principal Planner City of Saratoga Springs 474 Broadway Saratoga Springs, NY 518-587-3550 ext. 2493 From: "Matt Zeno" <matt.zeno@saratoga-springs.org> To: Sdrury@lebellapc.com Cc: "Cristina Hasenstein" <cristina.hasenstein@saratoga-springs.org>, "Katherine Tiedemann" <katie.tiedemann@saratoga-springs.org>, "James Salaway" <james.salaway@saratoga-springs.org>, "Debbie Labreche" <debbie.labreche@saratoga- springs.org>, "Bradley D. Grant" <bgrant@bartonandloguidice.com>, "Susan Barden" <susan.barden@saratoga-springs.org> Sent: Wednesday, April 26, 2023 8:53:04 AM Subject: Re: Liberty at Saratoga, PB# 20230032 comments Sara, Please see below comments from our team. Also attached are comments from our designated engineer. Let us know if you have any question. Thank you Matt Zeno Assistant City Engineer City of Saratoga Springs Dept. of Public Works 474 Broadway Saratoga Springs, NY 12866 518-587-3550 ext. 2492 See comments below for Liberty at Saratoga, PB#20230032: 6/1/23, 9:52 AM Zimbra https://m.saratoga-springs.org/h/printmessage?id=14793&tz=America/New_York 2/4 1. New sewer force main is not shown for its entirety on any plan sheet. Add plan sheet showing limits where sewer force main will be installed. Include callouts, receiving pits if being directionally drilled, profile, etc. 2. Multiple labels/callouts/descriptions upside down on multiple sheets, rotate labels/callouts/descriptions as necessary, to correct rotation in each plan view. 3. Add work/clearing limits line type and callouts, confusing line type used (tree line line type?) when comparing to legend on sheet G002. 4. Confirm approval of the plans from the City of Saratoga Springs Fire Department. 5. Show turning radiuses for trucks, busses, and fire trucks. 6. Sheet G002, datum states using North American Datum of 1983 (NAD83). The City of Saratoga Springs standard is National Geodetic Datum, 1929 . 7. Sheet G002, under 'Force Main Testing', leakage test numbers shown are for 1 hour only. Leakage tests run 2 hours, update numbers to correspond to 2 hour test. 8. Sheet C135, show locations of detectable texture warning and callout on plans. 9. Sheet C135, callout all signs as each sign is different (stop, handicap, charging, etc.) Do not use typical. 10. Sheet C135, parking stalls numbers should encapsulate grater number of stalls. Group up areas so less count callouts are needed. There should be a total number. 11. Sheet C135, use different hatching/shading for porous pavement vs typical asphalt pavement. It is unclear where porous paving is to be installed. 12. Give a detail for porous pavement 13. Why was porous pavement the only storm water practice implemented. 14. Sheet C136, the connection of the force main to the existing sewer manhole is connecting to the Saratoga County Sewer District. Send them these plans for review and confirm you have approval from them. 15. Sheet C150, additional concrete washout areas needed due to size of site. 16. Sheet C160, additional valve needed at tee near CB-5 heading west. Additional valve needed at tee near YD-6. 17. Sheet C160, remove two valves connecting to the existing main as only the tapping sleeve and valve is needed as per the callout. Add callout for sizing of tee and size of existing water main. 18. Sheet C160, overflow areas needed for detention basins. 19. Sheet C160, from YD-6 to FES-3, multiple invert in elevations are lower than invert out elevations, re-evaluate and update. 20. Sheet C160, missing Bend callout at watermain bend within detention basin. 21. Sheet C160, watermain is placed underneath detention basin and within existing ditch near existing connection point. Profile and additional bends needed for this section of watermain. Consider alternative path to avoid going under detention basin. 22. Sheet C160, North East Parking lot grading has elevations making the middle of the parking lot a low point. Show or explain how storm water is supposed to shed in this area. 23. Sheet C180, multiple tree callouts on plans are not apart of the City of Saratoga Springs Approved Species List, re-evaluate and update. 24. Sheet C560, Hydrant Installation detail has correct "open right" nomenclature and correct manufacturer, Tapping Sleeve and Valve Detail and Typical Gate Valve Detail have incorrect nomenclature for valve operating direction and manufacturer (which shall only be Mueller). 25. SWPPP, post construction management has sheets pertaining to permeable pavement. Per the details and drawings, site is to have porous pavement installed. Include proper 6/1/23, 9:52 AM Zimbra https://m.saratoga-springs.org/h/printmessage?id=14793&tz=America/New_York 3/4 From :Bradley D. Grant <bgrant@bartonandloguidice.com> post construction management sheets within the SWPPP. 26. In the letter dated January 13, 2023 to Deborah LaBreche it was requested that this office verify that the municipal system can accommodate the increase in demand. This office will provide LaBella a will serve letter after the County agrees to accept the increase in sewer flows and after LaBella had done the proper research to determine what the flows are in that area. 27. LaBella will also have to determine if there is adequate fire flow protection for the buildings. 28. Add City of Saratoga Springs Standard Note. 29. Show sewer main on Jefferson St. 30. The test pits were done during a relatively dry fall what are the elevation of the seasonally high ground water in the test pits? James Salaway Principal Engineering Technician City of Saratoga Springs Dept. of Public Works 474 Broadway Saratoga Springs, NY 12866 Office: 518-587-3550 Mobile: 518-920-2107 Confidentiality/Privilege Notice: This e-mail communication and any files transmitted with it contain privileged and confidential information from the City of Saratoga Springs and are intended solely for the use of the individual(s) or entity to which it has been addressed. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution, or taking any other action with respect to the contents of this message is strictly prohibited. If you have received this e-mail in error, please delete it and notify the sender by return e-mail. Thank you for your cooperation. Confidentiality/Privilege Notice: This e-mail communication and any files transmitted with it contain privileged and confidential information from the City of Saratoga Springs and are intended solely for the use of the individual(s) or entity to which it has been addressed. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution, or taking any other action with respect to the contents of this message is strictly prohibited. If you have received this e-mail in error, please delete it and notify the sender by return e-mail. Thank you for your cooperation. Confidentiality/Privilege Notice: This e-mail communication and any files transmitted with it contain privileged and confidential information from the City of Saratoga Springs and are intended solely for the use of the individual(s) or entity to which it has been addressed. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution, or taking any other action with respect to the contents of this message is strictly prohibited. If you have received this e-mail in error, please delete it and notify the sender by return e-mail. Thank you for your cooperation. Fri, Mar 31, 2023 08:54 PM 6/1/23, 9:52 AM Zimbra https://m.saratoga-springs.org/h/printmessage?id=14793&tz=America/New_York 4/4 Subject :Liberty Housing Project-DE Review-PO#230278- 539.068.001 To :Debbie LaBreche <debbie.labreche@saratoga- springs.org>, 'Matt Zeno' <matt.zeno@saratoga- springs.org> Cc :Kate Halliday <kate.halliday@saratoga-springs.org> 4 attachments CAUTION: This email originated outside of the City network. Please contact IT Support if you need assistance determi Please see our aached first comment leer and aachments. Stormwater management modeling needs a different methodology for gauging porous pavement performance du Bra dley D. Gra nt Senio r Pro ject Manager Sustainable Planning & Design Barton&Loguidice Office: 518.218.1801 Email: bgrant@bartonandloguidice.com Website | LinkedIn | Twitter | Faceb ook | Vimeo The information in this message is conidential and is intended for the identiied recipient(s). If you are not an intended recipient, please delete the message and notify th Porous pavement asphalt installation specs & data sheet (ID 2860096).pdf 529 KB View Download PP modeling example-Summary_Porous1 (ID 2862426).pdf 25 KB View Download Liberty Housing-539.068.001-comment ltd.-3-27-23.dox (ID 2855523).docx 256 KB View Download Liberty Housing-539.068.001-comment ltd.-3-27-23.dox (ID 2862556).pdf 750 KB View Download Download all attachments